Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Missions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,171 records · Page 65

Operating the Dual-Orbiter GRAIL Mission to Measure the Moon's Gravity

NASA's mission to measure the Moon's gravity and determine the interior structure, from crust to core, has almost completed its 3-month science data collection phase. The twin orbiters of the Gravity Recovery and Interior Laboratory (GRAIL) mission were launched from Florida on September 10, 2011, on a Delta-II launch vehicle. After traveling for nearly four months on a low energy trajectory to the Moon, they were inserted into lunar orbit on New Year's Eve and New Year's Day. In January 2012 a series of circularization maneuvers brought the orbiters into co-planar near-circular polar orbits. In February a distant (75- km) rendezvous was achieved and the science instruments were turned on. A dual- frequency (Ka and S-band) inter-orbiter radio link provides a precise orbiter-to-orbiter range measurement that enables the gravity field estimation. NASA's Jet Propulsion Laboratory in Pasadena, CA, manages the GRAIL project. Mission management, mission planning and sequencing, and navigation are conducted at JPL. Lockheed Martin, the flight system manufacturer, operates the orbiters from their control center in Denver, Colorado. The orbiters together have performed 28 propulsive maneuvers to reach and maintain the science phase configuration. Execution of these maneuvers, as well as the payload checkout and calibration activities, has gone smoothly due to extensive pre-launch operations planning and testing. The key to the operations success has been detailed timelines for product interchange between the operations teams and proven procedures from previous JPL/LM planetary missions. Once in science phase, GRAIL benefitted from the payload operational heritage of the GRACE mission that measures the Earth's gravity.

Moon missions↗

Mars Sample Return: Mars Ascent Vehicle Mission and Technology Requirements

A Mars Sample Return mission is the highest priority science mission for the next decade recommended by the recent Decadal Survey of Planetary Science, the key community input process that guides NASAs science missions. A feasibility study was conducted of a potentially simple and low cost approach to Mars Sample Return mission enabled by the use of developing commercial capabilities. Previous studies of MSR have shown that landing an all up sample return mission with a high mass capacity lander is a cost effective approach. The approach proposed is the use of an emerging commercially available capsule to land the launch vehicle system that would return samples to Earth. This paper describes the mission and technology requirements impact on the launch vehicle system design, referred to as the Mars Ascent Vehicle (MAV).

ascent↗

Micro - helm - a mission operation visualization system

Micro-Helm is a PC based mission visualization system that can be employed for comprehensive monitoring of mission system states during operation. Micro-Helm was designed as a cost-effective system solution that can be adapted to multiple missions in various mission lifecycle phases. It has been successfully applied to DS1 mission during its entire operation phases and Mars Odyssey mission during its launch and orbit-insertion phase, providing scenario design and validation.

Micro-Helm↗

Spitzer Pre Launch Mission Operations System - The Road to Launch

Spitzer Space Telescope was launched on 25 August 2003 into an Earth-trailing solar orbit to acquire infrared observations from space. Development of the Mission Operations System (MOS) portion prior to launch was very different from planetary missions from the stand point that the MOS teams and Ground Data System had to be ready to support all aspects of the mission at launch (i.e., no cruise period for finalizing the implementation). For Spitzer, all mission-critical events post launch happen in hours or days rather than months or years, as is traditional with deep space missions. At the end of 2000 the Project was dealt a major blow when the Mission Operations System (MOS) had an unsuccessful Critical Design Review (CDR). The project made major changes at the beginning of 2001 in an effort to get the MOS (and Project) back on track. The result for the Spitzer Space Telescope was a successful launch of the observatory followed by an extremely successful In Orbit Checkout (IOC) and operations phase. This paper describes how the project was able to recover the MOS to a successful Delta (CDR) by mid 2001, and what changes in philosophies, experiences, and lessons learned followed. It describes how projects must invest early or else invest heavily later in the development phase to achieve a successful operations phase.

observatory↗

Advances in Distributed Operations and Mission Activity Planning for Mars Surface Exploration

A centralized mission activity planning system for any long-term mission, such as the Mars Exploration Rover Mission (MER), is completely infeasible due to budget and geographic constraints. A distributed operations system is key to addressing these constraints; therefore, future system and software engineers must focus on the problem of how to provide a secure, reliable, and distributed mission activity planning system. We will explain how Maestro, the next generation mission activity planning system, with its heavy emphasis on portability and distributed operations has been able to meet these design challenges. MER has been an excellent proving ground for Maestro's new approach to distributed operations. The backend that has been developed for Maestro could benefit many future missions by reducing the cost of centralized operations system architecture.

