Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PENETRATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,171 records · Page 65

Unexpected Source and Transport of Iron from the Deep Peru Margin

Iron is the most important micronutrient in the ocean, but the nature and magnitude of its sources and sinks to the ocean are poorly constrained. Here we assess our understanding of the sources and sinks of iron in margin environments by synthesizing observations from the U.S. GEOTRACES GP16 Eastern Tropical Pacific Zonal Transect (EPZT) cruise near the Peru margin. GP16 observations showed elevated dissolved iron (dFe) concentrations along the margin, but a larger westward plume of dFe at slope depths (1000-3000 m) in oxygenated waters, rather than at shelf depths (100-300 m) in oxygen deficient waters. We examine the potential explanations for this unexpected observation. Multiple tracers from GP16 suggest that sediment resuspension was important at slope depths, which would lead to enhanced benthic flux of dFe above what was previously measured. The difference in the apparent persistence and penetration of shelf vs slope plumes of dFe into the interior of the ocean likely results from faster removal rates of the shelf dFe compared to slope dFe. DFe sourced from the shelf was almost entirely in the dFe(II) form, whereas dFe sourced from the slope was almost entirely in the dFe(III) form. Although benthic dFe(II) diffuses into oxygen deficient overlying waters, there is still oxidation of dFe(II), which precipitates to particulate Fe(III). In contrast, the slope plume appears to persist in a stabilized dFe(III) form. We hypothesize that sediment porewaters with moderate organic carbon delivery to sediments and shallow oxygen penetration are especially good sources of persistent dFe to the water column.

iron↗

Design considerations of GeoSAR

The primary purpose of GeoSAR is to demonstrate the feasibility of interferometric topographic mapping through foliage penetration. GeoSAR should become a commercially viable instrument after the feasibibility demonstration. To satisfy both requirements, we have designed a dual frequency (UHF- and X-band) interferometric radar. For foliage penetration, a lower frequency (UHF)radar is used. To obtain better height accuracy for low backscatter areas, we proposed a high frequency (X-band) interferometric system. In this paper, we present a possible GeoSAR system configuration and associated performance estimation.

GeoSAR↗

Exploring A Lunar Landslide Deposit In The Taurus-Littrow Valley (TLV). Variations In Mineralogy And Mineral Volatile Traps.

The double drive tube core sample (73001/73002), collected at Station 3 during the Apollo 17 mission, penetrated a lunar landslide deposit that was transported from the slope of the South Massif into the TLV (Figure 1). Orbital data suggest that this deposit represents multiple events that were triggered by movement along the Lee-Lincoln scarp [e.g., 1] or impact events [e.g., 2,3]. Although numerous core and trench samples were collected during the Apollo pro-gram and numerous landslide deposits have been identified on the lunar surface by orbital missions [e.g., 3], the Station 3 double drive tube is the only core that penetrated a landslide deposit. The intentions of our study are: to establish the stratigraphy of the deposit; to better understand the processes at work during the event(s), including the role of volatiles in the event(e.g., fluidization-enabled flow, escape of fluidizing volatiles) [1] and the capability of deposits for trapping indigenous volatiles; the number of landslide events; and the trigger(s) of such events. Here, we report some initial petrologic observations of the < 1mm fraction of the regolith. A companion abstract [4] emphasizes <1 mm lithic fragments, compares them to surface lithologies, and to > 4 mm lithic fragments.

M J Cato↗

Repurposing Drilling Control Diagnostics for Subsurface Edge Detection and Boundary Advisement During Planetary Drilling

