Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Contracting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,171 records · Page 65

Advanced Stirling Convertor (ASC) Development for NASA RPS

Sunpower's Advanced Stirling Convertor (ASC) initiated development under contract to the NASA Glenn Research Center (GRC) and after a series of successful demonstrations, the ASC began transitioning from a technology development project to flight development project. The ASC has very high power conversion efficiency making it attractive for future Radioisotope Power Systems (RPS) in order to make best use of the low plutonium-238 fuel inventory in the U.S. In recent years, the ASC became part of the NASA-Department of Energy Advanced Stirling Radioisotope Generator (ASRG) Integrated Project. Sunpower held two parallel contracts to produce ASC convertors, one with the Department of Energy/Lockheed Martin to produce the ASC-F flight convertors, and one with NASA GRC for the production of ASC-E3 engineering units, the initial units of which served as production pathfinders. The integrated ASC technical team successfully overcame various technical challenges that led to the completion and delivery of the first two pairs of flight-like ASC-E3 by 2013. However, in late Fall 2013, the DOE initiated termination of the Lockheed Martin ASRG flight development contract driven primarily by budget constraints. NASA continues to recognize the importance of high efficiency ASC power conversion for RPS and continues investment in the technology including the continuation of ASC-E3 production at Sunpower and the assembly of the ASRG Engineering Unit #2. This paper provides a summary of ASC technical accomplishments, overview of tests at GRC, plans for continued ASC production at Sunpower, and status of Stirling technology development.

Power Efficiency↗

NASA Project Develops Next-Generation Low-Emissions Combustor Technologies

NASA's Environmentally Responsible Aviation (ERA) Project is working with industry to develop the fuel flexible combustor technologies for a new generation of low-emissions engine targeted for the 2020 timeframe. These new combustors will reduce nitrogen oxide (NOx) emissions to half of current state-of-the-art (SOA) combustors, while simultaneously reducing noise and fuel burn. The purpose of the low NOx fuel-flexible combustor research is to advance the Technology Readiness Level (TRL) and Integration Readiness Level (IRL) of a low NOx, fuel flexible combustor to the point where it can be integrated in the next generation of aircraft. To reduce project risk and optimize research benefit NASA chose to found two Phase 1 contracts. The first Phase 1 contracts went to engine manufactures and were awarded to: General Electric Company, and Pratt & Whitney Company. The second Phase 1 contracts went to fuel injector manufactures Goodrich Corporation, Parker Hannifin Corporation, and Woodward Fuel System Technology. In 2012, two sector combustors were tested at NASA's ASCR. The results indicated 75% NOx emission reduction below the 2004 CAEP/6 regulation level.

Lee, Chi-Ming↗

Advanced Stirling Convertor Development for NASA Radioisotope Power Systems

Sunpower Inc.'s Advanced Stirling Convertor (ASC) initiated development under contract to the NASA Glenn Research Center and after a series of successful demonstrations, the ASC began transitioning from a technology development project to a flight development project. The ASC has very high power conversion efficiency making it attractive for future Radioisotope Power Systems (RPS) in order to make best use of the low plutonium-238 fuel inventory in the United States. In recent years, the ASC became part of the NASA and Department of Energy (DOE) Advanced Stirling Radioisotope Generator (ASRG) Integrated Project. Sunpower held two parallel contracts to produce ASCs, one with the DOE and Lockheed Martin to produce the ASC-F flight convertors, and one with NASA Glenn for the production of ASC-E3 engineering units, the initial units of which served as production pathfinders. The integrated ASC technical team successfully overcame various technical challenges that led to the completion and delivery of the first two pairs of flightlike ASC-E3 by 2013. However, in late fall 2013, the DOE initiated termination of the Lockheed Martin ASRG flight development contract driven primarily by budget constraints. NASA continues to recognize the importance of high-efficiency ASC power conversion for RPS and continues investment in the technology including the continuation of ASC-E3 production at Sunpower and the assembly of the ASRG Engineering Unit #2. This paper provides a summary of ASC technical accomplishments, overview of tests at Glenn, plans for continued ASC production at Sunpower, and status of Stirling technology development.

