The Port Hope Area Initiative's Port Granby Project: From Planning to Execution - 17451

The Port Hope Area Initiative's Port Granby Project involves the construction of a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and the excavation and relocation of some 450,000 m{sup 3} of LLRW and marginally contaminated soil from the former Port Granby Waste Management Facility (PGWMF) to the newly constructed LTWMF. Presented is an overview of the Port Granby Project and a description of the planning needed to execute the project successfully. A comprehensive suite of approximately 40 pre-construction submittals were developed and submitted for review and approval by Canadian Nuclear Laboratories (CNL), the project authority. Importantly, comprehensive training programs were developed and implemented to ensure all project staff fully understood the scope of the planning documents (covering such things as Quality Control, Environmental Monitoring, Radiation Protection, Dust Management, Noise, Radiation Protection etc.) and possess the appropriate competencies for completing the work to which they have been assigned. The effective planning that has been invested in the Port Granby project, from initial design to project planning and implementation, has allowed this complex project to proceed with minimal difficulty. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FUSRAP Maywood Site - Remediation of a Residential Property at 61 Trudy Drive, Lodi, NJ - 17533

The Formerly Utilized Sites Remedial Action Program (FUSRAP) is the U.S. government program started in 1974 to identify, investigate and clean up or control sites that became contaminated as a result of the nation's early atomic programs. The FUSRAP Maywood (New Jersey) Superfund Site (FMSS) consists of 92 designated property parcels known as vicinity properties. 61 Trudy Drive in Lodi, New Jersey is one such vicinity property. Construction planning for a recently-completed remedial excavation at 61 Trudy Drive was predicated on a fundamental question: to remediate the property with the existing home remaining in place or to demolish the exiting home. Answering this question involved detailed engineering and cost analyses, programmatic considerations, and stakeholder input. 61 Trudy Drive was originally addressed under FUSRAP in 1985 by the U.S. Department of Energy (DOE). However, subsequent remediation on an adjacent property by the U.S. Army Corps of Engineers (USACE) in 1998 suggested that residual contamination remained at depth at 61 Trudy. The property owner at that time declined to allow FUSRAP access to the property. However, a property transfer in 2012 presented USACE with an opportunity to address this property. Characterization of the property began in 2013; remedial activities were completed in 2015. The 61 Trudy Drive remediation required an intensive stakeholder communications program tailored for several audiences, including the affected property owner, local government officials and the neighboring community This paper will present the FUSRAP history at 61 Trudy Drive, to provide context for recent FUSRAP actions there. It will then focus on the challenges and complexities of performing environmental remediation in a suburban residential setting, focusing on both construction and communications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FUSRAP Maywood Site Remediation of Redstone Park, Lodi, NJ - 17534

The Formerly Utilized Sites Remedial Action Program (FUSRAP) is the U.S. government program started in 1974 to identify, investigate and clean up or control sites that became contaminated as a result of the nation's early atomic programs. FUSRAP was administered by the U.S. Department of Energy (DOE) until 1997, when it was transferred to the U.S. Army Corps of Engineers (USACE) by congressional action. Redstone Park is a 1.5-acre municipal park located in a residential neighborhood in Lodi, Bergen County, New Jersey, USA. The park is a designated vicinity property of the FUSRAP Maywood Superfund Site. This paper will summarize the FUSRAP history of the property spanning over 20 years and then focus on the construction and community relations challenges of recent FUSRAP actions at the site. All of Redstone Park except for a portion bordering a residential property was remediated under FUSRAP in 1996. This remaining portion was remediated in 1998. The 1996 remediation included some hand-digging of surface contamination around the roots of several large mature trees in the park. As part of this action, the DOE proposed alternate cleanup standards whereby subsurface contaminated soil would remain in place around the root balls of the trees and in deeper areas (greater than 1.2 meters [m]) under a large storm drain pipe (or culvert) that runs through the park. This proposal was made to preserve the natural value of the trees and to protect the drainage pipe from damage. After careful review which included an assessment of potential health hazards, the U.S. Environmental Protection Agency (EPA) approved this proposal. The Borough of Lodi also supported the proposal as a way to preserve the trees for the enjoyment of park users. In 2009, EPA conducted a mandatory Five-Year Review of the FUSRAP Maywood Site. The review identified data gaps which prevented a full assessment of remedy effectiveness at Redstone Park. The USACE reviewed all the historic soil data from the park [1] and developed a characterization plan to address those gaps. Field surveys and sampling confirmed that the material around the tree roots and under the pipe did not comply with the current FUSRAP Maywood Site unrestricted use soil cleanup criteria (an average of 5 pico Curies per gram of radium-226 and thorium-232 combined above background) as established in the site's Soils and Buildings Record of Decision [2]. As noted earlier, USACE also considered the widespread uprooting of trees in the region during Hurricane Sandy in 2012 in its re-evaluation of the earlier decision to leave the trees in the park in place. That re-evaluation concluded it was in the best interest of all stakeholders to remove the residual contamination in Redstone Park. USACE subsequently excavated the soil under and around the drainage pipe as Phase 1 of a two-phased approach to address this residual contamination. 1,116 cubic yards of soil were removed for safe offsite disposal during this action in June-July 2016. Phase 2 (removal of contaminated soil around the tree roots) began in September 2016 with expected completion by December 2016. The work was staged in two phases so as not to impact the park during the summer school vacation months when park use is heaviest. (authors)