Informed decision-making during lunar drilling and sampling missions will require data monitoring tools and specialized ground data systems. Accurate and updated situational awareness, with ongoing data monitoring, is critical for timely responses by to incoming science data. Traverse plans and scheduled activities may need to be flexibly changed in order to react to unexpected data or situations. Unlike (for example) Mars missions, the relative lightspeed closeness of the Moon allows for near-real-time ground processing of incoming mission and instrument data. An Apollo-class lunar regolith drill will in a sense “travel” a meter or two vertically at a given subsurface characterization site. As the drill penetrates into lunar regolith, it is likely to encounter a range of material densities, orientations, fracture toughness, and (perhaps) ice percentages. Lunar drill telemetry can provide science teams with a valuable first look into the subsurface structure, the regolith bulk properties, and constituents at each drilled site. Real-time AI-based recognition and reaction to downhole situations has been developed for automated deeper drilling on Mars and beyond. We can leverage the same knowledge bases and pattern-matching as areal-time interpreter of the subsurface, a situational awareness tool during drilling operations. We recently (Sept. 2019) demonstrated this AI drilling monitoring and analysis capability, in control of in-situ drilling and sampling operations, mounted on a KREX-2 rover in Chile’s Atacama Desert. Terrestrial automated drilling log analyses in oil exploration have used similar machine learning techniques in classifying and identifying features in drilling logs –but these typically are designed assuming a drilling fluid influencing downhole measurements and data (permeability, resistivity). Drilling models and existing AI software designed to detect and respond to drilling faults and hard materials can be repurposed, for near-real-time (ground-based) interpretation of drilling telemetry –a potentially valuable advisory tool for strata boundaries and changes in drilling parameters. On the Moon, this approach could be used to study the structure and to some extent the composition of lunar regolith vs. borehole depth, based on recognizable variations in fracture hardness, drilling energy and penetration rates while actively drilling. Since the early 2000s, a series of increasingly-capable real-time drilling telemetry interpretation and characterization software tools have been developed. These subsurface models and software tools have monitored the real-time drilling data received, and automatically identified changes in drill behavior (e.g., encountering a harder target layer, bit inclusions, drill choking due to infall downhole, and others) correlating these with subsurface structures and features. We discuss the mappings between drill borehole parameters, faults or events detected, and modeled changes in rock layer boundaries, in examples drawn from field testing at analog sites in an Arctic impact crater, Rio Tinto, and Chile’s Atacama Desert. These demonstrate how subsurface structural boundaries led to fault detections and responses by the software.

drilling advisor↗

Reflectivity, Emissivity, and Brightness from Multilayered Soil with Linearly Varying Permittivity at P- and L- bands

Passive sensing of root zone soil moisture is theoretically investigated using P and L band frequencies. The soil is considered to be a stratified medium. The reflectivity from the soil surface is found by considering the soil to be composed of a finely layered structure with layer widths that are small compared to a wavelength. A well-known transmission line algorithm is then used to compute the reflectivity at the surface. Emissivity is obtained as (1 – reflectivity). It assumed that the soil is at a constant temperature of 300o K when determining the brightness temperature. A soil moisture profile consisting of two homogeneous layers separated by a layer of linearly varying soil moisture is investigated. The study is made at an incident angle of 40O for horizontal polarization at 0.8 and 1.4 GHz. Two variations of the basic profile are considered: a transition from a layer of lesser moisture to a layer of greater moisture and the opposite. In both cases the P band signal shows greater penetration than the L band case. There is greater penetration in the transition to drier soils. In both cases the L band signals show sensitivity to only the upper surface of the soil as expected.

