Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Requirements Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,171 records · Page 65

Advanced information processing system: Input/output network management software

The purpose of this document is to provide the software requirements and specifications for the Input/Output Network Management Services for the Advanced Information Processing System. This introduction and overview section is provided to briefly outline the overall architecture and software requirements of the AIPS system before discussing the details of the design requirements and specifications of the AIPS I/O Network Management software. A brief overview of the AIPS architecture followed by a more detailed description of the network architecture.

Nagle, Gail↗

Microbial necromass in cropland soils: A global meta-analysis of management effects

Microbial necromass is a large and persistent component of soil organic carbon (SOC), especially under croplands. The effects of cropland management on microbial necromass accumulation and its contribution to SOC have been measured in individual studies but have not yet been summarized on the global scale. For this study, we conducted a meta-analysis of 481-paired measurements from cropland soils to examine the management effects on microbial necromass and identify the optimal conditions for its accumulation. Nitrogen fertilization increased total microbial necromass C by 12%, cover crops by 14%, no or reduced tillage (NT/RT) by 20%, manure by 21%, and straw amendment by 21%. Microbial necromass accumulation was independent of biochar addition. NT/RT and straw amendment increased fungal necromass and its contribution to SOC more than bacterial necromass. Manure increased bacterial necromass higher than fungal, leading to decreased ratio of fungal-to-bacterial necromass. Greater microbial necromass increases after straw amendments were common under semi-arid and in cool climates in soils with pH <8, and were proportional to the amount of straw input. In contrast, NT/RT increased microbial necromass mainly under warm and humid climates. Manure application increased microbial necromass irrespective of soil properties and climate. Management effects were especially strong when applied during medium (3–10 years) to long (10+ years) periods to soils with larger initial SOC contents, but were absent in sandy soils. Close positive links between microbial biomass, necromass and SOC indicate the important role of stabilized microbial products for C accrual. Microbial necromass contribution to SOC increment (accumulation efficiency) under NT/RT, cover crops, manure and straw amendment ranged from 45% to 52%, which was 9%–16% larger than under N fertilization. In summary, long-term cropland management increases SOC by enhancing microbial necromass accumulation, and optimizing microbial necromass accumulation and its contribution to SOC sequestration requires site-specific management.

59 BASIC BIOLOGICAL SCIENCES↗

NASA information resources management handbook

This National Aeronautics and Space Administration (NASA) Handbook (NHB) implements recent changes to Federal laws and regulations involving the acquisition, management, and use of Federal Information Processing (FIP) resources. This document defines NASA's Information Resources Management (IRM) practices and procedures and is applicable to all NASA personnel. The dynamic nature of the IRM environment requires that the controlling management practices and procedures for an Agency at the leading edge of technology, such as NASA, must be periodically updated to reflect the changes in this environment. This revision has been undertaken to accommodate changes in the technology and the impact of new laws and regulations dealing with IRM. The contents of this document will be subject to a complete review annually to determine its continued applicability to the acquisition, management, and use of FIP resources by NASA. Updates to this document will be accomplished by page changes. This revision cancels NHB 2410.1D, dated April 1985.

Source record↗

Software Configurable Multichannel Transceiver

Emerging test instrumentation and test scenarios increasingly require network communication to manage complexity. Adapting wireless communication infrastructure to accommodate challenging testing needs can benefit from reconfigurable radio technology. A fundamental requirement for a software-definable radio system is independence from carrier frequencies, one of the radio components that to date has seen only limited progress toward programmability. This paper overviews an ongoing project to validate the viability of a promising chipset that performs conversion of radio frequency (RF) signals directly into digital data for the wireless receiver and, for the transmitter, converts digital data into RF signals. The Software Configurable Multichannel Transceiver (SCMT) enables four transmitters and four receivers in a single unit the size of a commodity disk drive, programmable for any frequency band between 1 MHz and 6 GHz.

Freudinger, Lawrence C.↗

Safety Assurance in NextGen

The generation of minimum operational, safety, performance, and interoperability requirements is an important aspect of safely integrating new NextGen components into the Communication Navigation Surveillance and Air Traffic Management (CNS/ATM) system. These requirements are used as part of the implementation and approval processes. In addition, they provide guidance to determine the levels of design assurance and performance that are needed for each element of the new NextGen procedures, including aircraft, operator, and Air Navigation and Service Provider. Using the enhanced Airborne Traffic Situational Awareness for InTrail Procedure (ATSA-ITP) as an example, this report describes some limitations of the current process used for generating safety requirements and levels of required design assurance. An alternative process is described, as well as the argument for why the alternative can generate more comprehensive requirements and greater safety assurance than the current approach.

