Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FEASIBILITY STUDIES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,171 records · Page 65

Session 3: Agrivoltaics Pathways [Slides]

This presentation was developed for a webinar series for the USAID's South Asia Group for Energy (SAGE) and South Asia Regional Energy Partnership (SAREP). The presentation includes insights into agrivoltaic site assessment planning, including what is needed for a farm assessment, solar panel system design from the agricultural perspective, variables that go into crop selection, and environmental impact, sustainability, and agritourism, technical parameters for developing an agrivoltaics project, including what makes up a PV feasibility study, understanding variables that go into technology and equipment selection, agrivoltaic installation and agricultural integration, and monitoring and maintenance throughout the life of the project, and agrivoltaic financial planning, risk mitigation, and debt equity issues.

14 SOLAR ENERGY↗

Maximizing RHIC Deliverable Luminosity with Dynamic Telescopic Beta* Squeeze

To benefit fully from the exceptional performance of the Relativistic Heavy Ions Collider (RHIC) Stochastic Cooling system during heavy ions physics store, the betatron amplitude β ∗ at a given col lision point (IP) can be squeezed from its design value by using the available space in the quadrupole triplets from smaller beam emittances. This should allow reaching new heights in deliverable lumi nosity for both STAR and PHENIX experiments. Prior to 2014, RHIC lattice designs only squeezed the interaction regions (IR’s) down to β ∗ = 0.70 m. To get past this limitation, one can use a telescopic scheme where the non-experimental insertions surrounding STAR and PHENIX are used to generate and close a β-beat wave contributing to the final squeeze in the two IP’s of interest. The following presents the various steps of the implementation in RHIC of this telescopic scheme and the corresponding changes in collision rates and specific luminosity. A full feasibility study with a review of hardware and beam dynamics limitations is also included.

43 PARTICLE ACCELERATORS↗

An AI-Enabled Chat Bot for DuraMAT

The DuraMAT Data Hub has evolved to meet the ever expanding research demands by integrating a chatbot interface that enhances FAIR compliance and simplifies discovery across our growing archive of projects and datasets. With the Data Hubs increasing use by both consortium researchers and the international community, traditional navigation methods have become unwieldy. Building on last year's feasibility study, we now report the successful implementation of the chatbot system, detailing its architecture and demonstrating its ability to deliver a more intuitive and rewarding user experience.

14 SOLAR ENERGY↗

Assessment of Self-interrogation Safeguards Signatures for Pebble Bed Reactor Fuel

New reactor designs, such as pebble-bed reactors, present challenges for the safeguarding of fissile material. Due to the multi-pass fuel circulation design and the non-uniform path a pebble may traverse through a pebble-bed reactor, there will be variations in the irradiation history of spent fuel pebbles. The standard approach of estimating actinide quantities based on fission gamma spectra or neutron emission paired with depletion modeling may yield uncertainties too large for safeguards and material accountancy. This project investigated, through modeling and experimentation, the potential of neutron self-interrogation of spent fuel pebbles as an innovative method to implement materials accountability. As an example, our feasibility studies indicate that the mass of U-235, U-238, Pu-239 and Pu-241 can be predicted to 4.1, 0.86, 13 and 13 % accuracy, respectively, when measuring 100 closely packed end-of-life spent fuel pebbles over approximately 12 days using a 4π counting geometry.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Using Controlled-Source Electromagnetic (CSEM) for CO 2 Storage Monitoring in the North Dakota CarbonSAFE Project

Conference presentation for International Meeting for Applied Geophysics & Energy (IMAGE), September 26 – October 1, 2021, Denver, CO. Geophysical methods are key for characterizing the geologic formations to store CO 2 and monitor the injected CO 2 over time to ensure containment. In the integrated multimeasurement geophysical approach considered for this project, it is expected that the controlled-source electromagnetic (CSEM) method is a strong contributor to mapping the CO 2 movement. A feasibility study of the CSEM method, including 1D and 3D modeling and a field noise test, was conducted to determine its effectiveness in monitoring CO 2 in the Broom Creek and Deadwood Formations. The study results demonstrate that the CSEM method can be used for CO 2 storage monitoring in the study area.

