Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,171 records · Page 65

US EPA superfund radiation risk assessment update: new, revised, and upcoming tools - 15350

The U.S. EPA Superfund remedial program is finishing up a significant number of revisions to its guidance for the risk assessment process at radioactively contaminated Superfund sites. The six Preliminary Remediation Goal (PRG) and Dose Compliance Concentration (DCC) internet based calculators for risk and dose assessment at Superfund sites are being revised to reflect better science, revisions to existing exposure scenarios and new scenarios, and changes to match up more closely with the EPA chemical regional screening level calculator. A comprehensive set of revisions to the PRG calculator will be finished in November 2014. A revised version of the 1999 guidance document that provides an overview for the Superfund risk assessment process at radioactively contaminated sites, 'Radiation Risk Assessment At CERCLA Sites: Q and A' was issued on June 13, 2014 reflects Superfund recommended guidance and other technical documents issued over the past 15 years. Also on June 13, 2014 EPA issued a new tool-kit comprised of 22 fact sheets that was developed to help the general public understand more about EPA's risk assessment process used at radioactively contaminated Superfund sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 80: Interagency Community of Practice in Risk and Performance Assessment

This panel focused on the status of the Inter-agency Performance and Risk Assessment Community of Practice (P and RA COP). Representatives from the P and RA COP and subject matter experts discussed lessons learned and provided feedback on building the P and RA COP to support risk-informed environmental decision making. Panelists with presentations: Understanding Mechanisms to Manage Uncertainty and Risk in Waste Containment Systems (Craig Benson, University of Virginia - CRESP (USA) Scaling for Performance Assessments (Paul Black, Katie Catlett, Doug Anderson, Paul Duffy, Tom Stockton, Sam Van Sickle, John Carson); Interagency Community of Practice in Rick and Performance Assessment (Horst Monken Fernandes); Institutional Controls as a Risk Management Tool (David Esh); Superfund: Explanation of Screening and PRG's for Risk and Dose Assessment (Stuart Walker)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Choosing the Best Modeling Platform for Radiological Risk Assessment Models - 20468

Radiological risk assessments, in the form of performance or safety assessments, are often required under regulations or guidance for remediation of contaminated land, decommissioning of contaminated buildings or structures, and radioactive waste disposal. These risk assessments are usually supported by fate and transport models that address decay and ingrowth of radionuclides, as well as their movement through engineered systems and the natural environment. These models are often projected thousands, or more, years into the future, largely because the radioactive species change through decay and ingrowth, and hence the magnitude of the radioactive effect changes with time. There are many computer codes that are available to address this type of modeling. They range from addressing specific pathways or processes such as infiltration of water, groundwater, surface water, air, biota, diffusion and advection of water and gases, to those that try to couple all processes together to evaluate the impact of fate and transport through the entire system to places in space and time to which access is assumed. These different types of codes are sometimes separated with the monikers process-level and systems-level codes, although it is often not clear that this separation does justice to the capabilities of the many codes that are available to evaluate fate and transport of radionuclides. The focus of this paper is the latter group of modeling codes. Several systems level modeling codes exist and are used. There are differences between these codes in terms of utility, flexibility, complexity and cost. The purpose of this paper is to compare a few of these codes in the context of work currently being performed by the International Atomic Energy Agency (IAEA) Modeling and Data for Radiological Impact Assessments (MODARIA) II Working Group 1 (WG1). The MODARIA II WG1's main focus is how stakeholder engaged decision analysis can, or should, be applied to radiological contamination problems so that better, longstanding, sustainable, solutions are reached. However, the WG1 also recognizes the potential impact of the modeling tools that are chosen to address radiological risk, which is often a primary objective of decision making for radiological problems. Other objectives might also be important, such as constraining costs, obtaining financing, minimizing impact on ecosystems, saving cultural resources, saving jobs, farmland, environmental justice, etc., in a full decision analysis for a given radiological contamination problem, but none of these other objectives have the same types of complex modeling needs as minimize radiological dose. Consequently, a further focus of WG1 is to evaluate the potential impacts on decision making of the choice of fate and transport, and risk assessment, modeling codes that are used to support decision making. The WG1 will produce a report at the end of 2020 that will focus on an approach to effective decision making and stakeholder engagement. The report will also consider the role that performance assessment modeling should play in the decision-making process, including the impact of the choice of modeling tools or computer codes on risk-informed decision making. Several sites around the World have been made available by Member States for these model comparisons, and several modeling tools have been considered. However, the focus of this paper is on two of the sites, one in Belgium and one in Ukraine, and on three of the tools: NORMALYSA (NORM And Legacy Site Assessment); GoldSim{sup C}, and AMBER{sup C}. The final report from this working group will also cover other modeling tools, including RESRAD, and PC-Cream{sup R}. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Risk assessment of safety-critical data communication in digital safety feature control system - 205

