Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,171 records · Page 65

U.S. Climate Change Science Program. Vision for the Program and Highlights of the Scientific Strategic Plan

The vision document provides an overview of the Climate Change Science Program (CCSP) long-term strategic plan to enhance scientific understanding of global climate change.This document is a companion to the comprehensive Strategic Plan for the Climate Change Science Program. The report responds to the Presidents direction that climate change research activities be accelerated to provide the best possible scientific information to support public discussion and decisionmaking on climate-related issues.The plan also responds to Section 104 of the Global Change Research Act of 1990, which mandates the development and periodic updating of a long-term national global change research plan coordinated through the National Science and Technology Council.This is the first comprehensive update of a strategic plan for U.S. global change and climate change research since the origal plan for the U.S. Global Change Research Program was adopted at the inception of the program in 1989.

Climate change↗

Science opportunity analyzer - a multi-mission tool for planning

For many years the diverse scientific community that supports JPL's wide variety ofinterplanetary space missions has needed a tool in order to plan and develop their experiments. The tool needs to be easily adapted to various mission types and portable to the user community. The Science Opportunity Analyzer, SOA, now in its third year of development, is intended to meet this need. SOA is a java-based application that is designed to enable scientists to identify and analyze opportunities for science observations from spacecraft. It differs from other planning tools in that it does not require an in-depth knowledge of the spacecraft command system or operation modes to begin high level planning. Users can, however, develop increasingly detailed levels of design. SOA consists of six major functions: Opportunity Search, Visualization, Observation Design, Constraint Checking, Data Output and Communications. Opportunity Search is a GUI driven interface to existing search engines that can be used to identify times when a spacecraft is in a specific geometrical relationship with other bodies in the solar system. This function can be used for advanced mission planning as well as for making last minute adjustments to mission sequences in response to trajectory modifications. Visualization is a key aspect of SOA. The user can view observation opportunities in either a 3D representation or as a 2D map projection. The user is given extensive flexibility to customize what is displayed in the view. Observation Design allows the user to orient the spacecraft and visualize the projection of the instrument field of view for that orientation using the same views as Opportunity Search. Constraint Checking is provided to validate various geometrical and physical aspects of an observation design. The user has the ability to easily create custom rules or to use official project-generated flight rules. This capability may also allow scientists to easily impact the cost to science if flight rule changes occur. Data Output generates information based on the spacecraft's trajectory, opportunity search results or based on a created observation. The data can be viewed either in tabular format or as a graph. Finally, SOA is unique in that it is designed to be able to communicate with a variety of existing planning and sequencing tools. From the very beginning SOA was designed with the user in mind. Extensive surveys of the potential user community were conducted in order to develop the software requirements. Throughout the development period, close ties have been maintained with the science community to insure that the tool maintains its user focus. Although development is still in its early stages, SOA is already developing a user community on the Cassini project, which is depending on this tool for their science planning. There are other tools at JPL that do various pieces of what SOA can do; however, there is no other tool which combines all these functions and presents them to the user in such a convenient, cohesive, and easy to use fashion.

SOA science planning mission operations sequence s↗

Spatial Coverage Planning and Optimization for Planetary Exploration

We are developing onboard planning and scheduling technology to enable in situ robotic explorers, such as rovers and aerobots, to more effectively assist scientists in planetary exploration. In our current work, we are focusing on situations in which the robot is exploring large geographical features such as craters, channels or regional boundaries. In to develop valid and high quality plans, the robot must take into account a range of scientific and engineering constraints and preferences. We have developed a system that incorporates multiobjective optimization and planning allowing the robot to generate high quality mission operations plans that respect resource limitations and mission constraints while attempting to maximize science and engineering objectives. An important scientific objective for the exploration of geological features is selecting observations that spatially cover an area of interest. We have developed a metric to enable an in situ explorer to reason about and track the spatial coverage quality of a plan. We describe this technique and show how it is combined in the overall multiobjective optimization and planning algorithm.

autonomy↗

Mission Planning for Robotic and Human Exploration

Mission planning for spaceflight is a complex challenge for ground operators managing robotic or human missions. It requires integrating the needs of various disciplines and creating an effective, efficient, and safe plan to execute. NASA uses specialized tools to meet planning requirements and constraints. This talk will provide an overview of spaceflight mission planning as well as the software tools the Human-Computer Interaction Group has built to support scheduling and planning. Also, it identifies the future scheduling and planning challenges for human Mars missions and how we leverage Earth Analogs to learn about Mars operations.

