Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BOOSTER”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,171 records · Page 65

Modular Approach to Launch Vehicle Design Based on a Common Core Element

With a heavy lift launch vehicle as the centerpiece of our nation's next exploration architecture's infrastructure, the Advanced Concepts Office at NASA's Marshall Space Flight Center initiated a study to examine the utilization of elements derived from a heavy lift launch vehicle for other potential launch vehicle applications. The premise of this study is to take a vehicle concept, which has been optimized for Lunar Exploration, and utilize the core stage with other existing or near existing stages and boosters to determine lift capabilities for alternative missions. This approach not only yields a vehicle matrix with a wide array of capabilities, but also produces an evolutionary pathway to a vehicle family based on a minimum development and production cost approach to a launch vehicle system architecture, instead of a purely performance driven approach. The upper stages and solid rocket booster selected for this study were chosen to reflect a cross-section of: modified existing assets in the form of a modified Delta IV upper stage and Castor-type boosters; potential near term launch vehicle component designs including an Ares I upper stage and 5-segment boosters; and longer lead vehicle components such as a Shuttle External Tank diameter upper stage. The results of this approach to a modular launch system are given in this paper.

Creech, Dennis M.↗

A data acquisition system for longitudinal beam properties in a rapid cycling synchrotron

A longitudinal beam properties, data acquisition system has been commissioned to operate in the Fermilab booster ring. This system captures real time information including beam synchronous phase, bunch length, and coupled bunch instability amplitudes as the beam is accelerated from 400 MeV to 8 GeV in 33 ms. The system uses an off-the-shelf Tektronix oscilloscope running Labview software and a synchronous pulse generator. This paper describes the hardware configuration and the software configuration used to optimize the data processing rate. The Fermilab Booster is currently pushed to its intensity limit due to the high demand from different experiments for protons. This will continue into the era of the intensity frontier. While intensity is the most critical parameter, emittance must be controlled as well. Longitudinal emittance is an important parameter for optimizing the slip stacking process in the Main Injector. Longitudinal instabilities can spoil the emittance, so it is important to monitor bunch lengths and bunch phase oscillations in the Booster. The Booster presents a special challenge when it comes to measuring beam properties. The acceleration ramp is short (33ms), and the RF frequency varies from 38-52.8 MHz. Standard instrumentation like spectrum analyzers and network analyzers cannot effectively measure beam properties, because they cannot track the changing frequencies. Early instrumentation involved a series of tracking oscillators, mixers, and diode detectors that would require vigilant calibration. There was a demand for a more robust means of gathering beam parameters.

43 PARTICLE ACCELERATORS↗

FNAL PIP-II Accumulator Ring

The FNAL accelerator complex is poised to reach MW neutrino beams on target for the exploration of the dark sector physics and rare physics program spaces. Future operations of the complex will include CW linac operations at beam intensities that have not been seen before \cite{PIP2,RCS_LOI}. The ambitious beam program relies on multi-turn H$^{-}$ injection into the FNAL Booster and then extracted into delivery rings or the Booster Neutrino Beam (BNB) 8 GeV HEP program. A new rapid-cycling synchrotron (RCS) will be required to reach the LBNF goal of 2.4 MW because of intense space-charge limitations. There are many accelerator engineering challenges that are already known and many that will be discovered. This proposal calls for an intermediate step that will both facilitate the operation of Booster in the PIP-II era and gain operational experience associated with high power injection rings. This step includes the design, construction and installation of a 0.8 GeV accumulator ring (upgradeable to 1+ GeV) to be located in the PIP-II Booster Transfer Line (BTL). The PIP-II accumulator ring (PAR) may be primarily designed around permanent magnets or use standard iron core magnet technology with an aperture selected to accommodate the desired high intensity protons at 0.8 GeV.