HarrisonFleming, Cody↗

The Network Operations Control Center upgrade task: Lessons learned

This article synthesizes and describes the lessons learned from the Network Operations Control Center (NOCC) upgrade project, from the requirements phase through development and test and transfer. At the outset, the NOCC upgrade was being performed simultaneously with two other interfacing and dependent upgrades at the Signal Processing Center (SPC) and Ground Communications Facility (GCF), thereby adding a significant measure of complexity to the management and overall coordination of the development and transfer-to-operations (DTO) effort. Like other success stories, this project carried with it the traditional elements of top management support and exceptional dedication of cognizant personnel. Additionally, there were several NOCC-specific reasons for success, such as end-to-end system engineering, adoption of open-system architecture, thorough requirements management, and use of appropriate off-the-shelf technologies. On the other hand, there were several difficulties, such as ill-defined external interfaces, transition issues caused by new communications protocols, ambivalent use of two sets of policies and standards, and mistailoring of the new JPL management standard (due to the lack of practical guidelines). This article highlights the key lessons learned, as a means of constructive suggestions for the benefit of future projects.

Sherif, J. S.↗

S&MA Requirements Tool (SMART)

In FY03 QS10 began building an S&MA web based data management tool,"Safety & Mission Assurance Requirements Tool" (SMART) that identifies S&MA requirements, tailors requirements to IAW project/program categories, tracks implementation, and provides a template for developing requirements and tracking waivers. This report provides a SMART process flow, typical application, typical data requirement deliverables, progress in 03, and FY04 activities.

Kulpa, Vyga↗

Juggling Act: Re-Planning and Building on Observatory...Simultaneously!

SOFIA (Stratospheric Observatory for Infrared Astronomy) is a major SMD program that has been required to meet several requirements and implement major planning and business initiatives overthe past 1 1/2 years, in the midst of system development and flight test phases. The program was required to implementing JCL and EVM simultaneously, as well as undergo a major replan and Standing Review Board - and all without impacting technical schedule progress. The team developed innovative processes that met all the requirements, and improved Program Management process toolsets. The SOFIA team, being subject to all the typical budget constraints, found ways to leverage existing roles in new ways to meet the requirements without creating unmanageable overhead. The team developed strategies and value added processes - such as improved risk identification, structured reserves management, cost/risk integration - so that the effort expended resulted in a positive return to the program.

Zavala, Eddie↗

Initial Findings from US Department of Energy’s Better Plants Virtual in-Plant Training on 50001 Ready

Manufacturing facilities use about 35% of the domestic energy in the United States every year. Implementing an effective energy management system (EnMS) is one of the most important approaches to improve energy efficiency. However, the implementation of EnMS is low for many countries (including the US) and even for energy-intensive sectors. The reasons for the low implementation rate of energy management systems had been investigated by multiple researchers, but very few studies have focused on the barriers and challenges of implementing ISO 50001-based energy management systems. To contribute to this understudied area, this paper discusses the implementation and outcomes of the first Better Plants 50001 Ready Virtual In-plant Training. This paper first provides an overview of 50001 Ready and the 50001 Ready Navigator Tool. Then, it provides details on this training event and its outcomes. Finally, it discusses findings from the responses to 40 live polling questions about the status of the 25 tasks of the 50001 Ready Navigator for participating companies, key components of the participating manufacturing companies’ energy management systems, and challenges and barriers that these companies are facing. The findings suggest that although many companies understood the importance of an effective energy management system, about half of them do not understand the required resources for building energy management systems, and most of them have only just begun establishing these systems and need more assistance and resources in multiple areas. More specifically, more assistance is necessary for the following: (1) improving corporate management’s understanding of the time and resources needed to build an EnMS as well as the benefits; (2) creating linear regression models for more accurate energy performance tracking; (3) understanding energy use, collecting and analyzing energy performance data; (4) optimizing equipment operational controls, and creating action plans.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Noise Control in Space Shuttle Orbiter