Plutonium 238↗

NASA and ESA Collaboration on Hexavalent Chrome Alternatives - Pretreatments with Primers Screening Final Test Report

Hexavalent chromium (hex chrome or Cr(VI)) is a widely used element within applied coating systems because of its self-healing and corrosion-resistant properties. The replacement of hex chrome in the processing of aluminum for aviation and aerospace applications remains a goal of great significance. Aluminum is the major manufacturing material of structures and components in the space flight arena. The National Aeronautics and Space Administration (NASA) and the European Space Agency (ESA) are engaged in a collaborative effort to test and evaluate alternatives to hexavalent chromium containing corrosion coating systems. NASA and ESA share common risks related to material obsolescence associated with hexavalent chromium used in corrosion-resistant coatings. In the United States, Occupational Safety and Health Administration (OSHA) studies have concluded that hexavalent chromium is carcinogenic and poses significant risk to human health. On May 5, 2011, amendments to the Defense Federal Acquisition Regulation Supplement (DFARS) were issued in the Federal Register. Subpart 223.73 prohibits contracts from requiring hexavalent chromium in deliverables unless certain exceptions apply. Subpart 252.223-7008 provides the contract clause prohibiting contractors and subcontractors from using or delivering hexavalent chromium in a concentration greater than 0.1 percent by weight for all new contracts associated with supplies, maintenance and repair services, and construction materials. ESA faces its own increasingly stringent regulations within European directives such as Registration, Evaluation, Authorization and Restriction of Chemical (REACH) substances and the Restriction of Hazardous Substances Directive (RoHS) which have set a mid-2017 sunset date for hexavalent chromium. NASA and ESA continue to search for an alternative to hexavalent chromium in coatings applications that meet their performance requirements in corrosion protection, cost, operability, and health and safety, while typically specifying that performance must be equal to or greater than existing systems. The overall objective of the collaborative effort between NASA TEERM and ESA is to test and evaluate coating systems (pretreatments, pretreatments with primer, and pretreatments with primer and topcoat) as replacements for hexavalent chrome coatings in aerospace applications. This objective will be accomplished by testing promising coatings identified from previous NASA, ESA, Department of Defense (DOD), and other project experience. Additionally, several new materials will be analyzed according to ESA-identified specifications.

coating↗

Analytic Method to Estimate Particle Acceleration in Flux Ropes

The mechanism that accelerates particles to the energies required to produce the observed high-energy emission in solar flares is not well understood. Drake et al. (2006) proposed a kinetic mechanism for accelerating electrons in contracting magnetic islands formed by reconnection. In this model, particles that gyrate around magnetic field lines transit from island to island, increasing their energy by Fermi acceleration in those islands that are contracting. Based on these ideas, we present an analytic model to estimate the energy gain of particles orbiting around field lines inside a flux rope (2.5D magnetic island). We calculate the change in the velocity of the particles as the flux rope evolves in time. The method assumes a simple profile for the magnetic field of the evolving island; it can be applied to any case where flux ropes are formed. In our case, the flux-rope evolution is obtained from our recent high-resolution, compressible 2.5D MHD simulations of breakout eruptive flares. The simulations allow us to resolve in detail the generation and evolution of large-scale flux ropes as a result of sporadic and patchy reconnection in the flare current sheet. Our results show that the initial energy of particles can be increased by 2-5 times in a typical contracting island, before the island reconnects with the underlying arcade. Therefore, particles need to transit only from 3-7 islands to increase their energies by two orders of magnitude. These macroscopic regions, filled with a large number of particles, may explain the large observed rates of energetic electron production in flares. We conclude that this mechanism is a promising candidate for electron acceleration in flares, but further research is needed to extend our results to 3D flare conditions.

Energetic particle acceleration↗

Traffic Aware Strategic Aircrew Requests (TASAR) Analysis and Development

This document is the final report and deliverable 30 of Contract No. NNL12AA06C, the Traffic Aware Strategic Aircrew Requests (TASAR) contract awarded via the NASA Research Announcement (NRA). It documents the accomplishments of the contract, the evolution of its role in the overall TASAR project, and lessons learned from its execution.