54 ENVIRONMENTAL SCIENCES↗

A Retrospective Assessment of Correlation between Occupational and Public Radiation Protection Programs Performance Metrics at a FUSRAP Site - 17546

A retrospective assessment of the occupational and environmental radiation protection programs includes the consideration of performance metrics at the qualitative and quantitative level. When key radiation protection (RP) program metrics are tracked over the course of several years, correlations may present themselves. Strong correlations between variables may be considered when establishing or validating baseline RP Program elements (i.e., controls, monitoring regimes, and additional ALARA measures) for the safe excavation and handling of naturally occurring radioactive materials comingled in soil-like wastes at FUSRAP sites. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

Experience with decommissioning of the underground reservoirs of object No.41 at NPP A1 site -Bohunice, Slovakia - 15110

A new concept of measurement procedures for clearance of building have been developed and implemented at NPP A1 (Bohunice). They are based on measurements of total RN activity per unit of surface area at the erected building according to EU Recommendation RP-113 (pure Cs-137 limit - 10 Bq/cm{sup 2}). However, as a priority the requirements of national legislation had to be complied, which, in the case of concrete structures, limits the massic activity of the concrete bulk material to be rose from the building demolition (300 Bq/kg for pure Cs-137) and surface activity of (0,3 Bq/cm{sup 2} for pure Cs-137). Advantage of the new concept is that it avoids costly whole volume measurement of building rubble (e.g. 200 L drum monitor) and potentially decreases amount of produced radioactive waste. Whole volume measurement has been replaced by whole surface monitoring of surface contamination of the walls by portable devices in 1 x 1 m grid. The methodology was implemented on underground tanks as well, whose clearance is one of the primary goals of 2. stage of the NPP A1 decommissioning project. The measurements proved that contamination on the outer side is rarely present and it is caused by overflowing or leak of contaminated water from reservoir. The most expensive clearance activities were: soil excavation around the reservoir, dry decontamination of concrete, as well as whole volume measurement of crushed concrete ruble from the top of reservoir by drum monitor. A lot of obstacles had to be overcome because of lack of experience with methodology (procedures were implemented as a pilot project), measurement and sampling techniques. During the pilot project rose other difficulties which had to be overcome. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Considerations for improving the biosphere assessment methodology and the associated conceptual and mathematical models for application to LLW/ILW radioactive wastes in Spain - 15194

We give consideration to future needs in assessment studies relating to the disposal of very low level radioactive waste (VLLW), low level radioactive waste (LLW) and intermediate level radioactive waste (ILW) in Spain. As these wastes are primarily disposed at El Cabril, particular attention is given to the characteristics of that site. The focus is on post-closure performance assessment studies and specifically on the biosphere aspect of those studies. In particular, it gives consideration to the assessment methodology that should be used, taking into account the recommendations made in the international BIOMASS and BIOCLIM programs, as well as more recent developments. It then goes on to consider the conceptual models of the biosphere that should be developed and comments on how these should be transformed into mathematical models. The issues arising in conceptual and mathematical model development are illustrated by reference to El Cabril, but several of these issues would also be applicable to other engineered facilities excavated from the surface in a variety of geographical and geological contexts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Seismic design of a nuclear waste repository against an earthquake induced rock shear load - 15346