43 PARTICLE ACCELERATORS↗

Reactive Blast Waves from Composite Charges

Investigated here is the performance of composite explosives - measured in terms of the blast wave they drive into the surrounding environment. The composite charge configuration studied here was a spherical booster (1/3 charge mass), surrounded by aluminum (Al) powder (2/3 charge mass) at an initial density of {rho}{sub 0} = 0.604 g/cc. The Al powder acts as a fuel but does not detonate - thereby providing an extreme example of a 'non-ideal' explosive (where 2/3 of the charge does not detonate). Detonation of the booster charge creates a blast wave that disperses the Al powder and ignites the ensuing Al-air mixture - thereby forming a two-phase combustion cloud embedded in the explosion. Afterburning of the booster detonation products with air also enhances and promotes the Al-air combustion process. Pressure waves from such reactive blast waves have been measured in bomb calorimeter experiments. Here we describe numerical simulations of those experiments. A Heterogeneous Continuum Model was used to model the dispersion and combustion of the Al particle cloud. It combines the gasdynamic conservation laws for the gas phase with a dilute continuum model for the dispersed phase, as formulated by Nigmatulin. Inter-phase mass, momentum and energy exchange are prescribed by phenomenological models of Khasainov. It incorporates a combustion model based on mass conservation laws for fuel, air and products; source/sink terms are treated in the fast-chemistry limit appropriate for such gasdynamic fields, along with a model for mass transfer from the particle phase to the gas. The model takes into account both the afterburning of the detonation products of the booster with air, and the combustion of the Al particles with air. The model equations were integrated by high-order Godunov schemes for both the gas and particle phases. Adaptive Mesh Refinement (AMR) was used to capture the energy-bearing scales of the turbulent flow on the computational grid, and to track/resolve reaction zones. Numerical simulations of the explosion fields from 1.5-g and 10-kg composite charges were performed. Computed pressure histories (red curve) are compared with measured waveforms (black curves) in Fig. 1. Comparison of these results with a waveform for a non-combustion case in nitrogen (blue curve) demonstrates that a reactive blast wave was formed. Cross-sectional views of the temperature field at various times are presented in Fig. 2, which shows that the flow is turbulent. Initially, combustion occurs at the fuel-air interface, and the energy release rate is controlled by the rate of turbulent mixing. Eventually, oxidizer becomes distributed throughout the cloud via ballistic mixing of the particles with air; energy release then occurs in a distributed combustion mode, and Al particle kinetics controls the energy release rate. Details of the Heterogeneous Continuum Model and results of the numerical simulations of composite charge explosions will be described in the paper.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Tuning the operational parameters of the first microtron stage

The Laboratorio do Acelerador Linear is building a racetrack microtron electron accelerator. It has two acceleration stages: the booster and the main microtron. The aim of this work is to optimize the operation parameters of the booster stage by means of simulation tools. The accelerator admittances were determined successfuly and the results are presented. The injection beam has been characterized previously, and the available data were used to match the transverse beam emittances of the injector to the transverse beam admittances of the booster. Preliminary results showed that the simulations have a good agreement with the working parameters.

43 PARTICLE ACCELERATORS↗

RHIC Proton Luminosity and Polarization Improvement

The RHIC proton beam polarization can be improved by raising the Booster scraping, which also helps to reduce the RHIC transverse emittance, and therefore to improve the luminosity. By doing this, the beam-beam effect would be enhanced. Currently, the RHIC working point is constrained between 2/3 and 7/10, the 2/3 resonance would affect intensity and luminosity lifetime, and the working point close to 7/10 would enhance polarization decay in store. Run 2013 shows that average polarization decay is merely 1.8% in 8 hours, and most fills have the luminosity lifetime better than 14 hours, which is not a problem. Therefore, even without beam-beam correction, there is room to improve for RHIC polarization and luminosity. The key to push the Booster scraping is to raise the Booster input intensity; for that, two approaches can be used. The first is to extend the LINAC tank 9 pulse width, which has been successfully applied in run 2006. The second is to raise the source temperature, which has been successfully applied in run 2006 and run 2012.