Woods, Sharon E.↗

Community Extreme Tonnage User Service (CETUS): A 5000 Ton Open Research Facility in the United States

Large sample volume 5000 ton multi-anvil presses have contributed to the exploration of deep Earth and planetary interiors, synthesis of ultra-hard and other novel materials, and serve as a sample complement to pressure and temperature regimes already attainable by diamond anvil cell experiments. However, no such facility exists on the North American continent. We propose the establishment of an open user facility for COMPRES members and the entire research community, with the unique capability of a 5000 ton (or more) press, supported by a host of extant co-located experimental and analytical laboratories and research staff. We offer wide range of complementary and/or preparatory experimental options. Any required synthesis of materials or follow up experiments can be carried out controlled atmosphere furnaces, piston cylinders, multi-anvil, or experimental impact apparatus. Additionally, our division houses two machine shops that would facilitate any modification or custom work necessary for development of CETUS, one for general fabrication and one located specifically within our experimental facilities. We also have a general sample preparation laboratory, specifically for experimental samples, that allows users to quickly and easily prepare samples for ebeam analyses and more. A service we can offer to COMPRES community members in general, and CETUS visiting users specifically, is a multitude of analytical instrumentation literally steps away from the experimental laboratories. This year we will be pursuing site funding of our laboratories through NASA's Planetary Science Directorate, which should result in substantial cost savings to all visiting users, and supports our mission of interagency cooperation for the enhancement of science for all (see companion PSAMS abstract). The PI is in a unique position as an employee of Jacobs Technology to draw funding from multiple sources, including those from industry and commerce. We submitted a Planetary Major Equipment proposal to the NASA Emerging Worlds solicitation for the full cost of a press, with competitive bids submitted from Sumitomo, Rockland Research, and Voggenreiter. Additional funding is currently being sought from industry sources through the Strategic Partnerships Office at NASA JSC, External Pursuits Program Office on the JETS contract, and Jacobs corporate in the United States. Internal funding is available for JETS contract personnel to travel to large press locations worldwide to study set-up and operations. We also anticipate a fortuitous cost savings in installation of the large press because plans are already underway for major renovations to the entire experimental petrology suite within the next 2 years in order to accommodate our growing user base. Our focus as contract staff is on serving the scientific needs of our users and collaborators. We are seeking community expert input on multiple aspects of this proposed facility, such as the press type and design, access management, immediate projects, and future innovation initiatives.

Danielson, L.↗

Small Business Innovation Research GRC Phase I, Phase II, and Post-Phase II Opportunity Assessment for 2015

This report outlines the 2015 Small Business Innovation Research/Small Business Technology Transfer (SBIR/STTR) Phase I, Phase II, and Post-Phase II opportunity contract award results associated with NASA's Aeronautics Research Mission Directorate (ARMD), Human Exploration and Operations Mission Directorate (HEOMD), Science Mission Directorate (SMD), and Space Technology Mission Directorate (STMD) for NASA Glenn Research Center. The report also highlights the number of Phase I, Phase II, and Post-Phase II contracts awarded by mission directorate. The 2015 Phase I contract awards to companies in Ohio and their corresponding technologies are also discussed.

Aeronautics Research ARMD↗

Quality Assurance Surveillance Tool Designed for SLS EM-1 Certificate of Flight Readiness

Exploration Mission-1 (EM-1) is an uncrewed mission that is launching on the Space Launch System (SLS) Block 1 vehicle. This is a critical flight test for the agency's human deep space exploration goals. Exploration Ground Systems (EGS) Quality (SA-F2) is responsible for providing Quality Assurance Surveillance Plans (QASPs) for NASA contracts and facilities. A QASP assures products and services are provided to EGS in accordance with the contract requirements. In order to encapsulate the multiple KSC Safety and Mission Assurance surveillance and audit activities that need to be accomplished specifically for EM-1 Certificate of Flight Reediness (CoFR), a QASP tool needed to be implemented. This tool would be able to intuitively track Work Authorization Documents (WADs) under development by Test Operations Support Contract (TOSC), reviewed and accepted WADs, Government Mandatory Inspection Points (GMIPs), Nonconformances (NCs), Material Review Board (MRB) Status, Corrective Actions, Alterations, Deviations, and Waivers for flight hardware and Ground Support Equipment (GSE). This would help ensure that all SLS EM-1 flight hardware and related GSE surveillances and requirements are being recognized and completed with zero constraints identified for the mission.