Concepts for isolation of spent nuclear fuel have been studied by organizations in countries that employ nuclear power. These concepts typically involve a deep geological repository in bedrock, with processed radioactive waste encased in deposition canisters emplaced in underground excavations and surrounded by clay-based buffer. This multi-barrier approach is intended to provide long-term isolation of the waste package from the biosphere. According to many statistics, there is a tendency toward increasing numbers of earthquakes in the Korean peninsula each year. If an earthquake induced rock shear load occurs at a repository site, the engineered barrier system (EBS) can be sheared, resulting in a pressure increased in the buffer material. This is expected to result in damage to the canisters. Therefore, because the damage, which can be fatal to a disposal canister, can be given in case an earthquake occurs, the method protecting the canisters safely is needed. In this paper, 'an earthquake-resistance type buffer' was proposed using a method for protection from earthquake damage. To aid in achieving this objective, we have developed a technique for estimating the behavior of the EBS affected by earthquake induced rock shear using an analysis method, such as finite element method. As a first step, experimental tests are performed for understanding the behavior of the buffer material. Comparing the results of the numerical simulations to the experimental results can be used to verity the reliability of the analysis model. Then we developed the real scale analysis model of a nuclear waste repository. The main parameter having an effect on the earthquake-resistant performance was analyzed and an earthquake-resistance proof type buffer was designed. To improve the earthquake-resistance performance, we designed the buffer by putting the low- density buffer between the canister and buffer. The simulation results show that the earthquake-resistant performance was improved by about 65%. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experience in remote-operated decommissioning with electromechanical equipment - 15354

For the Reprocessing Plant (WAK) in Karlsruhe, Germany, Waelischmiller developed remote handling technologies and robotics used for dismantling of several high-activity radioactive storage buildings. The key component in this project is the Waelischmiller system TELBOT{sup R}. The TELBOT{sup R} system has been successfully deployed in dozens of applications based on the customer's requirements and lessons learned. The objectives for this project were to deliver a reliable, high payload manipulator that is deployed on an excavator. The TELBOT{sup R} is a seven degree of freedom manipulator, with a 2.7 meter reach and a payload capacity of 100 kg at full reach. It is modular with selectable drives, arm lengths and joint modules. The motors and gears are located in a base behind the arm. Movements are effected by concentric tubes inside the arm links and concentric bevel gears inside the joints. Consequently, there is no wiring either inside or outside the arm and all axes can rotate freely. High-quality materials such as radiation-, acid- and corrosion-resistant materials and a final surface protective treatment are used in the manufacture of the TELBOT{sup R}. This paper will describe the TELBOT{sup R} system used by the German decommissioning program at Karlsruhe. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of disposal container designs for disposal of high level waste and legacy spent fuel in the UK - 15471

Radioactive Waste Management Limited (RWM), a fully owned subsidiary of the Nuclear Decommissioning Authority (NDA), is responsible for the implementation of geological disposal in the UK. Three illustrative concepts of a geological disposal facility (GDF), corresponding to three generic geological environments - higher strength rock, lower strength sedimentary rock and evaporite rock - have been developed to demonstrate the viability of geological disposal of intermediate level waste, high level waste and spent fuel. It is envisaged that HLW which has been encapsulated in Waste Vitrification Plant (WVP) canisters, advanced gas-cooled reactor (AGR) SF which has been stripped of their spacers and packaged into slotted fuel cans, and PWR SF will be packaged into disposal containers for disposal. A set of schematic designs of these disposal containers was developed in the late 2000's. The design concept for the higher strength rock environment was based on the joint Posiva/SKB disposal container design, and the design concept for the lower strength sedimentary rock and evaporate rock illustrative environments was based on the disposal container concept from Switzerland's National Cooperative for the Disposal of Radioactive Waste (Nagra). The size, mass and dimensions of the disposal containers in the scheme designs vary significantly. The construction method and the lid closing method also vary between the disposal containers for the different waste contents. A design study has indicated that optimization of the number of HLW WVP canisters and the number of AGR slotted fuel cans in the disposal containers, standardizing construction method and closure arrangement across the containers for each geology type, providing handling features at both ends of the disposal container, and balancing of shielding around the containers, could bring significant advantage to the overall GDF programme by reducing the number of disposal containers, reducing GDF footprint, and reducing the extent of excavations, spoil generated and materials that are required for construction. A project to develop the scheme designs to conceptual level was carried in 2011 to 2013. In this project, the above changes were taken into account, technical underpinning of the designs was carried out and manufacturing method was considered. Two disposal container variants for different host rock environments have been developed: - Variant 1, for compatibility with the higher strength rock illustrative disposal system design. This is constructed from copper, with a cast iron insert and is based on the joint Posiva/SKB disposal container design. - Variant 2, for compatibility with the lower strength sedimentary rock and evaporite rock illustrative disposal system designs. This is a steel container based on the NAGRA disposal container design. Each variant has three internal configurations to accommodate 3 HLW vitrified canisters, 16 consolidated cans of AGR SF and 4 PWR spent fuel assemblies. These designs have been shown to bring significant benefit to the GDF designs, bringing a significant reduction to the operating programme and GDF programme cost, including reducing the number of disposal containers by 33% for HLW, 50% for AGR SF and reducing the size of the GDF footprint by 25%. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NDA Challenges during Cleanup of the Hanford 618-10 Burial Ground Trenches - 15542