43 PARTICLE ACCELERATORS↗

Doubling Beam Intensity Unlocks Rare Opportunities for Discovery at Fermi National Accelerator Laboratory

Particle accelerators such as the Booster synchrotron at the Fermi National Accelerator Laboratory (FNAL) produce high-intensity proton beams for particle physics experiments that can ultimately reveal the secrets of the universe. High-intensity proton beams are required by experiments at the “intensity frontier” of particle physics research, where the availability of more particles improves the chances of observing extremely rare physical processes. In addition to their central role in particle physics experiments, particle accelerators have found widespread use in industrial, nuclear, environmental, and medical applications. RF cavities are essential components of particle accelerators that, depending on the design, can perform multiple functions, including bunching, focusing, decelerating, and accelerating a beam of charged particles. Engineers are working to model the RF cavities required for upgrading the 40-year old Booster synchrotron. It is a rather complicated process to refurbish, test, and qualify the upgraded RF cavities to sustain an increased repetition rate of the RF field required to produce proton beams at double the current intensity. Both multiphysics simulation and physical measurements are used to evaluate the RF, thermal, and mechanical properties of the Booster RF cavities.

43 PARTICLE ACCELERATORS↗

Thermal Hydraulic Effect of Fuel Plate Surface Roughness

This study presents surface roughness measurements characteristic of the pre-film layer applied to a typical Advanced Test Reactor (ATR) fuel plate. This data is used to estimate the friction factor for thermal hydraulic flow calculations of a Gas Test Loop (GTL) system proposed for incorporation into ATR to provide a fast neutron flux environment for the testing of nuclear fuels and materials. To attain the required neutron flux, the design includes booster fuel plates clad with the same aluminum alloy as the ATR driver fuel and cooled with water supplied by the ATR primary coolant pumps. The objectives of this study are to: (1) determine the surface roughness of the protective boehmite layer applied to the ATR driver fuel prior to reactor operations in order to specify the machining tolerances for the surface finish on simulated booster fuel plates in a GTL hydraulic flow test model, and (2) assess the consequent thermal hydraulic impact due to surface roughness on the coolability of the booster fuel with a similar pre-film layer applied. While the maximum roughness of this coating is specified to be 1.6 µm (63 microinches), no precise data on the actual roughness were available. A representative sample coupon autoclaved with the ATR driver fuel to produce the pre-film coating was analyzed using optical profilometry. Measurements yielded a mean surface roughness of 0.53 µm (21 microinches). Results from a sensitivity study show that a ±15% deviation from the mean measured surface finish would have a minimal effect on coolant temperature, coolant flow rate, and fuel temperature. However, frictional losses from roughnesses greater than 1.5 µm (~60 microinches) produce a marked decrease in flow rate, causing fuel and coolant temperatures to rise sharply.

36 MATERIALS SCIENCE↗

Neutrino flux prediction at MiniBooNE

The booster neutrino experiment (MiniBooNE) searches for {nu}{sub {mu}}{yields}{nu}{sub e} oscillations using the O(1 GeV) neutrino beam produced by the booster synchrotron at the Fermi National Accelerator Laboratory). The booster delivers protons with 8 GeV kinetic energy (8.89 GeV/c momentum) to a beryllium target, producing neutrinos from the decay of secondary particles in the beam line. We describe the Monte Carlo simulation methods used to estimate the flux of neutrinos from the beam line incident on the MiniBooNE detector for both polarities of the focusing horn. The simulation uses the Geant4 framework for propagating particles, accounting for electromagnetic processes and hadronic interactions in the beam line materials, as well as the decay of particles. The absolute double differential cross sections of pion and kaon production in the simulation have been tuned to match external measurements, as have the hadronic cross sections for nucleons and pions. The statistical precision of the flux predictions is enhanced through reweighting and resampling techniques. Systematic errors in the flux estimation have been determined by varying parameters within their uncertainties, accounting for correlations where appropriate.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Beam formation in the alternative JLEIC ion complex

The proposed alternative design approach for the JLab-EIC (JLEIC) ion complex uses a more compact linac and pre-booster, and consolidates the electron storage ring (ering) as a large booster for the ions. Following a parameter study showing the feasibility of this design approach, we have adapted the e-ring lattice by adding RF sections to accelerate ion beams. In this study, we focus on the transverse beam formation for protons and lead ions from the ion source to collision point including the linac, pre-booster, e-ring and collider ring. Effects such as stripping injection, space charge, intra-beam scattering and beam cooling determine the total charge accumulated in each ring and the final luminosity of the collider.