As one of the safety-critical systems in Advanced Power Reactor-1400 (APR-1400) nuclear power plant (NPP), the Engineered Safety Feature-Component Control System (ESF-CCS) employs safety data link and network communication for transmitting safety component actuation to effectively facilitate various safety-critical field controllers. However, data communication failure risk in the ESF-CCS has yet to be fully quantified, the probability that a safety-critical system in digitalized NPP becomes unsafe due to a network failure must be evaluated to quantify the risk of digital I and C system. In this study, a fault tree model was developed to assess the data link and data network failure-induced unavailability of a safety-critical system function used to generate an automated control signal for actuating design basis accident mitigation equipment. Especially, the risk of data communication failure in a digital safety feature control system was analyzed in consideration of interconnection between safety-critical controllers and the fault-tolerant algorithm implemented in the network configuration. Based on the developed fault tree model, case studies were performed to quantitatively assess the unavailability of ESF-CCS signal generation due to safety data link and network failure and their risk effect on safety signal generation unavailability. This study is expected to provide risk information on the safety-critical data communication in a digitalized NPP instrumentation and control system. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Advancing Multi-Hazard Risk and Safety Considerations for Aging Nuclear Facilities

While probabilistic risk assessment (PRA) of nuclear facilities is expected to include internal and external hazards for a risk-informed and performance-based design, the current state of practice treats each hazard independently. However, such an independent treatment of hazards may not account for the correlations between different hazards and their response of and damage to the structures, systems, and components (SSCs) in a plant resulting in underestimating the overall risk. This project proposes to advance the multi-hazard PRA of nuclear facilities to more adequately evaluate concurrent hazards and contribute to an increased safety of nuclear plants. A framework for multi-hazard PRA will be developed by identifying concurrent hazard events (both internal and external) and event sequences that include interdependencies through the response of SSCs. An example application of the multi-hazard PRA framework will be demonstrated by considering a generic pressurized water reactor (PWR) subjected to seismic and internal flooding hazards. Computational models for the response of components will be developed to generated multi-hazard fragility surfaces under seismic and flooding loads. A PRA model consisting of event and fault trees will also be developed to quantify the multi-hazard risk profile and compare it with the independent hazard risk profile. Overall, by advancing the multi-hazard PRA of nuclear facilities, this project enhances nuclear safety and reduces costs by mitigating unforeseen consequences caused by correlations between concurrent hazards.

97 - MATHEMATICS AND COMPUTING↗

An Approach to Automate tools for the Risk Assessment of Digital Instrumentation and Control Systems

Reliable digital instrumentation and control systems (DI&C) are integral for sustaining the continued operation of nuclear power plants. These systems ensure that nuclear reactors operate safely, efficiently, and within regulatory requirements. Yet, the cost of designing and licensing new nuclear DI&C can be prohibitively expensive. Under the U.S. Department of Energy Light Water Reactor Sustainability Program, Idaho National Laboratory has developed a framework for supporting the risk-informed design of DI&C systems by offering methods to support the identification, quantification, and evaluation of risks for various DI&C design architectures. The framework indicates potential software failure modes and provides pathways for quantifying the potential for these software failures, including common cause failures. Using the framework’s systematic approach, challenges for assessing risks within new and existing nuclear DI&C systems can be reduced. Nevertheless, the current framework can be further improved using the convenience of automation. This paper introduces the development of Software for the Hazard Identification and Evaluation of Digital Systems (SHIELDS). SHIELDS is an engineering software package that enables the identification, elimination, and mitigation of potential risks and reduces the burden of deploying reliable DI&C systems. This work introduces plans and techniques to digitize and improve the manual risk assessment modules of the framework. These improvements will save time and increase the repeatability and usability of the framework, making it more accessible to a wider range of users. Ultimately, this introduces SHIELDS and how its modules support efficient development of safe and reliable DI&C systems.