The 618-10 Burial Ground on the Hanford Reservation was an early trench waste site used for the disposal of waste from the 300 Area at Hanford. Much of this waste consisted of residues from evaluations of failed fuel as well as various process and separations studies associated with the Department of Energy (DOE) mission which were performed in the 300 Area between March 1954 and September 1963. Much of this waste contained significant concentrations of fission products as well as Transuranic (TRU) radionuclides. Waste forms consist of drums and boxes which were disposed of in the trenches. Many of the drums are shielded containers, cemented sludge, or cemented debris. There are no identifying marks on the containers to correlate them to a specific waste stream. In addition there is some waste in the trenches which came from other locations outside of the 300 area. Cleanup of the 618-10 burial ground is covered under the Washington Closure Hanford (WCH) contract. Due to the proximity of the 618-10 site to the Columbia River, waste is being removed from the 618-10 site, stabilized, and disposed of into either the Environmental Restoration Disposal Facility (ERDF) if the containers are determined to be LLW or transferred to the Hanford Central Waste Complex (CWC) if the containers are suspected to be TRU waste. In order to determine the correct disposal path Non Destructive Assay (NDA) must be performed on all of the containers excavated from the trenches. The NDA of these containers is performed using germanium gamma spectroscopy with an In Situ Object Counting System (ISOCS) and with a neutron slab counter. Due to the challenges associated with these difficult waste streams, matrices, and lack of information to associate these containers with a particular process, the NDA program has had to develop a more robust process to ensure the correct disposition of the waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Brownfields to Brightfields: A Sustainability Initiative at DOE'S East Tennessee Technology Park Cleanup - 16120

