Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “authorization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,171 records · Page 65

Exploring Microsimulation Process for Energy Impact Evaluation of Connected and Automated Vehicles

In this paper, the authors present a microsimulation-based methodological approach for evaluating the energy impact of connected and automated vehicles (CAVs). They use an open-source micro-simulator, SUMO, and provide a way to set up a simulation environment that emulates real-world traffic dynamics. They also employ the Intelligent Driver Model to represent human drivers and calibrate its driving behavior using real-world traffic data and driving statistics. The authors conduct extensive simulation studies considering different penetration rates of CAVs, different car-following models, and varying car-following model parameters. Using the state-of-the-art Future Automotive System Technology Simulator (FASTSim), they estimate the fuel economy of each vehicle and analyze the energy impact of the given CAV implementation. Finally, the authors analyze the possible factors affecting the simulation results, and also discuss limitations and future work.

ADVANCED PROPULSION SYSTEMS↗

SAFSTOR and License Renewal: Making Them Coexist

The Indian Point Energy Center is located on the eastern shore of the Hudson River in the town of Buchanan, New York. It lies approximately thirty miles north of New York City, and thus, holds the distinction of being the closest nuclear facility to a major metropolitan area. Units 1 and 2 were constructed and operated by Consolidated Edison and Unit 3 was owned and operated by the New York State Power Authority. All three units are now owned and operated by Entergy Nuclear- Northeast. Indian Point Unit 1 was powered by a pressurized water reactor which operated with an authorized maximum steady state power level of 615 thermal megawatts until October 31, 1974. On June 19, 1980, the Commission issued an order revoking authority to operate the facility. Although 244 spent fuel assemblies were successfully shipped offsite to a spent fuel reprocessing facility, 160 assemblies remain in the Unit 1 spent fuel pool awaiting relocation to dry cask storage. Units 2 and 3 are also pressurized water reactors which each produce slightly in excess of 1,000 MWe. Since 1974, Unit 1 has been maintained in a Safe Store Mode (SAFSTOR). For the purposes of this document, the term 'SAFSTOR' is intended to mean 'Custodial SAFSTOR' as described in section 2.4.3 of NUREG 0586 (Final Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities (GEIS) as follows: 'Custodial SAFSTOR requires a minimum cleanup and decontamination effort initially, followed by a period of continuing care with the active protection systems (principally the ventilation system) kept in service throughout the storage period. Full-time onsite surveillance by operating and security forces is required to carry out radiation monitoring, to maintain the equipment, and to prevent accidental or deliberate intrusion into the facility and the subsequent exposure to radiation or the disposal of radioactivity beyond the confines of the facility'. The decision to enter SAFSTOR was based upon the immediate proximity of Unit 1 to the operating units and the fact that a number of Unit 1 systems are shared with Unit 2. Over the past few decades, additional Unit 1 space (primarily within the turbine building) has been cleaned out and is being used to support the operating Units. The original plan to maintain Unit 1 in a SAFSTOR condition until it could be safely dismantled along with Unit 2 at the end of the Unit 2 operating license in 2012, requires some level of re-thinking now that Units 2 and 3 are applying for renewal of their licenses with the desire to continue operation until the 2033 time frame. The remainder of this paper summarizes the inspections and assessments undertaken by Entergy to investigate and document the condition of Indian Point Unit 1 and the resulting steps taken to assure that it would not pose a threat to the license extension efforts being under taken by Units 2 and 3. In conclusion: the Entergy Indian Point management team has systematically undertaken an effort to ensure the Unit 1 SAFSTOR condition and has implemented programs and procedural controls which will assure that it will continue to be safely maintained and will not impact the continued safe operation of Units 2 and 3 during their license renewal period.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Packaging, Transportation, and Disposal Logistics for Large Radioactively Contaminated Reactor Decommissioning Components