Ming Li↗

InSight Robotic Arm Testing Activities for HP3 Mole Anomaly Recovery on Mars

The InSight lander’s Heat Flow and Physical Properties Package (HP3) was deployed on Mars in February 2019and began attempting to penetrate to its target depth range of3-5 meters shortly thereafter. However, the mole’s downwardprogress stopped after only 35 cm of penetration. In response,the project convened an Anomaly Response Team (ART) andsince then has been attempting to diagnose the problem andassist the mole using the tools available on Mars. The key assetused in this effort has been the Instrument Deployment System(IDS), which includes two cameras and a robotic InstrumentDeployment Arm (IDA). Since the IDS was originally intendedonly to deploy InSight’s primary instruments to the Martiansurface, new testbed setups, experiments, and operational protocols (e.g., command sequences) were required and had to bedeveloped on a short timeline. The HP3 Mole ART first focusedon gathering all observable data on Mars about the state ofthe mole and Support Structure Assembly (SSA), as well asthe physical properties of the Martian regolith. This includedusing the robotic arm to point the IDC at the SSA duringdiagnostic hammering attempts to observe motion of the SSAand science tether. Images taken during these attempts revealedsome motion of the SSA, but no apparent change in mole depth.At JPL, the IDS and Testbed teams re-created the hardwareconfiguration on Mars based on limited knowledge of the mole’sstate. They devised and tested techniques to use the roboticarm and cameras to accomplish previously untested activitieson Mars, including imaging the HP3, using the IDA to interactwith the terrain, and using the IDA to move the SSA awayfrom the partially-embedded mole. The team executed the morepromising techniques on Mars. After diagnostic hammering onMars, the team decided to move the SSA to gain visibility ofthe mole’s configuration and access to the soil around the mole.After developing the technique and practicing the maneuver inthe InSight testbed, the team lifted the SSA on Mars and placedit behind the mole. This revealed a pit surrounding the nowexposed mole, observations of which provided essential cluesfor determining the root cause of the mole’s lack of progress.The IDS and Testbed teams altered the testbed to match thesituation on Mars. They devised IDA techniques to determinethe Martian soil properties and assist the mole’s descent. Theytested these techniques in the testbed and executed the more978-1-7281-2734-7/20/$31.00 c 2021 IEEE. Copyright 2020 CaliforniaInstitute of Technology. U.S. Government sponsorship acknowledged.promising ones on Mars. These include using the robotic arm toalter the regolith near the mole and to push on the mole while ithammers. This paper discusses the anomaly resolution testing inthe testbed at JPL, describes how the IDS team prepared for theanomaly recovery activities on Mars, and provides preliminaryresults of the efforts to assist the HP3 mole on Mars.

Kim, Junggon↗

InSight Robotic Arm Testing Activities for HP3 Mole Anomaly Recovery on Mars

The InSight lander’s Heat Flow and Physical Properties Package (HP3 ) was deployed on Mars in February 2019 and began attempting to penetrate to its target depth range of 3-5 meters shortly thereafter. However, the mole’s downward progress stopped after only 35 cm of penetration. In response, the project convened an Anomaly Response Team (ART) and since then has been attempting to diagnose the problem and assist the mole using the tools available on Mars. The key asset used in this effort has been the Instrument Deployment System (IDS), which includes two cameras and a robotic Instrument Deployment Arm (IDA). Since the IDS was originally intended only to deploy InSight’s primary instruments to the Martian surface, new testbed setups, experiments, and operational protocols (e.g., command sequences) were required and had to be developed on a short timeline. The HP3 Mole ART first focused on gathering all observable data on Mars about the state of the mole and Support Structure Assembly (SSA), as well as the physical properties of the Martian regolith. This included using the robotic arm to point the IDC (Instrument Deployment Camera) at the SSA during diagnostic hammering attempts to observe motion of the SSA and science tether. Images taken during these attempts revealed some motion of the SSA, but no apparent change in mole depth. At JPL, the IDS and Testbed teams re-created the hardware configuration on Mars based on limited knowledge of the mole’s state. They devised and tested techniques to use the robotic arm and cameras to accomplish previously untested activities on Mars, including imaging the HP3 , using the IDA to interact with the terrain, and using the IDA to move the SSA away from the partially-embedded mole. The team executed the more promising techniques on Mars. After diagnostic hammering on Mars, the team decided to move the SSA to gain visibility of the mole’s configuration and access to the soil around the mole. After developing the technique and practicing the maneuver in the InSight testbed, the team lifted the SSA on Mars and placed it behind the mole. This revealed a pit surrounding the now exposed mole, observations of which provided essential clues for determining the root cause of the mole’s lack of progress. The IDS and Testbed teams altered the testbed to match the situation on Mars. They devised IDA techniques to determine the Martian soil properties and assist the mole’s descent. They tested these techniques in the testbed and executed the more promising ones on Mars. These include using the robotic arm to alter the regolith near the mole and to push on the mole while it hammers. This paper discusses the anomaly resolution testing in the testbed at JPL, describes how the IDS team prepared for the anomaly recovery activities on Mars, and provides preliminary results of the efforts to assist the HP3 mole on Mars.