As DOE works toward completing their cleanup mission at the East Tennessee Technology Park (ETTP), the ultimate goal is to return property no longer needed for government use to the community for beneficial re-use. The vision for ETTP is to transform the former gaseous diffusion facility into a commercial industrial park, leveraging the site's infrastructure to attract businesses to the site. While hundreds of acres at ETTP have been transferred for re-use, areas within the former production footprint of the site have future use restricted due to the presence of residual contamination, underground structures and utilities and/or physical features that limit their reuse potential. Brownfield redevelopment with solar energy generation has proven to be an excellent option for beneficial reuse and sustainability thanks to the flexible nature of solar photovoltaic technology and design that can address the restrictions and limitations of the site. Developing a solar project on a cleanup site can be challenging due to a large number of stakeholders and regulatory compliance issues of the environmental legacy at DOE cleanup sites; however, the challenges can be offset by the available infrastructure and low cost property. The requirement for large amounts of land or surface area is a major constraint to the growth of photovoltaic solar systems. An average solar generating facility requires 2 or more hectares (5 acres) for each megawatt (MW) of power generated. Re-using land that is otherwise un-developable provides a cost effective site for renewable energy generation to innovative solar developers. At ETTP, DOE's Oak Ridge Office of Environmental Management and the community reuse organization (Community Reuse Organization of East Tennessee - CROET) supported a local small business (Restoration Services, Inc. - RSI) familiar with the site and environmental regulations to secure a power purchase agreement with the regional electric provider (Tennessee Valley Authority - TVA) for a 1 MW utility-scale photovoltaic solar facility. The solar facility, Powerhouse Six, was developed through a commercial partnership (RSI and Vis Solis, Inc.) that worked closely with the lead ETTP site cleanup contractor (URS-CH2M Oak Ridge LLC - UCOR) and the local government. The selected site at ETTP had limitations on subsurface disturbance to 10 feet below ground surface because of utility ducts and residual contamination. Near surface relics (facility foundation remnants) were also found to prohibit ground penetration. A photovoltaic solar design using a ballasted ground mount system was developed to conform to the restrictions. The ballasted system could follow existing land contours, eliminating the need for any extensive site preparation and avoiding the risk of ground penetration. The lead cleanup contractor's role in facilitating the completion of this project included making the necessary environmental assessment documentation available to obtain the construction notice to proceed from the regional electric provider. They accelerated the transfer of ETTP power lines and electric demand to the city electric department to accommodate connection to the electric grid and supplied the communication connection required for metering the electric power generation. DOE's support along with their cleanup contractor's re-industrialization program and power integration group provided regular communication with the project stakeholders for more than six months to facilitate the early transfer of the utility infrastructure. Powerhouse Six sustainability benefits: - Generates enough clean energy to power more than 100 homes or prevents pollution equivalent to removing 240 cars from the road annually (1,141 metric tons of carbon dioxide); - Provides Brownfield reuse/redevelopment at ETTP; - Eliminates the generation of wastes through excavation and saves money to cleanup other areas for re-use; - Supports regional electric provider's renewable energy initiative; - Offers community economic development/ jobs and property tax income to the City of Oak Ridge; - Demonstrates benefit of ETTP re-industrialization; - Provides long-term lease payments to the community reuse organization; - Supports DOE renewable energy goals; - Demonstrates collaboration between DOE and a public utility for renewable energy development. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of Sr-90 Drums at the Hanford 618-10 Burial Ground - 16132

The 618-10 Burial Ground on the Hanford Reservation was an early trench waste site used for the disposal of waste from the 300 Area at Hanford. Much of this waste consisted of residues from evaluations of failed fuel as well as various process and separations studies associated with the Department of Energy (DOE) mission which were performed in the 300 Area between March 1954 and September 1963. Historical records indicated that there were also several drums which contained significant quantities of separated Sr-90. Cleanup of the 618-10 burial ground is covered under the Washington Closure Hanford (WCH) contract. Due to the proximity of the 618-10 site to the Columbia River, waste is being removed from the 618-10 site, stabilized, and disposed of into either the Environmental Restoration Disposal Facility (ERDF) if the containers are determined to be LLW or transferred to the Hanford Central Waste Complex (CWC) if the containers are suspected to be TRU waste. In order to determine the correct disposal path, Non Destructive Assay (NDA) must be performed on all of the containers excavated from the trenches. The NDA of these containers is performed using germanium gamma spectroscopy with an In Situ Object Counting System (ISOCS) and with a neutron slab counter. Occasional ISOCS spectra exhibited a characteristic Sr-90/Y-90 Bremsstrahlung continuum. In some cases there were measurable gammas present, however in other cases only the Bremsstrahlung continuum was present. Typically Sr-90 is correlated to Cs-137 as they are normally produced in approximately a 1:1 ratio during the fission process. For some of these drums there was no Cs-137 detectable and therefore no way to quantify the Sr-90. Due to concerns about providing a reasonable and conservative nuclide inventory it was decided to evaluate a technique to utilize data from the Bremsstrahlung continuum to quantify the Sr-90 activity in these drums. The development of the technique combined MCNP modeling and comparison of measured gammas to the continuum for a well-defined waste stream. The final result showed reasonable correlation to the expected scaling factors for many drums, while also providing a reasonable measured value for drums with significantly enhanced Sr-90 concentrations. Ultimately all drums were demonstrated to be within the ERDF waste acceptance criteria. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Management 2016 300-296 Soil Remediation Project. Developing Innovative Solutions to Overcome Design Challenges - 16229