Scheduling and planning↗

Decision Support Tool for Risk Assessment & Maneuver Planning in Collision Avoidance

As the quantity of orbital debris continues to grow, so too does the rate of conjunction messages that suggest possible collisions between high value payloads and debris. The abundance of these conjunction messages, and eventual misses, has led to a culture of ignored alerts, and an increase in satellite operation costs as a result of the frequent need to plan resources for maneuver planning and execution. The loss of “trust” in conjunction alerts is due to the poorly characterized evolution in probability of collision (Pc) as time approaches the time of closest approach (TCA) between two objects, as well as the interpretation of Pc in the context of maneuver planning. To address these problems, and in collaboration with the NASA Conjunction Assessment Risk Analysis (CARA) program, the Industrial Sciences Group has developed a novel Maneuver Decision Support System (MDSS) to assist satellite operations in conjunction assessment and Maneuver planning. It provides a meaningful and intuitive Urgency metric for actionable maneuver decisions, based on the physical dynamics of conjunctions. It is based on a forecast of the evolution of Pc over time and represents an advance over current methods that are in use for satellite conjunction monitoring and planning. The result is to give satellite operators a validated decision support systems to plan for maneuver execution or mitigation or monitoring up to 3 days before TCA.

Decision Support Tool↗

Facilitating Crew-Computer Collaboration During Mixed-Initiative Space Mission Planning

As NASA looks toward longer duration missions, there will inevitably be a stronger emphasis on crew autonomy, particularly in the domains of mission planning. Ensuring that astronauts, while subject to lengthy periods of communication delay with Earth-based mission support personnel, are able to independently adapt their schedules to rapidly changing environments is a critical aspect of deep-space exploration. This task will likely require the assistance of computer support systems, as the task of mission planning is complex and currently requires dedicated console operators. A mixed-initiative approach can help alleviate some of the more workload-heavy aspects of planning by offloading the intricate task of constraint management to a computer, while still allowing the crew member to maintain overall control of the plan. Playbook is a mission planning tool that has been developed specifically to support this type of mixed-initiative scheduling. This paper examines: 1) the operational evidence of the challenges and viability of autonomous crew planning, and 2) the novel scheduling capabilities in Playbook that are meant to address those findings.

human-computer interaction↗

Planning large-scale excavation and construction activities within an aerially constrained site for construction of a repository for low and short-lived intermediate level radioactive waste at the Bulgarian national disposal facility - 15372

The Bulgarian State Enterprise for Radioactive Waste Management (SERAW) is planning the construction of a near-surface repository for low and short-lived intermediate level radioactive waste, the National Disposal Facility (NDF), at the Radiana Site adjacent to the Kozloduy Nuclear Power Plant (KNPP). The Site, a rectangular area approximately 1.2 km east-west by 0.4 north-south, is located on a slopping area between the second and sixth loess terraces above the River Danube with elevations ranging from approximately +40 m to elevation +95 m. Construction of the NDF will be divided into three phases separated by approximately 20 years each. The first phase will see the construction of the primary support facilities, referred to as the Auxiliary Buildings and including the Waste Reception and Buffer Storage (WRBS) Building, and the first set of 22 reinforced concrete disposal cells and supporting infrastructure, including a network of subsurface observation galleries, the Infiltration Network Control (ICN) Galleries. Each disposal cell will be 20.15 m long by 17.05 m wide by 9.45 m in height. The disposal cells will be arranged in two parallel rows. Disposal activities will be conducted using overhead cranes installed inside of track mounted mobile roofs. Each row of disposal cells will be serviced by one mobile roof. The mobile roofs will be supported by massive concrete foundations. Construction at the site will present several logistical challenges that will need to be overcome to fully realize the NDF. First in order to begin construction of these facilities nearly 1 million 3 of soil will require excavation and handling. Consistent with requirements to minimize potential environmental impacts identified in the site Environmental Safety Assessment (EIA) excavated soil will, to the extent possible, remain onsite. Approximately three quarters of the soil can be accommodated within the site boundaries. Another challenge results from requirements imposed by the ground conditions. The sub-grade at the site, which consists primarily of loess, will require considerable improvement. To this end a 5 m thick loess-cement cushion will be constructed across much of the site. Specifically, the cushion will be required beneath the disposal cells and the WRBS Building. Construction of the loess-cement cushion in the disposal area will require detailed planning and coordination, particularly as the cushion beneath the disposal cells also contains embedded structures, including the ICN Galleries as well as massive concrete foundation beams required for the two mobile roofs. Construction of these structures will require planned interruptions in the construction of the loess-cement cushion. Specific cement types and strict quality requirements will be required for completion of the loess-cement cushion as well as for completion of the ICN Galleries. The construction planning will need to account for the large volumes of soil to be excavated as well as ensuring sufficient material supplies in terms of both quality as well as quantity. Large quantities of materials including both dry cement for mixing with the loess, and wet concrete for pouring of the mobile roof foundations are accounted for by the plan. However, even after completion of these activities additional challenges are addressed by the plan related to the contemporaneous construction management of the auxiliary buildings and the disposal cells. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Upgrade Your Work Plans for Better Performance - 16103