Kim, Junggon↗

Microsphere Plutonium-238 Oxide Fuel to Revolutionize New Radioisotope Power Systems and Heat Sources for Planetary Exploration

Microsphere 238PuO2 fuels have potential to provide performance and safety enhancements for future radioisotope heat and power systems (RPS) as well as enable more flexible and compact RPS designs. Improvements in RPS specific power and more flexible geometries were recently investigated by JPL and PNNL as part of a study on cryobot devices for exploring Ocean Worlds. Missions to penetrate ice and explore oceans, such as on Europa, will require RPS with high specific power within the vehicle to provide both heat and power. Such missions will be mass-constrained, and the energy required to penetrate the ice is highly dependent on cryobot size. Therefore, compact RPS geometries are needed to maximize heat and power while minimizing 238Pu inventory. Microsphere-based heat sources are an attractive way to obtain flexible geometries and high volumetric power loadings because they can fill a region of any size and shape provided fuel temperatures are kept below a threshold and launch/re-entry safety are not compromised. The sol-gel technique to produce 238PuO2 microsphere particles for heat sources has the benefit of preventing dust generation, as opposed to the current 238PuO2 powder/pellet processing method, reducing hazards in the fuel fabrication line. Microspheres can also be individually coated to enhance thermal conductivity, and/or reduce the likelihood of 238PuO2 fuel dispersal in an accident. Although PNNL has produced 238PuO2 microspheres using the sol-gel method, the application of coatings and their integrity over time has yet to be investigated. Continued R&D could demonstrate the feasibility of advanced, microspherebased heat sources and provide baseline data for planning future missions requiring new RPS with different heat source configurations.

Fleurial, Jean-Pierre↗

Acoustic Communication in Deep Ice at Ocean Worlds

One of NASA priorities is the in-situ exploration of ocean worlds in the solar system where potentially there might be life under the ice shell. This requires reaching the ocean below extremely cold through significant deep ice. Jupiter’s moon, Europa, is such a challenging body, where it is estimated to have a 40 km thick ice shell. An approach for reaching the ocean has been conceived using a melting probe Cryobot concept that has been studied for a potential future mission. A lander is assumed to be the platform from which the Cryobot would be deployed. The ice penetrating vehicle concept consists of a cylindrical, narrow-body probe that encases a radioisotope heat/power source that would be used to do the penetration by melting through the icy crust. The baseline design of the probe includes a suite of science instruments to analyze the ice during descent and the liquid ocean underneath. For communication, a set of fiber optic wire as well as wireless RF in the very cold porous top layer is assumed, and then acoustic modules would be used for the communication in warmer denser ice over distance of 25 km between the modules. In addition to the acoustic communication modules, a sonar is part of the concept, for obstacle avoidance. The focus of this paper is on the use of elastic waves in the 1kHz range.

Lih, Shyh-Shiuh↗

A Comparison of the CIR- and CME-Induced Geomagnetic Activity Effects on Mesosphere and Lower Thermospheric Temperature

Neutral temperature responses in the mesosphere and lower thermosphere (MLT) to severe geomagnetic storms induced by coronal mass ejections (CMEs) are of growing interest to the space science research community. Recently, it was found that geomagnetic activities produced by the corotating interaction regions (CIRs) caused comparable effects on the Earth's upper atmosphere. In this work, we carried out a comparative study of the temperature responses in the MLT region to these two types of geomagnetic activities, using the temperature measured by the Sounding of the Atmosphere using Broadband Emission Radiometry (SABER) instruments onboard the Thermosphere, Ionosphere, Mesosphere Energetics and Dynamics (TIMED) satellite. Our results demonstrate that CIR-induced geomagnetic activity produced temperature variations in the MLT region and that this effect can penetrate downward to ∼100 km at high latitudes in both hemispheres. Temperature enhancements penetrated deeper during CME-induced geomagnetic activities, but the heating effects lasted longer during CIR-induced geomagnetic activities. There is a hemispherical asymmetry in the geomagnetical activity induced temperature changes in the MLT region. The temperature enhancements are stronger in the southern hemisphere than in the northern hemisphere during CME events.