20 FOSSIL-FUELED POWER PLANTS↗

Solving the Pulsed-Power Driven Inertial Fusion Energy Standoff Problem (Abbreviated Final Report)

The standoff problem in pulsed-power driven IFE (Inertial Fusion Energy) refers to the problem of electrically connecting a fusion target with the driver in a way that preserves the driver/target interface in the presence of a large fusion energy release (100’s of megajoules to 1000 megajoules). High yield fusion drivers for stockpile stewardship applications have similar concerns, but without the complication of the high repetition rate needed for energy production. All proposed IFE or high yield systems have the challenge of protecting the reactor vessel and driver from the energy release, but pulsed power drivers have the additional challenge of establishing an electrical connection in a way that does not create excessive debris or require costly/massive structures that must be expendable. Fortunately, there are conceptual solutions in the form of very low mass transmission lines, usually in the form of wires or foils, since very little mass is needed to overcome the magnetic forces driving the transmission lines apart or provide a low resistance pathway given the short pulse duration of the driver. Several important aspects of the standoff problem were analyzed in the course of this LDRD project. Conceptual means of introducing the low mass transmission lines into the reactor chamber were proposed, including analysis of methods to retain the power flow gap between the electrodes in the presence of the chamber environment. The energy losses due to ohmic dissipation and magnetic acceleration of the low mass transmission lines were evaluated for candidate driver pulses and different transmission line masses, and the fluence of x-ray and neutron energy on the persistent power flow structures that must survive the pulse of energy were evaluated. Finally, means of rapidly pumping down the chamber were explored as a way to return the system to low pressure following the multi-atmosphere post-pulse pressure rise. The overall conclusion from the analysis is that, while the reactor environment creates stressful conditions for a low mass transmission line standoff system, there are concepts expending 10 kg or less of electrode mass each pulse with the potential to mitigate the stresses and successfully drive fusion targets. Whether such a system could lead to a practical and economical fusion reactor would require extensive research and development beyond the scope of the feasibility study.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Electrical Validation Testing for ORPC MHK Generator, Modification 6: ORPC SBV for MHK Generator System (CRADA Final Report)

For the U.S. Department of Energy’s (DOE) 2016 Small Business Voucher for Marine and Hydrokinetic (MHK) System, Second Round 2016, ORPC intends to work with the National Renewable Energy Laboratory (NREL) to perform dynamometer testing of the MHK generator systems and its associated controls and inverters. ORPC will provide the generator, variable frequency drives (VFD), controls, and inverter for this testing. NREL will utilize the NREL Energy Systems Integration Facility (ESIF) and dynamometer facilities at the National Wind Technology Center (NWTC) for this work. Modification 6: Additionally, NREL will conduct a feasibility study for implementing passive DC rectification at the turbine.

17 WIND ENERGY↗

Florida Regional DAC Hub

This project supported the U.S. Department of Energy's (DOE) mission to reduce the environmental and climate impacts of fossil fuels and industrial processes, contributing to the goal of achieving net-zero emissions across the U.S. economy. The primary objective is to conduct a feasibility study for a Regional Direct Air Capture (DAC) Hub in Bay County, Florida. This hub takes advantage of the region’s deep, permeable saline aquifers (Tuscaloosa Group, 1,500–2,150 meters deep), which have been the focus of numerous geological storage studies.

42 ENGINEERING↗

Development of Advanced Solid Sorbents for Direct Air Capture (Final Technical Report – Unlimited)

RTI Team, proposes an approach for demonstrating carbon-neutral methanol (MeOH) produced from carbon dioxide (CO 2 ) removed from air by direct air capture (DAC) and green hydrogen (H 2 ) from water (H 2 O) electrolysis using renewable electricity. The proposed project will include completing a feasibility study that informs a conceptual design of an integrated process that meets technical and economic targets set forth.

10 SYNTHETIC FUELS↗

Quantifying the Operational Impacts of Cyber Events on Enterprise Network Environments

The "Quantifying the Operational Impacts of Cyber Events on Enterprise Network Environments" Feasibility Study addressed the question: Can an existing (novel) class of network characterization and change detection algorithms previously developed at LLNL for internal enterprise datasets, be effectively applied to assess and measure the analytic value of features derived from datasets composed of passively collected RF and wireless network data?

97 MATHEMATICS AND COMPUTING↗

3 He Separation from US Liquid Natural Gas-Derived 4 He (Final Report)

This final report summarizes the technical and economic feasibility study conducted by Interlune, Lisbon Group, and Pacific Northwest National Laboratory on separating 3 He from 4 He derived from liquid natural gas (LNG) using magnetocaloric liquefaction (MCL), superleak heat-flush, and fractional distillation techniques. The project aims to address the growing shortage of 3 He, a critical resource for quantum computing and national security, by exploring a new domestic source, the bulk helium supply.