Mars Exploration Rover (MER)↗

Europa Explorer - An Exceptional Mission Using Existing Technology

A mission to Europa has been identified as a high priority by the science community for several years. The difficulty of an orbital mission, primarily due to the propulsive requirements and Jupiter's trapped radiation, led to many studies which investigated various approaches to meeting the science goals. The Europa Orbiter Mission studied in the late 1990's only met the most fundamental science objectives. The science objectives have evolved with the discoveries from the Galileo mission. JPL studied one concept, Europa Explorer, for a Europa orbiting mission which could meet a much expanded set of science objectives. A study science group was formed to verify that the science objectives and goals were being adequately met by the resulting mission design concept. The Europa Explorer design emerged primarily from two key self-imposed constraints: 1) meet the full set of identified nonlander science objectives and 2) use only existing technology.

spacecrafts↗

An Efficient Approach for the Reliability Analysis of Phased-Mission Systems with Dependent Failures

We consider the reliability analysis of phased-mission systems with common-cause failures in this paper. Phased-mission systems (PMS) are systems supporting missions characterized by multiple, consecutive, and nonoverlapping phases of operation. System components may be subject to different stresses as well as different reliability requirements throughout the course of the mission. As a result, component behavior and relationships may need to be modeled differently from phase to phase when performing a system-level reliability analysis. This consideration poses unique challenges to existing analysis methods. The challenges increase when common-cause failures (CCF) are incorporated in the model. CCF are multiple dependent component failures within a system that are a direct result of a shared root cause, such as sabotage, flood, earthquake, power outage, or human errors. It has been shown by many reliability studies that CCF tend to increase a system's joint failure probabilities and thus contribute significantly to the overall unreliability of systems subject to CCF.We propose a separable phase-modular approach to the reliability analysis of phased-mission systems with dependent common-cause failures as one way to meet the above challenges in an efficient and elegant manner. Our methodology is twofold: first, we separate the effects of CCF from the PMS analysis using the total probability theorem and the common-cause event space developed based on the elementary common-causes; next, we apply an efficient phase-modular approach to analyze the reliability of the PMS. The phase-modular approach employs both combinatorial binary decision diagram and Markov-chain solution methods as appropriate. We provide an example of a reliability analysis of a PMS with both static and dynamic phases as well as CCF as an illustration of our proposed approach. The example is based on information extracted from a Mars orbiter project. The reliability model for this orbiter considers the various phases of Launch, Cruise, Mars Orbit Insertion, and Orbit. Some of the CCF for the orbiter in this mission include environmental effects, such as micrometeoroids, human operator errors, and software errors.

reliability analysis↗

New Mission Old Spacecraft: EPOXI's Approach to the Comet Hartley-2

NASA's Deep Impact mission ended successfully in 2005 after an impact and close flyby of the comet 9P/Tempel-1. The Flyby spacecraft was placed in hibernation and was left to orbit the sun. In 2007, engineers at the Jet Propulsion Laboratory brought the spacecraft out of hibernation and successfully performed two additional missions. These missions were EPOCh, Extra-solar Planetary Observation and Characterization, a photometric investigation of transiting exo-planets, and DIXI, Deep Impact eXtended Investigation, which maneuvered the Flyby spacecraft towards a close encounter with the comet 103P/Hartley- 2 on 4 November 2010. The names of these two scientific investigations combine to form the overarching mission's name, EPOXI. The encounter with 103P/Hartley-2 was vastly different from the prime mission's encounter with 9P/Tempel-1. The geometry of encounter was nearly 180 ? different and 103P/Hartley-2 was approximately one-quarter the size of 9P/Tempel-1. Mission operations for the comet flyby were broken into three phases: a) Approach, b) Encounter, and c) Departure. This paper will focus on the approach phase of the comet encounter. It will discuss the strategies used to decrease both cost and risk while maximizing science return and some of the challenges experienced during operations.