geomagnetic activity↗

Vertical Translation System for the Common Habitat Architecture

The Common Habitat is a large, long-duration habitat that uses an SLS core stage Liquid Oxygen (LOX) tank as its primary structure. Measuring 8.4 meters in diameter and 15 meters in length, it is manufactured as a habitat and launched as such into space. It is intended for use on the Moon as part of a permanently occupied outpost, on Mars as part of an outpost that will be occupied for hundreds of days at a time, and in deep space as part of the Deep Space Exploration Vehicle where it will support crewed missions up to 1200 days in duration. A study of internal orientation and crew size resulted in a Common Habitat configuration sized for a crew of eight with a three-deck horizontal orientation. The Common Habitat Vertical Translation System provides a means for transporting crew and cargo between decks in a Common Habitat spacecraft in gravity levels varying from 0g to 1g. A crowdsourcing campaign was conducted through the GrabCAD platform to initially solicit ideas for restraints and mobility aids, including vertical translation. Four of the five top responses repeated ideas that would be incorporated into features of the Vertical Translation System. The first was a safety barrier (to prevent falls into the opening between decks) that could collapse to form a floor surface covering the opening when not in use. The second idea was a folding ladder that could be stowed in the ceiling when not in use. The third idea was an elevator platform that could traverse the ladder. Several key driving requirements were established for the Vertical Translation System: it may not penetrate into or through the lower deck; it must work on the Earth, Moon, Mars, and in microgravity; it must be easy to operate; it must enable translation of any item that can fit through the Common Habitat’s 40” x 60” hatches, inclusive of suited and unsuited crew with any degree of incapacitation and any equipment or cargo item; and it must include three component systems – deploying floor / safety barriers, a deployable ladder, and an elevator platform. Additional requirements were established for each of the component systems. The safety barriers must form a roughly 40-inch tall, complete wall enclosure on all four sides when deployed; it must include an easy to open gate that allows access to/from the ladder when deployed; and when retracted, the safety barrier must form a smooth, load-bearing floor that can be walked on, and wheeled objects can be rolled across in gravity, without being a trip hazard. The deployable ladder must be composed of multiple ladders that work together; it must stow in the ceiling when not in use; and it must not penetrate into the 40” x 60” vertical passage corridor. The elevator platform must work with the deployable ladder system; it must be able to bridge any gap in ladders between decks; it must stop at each deck flush with the deck surface; it must be capable of transporting an incapacitated crew member as a single rescuer operation; it must be capable of transporting a full-size subsystems pallet; it must function as an elevator for a crew member carrying large objects; it must have safety functions to prevent falls from the platform, or crew/cargo collisions with edges of hatch openings, or entanglement with ladder rungs/structure; it must stow when not in use; and it must autonomously both connect itself to the ladder and deploy itself to any deck where needed when called (e.g., a crew member on any deck can call for the platform and it must connect itself to the ladders without assistance and translate to the requestor’s deck). These requirements were developed into a system concept with the assistance of a NASA Pathways Intern who also added the requirement to size the design based on the use of commercial components, using existing motors and other mechanisms to ensure that the resulting system could be inexpensively produced. The Floor and Safety Barrier consists of four panels, two roughly 40 inches long and two roughly 60 inches long that can fold into the floor on top of each other when not in use. The uppermost panel is load bearing and acts as the floor surface. When deployed, they connect with each other to form a rigid barrier surrounding the vertical passageway. One of the panels contains a hinged gate that can be opened when deployed to allow for access to/from the passageway. The Deploying Ladder consists of two ladder segments, one mounted on the ceiling of the lower deck and the other mounted on the ceiling of the mid deck. A rotating mechanism is mounted on the ladder to allow it to rotate into a horizontal position against the ceiling for stowage, or down to a vertical position for use. A second rotating mechanism is built into the ladder, allowing the rungs to rotate. A toothed surface intended to work with the elevator platform covers the front of the ladder rails and the top and bottom of the rails are designed to be flush when aligned with another ladder segment. The elevator platform is essentially a motorized, self-propelled deck. It has a mechanism that holds it in contact with the ladder rails and drives itself against the toothed surface. This mechanism allows the elevator platform to ascend or descend the ladder. In order to stow the platform when not in use, a set of short ladder rails (without rungs) are mounted to the ceiling of the mid deck. When the mid deck ladder is stowed, it is flush with these rails and the platform can drive itself onto those short rails for stowage. An additional mechanism on the platform can pitch its deck surface 90 degrees, such that when the ladder is to be stowed, the platform can fold up against the ceiling. As a consequence of the ladder and elevator platform design, the opening between decks in the Common Habitat was enlarged to ensure that the elevator platform can accept a payload up to 40”x60” in dimension.