The 324 Building is a non-reactor, Hazard Category 2, Nuclear Facility located in the 300 Area of the U.S. Department of Energy (DOE) Hanford Site, located near Richland, Washington. The building is undergoing deactivation, decommissioning, decontamination, and demolition by Washington Closure Hanford (WCH) under the River Corridor Closure Contract. During the Cold War Era, the facility was used for chemical and radionuclide processing associated with nuclear weapons production. Historical records indicate that in October 1986, approximately 516 L of a concentrated liquid waste stream containing cesium-137 and strontium-90 was spilled onto the floor of B-Cell. B-Cell is located in the Radiochemical Engineering Complex (REC) of the 324 Building. It is estimated that this spill contained approximately 1.3 million curies of radioactivity. Some fraction of the spill was recovered; however, an unknown quantity was released into the soil beneath the 324 Building through an undetected breach in the B-Cell floor sump. Unknown quantities of water were used after the spill to wash items contained in B-Cell. When B-Cell was taken out of service, wastes being removed from B-Cell were placed in Grout Containers (GCs) and stabilized using a particulate grout. In the course of grouting activities, grout was spilled on the floor of B-Cell, eventually filling the sump. The primary scope of this project is to design, test, and implement a process capable of removing and isolating contaminated soil below B-Cell. This remediation effort has been divided into two removal zones identified as the primary and secondary removal zones. Based on current assumptions and estimates, the primary phase of this cleanup effort will remove roughly 156.45 m{sup 3} of highly contaminated materials. B-Cell debris, particulate grout, and the floor slab and liner comprise about 21.24 m{sup 3} of the total. The remaining 135.21 m3 will be contaminated soil. All of this material must be disposed of within the existing 324 Facility or packaged for disposal at the Hanford site. The objective of this project is to remove the B-Cell floor and highly contaminated underlying soils from beneath B-Cell using remote equipment to reduce the radiation levels and allow open-air excavation for the remaining contaminated soil. The challenges and subsequent technological solutions encountered from the Conceptual Design phase to the 100% Design Issued For Fabrication/Issued For Construction (IFF/IFC) consisted in part of the following: Design an efficient remote cleanup strategy for highly contaminated Low Level Waste (LLW) given the unknowns. Maintain contamination control down to 18 feet below B-Cell in a highly radioactive environment (12,870 R/Hr Cs-137 and Sr-90). Perform facility upgrades to enable remediation process implementation while maintaining integrity of pre-existing facility structure and license. Designing first-of-a-kind remote equipment for use in high radiation areas. Developing first-of-a-kind operations sequences for remote equipment while minimizing usage of original facility equipment (i.e. cranes, manipulators, etc.). Conducting time-motion studies of operations sequences to maximize efficiency while keeping dose As Low As Reasonably Achievable (ALARA) in a high dose environment. Construction of a full scale mockup to conduct performance testing in a clean environment and train the work force to operate the equipment. Overcoming scope, budget and schedule constraints associated with a fast-track DOE project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Canada's Underground Research Laboratory (1980-2014) - 16274

In 1980, Canada initiated a long-term, comprehensive research and development program of geologic characterization and large-scale in situ geotechnical experiments in a subsurface facility, the Underground Research Laboratory (URL). The URL was excavated specifically to evaluate the concept of permanent disposal of used CANDU{sup R} nuclear reactor fuel in a deep geological repository (DGR) constructed in Canadian Shield granite. Key phases of the URL included siting, detailed site characterization and monitoring, construction, operation, decommissioning, and closure. Much collaborative research with international organizations was undertaken at the URL and continues, even after the closure of the facility, through the ongoing Enhanced Sealing Project (ESP). The ESP monitors the engineered performance of a full-scale composite shaft seal that was emplaced during URL closure to permanently seal the main URL access shaft across a sub-horizontal hydraulically active fracture zone. Currently the ESP is jointly funded by Canadian Nuclear Laboratories (CNL) (Canada), Posiva (Finland), and Andra (France), and monitoring is planned to continue until the end of 2016. Decades of programmatic experience at the URL have shown that knowledge continuity is integral to supporting the development of a safe geological disposal facility for high level nuclear waste. This paper outlines the history of the URL and describes some technical lessons learned from its 30-plus years of construction, operation, and closure activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigating the Depth of Penetration of Radionuclides in Concrete - 16292