The packaging, transportation and disposal of large, retired reactor components from operating or decommissioning nuclear plants pose unique challenges from a technical as well as regulatory compliance standpoint. In addition to the routine considerations associated with any radioactive waste disposition activity, such as characterization, ALARA, and manifesting, the technical challenges for large radioactively contaminated components, such as access, segmentation, removal, packaging, rigging, lifting, mode of transportation, conveyance compatibility, and load securing require significant planning and execution. In addition, the current regulatory framework, domestically in Titles 49 and 10 and internationally in TS-R-1, does not lend itself to the transport of these large radioactively contaminated components, such as reactor vessels, steam generators, reactor pressure vessel heads, and pressurizers, without application for a special permit or arrangement. This paper addresses the methods of overcoming the technical and regulatory challenges. The challenges and disposition decisions do differ during decommissioning versus component replacement during an outage at an operating plant. During decommissioning, there is less concern about critical path for restart and more concern about volume reduction and waste minimization. Segmentation on-site is an available option during decommissioning, since labor and equipment will be readily available and decontamination activities are routine. The reactor building removal path is also of less concern and there are more rigging/lifting options available. Radionuclide assessment is necessary for transportation and disposal characterization. Characterization will dictate the packaging methodology, transportation mode, need for intermediate processing, and the disposal location or availability. Characterization will also assist in determining if the large component can be transported in full compliance with the transportation and disposal regulations and criteria or if special authorizations must be granted to transport and/or dispose. The U.S. DOT routinely issues special permits for large components where compliance with regulatory or acceptance criteria is impractical or impossible to meet. Transportation and disposal safety must be maintained even under special permits or authorizations. For example, if transported un-packaged, performance analysis must still be performed to assess the ability of the large component's outer steel shell to contain the internal radioactive contamination under normal transportation conditions and possibly incidence normal to transportation. The dimensions and weight of a large component must be considered when determining the possible modes of transportation (rail, water, or highway). At some locations, rail and/or barge access is unavailable. Many locations that once had an active rail spur to deliver new construction materials and components have let the spur deteriorate to the point that repair and upgrade of the spur is no longer economically feasible. Barge slips that have not been used since new plant construction require significant repair and/or dredging. Short on-site haul routes must be assessed for surface and subsurface conditions, as well as longer off-site routes. Off-site routes require clearance approvals from the regulatory authorities or, in the case of rail transport, the rail lines. Significant engineering planning and analysis must be performed during the pre-mobilization. In conclusion, the packaging, transportation, and disposal of large, oversized radioactively contaminated components removed during plant decommissioning is complex. However, over the last 15 years, a 100 or more components have been safely and compliantly packaged and transported for processing and/or disposal.

42 ENGINEERING↗

Decommissioning Lines-of-Inquiry for Design Review of New Nuclear Facilities

An independent review of the design of the Salt Waste Processing Facility (SWPF) at Savannah River included a requirement to address the ability to decommission the facility. This paper addresses the lines of inquiry (that were developed for the review and their use in future for reviews of other projects, referred to herein as 'DDLOI'. Decommissioning activities for almost any type of facility are well within the technological state-of-the-art. The major impacts for complications resulting from insufficient consideration during design of a new facility that involves radioactive processes and/or material is the cost of: a) gaining access to high radiation areas and b) dealing with high levels of contamination. For this reason, the DDLOI were developed as a way of raising the awareness of designers and design reviewers to design features that can impede or facilitate ultimate decommissioning. The intent is that this report can be used not only for review, but also by engineers in the early stages of design development when requirements are being assembled. The focus for the DDLOI is on types of facilities that contain nuclear and/or radioactive processes and materials. The level of detail is more specific than would be found in decommissioning plans prepared for regulatory purposes. In commencing this review, the author's could find no precedent for a systematic review of design for decommissioning that included results of a review. Therefore, it was decided to create a report that would provide detailed lines of inquiry along with the rationale for each. The resulting DDLOI report included 21 topical areas for design review. The DDLOI combined the authors' experience in developing baselines for facilities to be deactivated or demolished with prior publications by the U.S. Army and the International Atomic Energy Agency. These two references were found via an Internet search and were the only ones judged to be useful at a field application level. Most others addressed principles or methods but did not have specific recommendations at a detailed design level. The DDLOI not only recommended what reviewers should look for, but also provides the reason as to why each item is important. Overall, the 21 topical areas there are presented in four main sections, which are: - Yard and Exterior Spaces addresses yard areas, underground tunnels, vaults, roofs and siding. - Structures and Interior Spaces addresses interior spaces, use of hazardous materials, placement of large or heavy equipment, and walls and floors designed for shielding. - Systems and Equipment first addresses systems for deactivation, service and utility systems isolation, pipes and ducts, tanks, and crud traps. In addition, DDLOI for laboratories, gloveboxes, and hot cells are included. - Contamination Control addresses the design of, walls, floors, ceilings, sumps, and drains with regard to contamination control. The ability to decontaminate is also included. The final section of the report is a listing of the individual DDLOI topics in a table format, which is designed as a tool that for use as a review checklist. In applying the DDLOI, two cautions are advised: - Designing for the operational mission of the facility is a higher priority than accommodating ease of decommissioning. The recommendations should be considered as preferable design practices when they can be accommodated without compromising the primary design objectives. - The DDLOI should be considered as guidance and not design requirements; noting some will become requirements because they are incorporated in modern building codes. Applying the DDLOI to the SWPF resulted in an overall conclusion that the design for the most part was compatible with the ability to decommission the facility. The most significant recommendation was to completely line the walls of a hot cell with stainless steel that was originally designed with two of its sides as the concrete wall of the building. This recommendation was subsequently incorporated in the design. Future design reviews of nuclear or radioactively contaminated facilities, whether by independent parties or the designers themselves, can benefit from the lines-of-inquiry that are the subject of this paper. The DDLOI, with an example of their use, are in a public domain report, which is freely available from the authors.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Shipping Remote Handled Transuranic Waste to the Waste Isolation Pilot Plant - An Operational Experience