science return↗

Modeling and Simulation for Multi-Missions Space Exploration Vehicle

Asteroids and Near-Earth Objects [NEOs] are of great interest for future space missions. The Multi-Mission Space Exploration Vehicle [MMSEV] is being considered for future Near Earth Object missions and requires detailed planning and study of its Guidance, Navigation, and Control [GNC]. A possible mission of the MMSEV to a NEO would be to navigate the spacecraft to a stationary orbit with respect to the rotating asteroid and proceed to anchor into the surface of the asteroid with robotic arms. The Dynamics and Real-Time Simulation [DARTS] laboratory develops reusable models and simulations for the design and analysis of missions. In this paper, the development of guidance and anchoring models are presented together with their role in achieving mission objectives and relationships to other parts of the simulation. One important aspect of guidance is in developing methods to represent the evolution of kinematic frames related to the tasks to be achieved by the spacecraft and its robot arms. In this paper, we compare various types of mathematical interpolation methods for position and quaternion frames. Subsequent work will be on analyzing the spacecraft guidance system with different movements of the arms. With the analyzed data, the guidance system can be adjusted to minimize the errors in performing precision maneuvers.

Multi-Mission Space Exploration Vehicle [MMSEV]↗

AVIATR - Aerial Vehicle for In-situ and Airborne Titan Reconnaissance A Titan Airplane Mission Concept

We describe a mission concept for a stand-alone Titan airplane mission: Aerial Vehicle for In-situ and Airborne Titan Reconnaissance (AVIATR). With independent delivery and direct-to-Earth communications, AVIATR could contribute to Titan science either alone or as part of a sustained Titan Exploration Program. As a focused mission, AVIATR as we have envisioned it would concentrate on the science that an airplane can do best: exploration of Titan's global diversity. We focus on surface geology/hydrology and lower-atmospheric structure and dynamics. With a carefully chosen set of seven instruments-2 near-IR cameras, 1 near-IR spectrometer, a RADAR altimeter, an atmospheric structure suite, a haze sensor, and a raindrop detector-AVIATR could accomplish a significant subset of the scientific objectives of the aerial element of flagship studies. The AVIATR spacecraft stack is composed of a Space Vehicle (SV) for cruise, an Entry Vehicle (EV) for entry and descent, and the Air Vehicle (AV) to fly in Titan's atmosphere. Using an Earth-Jupiter gravity assist trajectory delivers the spacecraft to Titan in 7.5 years, after which the AVIATR AV would operate for a 1-Earth-year nominal mission. We propose a novel 'gravity battery' climb-then-glide strategy to store energy for optimal use during telecommunications sessions. We would optimize our science by using the flexibility of the airplane platform, generating context data and stereo pairs by flying and banking the AV instead of using gimbaled cameras. AVIATR would climb up to 14 km altitude and descend down to 3.5 km altitude once per Earth day, allowing for repeated atmospheric structure and wind measurements all over the globe. An initial Team-X run at JPL priced the AVIATR mission at FY10 $715M based on the rules stipulated in the recent Discovery announcement of opportunity. Hence we find that a standalone Titan airplane mission can achieve important science building on Cassini's discoveries and can likely do so within a New Frontiers budget.

UAV↗

The OSIRIS-Rex Asteroid Sample Return: Mission Operations Design

The OSIRIS-REx mission employs a methodical, phased approach to ensure success in meeting the missions science requirements. OSIRIS-REx launches in September 2016, with a backup launch period occurring one year later. Sampling occurs in 2019. The departure burn from Bennu occurs in March 2021. On September 24, 2023, the SRC lands at the Utah Test and Training Range (UTTR). Stardust heritage procedures are followed to transport the SRC to Johnson Space Center, where the samples are removed and delivered to the OSIRIS-REx curation facility. After a six-month preliminary examination period the mission will produce a catalog of the returned sample, allowing the worldwide community to request samples for detailed analysis.Traveling and returning a sample from an Asteroid that has not been explored before requires unique operations consideration. The Design Reference Mission (DRM) ties together space craft, instrument and operations scenarios. The project implemented lessons learned from other small body missions: APLNEAR, JPLDAWN and ESARosetta. The key lesson learned was expected the unexpected and implement planning tools early in the lifecycle. In preparation to PDR, the project changed the asteroid arrival date, to arrive one year earlier and provided additional time margin. STK is used for Mission Design and STKScheduler for instrument coverage analysis.