This paper focuses on some chemical and structural aspects for mature concrete structural substrate that functions as a barrier to radioactive material migration. Exposure to radioactive material may be a consequence of surface contact, such as resulting from exposure by spills or leaks. In properly-prepared waste storage areas, undamaged paint and sealant helps to protect the structural cement. However, damaged surfaces, cracks, and relatively porous slab seams can offer a preferred migration pathway for spilled contaminates, including radionuclides. The cost of remediation of concrete structures is directly related to the amount of concrete that must be removed and subsequently disposed. A carefully implemented investigative plan can be utilized to determine how much concrete must be removed and the approximate level of volumetric radiological contamination can be used to estimate disposal costs. Normal concrete pore solution is saturated with calcium hydroxide and also contains sodium and potassium hydroxide; the pH is typically 13 to 14. Contaminants (such as uranium) that hydrolyze in alkaline media that form precipitant phases and tend to deposit at the near-surface. However, more soluble contaminants, such as Cs-137 (as Cs{sup +}) and Tc-99 (as the pertechnetate anion TcO{sub 4}{sup -}) diffuse more rapidly (and deeply) into the porous substrate. Profiling the migration of the water-soluble radionuclides into a cure (hardened) cement surface is a challenge, since water-cooled saws, borers and similar implements are often used to excise and/or slice the core. Alternately, dry mechanical fracturing for excavation of cement may introduce the possibility of material cross-contamination and uncertainty for the average sampling depth for the sample collection event, potentially yielding non-representative samples, and may preclude determination of crack formation that may have been present in the native (non-fractured) substrate. Structural concrete is comprised of cement and pozzolan paste, relatively impervious aggregate (typically stone and/or sand), and rebar (iron reinforcement). Near-surface aggregate may act as a hydrolytic barrier, causing contaminants leached into the pore water to by-pass the impervious grains, causing deeper-than expected penetration, especially if there are grain boundary cracks also present to facilitate migration. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sustainable Remediation of Radionuclides By a Common Sense Approach to Enhanced Attenuation - 16441

Development of in situ and relatively passive remedies for treatment of groundwater contaminated by metals and radionuclides is becoming more important because of the difficulty and cost - both to the environment and financially -- of removing these types of contaminants from the subsurface by pump-and-treat or excavation. In situ technologies rely on reactions that tend to remove contaminants from groundwater by partitioning them to solid phases in the aquifer. Monitored natural attenuation (MNA) relies solely on natural reactions to achieve remedial goals. Enhanced attenuation (EA) uses engineered approaches to supplement remediation when MNA is not sufficient to meet remedial goals. Both approaches leave contaminants in the subsurface and require a high burden of proof that contaminants will not be mobilized and become a risk in the future. Proof of the sustained effectiveness of an EA remedy is made much easier by strategic design. In multi-contaminant plumes, it is important to prioritize contaminants according to the risk they pose, with the recognition that one remedy rarely treats all contaminants. The goal for the engineered portion of the remedy should be maximum risk reduction with minimal engineering. Natural attenuation or negotiated alternate concentration levels will often allow low risk contaminants to go untreated. Whenever possible, the remedy should be consistent with the geochemical evolution of the waste site, insuring that the treated immobilized contaminants are likely to remain relatively immobile for long time frames. Finally, use what nature provides geologically, hydrologically, geochemically, or microbiologically in the remedy design. One of the impediments faced by waste site managers in implementing EA remedies is paralysis by perceived complexity. There are things that must be known to design an effective EA remedy, but there is always the temptation to know everything to eliminate the possibility of failure. Furthermore, there are plenty of people warning of failure if all is not known and they are usually willing to help the design team know all, for a price. Yet, the price of trying to eliminate all risk is never implementing an innovative remedy. All parties involved -- scientists/engineers, waste site managers, regulators and stakeholders must assume some degree of risk to deploy an EA remedy. If all parties are to assume some risk, then trust built through close communication from the start is required. The U.S. Department of Energy Office of Environmental Management has funded an applied field research initiative for several years focused, in part, on developing EA remedies for metals and radionuclides using these guiding principles. This approach to EA remedies grew out of developing and deploying a remediation strategy to replace a pump-and-treat system at the F-Area Seepage Basins on the Savannah River Site. The pump-and-treat system was energy intensive, produced several thousand cubic feet of solid radioactive waste per year, and cost $ 1 million per month to operate. The EA remedy that replaced the pump-and-treat is energy efficient, produces no waste, and costs approximately $1 million per year to maintain. At the F-Area Seepage Basins approximately 7 billion liters of low level radioactive waste solutions were disposed in three unlined basins resulting in contaminated groundwater containing various radionuclides and other contaminants. The primary contaminants of concern are tritium, strontium-90, uranium, and iodine-129. Other key features of the contaminant plume are its acidic nature with pH values as low as 3.2, its vertical stratification in the water table aquifer, and the tendency of the most contaminated portions to follow troughs in the top of the clay separating the upper aquifer zone from the lower aquifer zone. The geology was exploited by installing a funnel-and-gate system into the clay with the barrier portion blocking contaminant flow paths in the troughs in the clay. This forces the most contaminated water to flow through the gates where it encounters an in situ treatment zone created by periodic injections of alkaline solution. The flux of tritium has been reduced significantly by the barrier walls. Strontium-90 and uranium are treated by enhanced sorption in the circum-neutral pH treatment zone, consistent with natural geochemical evolution of the waste site from acidic to more neutral pH. An additional in situ treatment zone was created up-gradient of the one of the gates to treat iodine-129. Sub-micrometer diameter silver chloride particles were injected into the aquifer by direct push methods to create the treatment zone. In the laboratory and in a field pilot test the poorly soluble silver chloride particles reacted with iodide to form much less soluble silver iodide. Evaluation of the effectiveness of the silver chloride is ongoing. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Andra's Underground Research Laboratory as a Tool to Prepare Monitoring System of Cigeo Project - 18070

