Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Expedition”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,171 records · Page 65

Zero-Boil-Off Tank (ZBOT) Experiment: Ground-Based Validation of Self-Pressurization and Pressure Control Two-Phase CFD Model

Integral to all phases of NASA's projected space and planetary expeditions is affordable and reliable cryogenic fluid storage for use in propellant or life support systems. Cryogen vaporization due to heat leaks into the tank from its surroundings and support structure can cause self-pressurization relieved through venting. This has led to a desire to develop innovative pressure control designs based on mixing of the bulk tank fluid together with some form of active or passive cooling to allow storage of the cryogenic fluid with zero or reduced boil-off. The Zero-Boil-Off Tank (ZBOT) Experiments are a series of small scale tank pressurization and pressure control experiments aboard the International Space Station (ISS) that use a transparent volatile simulant fluid in a transparent sealed tank to delineate various fundamental fluid flow, heat and mass transport, and phase change phenomena that control storage tank pressurization and pressure control in microgravity. The hardware for ZBOT-1 flew to ISS on the OA-7 flight in April 2017 and operations are planned to begin in September 2017, encompassing more than 90 tests. This paper presents preliminary results from ZBOT's ground-based research delineating both pressurization and pressure reduction trends in the sealed test tank. Tank self-pressurization tests are conducted under three modes: VJ heating, strip heating and simultaneous VJ and strip heating in attempt to simulate heat leaks from the environment, the support structure and both. The jet mixing pressure control studies are performed either from an elevated uniform temperature condition or from thermally stratified conditions following a self-pressurization run. Jet flow rates are varied from 2-25 cm/s spanning a range of jet Re number in laminar, transitional, and turbulent regimes and a range of Weber numbers covering no ullage penetration, partial penetration and complete ullage penetration and break-up (only in microgravity). Numerical prediction of a two-phase CFD model are compared to experimental 1g results to both validate the model and also indicate the effect of the residual non-condensable gas on evolution of pressure and temperature distributions in the tank during pressurization and pressure control.

microgravity evaporation condensatio↗

Methodologies for Root Locus and Loop Shaping Control Design with Comparisons

This paper describes some basics for the root locus controls design method as well as for loop shaping, and establishes approaches to expedite the application of these two design methodologies to easily obtain control designs that meet requirements with superior performance. The two design approaches are compared for their ability to meet control design specifications and for ease of application using control design examples. These approaches are also compared with traditional Proportional Integral Derivative (PID) control in order to demonstrate the limitations of PID control. Robustness of these designs is covered as it pertains to these control methodologies and for the example problems.

Classical ControlFeedback ControlsRoot LocusLoop S↗

Use of Shuttle Heritage Hardware in Space Launch System (SLS) Application-Structural Assessment

NASA is moving forward with the development of the next generation system of human spaceflight to meet the Nation's goals of human space exploration. To meet these goals, NASA is aggressively pursuing the development of an integrated architecture and capabilities for safe crewed and cargo missions beyond low-Earth orbit. Two important tenets critical to the achievement of NASA's strategic objectives are Affordability and Safety. The Space Launch System (SLS) is a heavy-lift launch vehicle being designed/developed to meet these goals. The SLS Block 1 configuration (Figure 1) will be used for the first Exploration Mission (EM-1). It utilizes existing hardware from the Space Shuttle inventory, as much as possible, to save cost and expedite the schedule. SLS Block 1 Elements include the Core Stage, "Heritage" Boosters, Heritage Engines, and the Integrated Spacecraft and Payload Element (ISPE) consisting of the Launch Vehicle Stage Adapter (LVSA), the Multi-Purpose Crew Vehicle (MPCV) Stage Adapter (MSA), and an Interim Cryogenic Propulsion Stage (ICPS) for Earth orbit escape and beyond-Earth orbit in-space propulsive maneuvers. When heritage hardware is used in a new application, it requires a systematic evaluation of its qualification. In addition, there are previously-documented Lessons Learned (Table -1) in this area cautioning the need of a rigorous evaluation in any new application. This paper will exemplify the systematic qualification/assessment efforts made to qualify the application of Heritage Solid Rocket Booster (SRB) hardware in SLS. This paper describes the testing and structural assessment performed to ensure the application is acceptable for intended use without having any adverse impact to Safety. It will further address elements such as Loads, Material Properties and Manufacturing, Testing, Analysis, Failure Criterion and Factor of Safety (FS) considerations made to reach the conclusion and recommendation.