On January 18, 2007, the first ever shipment of Remote Handled Transuranic (RH TRU) waste left the gate at the Idaho National Laboratory (INL), headed toward the Waste Isolation Pilot Plant (WIPP) for disposal, thus concluding one of the most stressful, yet rewarding, periods the authors have ever experienced. The race began in earnest on October 16, 2006, with signature of the New Mexico Environment Department Secretary's Final Order, ruling that the '..draft permit as changed is hereby approved in its entirety.' This established the effective date of the approved permit as November 16, 2006. The permit modification was a consolidation of several Class 3 modification requests, one of which included incorporation of RH TRU requirements and another of which incorporated the requirements of Section 311 of Public Law 108-137. The obvious goal was to complete the first shipment by November 17. While many had anticipated its approval, the time had finally come to actually implement, and time seemed to be the main item lacking. At that point, even the most aggressive schedule that could be seriously documented showed a first ship date in March 2007. Even though planning for this eventuality had started in May 2005 with the arrival of the current Idaho Cleanup Project (ICP) contractor (and even before that), there were many facility and system modifications to complete, startup authorizations to fulfill, and many regulatory audits and approvals to obtain before the first drum could be loaded. Through the dedicated efforts of the ICP workers, the partnership with Department of Energy (DOE) - Idaho, the coordinated integration with the Central Characterization Project (CCP), the flexibility and understanding of the regulatory community, and the added encouragement of DOE - Carlsbad Field Office and at Headquarters, the first RH TRU canister was loaded on December 22, 2006. Following final regulatory approval on January 17, 2007, the historic event finally occurred the following day. While some of the success of this endeavor can be attributed to the sheer will and determination of the individuals involved, the fact that it was established and managed as a separate sub-project under the ICP, accounts for a majority of the success. Utilizing a structured project management approach, including development of, and management to, a performance baseline, allowed for timely decision making and the flexibility to adapt to changing conditions as the various aspects of the project matured. This paper provides some insight into how this was achieved, in a relatively short time, and provides an overview of the experience of start-up of a new retrieval, characterization, loading, and transportation operation in the midst of an aggressive cleanup project. Additionally, as one might expect, everything within the project did not go as planned, which provides a great opportunity to discuss some lessons learned. Finally, the first shipment was just the beginning. There are 224 additional shipments scheduled. In keeping with the theme of WM 2008, Phoenix Rising: Moving Forward in Waste Management, this paper will address the future opportunities and challenges of RH TRU waste management at the INL. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Outlook for Some Fission Products Utilization with the Aim to Immobilize Long-Lived Radionuclides

The prospects for development of nuclear power are intimately associated with solving the problem of safe management and removal from the biosphere of generated radioactive wastes. The most suitable material for fission products and actinides immobilization is the crystalline ceramics. By now numerous literature data are available concerning the synthesis of a large range of various materials with zirconium-based products. It worth mentioning that zirconium is only one of fission products accumulated in the fuel in large amounts. The development of new materials intended for HLW immobilization will allow increasing of radionuclides concentration in solidified product so providing costs reduction at the stage of subsequent storage. At the same time the idea to use for synthesis of compounds, suitable as materials for long-term storage or final disposal of rad-wastes some fission products occurring in spent fuel in considerable amount and capable to form insoluble substances seems to be rather attractive. In authors opinion in the nearest future one can expect the occurrence of publications proposing the techniques allowing the use of 'reactor's zirconium, molybdenum or, perhaps, technetium as well, with the aim of preparing materials suitable for long-lived radionuclides storage or final disposal. The other element, which is generated in the reactor and worth mentioning, is palladium. The prospects for using palladium are defined not only by its higher generation in the reactor, but by a number of its chemical properties as well. It is evident that the use of natural palladium with the purpose of radionuclides immobilization is impossible due to its high cost and deficiency). In author's opinion such materials could be used as targets for long-lived radionuclides transmutation as well. The object of present work was the study on methods that could allow to use 'reactor' palladium with the aim of long-lived radionuclides such as I-129 and TUE immobilization. In the paper the results of experiments on synthesis of matrices with TUE oxides and PdI{sub 2} on palladium base are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress in Norwegian-Russian Regulatory Cooperation in Management of the Nuclear Legacy