Acoustic limits in habitable space enclosures are required to ensure crew safety, comfort, and habitability. Noise control is implemented to ensure compliance with the acoustic requirements. The purpose of this paper is to describe problems with establishing acoustic requirements and noise control efforts, and present examples of noise control treatments and design applications used in the Space Shuttle Orbiter. Included is the need to implement the design discipline of acoustics early in the design process, and noise control throughout a program to ensure that limits are met. The use of dedicated personnel to provide expertise and oversight of acoustic requirements and noise control implementation has shown to be of value in the Space Shuttle Orbiter program. It is concluded that to achieve acceptable and safe noise levels in the crew habitable space, early resolution of acoustic requirements and implementation of effective noise control efforts are needed. Management support of established acoustic requirements and noise control efforts is essential.

Goodman, Jerry R.↗

Implementation Plan for the Deep Vadose Zone-Applied Field Research Center

The Long-Range Deep Vadose Zone Program Plan was published in October 2010. It summarized the U.S. Department of Energy’s (DOE’s) state-of-knowledge about the contaminant remediation challenges facing the deep vadose zone (DVZ) beneath the Central Plateau of the Hanford Site and their approach to solving those challenges. Developing an implementation plan is the next step to address the knowledge and capabilities required to solve DVZ challenges when needed. This multi-year plan (FY-11 through FY-20) identifies the short to long-term research, management, and execution plans required to solve those problems facing the DVZ-Applied Field Research Center (DVZ-AFRC). The schedule supporting implementation overlies existing activities and milestones from Hanford’s DOE-Environmental Management (EM) end-user projects. Success relies upon multi-project teams focused on coordinated subsurface projects undertaken across the DOE Complex combined with facilitated, problem-focused, research investments implemented through the DVZ-AFRC.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DMS Advanced Applications for Accommodating High Penetrations of DERs and Microgrids

Efficient and effective management of the electric distribution system requires an integrated approach to allow various systems to work in harmony, including distribution management systems (DMS), distributed energy resources (DERs), distributed energy resources management systems, and microgrids. This study highlights some outcomes from a recent project sponsored by the US Department of Energy, Office of Electricity Delivery and Energy Reliability, including information about (i) the architecture of these integrated systems and (ii) expanded functions of two example DMS applications to accommodate DERs: volt-var optimisation and fault location, isolation, and service restoration. In addition, the relevant DER group functions necessary to support communications between the DMS and a microgrid controller in grid-tied mode are identified.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Outage and Control Center: Strategies for Nuclear Plant Outage Work Status Capabilities

The research effort is a part of the Light Water Reactor Sustainability (LWRS) Program. LWRS is a research and development program sponsored by the Department of Energy, performed in close collaboration with industry to provide the technical foundations for licensing and managing the long-term, safe and economical operation of current nuclear power plants. The LWRS Program serves to help the US nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The Outage Control Center (OCC) Pilot Project was directed at carrying out the applied research for development and pilot of technology designed to enhance safe outage and maintenance operations, improve human performance and reliability, increase overall operational efficiency, and improve plant status control. Plant outage management is a high priority concern for the nuclear industry from cost and safety perspectives. Unfortunately, many of the underlying technologies supporting outage control are the same as those used in the 1980’s. They depend heavily upon large teams of staff, multiple work and coordination locations, and manual administrative actions that require large amounts of paper. Previous work in human reliability analysis suggests that many repetitive tasks, including paper work tasks, may have a failure rate of 1.0E-3 or higher (Gertman, 1996). With between 10,000 and 45,000 subtasks being performed during an outage (Gomes, 1996), the opportunity for human error of some consequence is a realistic concern. Although a number of factors exist that can make these errors recoverable, reducing and effectively coordinating the sheer number of tasks to be performed, particularly those that are error prone, has the potential to enhance outage efficiency and safety. Additionally, outage management requires precise coordination of work groups that do not always share similar objectives. Outage managers are concerned with schedule and cost, union workers are concerned with performing work that is commensurate with their trade, and support functions (safety, quality assurance, and radiological controls, etc.) are concerned with performing the work within the plants controls and procedures. Approaches to outage management should be designed to increase the active participation of work groups and managers in making decisions that closed the gap between competing objectives and the potential for error and process inefficiency.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Emergency Management Overview [Slides]

Introdution: LANL's Emergency Management Program is designed and managed in accordance with standards and requirements mandated by the DOE. LANL's primary driver and foundation of this course is DOE O 151.1D, Comprehensive Emergency Management System ; Established the requirements for emergency preparedness, response, and recovery for DOE facilities; Implemented by Emergency Management Division (EMD) on behalf of the Laboratory.