46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗

Risk and Work Configuration Management as a Function of Integrated Safety Management

National Security Technologies, LLC (NSTec), has established a work management program and corresponding electronic Facilities and Operations Management Information System (e-FOM) to implement Integrated Safety Management (ISM). The management of work scopes, the identification of hazards, and the establishment of implementing controls are reviewed and approved through electronic signatures. Through the execution of the program and the implementation of the electronic system, NSTec staff work within controls and utilize feedback and improvement process. The Integrated Work Control Manual further implements the five functions of ISM at the Activity level. By adding the Risk and Work Configuration Management program, NSTec establishes risk acceptance (business and physical) for liabilities within the performance direction and work management processes. Requirements, roles, and responsibilities are specifically identified in the program while e-FOM provides the interface and establishes the flowdown from the Safety Chain to work and facilities management processes to company work-related directives, and finally to Subject Matter Expert concurrence. The Program establishes, within the defined management structure, management levels for risk identification, risk mitigation (controls), and risk acceptance (business and physical) within the Safety Chain of Responsibility. The Program also implements Integrated Safeguards and Security Management within the NSTec Safety Chain of Responsibility. Once all information has been entered into e-FOM, approved, and captured as data, the information becomes searchable and sortable by hazard, location, organization, mitigating controls, etc.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ITER risk workshop facilitator guide

The goal of planning risk management is to make everyone involved in a program aware that risk should be a consideration in the design, development, and fielding of a system. Risk planning is a tool to assess and mitigate events that might adversely impact the program. Therefore, risk management increases the probability/likelihood of program success and can help to avoid program crisis management and improve problem solving by managing risk early in the acquisition cycle.

42 ENGINEERING↗

ITER risk workshop participant guide

The goal of planning risk management is to make everyone involved in a program aware that risk should be a consideration in the design, development, and fielding of a system. Risk planning is a tool to assess and mitigate events that might adversely impact the program. Therefore, risk management increases the probability/likelihood of program success and can help to avoid program crisis management and improve problem solving by managing risk early in the acquisition cycle.

42 ENGINEERING↗

Risk associated with the use of barriers in hydrogen refueling stations.

Separation distances are used in hydrogen refueling stations to protect people, structures, and equipment from the consequences of accidental hydrogen releases. Specifically, hydrogen jet flames resulting from ignition of unintended releases can be extensive in length and pose significant radiation and impingement hazards. Depending on the leak diameter and source pressure, the resulting separation distances can be unacceptably large. One possible mitigation strategy to reduce exposure to hydrogen flames is to incorporate barriers around hydrogen storage, process piping, and delivery equipment. The effectiveness of barrier walls to reduce hazards at hydrogen facilities has been previously evaluated using experimental and modeling information developed at Sandia National Laboratories. The effect of barriers on the risk from different types of hazards including direct flame contact, radiation heat fluxes, and overpressures associated with delayed hydrogen ignition has subsequently been evaluated and used to identify potential reductions in separation distances in hydrogen facilities. Both the frequency and consequences used in this risk assessment and the risk results are described. The results of the barrier risk analysis can also be used to help establish risk-informed barrier design requirements for use in hydrogen codes and standards.

08 HYDROGEN↗

A Methodology to Evaluate Ecological Resources and Risk Using Two Case Studies at the Department of Energy’s Hanford Site

An assessment of the potential risks to ecological resources from remediation activities or other perturbations should involve a quantitative evaluation of resources on the remediation site and in the surrounding environment. We developed a risk methodology to rapidly evaluate potential impact on ecological resources for the U.S. Department of Energy’s Hanford Site in southcentral Washington State. We describe the application of the risk evaluation for two case studies to illustrate its applicability. The ecological assessment involves examining previous sources of information for the site, defining different resource levels from 0 to 5. We also developed a risk rating scale from nondiscernable to very high. Field assessment is the critical step to determine resource levels or to determine if current conditions are the same as previously evaluated. We provide a rapid assessment method for current ecological conditions that can be compared to previous site-specific data, or that can be used to assess resource value on other sites where ecological information is not generally available. The method is applicable to other Department of Energy’s sites, where its development may involve a range of state regulators, resource trustees, Tribes and other stakeholders. Achieving consistency across Department of Energy’s sites for valuation of ecological resources on remediation sites will assure Congress and the public that funds and personnel are being deployed appropriately.