Aggarwal, Pravin↗

Primary Objective Grating Astronomical Telescope

It has been 370 years since a seventeenth century French mathematician, Mersenne, presciently sketched out an astronomical telescope based on dual parabolic reflectors. Since that time the concept of the primary objective has been virtually unchanged. Now a new class of astronomical telescope with a primary objective grating (POG) has been studied as an alternative. The POG competes with mirrors, in part, because diffraction gratings provide the very chromatic dispersion that mirrors defeat. The resulting telescope deals effectively with long-standing restrictions on multiple object spectroscopy (MOS). Other potential benefits include unprecedented apertures and collection areas. The new design also favors space deployment as a gossamer membrane. The inventor, Tom Ditto, first discovered that higher-order diffraction images contain hidden depth cues, for which he was granted a seminal range finding patent in 1987. Subsequently, he invented and patented 3D localizers, profilometers and microscopes using POGs. The POG telescope was placed in the public domain to expedite research. The function of a telescopes primary objective is to collect flux and to deliver images. Both functions dictate that size matters, and bigger is better. For that reason, there has been a steady push over the past century to ramp up the size of the primary mirror. However, for every doubling of mirror diameter, the elapsed time between initial effort and first light has also doubled. Meanwhile, costs escalated beyond the mirror alone, because larger instruments required larger enclosures and better pointing mechanisms. One key catalog of observation, spectrographic data, is far more difficult to amass than two-dimensional imagery. While the number of observable objects has increased with mirror size, the capacity to take spectra has not increased proportionately. In the best of circumstances, spectrograms are available for one per cent of the all objects surveyed. Spectroscopy was a historical afterthought introduced in the nineteenth century shortly after the invention of the diffraction grating and over a century after Newtons 1670 telescope. Spectroscopy is generally accomplished using a diffraction grating as the disperser in the secondary. The light being delivered to the spectrograph is first captured by a primary mirror which provides no chromatic magnification by itself. Sizeable spectrographs could not be deployed while diffraction gratings were rare commodities scribed using mechanical ruling engines that produced one grating line at a time. Today diffraction gratings are commonplace. Their recent availability is a product of both the invention of holography and the mass replication of surface microstructures. Holography permits all lines in a grating to be made simultaneously in a single photographic exposure. Holograms can then be reproduced by embossing processes. The improvement in replication is analogous to how Gutenberg changed the availability of books. The masters may be expensive, but the copies are not. Computer science is another technology that emerged in the second half of the twentieth century without which our proposed spectrographic instrument could not function due to the complexity of image processing required in data reduction. The employment of very large diffraction gratings as primary objectives for astronomical telescopes requires a novel