Human Centered Design↗

Stiffener Jumping for Unitized Stitched Composite Preform Manufacturing

A single-sided stitching head is used to assemble unitized three-dimensional preforms using the NASA Langley Research Center (LaRC) Integrated Structural Assembly of Advanced Composites (ISAAC) robotic manufacturing system. Typically, assembly of a preform includes a “skin” that is stiffened by stiffener elements stitched to the skin. The single-sided stitching head has two needles that pass through the preform from the same side to form the stitch, typically from the smooth outer surface so the needles penetrate through the preform towards the stiffener side. The single-sided head cannot stitch across stiffening elements (e.g., stringer, frame, integral cap, etc.) because the needles would penetrate into the stiffener web, which would not allow the stitch form because the thread movement would be impeded. As a result, stitching seams cannot cross stiffening elements, and therefore are very short and must remain in the skin/flange connections within the space between the stiffening element webs. Each short segment requires a stop and cut process that takes a significant amount of time. A stiffener jumping stitching method was developed that eliminates the need to cut and restart seams when encountering a stiffener, thus providing a long, continuous seam with a significant reduction in stitching time by eliminating cutting operations and associated excess thread end trimming. This stiffener jumping process places what could be considered a very long stitch that bridges the stiffener to connect the end of one segment of the seam with the beginning of the next segment of the seam to provide a longer continuous seam. As a result, all intermediate thread cuts that would be done at the end of each individual segment of the seam are eliminated, with only a single cut at the end of the seam. The process and programming requirements for carrying out the stiffener jumping stitching approach are presented in this paper. Using the presented stiffener jumping approach to produce the long continuous seams, the stitching time for a representative commercial transport unitized stiffened wing cover panel can possibly be reduced by at least 25 percent.

stitched↗

High Energy Dynamic Impact Testing of APC AS4/PEKK-FC and TC1225 LMPAEK T700G Thermoplastic Composite Materials

High energy dynamic impact tests were conducted on Solvay APC AS4D/PEKK-FC and Toray TC1225 LMPAEK T700Gthermoplastic composite laminates. The primary objective was to provide data for evaluation of computational composite impact models. Empirical results indicate an approximately 50% increase in penetration threshold velocity and over 100% increase in penetration energy threshold for the TC1225 LMPAEK T700Gcomposite compared to the APC AS4D/PEKK-FC composite. The velocity required to produce NDE-detectable delamination in the TC1225 LMPAEK T700Gcomposite was roughly twice that for the APC AS4D/PEKK-FC composite. Comparison of the normalized energy absorption showed similar results for the APC AS4D/PEKK-FC system compared to a previously studied IM7/8552 composite material. The TC1225 LMPAEK T700Gsystem absorbed approximately twice that of the other two systems when normalized by areal weight.

Impact↗

Evaluating Surface Exposure Timescales Derived From Solar Energetic Particle Track Densities for Grains From Apollo 17 Core Sample 73002

Space weathering causes the surface soils of airless bodies like the Moon to be morphologically, microstructurally, and chemically altered due to micrometeoroid bombardment and solar wind exposure. These processes produce a multitude of microstructural and chemical changes that accumulate on individual soil grains that are continuously exposed on the surface. One characteristic is the formation of solar wind damaged rims on grains which develop from low energy solar wind particles penetrating <100 nm in depth. Also present are solar energetic particle (SEP) tracks, which are nanoscale streaks of irradiation damage in grain interiors formed by heavy, high energy ions (predominantly Fe group nuclei) originating from solar energetic particles (SEPs) that penetrate millimeters below the surface.