Morris, Patrick↗

Measured Interfacial Residual Strains Produced by In-Flight Ice

The formation of ice on aircraft is a highly dynamic process during which ice will expand and contract upon freezing and undergoing changes in temperature. Finite Element Analysis (FEA) simulations were performed investigating the stress build up in a simplified case with uniform temperature changes between an idealized ice sample and acrylic substrate. These results were used to place strain gages on custom-built acrylic and aluminum specimens; these specimens were then placed in icing conditions such that ice was grown on top of the specimen. Tee rosettes were placed in two configurations adjacent to thermocouple sensors. It was hypothesized that the ice would expand on freezing and contract as the temperature of the interface returned to the equilibrium conditions. While results from the aluminum specimens matched this hypothesis, results from the acrylic specimens show a short period of contraction followed by a much larger expansion at the interface, indicating more complex ice growth thermodynamics than anticipated. Samples were observed to delaminate, and the data suggests that the residual strain is significant to the shedding of ice for in-flight applications.

residual strain↗

Overview of NASA's Solar Electric Propulsion Project

NASA is continuing to develop and qualify a state of the art 13 kW-class Advanced Electric Propulsion System (AEPS) for NASA exploration missions through a contract with Aerojet Rocketdyne (AR). An objective of the AEPS project is accelerate the adoption of high power electric propulsion technologies by reducing the risk and uncertainty of integrating Solar Electric Propulsion (SEP) technologies into space flight systems. NASA and AR have recently initiated testing of engineering hardware including the Hall Current Thruster (HCT), Power Processing Unit (PPU), and Xenon Flow Controller (XFC) at both the component and system levels. The successful completion of these tests will provide the required information to advance the AEPS system towards Critical Design Review. In support of the AEPS contract, NASA and JPL have been performing risk reduction activities to address specific concerns of this higher power Hall thruster propulsion system. These risk reduction activities have included long duration wear testing of the Technology Demonstration Unit (TDU) Hall thruster and cathode hardware, thermal cycling of TDU cathode heaters and coils, plasma plume measurements, and performed early circuit testing of the AEPS PPU design. In addition to the propulsion system development, the SEP project is developing the Plasma Diagnostic Package (PDP) and the SEP Testbed. The PDP is designed for use in conjunction with a high-powered electric propulsion (EP) system to characterize in-space operation. The SEP Testbed system is being developed to demonstrate integrated SEP system performance. The paper presents an overview of the NASA and the AEPS contract activities and a summary of the associated NASA in-house activities.

Plasma diagnostics package↗

Extreme Environments Solar Power Project For Use Near Jupiter

The Extreme Environment Solar Power (EESP) Project goal was to develop solar cell and solar array design concept technologies for space power applications in high radiation and low solar intensity, low temperature (LILT) environments. NASA missions focused on outer planets, such as Jupiter, are subjected to intense radiation while experiencing less than ten percent of the solar flux relative to a mission in the general vicinity of Earth. Under these conditions, present solar array technology is not as efficient in converting the sun’s energy, and the solar array performance degrades quickly due to the additional radiation exposure. The EESP Project objectives were accomplished through four competitively selected contracts. These contracts were awarded with a Base and two option periods of performance. The Base requirements included System Design and Component Test & Analysis with a duration of nine and one half (9.5) months. The Option I requirements involved the fabrication of test hardware that NASA would evaluate following its delivery, and this period of performance had a duration of thirteen (13) months. The Option II requirements involved the fabrication of a scalable system prototype that can be integrated into a system level application and be demonstrated in a relevant environment. Option II had a duration of fifteen (15) months. The Transformational Array (TA) is an array concept developed by JHU-APL with Deployable Space Systems (DSS), SolAero Technologies and NewForge Technologies that proceeded through all three contract periods. The TA combines the DSS Roll Out Solar Array (ROSA) with Flexible Array Concentrator Technology (FACT) and SolAero’s Inverted Metamorphic Multijunction (IMM) solar cells for operation in the EESP Project environment. To achieve the EESP Project goals, the JHU-APL team conducted several investigations to improve performance of the solar cells and increase their efficiency, reduce outgassing contamination of the concentrators from the solar cell assembly adhesives, and to test the robustness of a sample blanket during deployment and retraction. Additionally, the team performed vibration, thermal cycling, and performance tests at a Standard Power Module (SPM) level. At the end of Option II, the JHU-APL team achieved the following performance metrics: • 39% beginning of life (BOL) cell efficiency at 5 AU and -125 C • 29% end of life (EOL) efficiency at the blanket level at 50 W/m2, -125 C and 4x1015 1 MeV e/cm2 • Increased specific power to 8 W/kg at EOL for the entire array including structure, deployment, and pointing mechanisms • Demonstrated the ability to survive numerous deploy-retract cycles without degradation • Reached a current System-Level Technology Readiness Level, TRL5 This presentation will describe the Transformational Array and component technologies and will discuss future potential uses for the system.