The Norwegian Radiation Protection Authority (NRPA) and the Federal Medical-Biological Agency (FMBA) of the Russian Federation have a collaboration programme which forms part of the Norwegian government's Plan of Action to improve radiation and nuclear safety in northwest Russia. The background to the NRPA-FMBA collaboration programme has been described in previous WM presentations. This paper presents the substantial progress made within that programme, describes ongoing progress within specific projects and sets out the value arising from wider involvement in the programme of other organisations such as NATO and the technical support derived from other national agencies such as the IAEA, and regulatory authorities from the USA, the UK and France. The main activities of the cooperation projects are concerned with the management of the nuclear legacy in northwest Russia, in particular the remediation of facilities, and related spent fuel and radioactive waste management, at the former Shore Technical Bases at Andreeva Bay and Gremikha Village. New regulatory guidance documents have been developed, necessary because of the special abnormal situation at these sites, now designated as Sites of Temporary Storage (STS), but also because of the transition from military to civilian regulatory supervision and the evolving regulatory system in the Russian Federation. The work has involved major technical inputs from the Russian Federation Institute of Biophysics, as well as review and advice on international recommendations and good practice in other countries provided by other technical support organisations. Projects on-going in 2007 are described which involve regulatory guidance on very Low-Level Waste management, specifically for the licensing and operation of new VLLW disposal facilities; optimisation of operational radiation protection, particularly in areas of high ambient radiation dose rate as are found in some parts of the STSs; determination of factors which can be used to identify when to apply emergency procedures before the full emergency is obvious; and development of the radio-ecological basis for identifying radiation supervision area boundaries. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Disposal of LLW and ILW in Germany - Characterisation and Documentation of Waste Packages with Respect to the Change of Requirements

Since the 1998 termination of LLW and ILW emplacement in the Morsleben repository (ERAM), Germany, the treatment, conditioning and documentation of radioactive waste products and packages have been continued on the basis of the waste acceptance requirements as of 1995, prepared for the Konrad repository near Salzgitter in Lower Saxony, Germany. The resulting waste products and packages are stored in interim storage facilities. Due to the Konrad license issued in 2002 the waste acceptance requirements have to be completed by additional requirements imposed by the licensing authority, e. g. for the declaration of chemical waste package constituents. Therefore, documentation of waste products and packages which are checked by independent experts and are in parts approved by the responsible authority (Office for Radiation Protection, BfS) up to now will have to be checked again for fulfilling the final waste acceptance requirements prior to disposal. In order to simplify these additional checks, databases are used to ensure an easy access to all known facts about the waste packages. A short balance of the existing waste products and packages which are already checked and partly approved by BfS as well as an overview on the established databases ensuring a fast access to the known facts about the conditioning processes is presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Plutonium Finishing Plant Model for the Cercla Removal Action and Decommissioning Construction Final Report

The joint policy between the U.S. Environmental Protection Agency (EPA) and the U.S. Department of Energy (DOE) for decommissioning buildings at DOE facilities documents an agreement between the agencies to perform decommissioning activities including demolition under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). The use of removal actions for decommissioning integrates EPA oversight authority, DOE lead agency responsibility, and state authority for decommissioning activities. Once removal actions have been performed under CERCLA, a construction completion report is required to document the completion of the required action. Additionally, a decommissioning report is required under DOE guidance. No direct guidance was found for documenting completion of decommissioning activities and preparing a final report that satisfies the CERCLA requirements and the DOE requirements for decommissioning. Additional guidance was needed for the documentation of construction completion under CERCLA for D and D projects undertaken under the joint policy that addresses the requirements of both agencies. A model for the construction completion report was developed to document construction completion for CERCLA D and D activities performed under the joint EPA/DOE policy at the Plutonium Finishing Plant (PFP). The model documentation report developed at PFP integrates the DOE requirements for establishing decommissioning end-points, documenting end-point completion and preparing a final decommissioning report with the CERCLA requirements to document completion of the action identified in the Action Memorandum (AM). The model includes the required information on health and safety, data management, cost and schedule and end-points completion. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of the Updated Environmental Protection Agency Manual of Protective Action Guides (PAGS) and Protective Actions for Nuclear Incidents