J. A. McFadden↗

Power Operations of the Mars Exploration Rovers

The rovers of the National Aeronautics and Space Administration’s (NASA) Mars Exploration Rovers (MER) project, Spirit (MER-A) and Opportunity (MER-B), safely landed on the surface of Mars three weeks apart during January 2004. Spirit and Opportunity were built and operated by the Jet Propulsion Laboratory (JPL), which is managed by the California Institute of Technology (Caltech) for NASA. Spirit landed at Gusev Crater, 14.8 degrees south of the equator, and operated continuously on the surface of Mars from January 4, 2004 until last contact from Spirit on March 22, 2010. Opportunity landed at Meridiani Planum, a location 2.5 degrees south of the Martian equator. Opportunity operated continuously on the Martian surface from January 25, 2004 until the last received transmission from Opportunity on June 10, 2018. The goal of the MER project was to determine if Mars ever had a habitable environment, in particular, if it ever had water. During their missions, both Spirit and Opportunity found evidence that liquid water once flowed on the surface of Mars. Both Spirit and Opportunity used a 1.33 m2 triple-junction solar array as their power sources. Based on observations of the original Mars rover, the Sojourner rover of the Mars Pathfinder mission that landed on Mars on July 4, 1997, the expectation was that the Martian dust would rapidly accumulate on the solar arrays of Spirit and Opportunity, and that the rovers would not have enough energy to continue operations after 90 Martian days (sols). Instead, due in part to lower dust accumulation rates than expected and numerous dust cleaning events, the Spirit and Opportunity rovers continued to operate on the Martian surface for over 2000 sols (MER-A) and 5000 sols (MER-B), respectively. During this time, the rovers experienced multiple Martian winters and several dust storms. Because the sources of solar array energy loss were known, the solar array energy output offered a method to scientifically estimate the loading and aeolian removal of dust from the solar arrays each sol. The MER Power operations team called this value that they calculated the solar array Dust Factor (DF). Dust Factor was defined as the fraction of sunlight that penetrates the accumulated dust on the surface of the solar array. A Dust Factor of 1.0 would indicate that the solar array was perfectly clean. A Dust Factor of 0.6 would indicate that only 60% of the available sunlight was able to penetrate the accumulated dust on the solar arrays. The MER Power subsystem operations team used the Multi-Mission Power Analysis Tool (MMPAT) to perform these Dust Factor calculations. The MMPAT software tool modeled the behavior of the solar arrays and the batteries as they interacted with the spacecraft power loads over the mission timeline. MMPAT also had knowledge (through telemetry and user inputs) of telemetered Power subsystem voltages and currents, atmospheric opacity (Tau), rover surface location, rover attitude, the planetary tilt and distance of Mars from the sun based on day of year, the instantaneous elevation of the sun based on time of day, temperatures (internal and external), terrain masking, and shadowing (due to the camera mast and antennas). Once all of the known sources of array energy loss are accounted, the remaining difference between the expected array energy and the actual array energy determines the solar array Dust Factor. The assumptions made while determining the Dust Factor are 1) that the single measured atmospheric opacity value (Tau) is constant over the course of the entire sol, 2) there is no measurable solar cell degradation, 3) there are no shorted strings and therefore, 4) all unexpected solar array energy losses are due to accumulated dust on the solar array. Although it cannot provide an absolute measure of dust loading, the determination of solar array Dust Factor provides a useful way of tracking dust accumulation and aeolian dust removal trends on Martian spacecraft. Any spacecraft on the Martian surface is vulnerable to dust, especially solar-powered spacecraft. The Spirit and Opportunity rovers were operational on the Martian surface for much longer than expected due in part to aeolian removal of dust from their solar arrays. The first few dust removal events were a pleasant surprise to the MER operations teams; however, over time a pattern began to arise. In over three Mars Years on the surface, the Power operations team tracked the solar array Dust Factor at Gusev Crater (location of MER-A) and observed that there were several significant dust removal and deposition events in Mars Year (MY) 27, even in the absence of a large dust storm. In MY 28 at Gusev Crater, the large atmospheric opacity (Tau) increase lagged significant dust removal events. Overall at Gusev Crater, there was a pattern of steady dust accumulation on the solar arrays, with a small number of significant dust cleaning events. At Meridiani Planum, where Opportunity rover operated for over seven Mars Years (late MY 26 to mid MY 34), a clear and consistent pattern of dust movement emerged. Meridiani Planum had a predictable, seasonally dependent pattern of gradual and continuous dust accumulation and removal. In summary, this paper explains the reasons for the development of the solar array Dust Factor and how it was used in mission operations. In particular, this paper describes the MMPAT software package, how it models array energy, including the important assumptions, model inputs and sources of error. And finally, this paper will show how the calculated solar array Dust Factor was used at Gusev Crater and Meridiani Planum to predict dust accumulation rates and weather patterns, and the importance of this generated data set for current and future solar- powered missions to Mars, such as the InSight lander and the planned Mars Sample Return rover.