99 GENERAL AND MISCELLANEOUS↗

RESolution Project Management Tool

The Resolution Project Management Tool is designed to provide a light, yet comprehensive, application to facilitate the management of scientific and research and development projects. The approach to the tool is minimalistic in nature; only require the minimum, essential information needed to facilitate the management of a project and display it in a simple, noncomplex format. The simple platform provides for the collaborative identification, monitoring and status of the essential elements of a project: scope, schedule, cost, risks, changes and reporting. Additionally, the tool provides the ability to create and monitor portfolios of projects without complex or over-burdensome user interfaces or data requirements. The novelty of the tool is the unique selectivity of the data required to manage a project combined with the simple and clear user interface.

Capps, Greg↗

Task Analytic Models to Guide Analysis and Design: Use of the Operator Function Model to Represent Pilot-Autoflight System Mode Problems

Task-analytic models structure essential information about operator interaction with complex systems, in this case pilot interaction with the autoflight system. Such models serve two purposes: (1) they allow researchers and practitioners to understand pilots' actions; and (2) they provide a compact, computational representation needed to design 'intelligent' aids, e.g., displays, assistants, and training systems. This paper demonstrates the use of the operator function model to trace the process of mode engagements while a pilot is controlling an aircraft via the, autoflight system. The operator function model is a normative and nondeterministic model of how a well-trained, well-motivated operator manages multiple concurrent activities for effective real-time control. For each function, the model links the pilot's actions with the required information. Using the operator function model, this paper describes several mode engagement scenarios. These scenarios were observed and documented during a field study that focused on mode engagements and mode transitions during normal line operations. Data including time, ATC clearances, altitude, system states, and active modes and sub-modes, engagement of modes, were recorded during sixty-six flights. Using these data, seven prototypical mode engagement scenarios were extracted. One scenario details the decision of the crew to disengage a fully automatic mode in favor of a semi-automatic mode, and the consequences of this action. Another describes a mode error involving updating aircraft speed following the engagement of a speed submode. Other scenarios detail mode confusion at various phases of the flight. This analysis uses the operator function model to identify three aspects of mode engagement: (1) the progress of pilot-aircraft-autoflight system interaction; (2) control/display information required to perform mode management activities; and (3) the potential cause(s) of mode confusion. The goal of this paper is twofold: (1) to demonstrate the use of the operator functio model methodology to describe pilot-system interaction while engaging modes And monitoring the system, and (2) to initiate a discussion of how task-analytic models might inform design processes. While the operator function model is only one type of task-analytic representation, the hypothesis of this paper is that some type of task analytic structure is a prerequisite for the design of effective human-automation interaction.

Degani, Asaf↗

Flight Services and Aircraft Access: Active Flow Control Vertical Tail and Insect Accretion and Mitigation Flight Test

This document serves as the final report for the Flight Services and Aircraft Access task order NNL14AA57T as part of NASA Environmentally Responsible Aviation (ERA) Project ITD12A+. It includes descriptions of flight test preparations and execution for the Active Flow Control (AFC) Vertical Tail and Insect Accretion and Mitigation (IAM) experiments conducted on the 757 ecoDemonstrator. For the AFC Vertical Tail, this is the culmination of efforts under two task orders. The task order was managed by Boeing Research & Technology and executed by an enterprise-wide Boeing team that included Boeing Research & Technology, Boeing Commercial Airplanes, Boeing Defense and Space and Boeing Test and Evaluation. Boeing BR&T in St. Louis was responsible for overall Boeing project management and coordination with NASA. The 757 flight test asset was provided and managed by the BCA ecoDemonstrator Program, in partnership with Stifel Aircraft Leasing and the TUI Group. With this report, all of the required deliverables related to management of this task order have been met and delivered to NASA as summarized in Table 1. In addition, this task order is part of a broader collaboration between NASA and Boeing.

Whalen, Edward A.↗