Anna Maria Pal↗

Blue Origin De-orbit Descent and Landing Tipping Point: Program Final Report

The purpose of this document is to provide a final report on the Deorbit, Descent, and Landing (DDL) Tipping Point program, a public-private partnership between Blue Origin and NASA that is partially funded by NASA contract 80LARC19C0005. In this report we summarize the results of the entire contract, including recommendations and conclusions based on the experience and results obtained. Only the portions funded by the government with associated unlimited rights are documented in detail in this report. For the work funded by Blue Origin, summaries with unlimited rights are provided for context and completeness. The Blue Origin funded work exceeded 25% of the originally proposed total program cost and included a mixture of hardware procurement and critical technology maturation. The scope of this document is a discussion of all the major tasks performed under the contract including the sensor flight demonstrations on New Shepard, the hardware in the loop lunar landing navigator demonstration, and the ground testing of the Flash LiDAR hazard sensor. The contributions from the multiple NASA teams – Johnson Space Center, Langley Research Center, Goddard Space Flight Center, and Jet Propulsion Laboratory – are described along with the contributions from Blue Origin. This document is the Final Report for statement of work item 4.1.2.10 as Deliverable 5.8.

Stefan Bieniawski↗

Maturation of Dynamic Power Convertors for RPS Robotic Space Exploration

NASA is developing dynamic power conversion technologies for future robotic space science and exploration missions powered by Radioisotope Power Systems (RPS). The Dynamic Radioisotope Power Systems (DRPS) Project is working to mature numerous dynamic power convertors and controllers for potential infusion into future flight generators. Maturation of power conversion technologies is being managed by the RPS Program and executed by the DRPS Project and Thermal Energy Conversion Branch located at NASA’s Glenn Research Center (GRC). Convertor maturation includes multiple convertor technology development contracts to deliver new prototypes and continued testing of relevant legacy convertors, commissioned during past projects. The convertor technology development contracts include two Stirling contractor teams and one Brayton team. All contracts have now completed prototype fabrication and testing planned during Phase 2. Government assessment of the new prototypes includes verification of performance in relevant environments and validation of the design with a focus on robustness.

Scott Wilson↗

Maturation of Dynamic Power Convertors for RPS Robotic Space Exploration

NASA is developing dynamic power conversion technologies for future robotic space science and exploration missions powered by Radioisotope Power Systems (RPS). The Dynamic Radioisotope Power Systems (DRPS) Project is working to mature numerous dynamic power convertors and controllers for potential infusion into future flight generators. Maturation of power conversion technologies is being managed by the RPS Program and executed by the DRPS Project and Thermal Energy Conversion Branch located at NASA’s Glenn Research Center (GRC). Convertor maturation includes multiple convertor technology development contracts to deliver new prototypes and continued testing of relevant legacy convertors, commissioned during past projects. The convertor technology development contracts include two Stirling contractor teams and one Brayton team. All contracts have now completed prototype fabrication and testing planned during Phase 2. Government assessment of the new prototypes includes verification of performance in relevant environments and validation of the design with a focus on robustness.