Andra, as French radioactive waste management agency, plans to build an underground disposal facility, named Cigeo, dedicated to high and intermediate level, long lived radioactive wastes. To ensure the safety during the disposal operations that includes the principle of reversibility, the design of the associated monitoring system will be based on specific research and development program and feedback obtained over more than 15 years on tests performed in representative conditions. Andra's Underground Research Laboratory (URL), located at 500 m deep, is excavated in a clay-rich formation. It is dedicated to (i) assess the thermo-hydro-mechanical, chemical and radiologic behaviors of the rock and supporting layers (concrete and steel), (ii) test envisaged monitoring system, (iii) provide feedback on operational organization and safety management and (iv) qualify operating methods (digging, concrete pouring, monitoring system design, etc.) to be implemented in the future disposal. Data collected from (i) characteristics of samples retrieved from boreholes, (ii) experts' observations, (iii) sensors installed in situ and (iv) manual measurements, are integrated in a database. This database is dedicated to samples management (more than 73 600 classified samples), data measurements collection, and conversion to physical values and available to plots or exports. Each day, approximately 1.6 million of values are integrated in the database. Finally, a geo-referenced database is linked to the main database in order to allow the spatial localization, both on the surface or in the underground galleries. All these tools give confidence in Andra's capacity to monitor Cigeo and be ready for the future industrial pilot phase. The monitoring system will also allow, step by step, optimizing the disposal design, performing regular safety control, helping in decision making for reversibility and improving long term safety. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The 'Site of Things': Remediation in the Information Age - 18088

More than just a payload, machines now haul data as well. Wood Environment and Infrastructure's maiden voyage into civil engineering automation at the Port Granby Project Long-Term Waste Management Facility demonstrated enormous potential for the remediation industry. The Port Granby Project will relocate approximately 450,000 cubic meters of historic low-level radioactive waste and marginally contaminated soils, located at an existing waste management facility on the shoreline of Lake Ontario, to a new, engineered aboveground mound to be built about a kilometer north of the current site. Sounds simple, right? Just move a bunch of dirt up the road? Hardly, this is marginally contaminated soil situated near Lake Ontario in a beautiful little village an hour east of Toronto. We must relocate safely, meaning limiting the number of staff in the field and efficiently to deliver according to our agreed upon budget and schedule. As if that wasn't enough we were asked to keep track of where each truckload of dirt was excavated from (with a high degree of accuracy), where it was placed in the new engineered disposal facility, how much it weighed and the amount of radioactivity in each load... a virtual chain of custody for each load. Presented is an overview of the Information Technology that supports the Port Granby Project and how the Data Management System (DMS) is being leveraged to make the project safer, more effective and efficient. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