As a student intern with the United States Environmental Protection Agency (EPA) Headquarters, the author was trained in the National Response Plan (NRP) and assisted in the editing of the new (unpublished) EPA Protective Action Guides (PAGs) [1] which has been revised in light of the perceived post 9/11 potential for 'Dirty Bomb' and 'Improvised Nuclear Device' attacks on civilian areas. Technical aspects and the public policy aspects of developing the new guides are discussed. Early Phase initial responses discussed include: Notification of state and/or local authorities, immediate evacuation/sheltering prior to release information or measurements, monitoring of releases and exposure rate measurements, estimation of dose consequences, implementation of protective actions in other areas. The new PAG clarifies the use of 1992 PAGs [2] for incidents other than nuclear power plant accidents, lowers projected thyroid dose for potassium iodine (KI), provides drinking water guidance, includes guidance for long-term site restoration, and updates dosimetry from ICRP 26 to ICRP 60. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

Romanian Experience in The Conditioning of Radium Sources

Ra{sup 226} first radionuclide separated from pitchblende in 1898 by Pierre and Marie Curie was successfully used in medicine, industry as in other fields being the only one available radionuclide till 1940 when were produced other radionuclides in accelerators. On long term the use of Ra{sup 226} sealed sources are not any more safe due to: the high specific activity, long half live, decays in Rn{sup 226} gas which increases the internal pressure of capsule leading in time to the leakage, the salts as raw materials from which the sealed sources are manufactured are soluble, there is a leak of information and records on the manufacture and operation. Based on this consideration in Romania regulatory authority did not authorized any more the use of these sealed sources [1]. The paper presents some aspects from Romanian experience related to the collection and conditioning of radium sealed sources. Data relating the radium inventory as well as the arrangements made in order to create a workshop for the conditioning of radium sources are presented. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

The effect of water on tritium release behavior from solid breeder candidates

The authors have made a tritium release model to represent the release behavior of bred tritium from solid breeder materials using a series of studies. It has been observed that a large amount of adsorbed water and water produced by water formation reaction are released to the purge gas even though dry purge gas with hydrogen is introduced to solid breeder materials. According to our tritium release model, the presence of water in the purge gas and surface water on the material has a large effect on the tritium release behavior. In this study, the authors quantified the amount of adsorbed water and the capacity of the water formation reaction for various solid breeder materials (Li{sub 2}TiO{sub 3}, Li{sub 4}SiO{sub 4}, Li{sub 2}ZrO{sub 3}, LiAlO{sub 2}). The effect of surface water on the chemical form of tritium released from the LiAlO{sub 2} blanket is also discussed in this study. (authors)