Chin, Keith B.↗

Energy and Momentum in Mechanical Impact Testing

The ASTM G86 method is used to determine the ignition sensitivity of materials to mechanical impact in oxygen. It has long been known that different systems built to the standard produce different results. Given the current push towards direct comparison of numerical results from different systems rather than just material rankings, it is desirable to normalize the systems to some performance-based metric. Normalization is complicated by the fact that the energy and momentum of a particular impact scale differently with plummet mass and drop height, and therefore adjusting the mass and height to account for system differences would result in a different impact. The standard uses dent blocks to assess impacts. However, it was unknown if the differences in momentum could be identified during dent block impacts. To determine this, dent blocks were impacted with constant energy and different momentums, using instrumented and non-instrumented plummets. The dent blocks showed statistically significant differences in the penetration function when subjected to impacts with the same energy but different momentum. Further, the instrumented plummet showed drastic differences in the power delivery with different momentums. System configuration was also shown to have an effect on the response of the penetration function to different momentums.

Energy↗

Results from InSight Robotic Arm Activities

The InSight lander carried an Instrument Deployment System (IDS) that included an Instrument Deployment Arm (IDA), scoop, five finger “claw” grapple, forearm-mounted Instrument Deployment Camera (IDC) requiring arm motion to image a target, and landermounted Instrument Context Camera (ICC), designed to image the workspace, and to place the instruments onto the surface. As originally proposed, the IDS included a previously built arm and flight spare black and white cameras and had no science objectives or requirements, or expectation to be used after instrument deployment (90 sols). During project development the detectors were upgraded to color, and it was recognized that the arm could be used to carry out a wide variety of activities that would enable both geology and physical properties investigations. During surface operations for two martian years, the IDA was used during major campaigns to image the surface around the lander, to deploy the instruments, to assist the mole in penetrating beneath the surface, to bury a portion of the seismometer tether, to clean dust from the solar arrays to increase power, and to conduct a surface geology investigation including soil mechanics and physical properties experiments. No other surface mission has engaged in such a sustained and varied campaign of arm and scoop activities directed at such a diverse suite of objectives. Images close to the surface and continuous meteorology measurements provided important constraints on the threshold friction wind speed needed to initiate aeolian saltation and surface creep. The IDA was used extensively for almost 22 months to assist the mole in penetrating into the subsurface. Soil was scraped into piles and dumped onto the seismometer tether six times in an attempt to bury the tether and ∼ 30% was entrained in the wind and dispersed downwind 1-2 m, darkening the surface. Seven solar array cleaning experiments were conducted by dumping scoops of soil from 35 cm above the lander deck during periods of high wind that dispersed the sand onto the panels that kicked dust off of the panels into suspension in the atmosphere, thereby increasing the power by ∼15% during this period. Final IDA activities included an indentation experiment that used the IDA scoop to push on the ground to measure the plastic deformation of the soil that complemented soil mechanics measurements from scoop interactions with the surface, and two experiments in which SEIS measured the tilt from the arm pressing on the ground to derive near surface elastic properties.

Mars↗

Automation and AI in Space Drilling

Future planetary surface sampling missions, such as delving past the near-surface ice layers on Mars in search of organics and possibly signs of past/extant life, will require lightweight, low-mass planetary drilling and sample handling. Unlike terrestrial drills, these exploration drills must work dry (without drilling muds or gas), blind (no prior local or regional seismic or other surveys), and light (very low downward force or weight on bit, and perhaps 100 W available from solar power or batteries). Given the lightspeed transmission delays to Mars and outward, an exploratory planetary drill cannot be controlled directly from Earth. Drills that penetrate deeper than a few centimeters are likely to get stuck if operated open-loop (the MSL drill only penetrates 5 cm, and the MER Rock Abrasion Tools 5 mm by comparison), so some form of local drill control is required. In the relatively near-term, human crews cannot be presumed to be available for surface instrument teleoperation. Therefore highly automated drill and sample-transfer operations will be required, to explore the subsurface with the ability to safe robotic drilling systems and recover and continue on from the most probable fault conditions. Current automation, scheduling and diagnostic approaches will be discussed that roughly track the actions and roles of humans in terrestrial manual drilling operations.

drill automation↗