Mustapha, Brahim↗

IOTA experiment for proton pulse compression at extreme space-charge

A gammaT scheme may be required for the PIP-II era performance or ACE-MIRT era performance of the Booster. PIP-II era operations of the Fermilab proton complex will require the Fermilab Booster to increase beam intensity from 4.5e12 to 6.5e12 protons, while also increasing its ramp from 15 Hz to 20 Hz. These changes pose particular challenges for transition-crossing in the Booster, where longitudinal beam quality must be controlled in order to facilitate slip-stacking in the Recycler Ring later in the Main Injector cycle. Two novel gammaT jump schemes are proposed, termed “double gammaT jump” and “partial gammaT jump”, which optimize the magnitude of the gammaT jump within optics and power supply constraints.

Eldred, Jeffrey [Fermilab]↗

Settings of the NSLS-II BSR magnets for energy interlock

It was determined that for the commissioning purposes energy range of the beam reaching the NSLS-II storage ring (SR) is allowed to be 2 GeV - 3.15 GeV. The Booster to SR (BSR) bends B1 and B2 interlocked at their nominal 3 GeV settings with ± 5% window provide the required “energy filter”. Another scenario of Booster operation suggests extracting the beam from the Booster to the BSR phase 1 line (or dump line). Under these circumstances the bend B2 is turned off. An adequate shielding is planned in BSR phase one line for B1 set within the boundaries of its 2 GeV nominal setting minus 5% and its 3 GeV setting plus 5 %. The goal of this exercise is to find the proper settings of respective bends PS currents, which will realize described interlock.

43 PARTICLE ACCELERATORS↗

Maximum Current of the NSLS-II Linac

The maximum current of the NSLS-II linac is an important operational parameter for determining the safety envelope of the acceleration. In this document we establish the maximum current of the NSLS-II linac. First we establish the maximum current that can be emitted by the gun and the parameters that limit this. Then we show that beam loading in the linac further limits the current available at the exit of the linac. Beam loading also determines the energy spectrum of the beam at the end of the linac. Once the maximum current at the exit of the linac is established, we transport this beam through the linac to booster transport line using the designed optics which will match the beam from the linac into the booster. This will determine the maximum current that can be delivered to the booster accelerator from the linac.

36 MATERIALS SCIENCE↗

Maximum Current of the NSLS-II Linac

The maximum current of the NSLS-II linac is an important operational parameter for determining the safety envelope of the acceleration. In this document we establish the maximum current of the NSLS-II linac. First we establish the maximum current that can be emitted by the gun and the parameters that limit this. Then we show that beam loading in the linac further limits the current available at the exit of the linac. Beam loading also determines the energy spectrum of the beam at the end of the linac. Once the maximum current at the exit of the linac is established, we transport this beam through the linac to booster transport line using the designed optics which will match the beam from the linac into the booster. This will determine the maximum current that can be delivered to the booster accelerator from the linac.

36 MATERIALS SCIENCE↗

Supplemental Shielding for the LBT-B1 Dipole

The LBT-B1 dipole is a important element in the LBT beam line, since its input beam energy can span a very large range from the e-gun potential to the maximum Linac output energy. Under these assumptions the B1 power supply is capable of bending the full beam current over quite a large angular range, even more than 180°. In order to prevent high radiation levels inside the Booster tunnel while the Linac is operating an extended supplemental shield will be added to the existing approved LBT-SHLD-1000, Figure 1(a). This modified supplemental shield, Figure 1(b), has 20 cm in the forward direction (at right angles to the beam pipe) and 20cm transverse (parallel to the beam pipe) between the forward shield and the LBT-B1 dipole yoke itself. This extended shield will provide protection for full beam current over the entire range of angles possible to exit downstream of the LBT-B1, as well as those trajectories that pass through the B1 magnet yoke. A small gap between this shield and the magnet yoke is important to reduce radiation entering the Labyrinth and booster wall. The B1 yoke thickness on the beam plane (15.5 cm of iron) is adequate to suppress the radiation to the Klystron Gallery for all trajectories that pass through the entire magnet yoke as well as the upstream edge of the yoke. Particles that are bent beyond the upstream edge of the magnet are sufficiently low in energy to be shielded by the Linac vault bulk shielding. The summary of the calculated dose rates in the Booster Tunnel along the wall downstream of the Labyrinth and inside the Labyrinth to the downstream end of the Klystron Gallery, are shown in the table below. All dose rates are based on an incident beam current of 15nC/sec, and need to be increased proportionally for the maximum operating current for injection at 22nC/sec.