Most work plans involve at least two basic pieces: a list of things to do and a timeline for doing them. These 'tasks-and-times' plans can be used for managing a project, an organizational change, or the implementation of a strategic objective. But given the high rate of plan failures - often cited as ranging from 35% to over 80% - something must be missing. Three ideas for upgrading work plans have demonstrated higher success rates than the time-and-task method alone. First, maintain a 'GPS Scorecard' of the Goals, Performance metrics, and Schedules for accomplishment. Second, maintain a Performance Circle Register of all key players, and the key deliverables to and from each of them, that will ensure success. Third, implement all three parts of an accountability management system, collectively referred to as 'T3': Tracking, Team assignments, and Talk-times to update status and progress against the plan. Why bother to take the extra steps to strengthen work plans? There are three reasons: (a) Because traveling without a map is risky in times of high change in infrastructure, staffing, and technology; (b) Because 'expectations' do not guarantee delivery as reliably as well-defined agreements; and (c) Because 'accountability' is a management practice, not a personality trait. Together, implementing these three ideas can provide for clarity of purpose, guidance in establishing the productive relationships necessary for success, and a system of supporting accountability for all participants, both on the team and with others inside and outside of the organization. (authors)

99 GENERAL AND MISCELLANEOUS↗

Overview of the U.S. Department of Energy, Office of Nuclear Energy's Nuclear Fuel Storage and Transportation Planning Project

The U.S. Department Energy, Office of Nuclear Energy (DOE-NE) is laying the groundwork for implementing interim storage, including associated transportation, per the Administration's Strategy for the Management and Disposal of Used Nuclear Fuel and High- Level Radioactive Waste, and to develop a foundation for a new nuclear waste management organization. The organization within DOE-NE that is responsible for this planning is the Office of Nuclear Fuels Storage and Transportation (NFST). The technical work to support this planning effort is being conducted by DOE's national laboratories. DOE's overarching goal is to develop options for decision-makers on the design of an integrated waste management system. The goal is to develop an integrated plan to (1) implement interim storage; (2) improve the overall integration of storage as a planned part of the waste management system; (3) prepare for the large-scale transportation of SNF and high-level waste (HLW), with an initial focus on removing SNF from the shutdown reactor sites; and (4) develop the foundational information, resources, and capabilities needed to support future implementation decisions and actions. Near-term objectives are to (1) develop and maintain an integrated plan to accomplish the Administration's Strategy goals, (2) improve integration of storage as a planned part of the waste management system, (including evaluating standardization of dry cask storage systems), (3) develop and evaluate design options for an integrated waste management system, (4) develop and apply systems analyses to provide quantitative estimates of system impacts of utility actions' impacts on the system and inform future decisions, (5) prepare for the large-scale transportation of SNF and HLW, (with an initial focus on removing SNF from the shutdown reactor sites), and (6) establish and maintain a unified, integrated SNF database and analysis system to characterize the input to the waste management system. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Software tools for operations and maintenance planning at Jefferson Lab