spectroscopy↗

Antarctic Martian Meteorites at Johnson Space Center

This past year marked the 40th anniversary of the first Martian meteorite found in Antarctica by the ANSMET Antarctic Search for Meteorites) program, ALH 77005. Since then, an additional 14 Martian meteorites have been found by the ANSMET program making for a total of 15 Martian meteorites in the U. S. Antarctic meteorite collection at Johnson Space Center (JSC). Of the 15 meteorites, some have been paired so the 15 meteorites actually represent a total of approximately 9 separate samples. The first Martian meteorite found by ANSMET was ALH 77005 (482.500 g), a lherzolitic shergottite. When collected, this meteorite was split as a part of the joint expedition with the National Institute of Polar Research (NIPR) Japan. Originally classified as an "achondrite-unique", it was re-classified as a Martian lherzolitic shergottite in 1982. This meteorite has been allocated to 137 scientists for research and there are 180.934 g remaining at JSC. Two years later, one of the most significant Martian meteorites of the collection at JSC was found at Elephant Moraine, EET 79001 (7942.000 g), a shergottite. This meteorite is the largest in the Martian collection at JSC and was the largest stony meteorite sample collected during the 1979 season. In addition to its size, this meteorite is of particular interest because it contains a linear contact separating two different igneous lithologies, basaltic and olivine-phyric. EET 79001 has glass inclusions that contain noble gas and nitrogen compositions that are proportionally identical to the Martian atmosphere, as measured by the Viking spacecraft. This discovery helped scientists to identify where the "SNC" meteorite suite had originated, and that we actually possessed Martian samples. This meteorite has been allocated to 205 scientists for research and 5,298.435 g of sample is available.

Funk, R. C.↗

GPM Mission's Best Practices: PERP

Similar to other missions, the Global Precipitation Measurement (GPM) Core Observatory's Command and Data Handling (C&DH) subsystem is critical for operations of the spacecraft. The onboard C&DH system comprises of two fully redundant boxes - a primary and a cold backup. Within each box, amongst other components, is a Single Board Computer (SBC) that hosts the flight software (FSW) system. In the event of an SBC reset, the Flight Operations Team (FOT) is poised with a lengthy task of restoring the SBC to nominal configuration. Due to the complexity of the C&DH system, this may take many days at a time to complete. The spacecraft's FSW applications are located in Electronically Erasable Programmable Read-Only Memory (EEPROM) and are copied into Random Access Memory (RAM) upon SBC initialization/reset. Each SBC has two banks of EEPROM, with each bank containing a copy of the FSW. Since launch, there have been many configuration changes to tables and applications that have been loaded into just RAM. Unfortunately, these changes are vulnerable to being wiped during a SBC initialization/reset, when the RAM is overwritten by the EEPROM. Although the EEPROM loads the default FSW configurations, the process to command non-default individual table and application changes is very cumbersome and time consuming. This consequentially increases the time until the spacecraft is back into nominal Mission Science Mode (MSM) drastically. The GPM Power-On Reset (POR) Expedited Recovery Process (PERP) Design introduces a method of consolidating commands into a single file load which the SBC can process independently of the ground - decreasing recovery time, the level of TDRS support reliance, and human error. This tested design can be implemented across many other missions that utilize a similar core Flight Executive (cFE) platform; hence providing an easy-to-follow, safe, and efficient process that can be applied across the board.

recovery↗

Advantages of a Modular Mars Surface Habitat Approach

Early crewed Mars mission concepts developed by the National Aeronautics and Space Administration (NASA) assumed a single, large habitat would house six crew members for a 500-day Mars surface stay. At the end of the first mission, all surface equipment-including the habitat-would be abandoned and the process would be repeated at a different Martian landing site. This work was documented in a series of NASA publications culminating with the Mars Design Reference Architecture 5.0. More recent work, dubbed the Evolvable Mars Campaign (EMC), explored whether re-using surface equipment at a single landing site could be more affordable than the Apollo-style explore-abandon-repeat mission cadence. Initial EMC assumptions preserved the single, monolithic habitat-the only difference being a new requirement to reuse the surface habitat for multiple expedition crews. A trade study comparing a single large habitat versus smaller, modular habitats leaned towards the monolithic approach as more mass-efficient. More recent work has focused on the operational aspects of building up Mars surface infrastructure over multiple missions, and has identified compelling advantages of a modular approach that should be considered before making a final decision. This paper explores Mars surface mission operational concepts and integrated system analysis, and presents an argument for the modular habitat approach.