The ISIS Mission Concept: An Impactor for Surface and Interior Science

The Impactor for Surface and Interior Science (ISIS) mission concept is a kinetic asteroid impactor mission to the target of NASA's OSIRIS-REx (Origins-Spectral Interpretation-Resource Identification-Security-Regolith Explorer) asteroid sample return mission. The ISIS mission concept calls for the ISIS spacecraft, an independent and autonomous smart impactor, to guide itself to a hyper-velocity impact with 1999 RQ36 while the OSIRIS-REx spacecraft observes the collision. Later the OSIRIS-REx spacecraft descends to reconnoiter the impact site and measure the momentum imparted to the asteroid through the impact before departing on its journey back to Earth. In this paper we discuss the planetary science, human exploration and impact mitigation drivers for mission, and we describe the current mission concept and flight system design.

cratering experiment↗

The Earth Observing System (EOS) Ground System: Leveraging an Existing Operational Ground System Infrastructure to Support New Missions

The Earth Observer System (EOS) was officially established in 1990 and went operational in December 1999 with the launch of its flagship spacecraft Terra. Aqua followed in 2002 and Aura in 2004. All three spacecraft are still operational and producing valuable scientific data. While all are beyond their original design lifetime, they are expected to remain viable well into the 2020s. The EOS Ground System is a multi-mission system based at NASA Goddard Space Flight Center that supports science and spacecraft operations for these three missions. Over its operational lifetime to date, the EOS Ground System has evolved as needed to accommodate mission requirements. With an eye towards the future, several updates are currently being deployed. Subsystem interconnects are being upgraded to reduce data latency and improve system performance. End-of-life hardware and operating systems are being replaced to mitigate security concerns and eliminate vendor support gaps. Subsystem hardware is being consolidated through the migration to Virtual Machine based platforms. While mission operations autonomy was not a design goal of the original system concept, there is an active effort to apply state-of-the-art products from the Goddard Mission Services Evolution Center (GMSEC) to facilitate automation where possible within the existing heritage architecture. This presentation will provide background information on the EOS ground system architecture and evolution, discuss latest improvements, and conclude with the results of a recent effort that investigated how the current system could accommodate a proposed new earth science mission.

Earth Science Mission Operations (ESMO)↗

Towards the Development of a Global, Satellite-based, Terrestrial Snow Mission Planning Tool

A global, satellite-based, terrestrial snow mission planning tool is proposed to help inform experimental mission design with relevance to snow depth and snow water equivalent (SWE). The idea leverages the capabilities of NASAs Land Information System (LIS) and the Tradespace Analysis Tool for Constellations (TAT C) to harness the information content of Earth science mission data across a suite of hypothetical sensor designs, orbital configurations, data assimilation algorithms, and optimization and uncertainty techniques, including cost estimates and risk assessments of each hypothetical orbital configuration.One objective the proposed observing system simulation experiment (OSSE) is to assess the complementary or perhaps contradictory information content derived from the simultaneous collection of passive microwave (radiometer), active microwave (radar), and LIDAR observations from space-based platforms. The integrated system will enable a true end-to-end OSSE that can help quantify the value of observations based on their utility towards both scientific research and applications as well as to better guide future mission design. Science and mission planning questions addressed as part of this concept include:1. What observational records are needed (in space and time) to maximize terrestrial snow experimental utility?2. How might observations be coordinated (in space and time) to maximize utility? 3. What is the additional utility associated with an additional observation?4. How can future mission costs being minimized while ensuring Science requirements are fulfilled?

Mission Design↗

Towards the Development of a Global, Satellite-Based, Terrestrial Snow Mission Planning Tool

A global, satellite-based, terrestrial snow mission planning tool is proposed to help inform experimental mission design with relevance to snow depth and snow water equivalent (SWE). The idea leverages the capabilities of NASA's Land Information System (LIS) and the Tradespace Analysis Tool for Constellations (TAT-C) to harness the information content of Earth science mission data across a suite of hypothetical sensor designs, orbital configurations, data assimilation algorithms, and optimization and uncertainty techniques, including cost estimates and risk assessments of each hypothetical permutation. One objective of the proposed observing system simulation experiment (OSSE) is to assess the complementary or perhaps contradictory information content derived from the simultaneous collection of passive microwave (radiometer), active microwave (radar), and LIDAR observations from space-based platforms. The integrated system will enable a true end-to-end OSSE that can help quantify the value of observations based on their utility towards both scientific research and applications as well as to better guide future mission design. Science and mission planning questions addressed as part of this concept include: What observational records are needed (in space and time) to maximize terrestrial snow experimental utility? How might observations be coordinated (in space and time) to maximize this utility? What is the additional utility associated with an additional observation? How can future mission costs be minimized while ensuring Science requirements are fulfilled?