36 MATERIALS SCIENCE↗

Chooz A, First Pressurized Water Reactor to be Dismantled in France - 13445

Nine commercial nuclear power plants have been permanently shut down in France to date, of which the Chooz A plant underwent an extensive decommissioning and dismantling program. Chooz Nuclear Power Station is located in the municipality of Chooz, Ardennes region, in the northeast part of France. Chooz B1 and B2 are 1,500 megawatt electric (MWe) pressurized water reactors (PWRs) currently in operation. Chooz A, a 305 MWe PWR implanted in two caves within a hill, began operations in 1967 and closed in 1991, and will now become the first PWR in France to be fully dismantled. EDF CIDEN (Engineering Center for Dismantling and Environment) has awarded Westinghouse a contract for the dismantling of its Chooz A reactor vessel (RV). The project began in January 2010. Westinghouse is leading the project in a consortium with Nuvia France. The project scope includes overall project management, conditioning of the reactor vessel (RV) head, RV and RV internals segmentation, reactor nozzle cutting for lifting the RV out of the pit and seal it afterwards, dismantling of the RV thermal insulation, ALARA (As Low As Reasonably Achievable) forecast to ensure acceptable doses for the personnel, complementary vacuum cleaner to catch the chips during the segmentation work, needs and facilities, waste characterization and packaging, civil work modifications, licensing documentation. The RV and RV internals will be segmented based on the mechanical cutting technology that Westinghouse applied successfully for more than 13 years. The segmentation activities cover the cutting and packaging plan, tooling design and qualification, personnel training and site implementation. Since Chooz A is located inside two caves, the project will involve waste transportation from the reactor cave through long galleries to the waste buffer area. The project will end after the entire dismantling work is completed, and the waste storage is outside the caves and ready to be shipped either to the ANDRA (French National Radioactive Waste Management Agency) waste disposal facilities - (for low-level waste [LLW] and very low-level waste [VLLW], which are considered short lived) - or to the EDF Interim Storage Facility planned to be built on another site - (for low- and intermediate-level waste [LILW], which is considered long lived). The project has started with a detailed conceptual study that determines the step-by-step approach for dismantling the reactor and eventually supplying the packed containers ready for final disposal. All technical reports must be verified and approved by EDF and the French Nuclear Safety Authority before receiving the authorization to start the site work. The detailed conceptual study has been completed to date and equipment design and manufacturing is ongoing. This paper will present the conceptual design of the reactor internals segmentation and packaging process that will be implemented at Chooz A, including the planning, methodology, equipment, waste management, and packaging strategy. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dismantling of Loop-Type Channel Equipment of MR Reactor in NRC 'Kurchatov Institute' - 13040

In 2009 the project of decommissioning of MR and RTF reactors was developed and approved by the Expert Authority of the Russian Federation (Gosexpertiza). The main objective of the decommissioning works identified in this project: - complete dismantling of reactor equipment and systems; - decontamination of reactor premises and site in accordance with the established sanitary and hygienic standards. At the preparatory stage (2008-2010) of the project the following works were executed: loop-type channels' dismantling in the storage pool; experimental fuel assemblies' removal from spent fuel repositories in the central hall; spent fuel assembly removal from the liquid-metal-cooled loop-type channel of the reactor core and its placement into the SNF repository; and reconstruction of engineering support systems to the extent necessary for reactor decommissioning. The project assumes three main phases of dismantling and decontamination: - dismantling of equipment/pipelines of cooling circuits and loop-type channels, and auxiliary reactor equipment (2011-2012); - dismantling of equipment in underground reactor premises and of both MR and RTF in-vessel devices (2013-2014); - decontamination of reactor premises; rehabilitation of the reactor site; final radiation survey of reactor premises, loop-type channels and site; and issuance of the regulatory authorities' de-registration statement (2015). In 2011 the decommissioning license for the two reactors was received and direct MR decommissioning activities started. MR primary pipelines and loop-type facilities situated in the underground reactor hall were dismantled. Works were also launched to dismantle the loop-type channels' equipment in underground reactor premises; reactor buildings were reconstructed to allow removal of dismantled equipment; and the MR/RTF decommissioning sequence was identified. In autumn 2011 - spring 2012 results of dismantling activities performed are: - equipment from underground rooms (No. 66, 66A, 66B, 72, 64, 63) - as well as from water and gas loop corridors - was dismantled, with the total radwaste weight of 53 tons and the total removed activity of 5,0 x 10{sup 10} Bq; - loop-type channel equipment from underground reactor hall premises was dismantled; - 93 loop-type channels were characterized, chopped and removed, with radwaste of 2.6 x 10{sup 13} Bq ({sup 60}Co) and 1.5 x 10{sup 13} Bq ({sup 137}Cs) total activity removed from the reactor pool, fragmented and packaged. Some of this waste was placed into the high-level waste (HLW) repository of the Center. Dismantling works were executed with application of remotely operated mechanisms, which promoted decrease of radiation impact on the personnel. The average individual dose for the personnel was 1.9 mSv/year in 2011, and the collective dose is estimated as 0.0605 man x Sv/year. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Right-Sized Reuse - Use a Systematic Process, and Design for a Specialized, Yet Flexible Result - 13558