Rucker, Michelle A.↗

Advantages of a Modular Mars Surface Habitat Approach

Early crewed Mars mission concepts developed by the National Aeronautics and Space Administration (NASA) assumed a single, large habitat would house six crew members for a 500-day Mars surface stay. At the end of the first mission, all surface equipment?including the habitat--would be abandoned and the process would be repeated at a different Martian landing site. This work was documented in a series of NASA publications culminating with the Mars Design Reference Mission 5.0 (NASA-SP-2009-566). The Evolvable Mars Campaign (EMC) explored whether re-using surface equipment at a single landing site could be more affordable than the Apollo-style explore-abandon-repeat mission cadence. Initial EMC assumptions preserved the single, monolithic habitat?the only difference being a new requirement to reuse the surface habitat for multiple expedition crews. A trade study comparing a single large habitat versus smaller, modular habitats leaned towards the monolithic approach as more mass-efficient. More recent work has focused on the operational aspects of building up Mars surface infrastructure over multiple missions, and has identified compelling advantages of the modular approach that should be considered before making a final decision. This paper explores Mars surface mission operational concepts and integrated system analysis, and presents an argument for the modular habitat approach.

Rucker, Michelle↗

NASA: 60 Years and Counting...

Sputnik launched on 4 Oct 1057. On July 29, 1958, Eisenhower signed the National Aeronautics and Space Act, the creation of NASA. The Soviets launched the first human into orbit, Yuri Gagarin, on April 12, 1961. On 5 May 1961, Alan Shepard's Freedom 7 Mercury capsule lifted off at 9:34 a.m. from Launch Complex 5 at Cape Canaveral Air Force Station, and flew a suborbital trajectory lasting 15 minutes and 22 seconds, America's first man in space. On 25 May 1961, Kennedy delivered a speech to a joint session of Congress. In that speech, he stated "I believe that this nation should commit itself to achieving the goal, before this decade is out, of landing a man on the moon and returning him safely to the earth." The rest, as they say, is history. Project Mercury, the first U.S. program to put humans in space, made 25 flights, six of which carried astronauts between 1961 and 1963. The Gemini program primarily tested equipment and mission procedures and trained astronauts and ground crews for future Apollo missions to the Moon. Exactly eight years, one month and 26 days after President Kennedy challenged Americans to reach for the Moon, Project Apollo landed the first humans on the lunar surface and returned them safely to Earth. In 1973, Skylab expeditions paved the way for the International Space Station. Over 30 years, NASA's space shuttle fleet, ”Columbia, Challenger, Discovery, Atlantis and Endeavour,” flew 135 missions and carried 355 different people to space. The space shuttle carried people into orbit repeatedly; launched, recovered and repaired satellites; conducted cutting-edge research; and built the largest structure in space, the International Space Station. Tragically, NASA lost two crews of seven in the 1986 Challenger accident and the 2003 Columbia accident. The International Space Station is a model for global cooperation and scientific advancements that is enabling growth of private industry in low-Earth orbit and development of new technologies to advance human space exploration. Built between 1998 and 2011, the space station has housed humans continuously since Nov. 2, 2000. NASA has contracted with commercial companies SpaceX, Orbital ATK, and Sierra Nevada Corporation to deliver science investigations, cargo, and supplies to the crews living in space, and soon Boeing and SpaceX will transport astronauts to and from the station. Today, NASA is working on many fronts to advance man's presence in space. NASA's Exploration Campaign will establish U.S. preeminence in cislunar space through the operations and the deployment of a U.S.-led Lunar Orbital Platform-Gateway (LOPG). Together with the Orion and SLS Programs, the LOPG is central to advancing and sustaining human space exploration goals, and is the unifying single stepping off point for human cislunar operations, lunar surface access and missions to Mars. As one might expect, EMC for all this activity is challenging, to say the least. In the next half-hour or so, I will talk about some of those challenges and how the different programs are meeting them.