54 ENVIRONMENTAL SCIENCES↗

Development of Standardized Probabilistic Risk Assessment Models for Shutdown Operations Integrated in SPAR Level 1 Model

Nuclear plant operating experience and several studies show that the risk from shutdown operation during Modes 4, 5, and 6 at pressurized water reactors and Modes 4 and 5 at boiling water reactors can be significant. This paper describes using the U.S. Nuclear Regulatory Commission’s full-power Standardized Plant Analysis Risk (SPAR) model as the starting point for development of risk evaluation models for commercial nuclear power plants. The shutdown models are integrated with their respective internal event at-power SPAR model. This is accomplished by combining the modified system fault trees from the SPAR full-power model with shutdown event tree logic. Preliminary human reliability analysis results indicate that risk is dominated by the operator’s ability to correctly diagnose events and initiate systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

International Projects Proposal Analysis: Risk Assessment Using Radial Maps

International projects are very attractive to companies seeking to expand their business horizons, and collaborative networks of international partners have created new work environments that differ from the conventional business structures of the past. This study provides scholarly research into the risks that inherently affect an international project's success and provides insight into the effective measures that project managers may employ to assist in analyzing and mitigating these multinational risks during the bid and proposal process. A new method of radial risk mapping assists management in graphing their risk findings to aid in their proposal analysis. These graphical representations provide firms seeking international markets with a method for selecting those projects with the least risk, thereby increasing their chances of success and maximum profit.

Steffey, R Wayne↗

Risk-adjusted monitoring of survival times

We consider the monitoring of clinical outcomes, where each patient has a di®erent risk of death prior to undergoing a health care procedure.We propose a risk-adjusted survival time CUSUM chart (RAST CUSUM) for monitoring clinical outcomes where the primary endpoint is a continuous, time-to-event variable that may be right censored. Risk adjustment is accomplished using accelerated failure time regression models. We compare the average run length performance of the RAST CUSUM chart to the risk-adjusted Bernoulli CUSUM chart, using data from cardiac surgeries to motivate the details of the comparison. The comparisons show that the RAST CUSUM chart is more efficient at detecting a sudden decrease in the odds of death than the risk-adjusted Bernoulli CUSUM chart, especially when the fraction of censored observations is not too high. We also discuss the implementation of a prospective monitoring scheme using the RAST CUSUM chart.

99 GENERAL AND MISCELLANEOUS↗

Reference range of liver corrected T1 values in a population at low risk for fatty liver disease—a UK Biobank sub-study, with an appendix of interesting cases

Purpose: Corrected T1 (cT1) value is a novel MRI-based quantitative metric for assessing a composite of liver inflammation and fibrosis. It has been shown to distinguish between non-alcoholic fatty liver disease (NAFL) and non-alcoholic steatohepatitis. However, these studies were conducted in patients at high risk for liver disease. This study establishes the normal reference range of cT1 values for a large UK population, and assesses interactions of age and gender. Methods: MR data were acquired on a 1.5 T system as part of the UK Biobank Imaging Enhancement study. Measures for Proton Density Fat Fraction and cT1 were calculated from the MRI data using a multiparametric MRI software application. Data that did not meet quality criteria were excluded from further analysis. Inter and intra-reader variability was estimated in a set of data. A cohort at low risk for NAFL was identified by excluding individuals with BMI ≥ 25 kg/m{sup 2} and PDFF ≥ 5%. Of the 2816 participants with data of suitable quality, 1037 (37%) were classified as at low risk. Results: The cT1 values in the low-risk population ranged from 573 to 852 ms with a median of 666 ms and interquartile range from 643 to 694 ms. Iron correction of T1 was necessary in 36.5% of this reference population. Age and gender had minimal effect on cT1 values. Conclusion: The majority of cT1 values are tightly clustered in a population at low risk for NAFL, suggesting it has the potential to serve as a new quantitative imaging biomarker for studies of liver health and disease.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

A Framework for Developing Management Goals for Species at Risk and Application to Military Installations in the United States