Scott Wilson↗

NASA's Initial Artemis Human Landing System

In April 2020, NASA announced the selection of three companies to begin the initial phase of development of human landing systems to take the first woman and the first person of color to the lunar surface through NASA’s Artemis lunar exploration program. The selected companies were a Blue Origin-led team with Lockheed Martin, Northrup Grumman, and Draper; Dynetics (a Leidos company); and SpaceX. Contracts were awarded shortly after, kicking off a ten-month base period during which NASA worked closely with each company to finalize functional and performance requirements, confirm lander development standards, and establish baseline designs, schedules, and management plans for contract execution and human spaceflight certification. At the end of the base period, in the Spring of 2021, NASA awarded a single follow-on Option A contract to SpaceX to continue their work on Human Landing System (HLS) Starship development. Currently NASA and SpaceX are working collaboratively on Option A which will ultimately culminate in one uncrewed and one crewed mission to the lunar surface under Artemis III. This paper will provide a look at the Option A phase of development for the Human Landing System Program, including publicly available information on SpaceX’s HLS Starship design as well as near-term and future milestones for HLS and the Artemis program.

Lisa Watson-Morgan↗

NASA’s Human Landing System: A Sustaining Presence on the Moon

For more than a decade, efforts have been ongoing at NASA’s Marshall Space Flight Center (MSFC) in Huntsville, Alabama, to land humans and cargo on planetary bodies like the Moon and Mars and today this work continues under the Center’s Lander Programs (LP) office. In August of 2019, NASA stood up the Human Landing System (HLS) program to be responsible for spacecrafts that will land astronauts on the Moon under Artemis. Work is well underway with the historic Artemis III mission to land the first Americans on the lunar surface in more than 50 years through the Appendix H Option A [1] contract with SpaceX. In November, NASA awarded SpaceX an Option B modification to its existing HLS Appendix H contract, which will further develop its Starship HLS to meet NASA’s sustaining lander requirements for lunar missions beyond Artemis III. In September of 2022, NASA issued an HLS Sustaining Lunar Development solicitation under the NextSTEP-2 Appendix P Broad Agency Announcement [2] asking a second provider, in addition to SpaceX, to develop and demonstrate a lander that meets the program’s extended set of requirements for missions beyond Artemis III. Under the umbrella of Sustaining Lunar Development [3], these requirements will meet NASA’s needs for recurring, long-term access to the lunar surface. Proposals were received from industry late last year and NASA is planning to award an Appendix P contract in the summer of 2023. This paper will provide an update of the Lander Program office’s progress and will discuss how the program is bridging from the initial demonstration phase of development for the Human Landing System program to the Sustaining Lunar Development phase. The paper will include publicly available information on SpaceX’s Starship HLS design as well as near-term and future milestones for HLS and the Artemis program.

Lisa Watson-Morgan↗

NASA Hybrid Thermally Efficient Core (HyTEC) Phase 2 Q3’GFY25 to Q2’GFY26 Unlimited Rights Annual Report for CLIN 1 and 2

The HyTEC Phase 2 Project focuses on the development and demonstration of high-power density, small engine core gas turbine engine technologies. The focus of HyTEC on these small engine core technologies will provide direct benefits to the next single-aisle class aircraft in terms of thermal efficiency, as well as integrate with other technologies, through increased hybridization, as they mature to provide substantial continuous fuel burn reductions during the aircraft lifecycle. These advances will strengthen the US position in the commercial aviation engine market and enable cost benefits in commercial aviation. In Government fiscal year 26 the HyTEC Project was closed and contract moved to the Subsonic Vehicle Technologies and Tools Project. GE Aerospace is executing two major work plans as part of the HyTEC Phase 2 contract. The first is Contract Line-Item Number (CLIN) 001 and its objective is to mature High Pressure Turbine (HPT) aerodynamics technology to TRL 5 through multiple rigs so that it may be incorporated into a complete TRL 6 evaluation and unlock learnings for the engine core demonstration as applicable. CLIN 002, the second work plan, is to design, procure and test a cost shared portion of technologies on the TRL6 Compact Core test vehicle. The compact core demonstrated through HyTEC Phase 2 along with the HPT rig TRL advancement directly matures the technologies being developed as part of the CFM RISE demonstrator program which is targeting a more than 20% fuel burn reduction at the engine level versus today’s state of the art. The RISE program’s objective is to advance both the novel Open Fan architecture, compact core technologies and advanced systems such as hybrid electric needed to achieve the desired fuel burn reduction to TRL6 ahead of a new product introduction in the single-aisle class aircraft in the 2030s timeframe.

gas turbine engine↗