Scully, Bob↗

Reversed Tantalum Capacitor Problem: A Failure to Fail, a Case Study

Reverse Ta capacitors are not expected to last for any length of time much less the over 74000 hours that they have been flying on Express (i.e. ExPRESS (Expedite the Processing of Experiments to the Space Station) Logistics Carrier (ELC) on the International Space Station. The report looks at the effects of moisture and temperature have on the capacitors. The removal of moisture has a far greater role in the survival of the capacitors than one would expect. Over 10000 hours of testing will be reviewed.

Shue, Jack↗

AMO EXPRESS: A Command and Control Experiment for Crew Autonomy Onboard the International Space Station

NASA is investigating a range of future human spaceflight missions, including both Mars-distance and Near Earth Object (NEO) targets. Of significant importance for these missions is the balance between crew autonomy and vehicle automation. As distance from Earth results in increasing communication delays, future crews need both the capability and authority to independently make decisions. However, small crews cannot take on all functions performed by ground today, and so vehicles must be more automated to reduce the crew workload for such missions.NASAs Advanced Exploration Systems Program funded Autonomous Mission Operations (AMO) project conducted an autonomous command and control experiment on-board the International Space Station that demonstrated single action intelligent procedures for crew command and control. The target problem was to enable crew initialization of a facility class rack with power and thermal interfaces, and involving core and payload command and telemetry processing, without support from ground controllers. This autonomous operations capability is enabling in scenarios such as initialization of a medical facility to respond to a crew medical emergency, and representative of other spacecraft autonomy challenges. The experiment was conducted using the Expedite the Processing of Experiments for Space Station (EXPRESS) rack 7, which was located in the Port 2 location within the U.S Laboratory onboard the International Space Station (ISS).

Autonomous Mission Operations↗

Mars 2020 Entry, Descent and Landing Instrumentation 2 (MEDLI2)

This paper introduces the Mars Entry Descent and Landing Instrumentation 2 (MEDLI2) concept for NASAs Mars 2020 mission. Mars 2020 is a flagship-class mission, scheduled for launch in 2020, with science and technology objectives to help answer questions about habitability of Mars as well as to demonstrate technologies for future human expedition. MEDLI2 is a suite of instruments embedded in the heatshield and backshell thermal protection systems (TPS) of the Mars 2020 entry vehicle. The objectives of MEDLI2 are to gather critical aerodynamics, aerothermodynamics and TPS (Thermal Protective System) performance data during the Entry Descent and Landing (EDL) phase of the mission.

Aerothermodynamics↗

Rapid Development of the Seeker Free-Flying Inspector Guidance, Navigation, and Control System

Seeker is an automated extravehicular free-flying inspector CubeSat designed and built in-house at the Johnson Space Center (JSC). As a Class 1E project funded by the International Space Station (ISS) Program, Seeker had a streamlined process to flight certification, but the vehicle had to be designed, developed, tested, and delivered within approximately one year after authority to pro-ceed (ATP) and within a $1.8 million budget. These constraints necessitated an expedited Guidance, Navigation, and Control (GNC) development schedule, development began with a navigation sensor trade study using Linear Covariance (LinCov) analysis and a rapid sensor downselection process, resulting in the use of commercial off-the-shelf (COTS) sensors which could be procured quickly and subjected to in-house environmental testing to qualify them for flight. A neural network was used to enable a COTS camera to provide bearing measurements for visual navigation. The GNC flight software (FSW) algorithms utilized lean development practices and leveraged the Core Flight Software (CFS) architecture to rapidly develop the GNC system, tune the system parameters, and verify performance in simulation. This pace was anchored by several Hardware-Software Integration (HSI) milestones, which forced the Seeker GNC team to develop the interfaces both between hardware and software and between the GNC domains early in the project and to enable a timely delivery.