Time for maintenance, repair and testing is a precious commodity. A queue of pre-planned work is critical to taking advantage of unplanned repair downtime to squeeze in extra work. Jefferson Lab has a web-based tool called ATLis (Accelerator Task List) that collects work plans and routes them for review. By means of templates, requests for software installation and beam studies are also planned through ATLis. The entire list of ATLis work plans is available to all authenticated users who may append comments and additional information to any task at any time. ATLis is also integrated into the Operations Electronic Logbook and Operations Reporting system, so it is possible to see at a glance if a work plan is pending in ATLis to address an outstanding problem report. Following the successful adoption of ATLis by the Operations department, the software has been installed for and adapted to the work planning of additional groups at Jefferson Lab including Cryogenics and the Free Elect

43 PARTICLE ACCELERATORS↗

Planning India's long-term energy shipment infrastructures for electricity and coal

The Purdue Long-Term Electricity Trading and Capacity Expansion Planning Model simultaneously optimizes both the expansion of transmission and generation capacity. Most commercial electricity system planning software is limited to only transmission planning. An application of the model to India's national power grid, for 2008-2028, indicates substantial transmission expansion is the cost-effective means of meeting the needs of the nation's growing economy. An electricity demand growth rate of 4% over the 20-year planning horizon requires more than a 50% increase in the Government's forecasted transmission capacity expansion, and 8% demand growth requires more than a six-fold increase in the planned transmission capacity expansion. The model minimizes the long-term expansion costs (operational and capital) for the nation's five existing regional power grids and suggests the need for large increases in load-carrying capability between them. Changes in coal policy affect both the location of new thermal power plants and the optimal pattern inter-regional transmission expansions. 15 refs., 10 figs., 7 tabs.

20 FOSSIL-FUELED POWER PLANTS↗

Renewable Energy Zone (REZ) Transmission Planning Process: A Guidebook for Practitioners

Achieving clean energy goals may require new investments in transmission, especially if planners anticipate economic growth and increased demand for electricity. The renewable energy zone (REZ) transmission planning process can help policymakers ensure their infrastructure investments achieve national goals in the most economical manner. Policymakers, planners, and system operators around the world have used variations of the REZ process to chart the expansion of their transmission networks and overcome the barriers of traditional transmission planning. This guidebook seeks to help power system planners, key decision makers, and stakeholders understand and use the REZ transmission planning process to integrate transmission expansion planning and renewable energy generation planning.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Task 1 Report - Assessment of Data Availability to Inform Energy Planning Analyses: Energy Alternatives Study for the Lao People's Democratic Republic: Smart Infrastructure for the Mekong Program

In an effort to address concerns such as energy security, reliability, affordability, and other objectives, the Government of the Lao People's Democratic Republic (Lao PDR) is seeking to advance its expertise and experience in energy system analysis and planning to explore energy alternatives. Assessing the potential and alternatives for deploying energy technology options is often an early step - and, in most cases, an ongoing process - in planning for the development of the energy sector as a whole. Reliable and robust data are crucial to conducting these types of planning-related analyses in a transparent manner that builds confidence among power sector stakeholders and encourages investment in future energy project development and infrastructure opportunities. This report represents the first output of the Energy Alternatives Study for the Lao PDR (Energy Alternatives Study), a collaboration between Ministry of Energy and Mines and the United States Agency for International Development (USAID) under the auspices of the Smart Infrastructure for the Mekong (SIM) program. The Energy Alternatives Study includes five tasks that build upon each other to meet the goal of the project. The report summarizes the availability, quality, and accessibility of data that serve as key inputs to energy planning activities for the power sector. The purpose of this data assessment is two-fold: 1. To facilitate the informed use of existing data by highlighting applications for these data as they relate to priority energy planning analyses; and 2. To inform future investments in energy data collection and management by identifying significant data gaps and providing guidance on how to fill these gaps.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Monitoring, Evaluating, and Updating Your Community Solar Action Plan

The Community Solar Action Plan is a living document that guides community solar planning action over time. As conditions change, new information becomes available, or actions progress over the life of the plan, adjustments may be necessary to maintain the plan's relevance. This fact sheet describes some things to consider when implementing, monitoring, evaluating, and updating the Community Solar Action Plan over time.

14 SOLAR ENERGY↗

Social Impact Management Plans: Innovation in corporate and public policy

Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes – assessment, management and monitoring – to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples are analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs. -- Highlights: • Social impact management plans are effective strategies to manage social issues. • They are developed in partnership with regulatory agencies, investors and community. • SIMPs link assessment to ongoing management and address social and community issues. • SIMPs clarify responsibilities in the management of impacts, opportunities and risks. • SIMPs demonstrate a shift to include management as a core component of SIA practice.