36 MATERIALS SCIENCE↗

A Cost-Effective Upgrade Path for the Fermilab Accelerator Complex

The Fermilab Proton Improvement Plan II, or PIP-II, would enable the world's most intense high-energy neutrino beam and would help scientists search for rare particle physics processes. The PIP-II goal is to deliver 1.2 MW of proton beam power from the Fermilab Main Injector, over the energy range 60 - 120 GeV, at the start of operation of the LBNF/DUNE program. PIP-II provides a variety of upgrade paths to higher beam power from the Main Injector, as demanded by the neutrino science program and as recommended by the 2014 P5 report. Delivering more than 2 MW to the LBNF target in the future will require a replacement of the existing Booster. This report outlines a cost-effective Booster replacement option and an upgrade path for the Fermilab Accelerator Complex to attain 2.4-MW beam power on the LBNF target, as well as to retain the capability to provide 8-GeV proton beams to the existing Fermilab Muon Campus via the existing Recycler ring. Its cost-effectiveness is achieved by: (1) using a small-diameter metallic vacuum chamber in the Booster replacement and (2) reusing the existing Recycler ring. Reusing the Recycler ring may be of particular advantage since it is presently employed to deliver 8-GeV beams to the Muon Campus experiments. The present concept also retains such a capability.

43 PARTICLE ACCELERATORS↗

An Upgrade Path for the Fermilab Accelerator Complex

The completion of the PIP-II project and its superconducting linear accelerator will provide up to 1.2 MW of beam power to the LBNF/DUNE facility for neutrino physics. It will also be able to produce high-power beams directly from the linac that can be used for lower-energy particle physics experiments as well, such as directing beam toward the Muon Campus at Fermilab for example. Any further significant upgrade of the beam power to DUNE, however, will be impeded by the limitations of the present Booster synchrotron at the facility. To increase the power to DUNE by a factor of two would require a new accelerator arrangement to feed the Main Injector that does not include the Booster. In what follows, a path toward upgrading the Fermilab accelerator complex to bring the beam power for DUNE to 2.4 MW is presented, using a new rapid-cycling synchrotron plus an energy upgrade to the PIP-II linac. The path includes the ability to instigate a new lower-energy, very high-power beam delivery system for experiments that can address much of the science program presented by the Booster Replacement Science Working Group. It also allows for the future possibility to go beyond 2.4 MW up to roughly 4 MW from the Main Injector.

43 PARTICLE ACCELERATORS↗

The 2022 Polarized Proton Run in the Injectors

The previous polarized proton (PP) run was in 2017. During the start up process this run the injectors were set up in the same configuration using Booster and AGS PPM user 4 (BU4/AU4). Concurrently with this a new setup was established on Booster and AGS user 3 (BU3/AU3) called the split/merge. This new setup splits a single bunch into 2 in the Booster and recombines them on the AGS flattop in an attempt to improve polarization mainly by reducing the transverse emittance growth thought to be associated with higher peak beam current. Although Gold beam from EBIS was used at times in RHIC for LEReC and CeC development, from the injector perspective there is little noteworthy about it and so this note will focus solely on PP. According to the OC log, STAR Physics was first declared on Dec. 22, 2021 and the run ended on April 18, 2022. Initially, BU4/AU4 was used for RHIC. Then the split/merge setup was used from Dec. 27 until the Siemens motor generator failed on Jan. 12 and the Westinghouse motor generator had to be used in its place. The peak dB/dt available using the Westinghouse is half what it is with Siemens so the AGS required a different setup. Since the split/merge setup is more complicated than the standard one, and any benefit from it to polarization had not been demonstrated, a cycle was developed on AU6 for RHIC based on the AU4 setup but with a longer ramp. The split/merge was also set up with Westinghouse on BU3/AU7, but it was never used for RHIC. The switch back to the Siemens occurred on March 8 th once again using BU4/AU4.

43 PARTICLE ACCELERATORS↗