07 ISOTOPE AND RADIATION SOURCES↗

Feasibility of Observing Gamma-Ray Polarization from Cygnus X-1 Using a CubeSat

Instruments flown on CubeSats are small. Meaningful applications of CubeSats in astronomical observations rely on the choice of a particular subject that is feasible for CubeSats. Here we report the result of a feasibility study for observing gamma-ray polarization from Cygnus X-1 using a small Compton polarimeter on board a 3U CubeSat. Silicon detectors and cerium bromide scintillators were employed in the instrument models that we discuss in this study. Through Monte Carlo simulations with a Geant4-based MEGAlib package, we found that, with a 10 Ms on-axis, zenith-direction observation in a low-inclination, low-altitude, Earth-orbit radiation background environment, the minimum detectable polarization degree can be down to about 10% in 160–250 keV, 20% in 250–400 keV, and 65% in 400–2000 keV. A 3U CubeSat dedicated to observing Cygnus X-1 can therefore yield useful information on the polarization state of gamma-ray emissions from the brightest persistent X-ray black hole binary in the sky.

79 ASTRONOMY AND ASTROPHYSICS↗

Guideline for Characterizing and Evaluating a Candidate Project Site for Solar Thermal Applications

This document presents a structured procedure for characterizing and evaluating candidate project sites for concentrating solar power (CSP) and solar heat for industrial processes (SHIP) applications. The objective is to provide project developers, researchers, and other stakeholders with a consistent, technology-agnostic framework for early-stage site assessment, enabling informed decision-making prior to significant investment in project development. Site selection is a critical factor in project success or failure for both CSP and SHIP projects. Key factors such as solar resource availability, land characteristics, environmental and regulatory constraints, infrastructure availability, and community context are determined by the choice of project site and can materially impact project performance, cost, schedule, and overall viability. This procedure is designed to systematically evaluate these factors, identify potential fatal flaws, and prioritize the most favorable candidate sites for further development. The process begins with rapid screening-level evaluation, using publicly available data to assess solar resource, land availability and suitability, zoning and land-use compatibility, and exclusion zones such as protected lands or sensitive habitats. Sites that meet the minimum screening criteria advance to a more detailed characterization. Subsequent sections of this report provide guidance for a next-level assessment of the most important technical and environmental parameters, including: 1) Solar resource quality, variability, and uncertainty using multiyear datasets and, where appropriate, on-site measurement campaigns; 2) Meteorological conditions such as wind, temperature, extreme weather events, and soiling impacts; 3) Land characteristics including slope, shading, and geotechnical conditions; and 4) Environmental and regulatory considerations, including permitting processes, endangered species, cultural resources, and visual impacts. The procedure also addresses infrastructure and integration considerations, including: 1) Grid interconnection requirements for CSP power generation projects; 2) Electrical and operational integration for SHIP facilities; 3) Water availability, quality, and permitting constraints, which are particularly critical for CSP in arid regions; and 4) Site access, construction logistics, and availability of workforce and supporting services. Recognizing the importance of social and economic context, the procedure includes evaluation of community engagement factors, such as stakeholder sentiment, proximity to sensitive visual receptors, workforce development opportunities, and local economic incentives. The outputs of these assessments are synthesized in a cost and risk evaluation, translating site characteristics into expected impacts on capital cost, operating cost, schedule, and technical risk. This is complemented by screening-level performance modeling, including 8760 simulations and long-term projections, to quantify expected energy or thermal output, assess variability thereof, and support comparison between candidate sites. Finally, the procedure provides high-level guidance on a structured go/no-go decision framework, categorizing sites based on identified risks and constraints, and outlining a clear path forward to feasibility studies and front-end engineering design for viable projects. By standardizing the site characterization process across both CSP and SHIP applications, this guideline aims to: 1) Improve consistency and transparency in early-stage project evaluation; 2) Reduce development risk and avoid investment in nonviable project sites; 3) Support collaboration between developers, researchers, and public agencies; and 4) Accelerate successful deployment of concentrating solar technologies for both power generation and industrial process heat.

14 SOLAR ENERGY↗