The process of transferring real property from the U.S. Department of Energy (DOE) is always the same - except when it's not. The most frequently asked questions in the process are: how can this take so long and be so complex, and why is it different every time? The process of transferring real property from the Department of Energy is always the same - except when it's not. Repeat as needed. The authority for DOE to transfer property is found in the Atomic Energy Act of 1954 (AEA). Specifically, the transfer of real property for mission-related purposes is done pursuant to the AEA Section 161(g). Another rule that can provide certain unique benefits to the transferee is found in 10 Code of Federal Regulations (CFR) Part 770, Transfer of Real Property at Defense Nuclear Facilities for Economic Development; it can be followed for economic development purposes at defense nuclear facilities. All federal real property transfers include at minimum a National Environmental Policy Act (NEPA) review and a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) chap. 120(h) environmental due diligence evaluation. The end-point objective is to be able to demonstrate that a transfer is protective of human health and the environment - typically attained via a risk evaluation. That's it...mostly. None of these requirements are new; their processes are well-known. So, why is it different every time there is a transfer and what can be done to move things along? Time and the perception of open-ended schedules kill projects. Economic development projects that are proposed by Community Reuse Organizations (CROs) and others or by parties who need private capital are especially time-sensitive. It is not reasonable to expect business interests or investors to wait two years while the property transfer process is carried out. Lenders are also risk-sensitive and not solely business-risk sensitive. After all, these are federal properties where contamination is a factor. What are some of the things you can do to address those time and risk issues? Issues of time and complexity arise from several variables. Short-sighted vision and lack of project definition lead to wasted effort and lengthy delays. Some variability on the input side of the process can be controlled in a way that will save you time and actually work to your advantage. Steps can be taken to systematize the transfer process on the agency's part and on the requester/grantee's part. Having the right mix of dedicated people from the beginning, planning with flexibility, coordinating with the clean-up program at your site, knowing the interests and issues of your stakeholders, and working with the CRO/economic development authorities - all of these measures and others can and will help you. The key is not simply knowing the steps and making a punch-list, but understanding the steps and how to work with and use them. These concepts can be applied to create a vision of success for those engaged in real property transfer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The French Geological Repository Project Cigeo - 12023

The French Agency for Radioactive Waste Management, ANDRA, was launched by law in 1991 to perform and develop the research programme for managing high level and intermediate level long-lived radioactive waste generated by the French nuclear fleet. After a 15-year intensive research programme, including the study of alternative solutions, an overall review and assessment of the results was organized, including a national public debate. As a result, the Parliament passed a Planning Act on radioactive waste management in 2006. Commissioning of a geological repository by 2025 was one of the most important decisions taken at that time. To reach this goal, a license application must be submitted and reviewed by the competent authorities by 2015. A detailed review and consultation process is, as well, defined in the Planning Act. Beside the legal framework the project needs to progress on two fronts. The first one is on siting. A significant milestone was reached in 2009 with the definition of a defined area to locate the underground repository facilities. This area was approved in March 2010 by the Government, after having collected the opinions and positions of all the interested parties, at both National and local levels. A new phase of dialogue with local players began to refine the implementation scenarios of surface facilities. The final site selection will be approved after a public debate planned for 2013. The second one is the industrial organization, planning and costing. The industrial project of this geological repository was called Cigeo (Centre Industriel de Stockage Geologique). Given the amount of work to be done to comply with the given time framework, a detailed organization with well-defined milestones must be set-up. Cigeo will be a specific nuclear facility, built and operated underground for over a hundred years. The consequence of this long duration is that the development of the repository facilities will take place in successive operational phases. The characteristics of the first waste packages received will determine the work and the corresponding investments by 2025 on the repository site. One of the main challenges will be to accommodate both activities of mining and nuclear operations at the same time and at the same location. From the technical standpoint, ventilation and fire risk cannot be managed through a simple transposition from current nuclear industry practices. The reversibility demand also leads to concrete proposals with regard to repository management flexibility and waste package retrievability. These proposals contribute to the dialogue with stakeholders to prepare for the public debate and a future law which will determine the reversibility conditions. New design developments are expected to be introduced in the application from the current studies conducted until 2014. The possibility of optimization beyond 2015 will be kept open taking into account the one hundred years operating time as well as the capability to integrate feedback gained from the first construction and operation works. The industrial committed work aims to reach the application stage by 2015. The license application procedure was defined by the 2006 Act. Subject to authorization, the construction might begin in 2017. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radioactive Waste Management in Central Asia - 12034