Sullivan, Jacob↗

Rapid Development of the Seeker Free-Flying Inspector Guidance, Navigation, and Control System

Seeker is an automated extravehicular free-flying inspector CubeSat designed and built in-house at the Johnson Space Center (JSC). As a Class 1E project funded by the International Space Station (ISS) Program, Seeker had a stream-lined process to flight certification, but the vehicle had to be designed, developed, tested, and delivered within approximately one year after authority to proceed (ATP) and within a $1.8 million budget. These constraints necessitated an expedited Guidance, Navigation, and Control (GNC) development schedule. Development began with a navigation sensor trade study using Linear Covariance (LinCov) analysis and a rapid sensor down-selection process, resulting in the use of commercial off-the-shelf (COTS) sensors which could be procured quickly and subjected to in-house environmental testing to qualify them for flight. A neural network was used to enable a COTS camera to provide bearing measure-ments for visual navigation. The GNC flight software (FSW) algorithms utilized lean development practices and leveraged the Core Flight Software (CFS) architecture to rapidly develop the GNC system, tune the system parameters, and verify performance in simulation. This pace was anchored by several Hardware-Software Integration (HSI) milestones, which forced the Seeker GNC team to develop the interfaces both between hardware and software and between the GNC domains early in the project and to enable a timely delivery.

Sullivan, Jake↗

Sphene Emotional: How Titanite Was Shocked When the Dinosaurs Died

Accessory mineral geochronometers such as zircon, monazite, baddeleyite, and xenotime are increasingly being recognized for their ability to preserve diagnostic microstructural evidence of hypervelocity processes. However, little is known about the response of titanite to shock metamorphism, even though it is a widespread accessory phase and U-Pb geochronometer. Here we report two new mechanical twin modes in titanite within shocked granitoids from the Chicxulub impact structure, Mexico. Titanite grains in the newly acquired International Ocean Discovery Program Site expedition 364 M0077A core preserve multiple sets of polysynthetic twins, most commonly with composition planes (K1), = ~{1̅11}, and shear direction (η1) = <110>, and less commonly with the mode K1 = {130}, η1 = ~<522>. In some grains, {130} deformation bands have formed concurrently with shock twins, indicating dislocation glide with Burgers vector b = [341] can be active at shock conditions. Twinning of titanite in these modes, the presence of planar deformation features in shocked quartz, and lack of diagnostic shock microstructures in zircon in the same samples highlights the utility of titanite as a shock indicator for a shock pressure range between ~12 and ~17 GPa. Given the challenges of identifying ancient impact evidence on Earth and other bodies, microstructural analysis of titanite is here demonstrated to be a new avenue for recognizing impact deformation in materials where other impact evidence may be erased, altered, or did not manifest due to low shock pressure.

Timms, Nicholas E.↗

Changes in Exercise Data Management

The suite of exercise hardware aboard the International Space Station (ISS) generates an immense amount of data. The data collected, treadmill, cycle ergometer, and resistance strength training hardware, are basic exercise parameters (time, heart rate, speed, load, etc.). The raw data are processed in the laboratory and more detailed parameters are calculated from each exercise data file. Updates recently have been made to how these valuable data are stored, adding an additional level of security, increasing accessibility, and resulting in overall increased efficiency of medical report delivery. Questions regarding exercise performance or how exercise may influence other variables of crew health frequently arise within the crew health care community. Inquiries regarding the health of the exercise hardware often need quick analysis and response to ensure the exercise system is operable on a continuous basis. Consolidating all of the exercise system data in a single repository enables a quick response to both the medical and engineering communities. A SQL server database is currently in use, and provides a secure location for all of the exercise data starting at ISS Expedition 1 to current date. The database has been structured to update derived metrics automatically, making analysis and reporting available within minutes of dropping the in-flight data into the database. Commercial tools were evaluated to help aggregate and visualize data from the SQL database. The Tableau software provides manageable interface, which has improved the laboratory’s output time of crew reports by 67%. Expansion of the SQL database, to be inclusive of additional medical requirement metrics, addition of ‘app-like’ tools for mobile visualization, and collaborative use (e.g., operational support teams, research groups, and International Partners) of the data system, is currently being explored.