A decision framework for setting management goals for species at risk is presented. Species at risk are those whose potential future rarity is of concern. Listing these species as threatened or endangered could potentially result in significant restrictions to activities in resource management areas in order to maintain those species. The management areas in the example application are United States (US) military installations, which are concerned about potential restrictions to military training capacity if species at risk become regulated under the US Endangered Species Act. The decision framework, designed to foster proactive management, has nine steps: identify species at risk on and near the management area, describe available information and potential information gaps for each species, determine the potential distribution of species and their habitat, select metrics for describing species status, assess the status of local population or metapopulation, conduct threat assessment, set and prioritize management goals, develop species management plans, and develop criteria for ending special species management where possible. This framework will aid resource managers in setting management goals that minimally impact human activities while reducing the likelihood that species at risk will become rare in the near future. The benefits of the proactive management set forth in this formal decision framework are that it is impartial, provides a clear procedure, calls for identification of causal relationships that may not be obvious, provides a way to target the most urgent needs, reduces costs, enhances public confidence, and, most importantly, decreases the chance of species becoming more rare.

54 ENVIRONMENTAL SCIENCES↗

Chemoembolization Decreases Drop-Off Risk of Hepatocellular Carcinoma Patients on the Liver Transplant List

Introduction: The drop-off risk for patients awaiting liver transplantation for hepatocellular carcinoma (HCC) is 22%. Transplant liver availability is expected to worsen, resulting in longer waiting times and increased drop-off rates. Our aim was to determine whether chemoembolization can decrease this risk. Patients and Methods: Eighty-seven consecutive HCC patients listed for liver transplant (Milan criteria) underwent statistical comparability adjustments using the propensity score (Wilcoxon, Fisher's, and chi-square tests). Forty-three nonchemoembolization patients and 22 chemoembolization patients were comparable for Child-Pugh and Model for End-Stage Liver Disease scores, tumor size and number, alpha fetoprotein (AFP) levels, and cause of cirrhosis. We calculated the risk of dropping off the transplant list by assigning a transplant time to those who dropped off (equal probability with patients who were on the list longer than the patient in question). The significance level was obtained by calculating the simulation distribution of the difference compared with the permutations of chemoembolization versus nonchemoembolization assignment of the patients. Kaplan-Meier estimators (log-rank test) were used to determine survival rates. Results: Median follow-up was 187 {+-} 110 weeks (range 38 to 435, date of diagnosis). The chemoembolization group had an 80% drop-off risk decrease (15% nonchemoembolization versus 3% chemoembolization, p = 0.04). Although survival was better for the chemoembolization group, it did not reach statistical significance. Two-year survival for the nonchemoembolization and chemoembolization group was 57.3% {+-} 7.1% and 76.0% {+-} 7.9%, respectively (p = 0.078). Conclusions: Chemoembolization appears to result in a significant decrease in the risk of dropping off liver transplant list for patients with HCC and results in a tendency toward longer survival.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Predictors of Recurrent Biliary Obstruction Following Percutaneous Uncovered Metal Stent Insertion in Patients with Distal Malignant Biliary Obstruction: An Analysis Using a Competing Risk Model

Objective: To evaluate predictive factors of recurrent biliary obstruction (RBO) following percutaneous uncovered metal stent placement for unresectable distal malignant biliary obstruction (MBO) by using a competing risk model. Materials and Methods: Between March 2012 and March 2016, 119 patients underwent percutaneous uncovered metal stent placement with distal MBO at our institution. Univariate and multivariate analyses were conducted to identify the prognostic factors for RBO using a competing risk model. Results: The median overall survival period was 170 days (range 19–775 days). Recurrent biliary obstruction before death was observed in 34 patients (28.6%). The 3-, 6-, and 12-month cumulative incidences of RBO were 14.3%, 21.0%, and 27.7%, respectively. A multivariate analysis indicated that ampullary carcinoma compared with metastatic carcinoma (hazard ratio [HR] = 4.86; 95% confidence interval [CI], 1.74–13.54; P = 0.003) and a stent insertion above the sphincter of Oddi (HR 2.49; 95% CI, 1.11–5.62; P = 0.028) were the independent risk factors for RBO when we considered death to be a competing risk. Conclusion: Ampullary carcinoma and stent insertion above the sphincter of Oddi were risk factors for RBO in these patients who received percutaneous transhepatic stent placement.

62 RADIOLOGY AND NUCLEAR MEDICINE↗