After the collapse of the Soviet Union the newly independent states in Central Asia (CA) whose regulatory bodies were set up recently are facing problems with the proper management of radioactive waste and so called 'nuclear legacy' inherited from the past activities. During the former Soviet Union (SU) period, various aspects of nuclear energy use took place in CA republics of Kazakhstan, Kyrgyzstan, Tajikistan and Uzbekistan. Activities range from peaceful use of energy to nuclear testing for example at the former Semipalatinsk Nuclear Test Site (SNTS) in Kazakhstan, and uranium mining and milling industries in all four countries. Large amounts of radioactive waste (RW) have been accumulated in Central Asia and are waiting for its safe disposal. In 2008 the Norwegian Radiation Protection Authority (NRPA), with the support of the Norwegian Ministry of Foreign Affairs, has developed bilateral projects that aim to assist the regulatory bodies in Kazakhstan, Kyrgyzstan Tajikistan, and Uzbekistan (from 2010) to identify and draft relevant regulatory requirements to ensure the protection of the personnel, population and environment during the planning and execution of remedial actions for past practices and radioactive waste management in the CA countries. The participating regulatory authorities included: Kazakhstan Atomic Energy Agency, Kyrgyzstan State Agency on Environmental Protection and Forestry, Nuclear Safety Agency of Tajikistan, and State Inspectorate on Safety in Industry and Mining of Uzbekistan. The scope of the projects is to ensure that activities related to radioactive waste management in both planned and existing exposure situations in CA will be carried out in accordance with the international guidance and recommendations, taking into account the relevant regulatory practice from other countries in this area. In order to understand the problems in the field of radioactive waste management we have analysed the existing regulations through the so called 'Threat assessment' in each CA country which revealed additional problems in the existing regulatory documents beyond those described at the start of our ongoing bilateral projects in Kazakhstan, Kirgizistan Tajikistan and Uzbekistan. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Disposition of Radioisotope Thermoelectric Generators Currently Located at the Oak Ridge National Laboratory - 12232

Under the American Recovery and Reinvestment Act (ARRA), the U.S. Department of Energy (DOE) awarded SEC Federal Services Corporation (SEC) a 34-building demolition and disposal (D and D) project at the Oak Ridge National Laboratory (ORNL) that included the disposition of six Strontium (Sr-90) powered Radioisotope Thermoelectric Generators (RTGs) stored outside of ORNL Building 3517. Disposition of the RTGs is very complex both in terms of complying with disposal facility waste acceptance criteria (WAC) and U.S. Department of Transportation (DOT) requirements for packaging and transportation in commerce. Two of the RTGs contain elemental mercury which requires them to be Land Disposal Restrictions (LDR) compliant prior to disposal. In addition, all of the RTGs exceed the Class C waste concentration limits under Nuclear Regulatory Commission (NRC) Waste Classification Guidelines. In order to meet the LDR requirements and Nevada National Security Site (NNSS) WAC, a site specific treatability variance for mercury was submitted to the U.S. Environmental Protection Agency (EPA) to allow macro-encapsulation to be an acceptable treatment standard for elemental mercury. By identifying and confirming the design configuration of the mercury containing RTGs, the SEC team proved that the current configuration met the macro-encapsulation standard of 40 Code of Federal Regulations (CFR) 268.45. The SEC Team also worked with NNSS to demonstrate that all radioisotope considerations are compliant with the NNSS low-level waste (LLW) disposal facility performance assessment and WAC. Lastly, the SEC team determined that the GE2000 Type B cask met the necessary size, weight, and thermal loading requirements for five of the six RTGs. The sixth RTG (BUP-500) required a one-time DOT shipment exemption request due to the RTG's large size. The DOT exemption justification for the BUP-500 relies on the inherent robust construction and material make-up of the BUP- 500 RTG. DOE-ORO, SEC, and the entire SEC RTG team are nearing the conclusion of the Sr-90 RTG disposition challenge - a legacy now 50 years in the making. Over 600,000 Ci of Sr-90 waste await disposal and its removal from ORNL will mark an historical moment in the clean-up of the cold-war legacy in the ORNL central industrial area. Elimination (i.e., removal) of the RTGs will reduce security risks at ORNL and disposal will permanently eliminate security risks. The RTGs will eventually decay to benign levels within a reasonable timeframe relative to radiological risks posed by long-lived isotopes. The safety authorization basis at ORNL Building 3517 will be reduced enabling greater operational flexibility in future clean-out and D and D campaigns. Upon disposition the Department of Energy will realize reduced direct and indirect surveillance and maintenance costs that can be reapplied to accelerated and enhanced clean-up of the Oak Ridge Reservation. At present, waste profiles for the RTGs are developed and under review by NNSS RWAP staff and approval authorities. Disposition schedule is driven by the availability of compliant shipping casks necessary to safely transport the RTGs from ORNL to NNSS. The first disposal of the RCA RTG is expected in April 2012 and the remaining RTGs disposed in 2012 and 2013. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