Mission Desig↗

Science Objectives and Rationale for the Radiation Belt Storm Probes Mission

The NASA Radiation Belt Storm Probes (RBSP) mission addresses how populations of high energy charged particles are created, vary, and evolve in space environments, and specifically within Earths magnetically trapped radiation belts. RBSP, with a nominal launch date of August 2012, comprises two spacecraft making in situ measurements for at least 2 years in nearly the same highly elliptical, low inclination orbits (1.1 x 5.8 RE, 10 deg.).The orbits are slightly different so that 1 spacecraft laps the other spacecraft about every 2.5 months, allowing separation of spatial from temporal effects over spatial scales ranging from 0.1 to 5 RE. The uniquely comprehensive suite of instruments, identical on the two spacecraft, measures all of the particle (electrons, ions, ion composition), fields (E and B),and wave distributions (dE and dB) that are needed to resolve the most critical science questions. Here we summarize the high level science objectives for the RBSP mission, provide historical background on studies of Earth and planetary radiation belts, present examples of the most compelling scientific mysteries of the radiation belts, present the mission design of the RBSP mission that targets these mysteries and objectives, present the observation and measurement requirements for the mission, and introduce the instrumentation that will deliver these measurements. This paper references and is followed by a number of companion papers that describe the details of the RBSP mission, spacecraft, and instruments.

magnetosphere↗

MMS Extended Mission Design: Evaluation of a Lunar Gravity Assist Option

This paper will describe a study that was carried out on the design of a set of maneuvers that were considered for the later stages of an extended mission of the Magnetospheric Multiscale (MMS) mission. The goal of these maneuvers was to put MMS into a significantly different orbit from those flown heretofore, so allowing science collection in a different region of the magnetosphere. This study was made feasible by the fact that the rate at which fuel is being consumed to maintain small formations on the MMS high-apogee orbit is less than expected pre-flight: the current consumption rate is only about 2 kg/yr/spacecraft. In addition, the spacecraft finished the prime mission with a significant amount of fuel remaining: this was about 1-sigma above the mean when compared with pre-launch Monte Carlo simulations. The resulting situation is similar to that of a libration orbit mission, where station-keeping requires so little fuel that any margin at all will lead to an extensive mission lifetime. In the case of MMS, the spacecraft could, if desired, perform formation flying in the current orbit for several decades. Alternatively, the spacecraft could use a significant fraction of the remaining fuel to perform major orbit modifications, while still leaving enough to conduct formation flying for on the order of a decade. The extended mission maneuvers studied here are further apogee-raises, with the goal of setting up one or more lunar gravity assists. Geometry dictates that a lunar encounter is only achievable when the MMS apogee vector lies approximately in the lunar orbit plane: this limits the possible dates to mid-2021 or early 2027.

Design↗

Landsat 9 Micrometeoroid and Orbital Debris (MMOD) Mission Success Approach

Landsat 9* (L9) is the successor mission to Landsat 8 (L8) previously known as Landsat Data Continuity Mission (LDCM). Both missions are large unmanned remote sensing satellites operating in sunsynchronous polar orbits. As opposed to L8/LDCM, systems engineers for L9 incorporated Micrometeoroid/Orbital Debris (MMOD) protection for small object collisions as part of the L9’s mission success criteria. In other words, the NASA Process for Limiting Orbital Debris (NASA-STD-8719.14A) only calls for analyses of the protection of disposal-critical hardware, but L9 opted to also assess and provide small particle penetration protections for all observatory components including instruments that are not part of the spacecraft components needed for controlled reentry. Systems engineers at Goddard developed a design process to protect against MMOD during the life of Low Earth Orbit (LEO) observatories, and in particular the Landsat 9 Mission. Simply stated, this design process enhanced the effectiveness of existing Multi-Layer Insulation (MLI) to provide the needed protection. The end goal of the design process was to establish a necessary blanket areal density for a given electronics box or instrument wall thickness and a separation between the outer MLI blanket and the structure underneath. The trade space was presented as a set of design curves for different combinations of blanket density, box wall thickness, and separation distance between MLI and structure. An advantage of this process was that it is largely independent of MMOD flux data on a surface-by surface basis. Ultimately, cost savings should result from incorporating small object penetration protection early in the design cycle, rather than adding spot shielding blankets later as needed to meet an overall penetration risk standard (the more traditional approach). The approach and implementation to the L9 Observatory design will be addressed in this paper. *L9 is a joint mission being formulated, implemented, and operated by the National Aeronautics and Space Administration (NASA) and the Department of the Interior’s (DOI) United States Geological Survey (USGS).

Approach↗