54 ENVIRONMENTAL SCIENCES↗

Strategic environmental assessment of energy planning tools. A study of Italian regions and provinces

SEA has been applied in different ways in EU energy and environmental planning instruments, because different member states have interpreted European Directive 2001/42/CE in a variety of ways. Italy, for example, has only recently completed the integration of the directive into its legislation, through a number of decrees which were approved between 2006 and 2010. As a result SEA practice in Italy is very fragmented, particularly with respect to energy planning, and needs to be steered towards homogeneous quality objectives. The aim of this paper is to study the quality of the SEA reports on the energy and environmental planning tools used by Italian regions and provinces. We study nine cases and use the methodology suggested by Fisher (2010) in his review of the quality of SEA. To be more precise, we integrate the views of external evaluators with those of a selection of the personnel directly involved in preparing the plans. Our results show that there are some differences in the quality scores given by the outsiders and insiders, although the two groups identified similar strengths and weaknesses in implementing SEA. - Highlights: • This is a comparative study on SEA report quality within Italian energy planning tools. • In Italy, the level of SEA implementation on energy planning is still poor. • External academic experts and internal officers assessed SEA reports' quality. • Outsiders and insiders unveil a similar judgement. • Most critical remarks concern consultation, monitoring measures, and follow-up.

54 ENVIRONMENTAL SCIENCES↗

Cumulative effects in strategic environmental assessment: The influence of plan boundaries

Cumulative effects (CE) assessment is lacking quality in impact assessment (IA) worldwide. It has been argued that the strategic environmental assessment (SEA) provides a suitable IA framework for addressing CE because it is applied to developments with broad boundaries, but few have tested this claim. Through a case study on the Danish mining sector, this article explores how plan boundaries influence the analytical boundaries applied for assessing CE in SEA. The case was studied through document analysis in combination with semi-structured group interviews of the responsible planners, who also serve as SEA practitioners. It was found that CE are to some extent assessed and managed implicitly throughout the planning process. However, this is through a focus on lowering the cumulative stress of mining rather than the cumulative stress on and capacity of the receiving environment. Plan boundaries do influence CE assessment, though all boundaries are not equally influential. The geographical and time boundaries of the Danish mining plans are broad or flexible enough to accommodate a meaningful assessment of CE, but the topical boundary is restrictive. The study indicates that collaboration among planning authorities and legally appointed CE leadership may facilitate better practice on CE assessment in sector-specific SEA contexts. However, most pressing is the need for relating assessment to the receiving environment as opposed to solely the stress of a proposed plan.

54 ENVIRONMENTAL SCIENCES↗

Comparison of Intensity-Modulated Radiotherapy Planning Based on Manual and Automatically Generated Contours Using Deformable Image Registration in Four-Dimensional Computed Tomography of Lung Cancer Patients

Purpose: To evaluate the implications of differences between contours drawn manually and contours generated automatically by deformable image registration for four-dimensional (4D) treatment planning. Methods and Materials: In 12 lung cancer patients intensity-modulated radiotherapy (IMRT) planning was performed for both manual contours and automatically generated ('auto') contours in mid and peak expiration of 4D computed tomography scans, with the manual contours in peak inspiration serving as the reference for the displacement vector fields. Manual and auto plans were analyzed with respect to their coverage of the manual contours, which were assumed to represent the anatomically correct volumes. Results: Auto contours were on average larger than manual contours by up to 9%. Objective scores, D{sub 2%} and D{sub 98%} of the planning target volume, homogeneity and conformity indices, and coverage of normal tissue structures (lungs, heart, esophagus, spinal cord) at defined dose levels were not significantly different between plans (p = 0.22-0.94). Differences were statistically insignificant for the generalized equivalent uniform dose of the planning target volume (p = 0.19-0.94) and normal tissue complication probabilities for lung and esophagus (p = 0.13-0.47). Dosimetric differences >2% or >1 Gy were more frequent in patients with auto/manual volume differences {>=}10% (p = 0.04). Conclusions: The applied deformable image registration algorithm produces clinically plausible auto contours in the majority of structures. At this stage clinical supervision of the auto contouring process is required, and manual interventions may become necessary. Before routine use, further investigations are required, particularly to reduce imaging artifacts.

62 RADIOLOGY AND NUCLEAR MEDICINE↗