Buxton, R. E.↗

Microstructural Characterization of TiO2-II in the Chicxulub Peak Ring

The peak ring of the approximately 180 kilometer-diameter Chicxulub impact crater on the Yucatan Peninsula, Mexico, was recently drilled during IODP-ICDP (International Ocean Discovery Program-International Continental Scientific Drilling Program) Expedition 364, producing core M0077A. The new core provides insights into the anatomy, composition, tectonic deformation, shock metamorphism, and post-impact overprint of crater-filling impactites and crystalline basement rocks. The basement rocks were shocked to approximately 12.5-17.5 gigapascals, uplifted, and hydrothermally altered. This study presents a combined Raman spectroscopic and electron backscatter diffraction (EBSD) study of TiO2-II, a high-pressure polymorph of TiO2 with an alpha-PbO2 structure (orthorhombic; space group Pbcn; density 4.34 grams per cubic centimeter, in shocked granitoid rock of the Chicxulub peak ring.

Schmieder, Martin↗

The IOAG Recommendations on Spacecraft Emergency Cross Support

In 2014, the Inter-agency Operations Advisory Group (IOAG) chartered a multi-agency team effort to study how to best handle spacecraft emergency as part of cross support among network assets. The original intent is to put in place for the first time a process and guidelines to make emergency support as part of a permanent cross-support capability between space agencies. From the perspective of space communications service providers, a few key issues, common to all agencies, concerning the Spacecraft Emergency Cross Support (SECS) have been explored. They are: context of emergency support, provision of emergency support under a cross-support agreement, provision of emergency support with no cross-support agreement, legal and liability issues, response time, support priority, services provided, sustaining emergency support capabilities, and charge for the support. The positions of the various participating agencies with respect to these issues have been collected, analyzed, and finally harmonized to form the recommended IOAG positions. A central challenge most communications service providers are facing is that since the spacecraft emergency is an unplanned critical event, it typically requires fast response to the emergency call, hence lacking an international standard process for the operational interfaces seems to exacerbate the difficulty in providing SECS. For reducing the response time, i.e. from the time of accepting a request for SECS to the readiness for support, it is recommended that a “cross-support emergency system” be established by IOAG member agencies. Along with it, the IOAG core services, just-in-time ground communications line, cross support service management (CSSM), and standard operations procedures (SOP) for operational interfaces form the basic foundation of the “cross support emergency system”. Of the above, new to the cross support conducted thus far in the IOAG community is the concept of the SOP specifically for the interfaces between the service provider and service user during the SECS. Use cases, salient features, and definition of the key operational activities/tasks relevant to the interfaces are addressed by the effort. Underpinning such a system is the availability of the RF license granted by the local authority, at national and/or regional level, for a given ground station to communicate with and track the spacecraft in emergency mode at the uplink and downlink frequencies assigned to that spacecraft. That means it is critical for the IOAG member agencies to obtain a priori all-band licenses (for the entire X-band or S-band) for some, if not all, of their ground stations that are most capable of or likely to provide SECS. It is also recommended that certain prior arrangements be made with the relevant local licensing authorities for a process that will allow expedited authorization to transmit/receive signals to/from the declared spacecraft over the declared ground stations specifically and solely for the emergency case. Our analysis of the SECS has also uncovered a few fundamental programmatic issues. Recognizing any IOAG positions reached on these issues do not necessarily lead to any binding authority, it is recommended that they, along with those key attributes of the cross support emergency system, be explicitly stated as multi-agency guidelines to guide the implementation and provision of the SECS. The paper will present the results of the working group on Spacecraft Emergency Cross Support and, in particular, its findings, products and recommendations. It will also identify the next steps of this work that may include the production of some international standards as an extension of this work, or the process to make this emergency system usable by other spacecraft operators beyond the space agencies.

Tai, Wallace S.↗