Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “working clean”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,153 records · Page 64

Reverse Osmosis Simulation Data

This dataset consists of computational fluid dynamics (CFD) output for various spacer configurations in a feed-water channel in reverse osmosis (RO) applications. Feed-water channels transport brine solution to the RO membrane surfaces. The spacers embedded in the channels help improve membrane performance by disrupting the concentration boundary layer growth on membrane surfaces. Refer to the "Related Work" resource below for more details. This dataset considers a feed-water channel of length 150mm. The inlet brine velocity and concentration are fixed at 0.1m/s and 100kg/m3 respectively. The diameter of the cylindrical spacers is fixed as 0.3mm and six varying inter-spacer distances of 0.75mm, 1mm, 1.5mm, 2mm, 2.5mm, and 3mm are simulated. The dataset comprising the steady, spatial fields of solute concentration, velocity, and density near each spacer is placed in the folder corresponding to the spacer configuration considered. We run two sets of CFD simulations and include the outputs from both sets for each configuration: (1) with a coarser mesh, producing low-resolution (LR) data of spatial resolution 20x20, and (2) with a finer mesh, producing high-resolution (HR) data of spatial resolution 100x100. These data points can be treated as images with the quantities of interest as their channels and can be used to train machine learning models to learn a mapping from the LR images as inputs to the HR images as outputs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

MULTI-TECHNIQUE CHARACTERIZATION OF SUPERCONDUCTING MATERIALS FOR PARTICLE ACCELERATOR APPLICATIONS

We investigated the performance limitations of superconducting radio-frequency (SRF) cavities and materials using multiple experimental techniques. In particular, this study focuses on understanding the surface properties of nitrogen-doped Nb cavities and super?conducting thin films with higher Tc such as Nb3Sn. The main goal of this work is to use different techniques to better understand each aspect of the complex loss mechanism in superconductors to further improve the already highly efficient SRF cavities. Nitrogen doping applied to a Nb SRF cavity significantly improves the quality factor Q0 compared to a conventional Nb cavity, at an expense of reduced maximum accelerating gradient. The early quench mechanism was analyzed by using temperature maps before and during the quenching. The temperature maps revealed insignificant heating before the quench, and we concluded that nitrogen doping reduces critical magnetic fields in local regions, leading to premature quenching. To understand the origin of the increasing Q0 with the rf field, the density of states (DOS) of cold spots from nitrogen-doped and standard cavities were measured and analyzed using scanning tunneling microscopy. The results suggested that nitrogen doping reduces the spatial inhomogeneity of superconducting properties and shrinks the metallic suboxide layers, which tunes the DOS in such a way as to produce the field-induced reduction in the surface resistance. To characterize SRF thin films, an experimental setup for measuring a coplanar waveguide (CPW) resonator was developed and tested. A surface impedance measurement of the Nb film showed good agreement with the BCS calculation. The preliminary results from measurements of Nb3Sn and NbTiN films are also presented here. The nonlinear Meissner effect was investigated in Nb3Sn film CPW resonators by mea?suring the resonant frequency as a function of a parallel magnetic field. Contrary to a conventional quadratic dependence of the penetration depth ?(B) on the applied magnetic field B, as expected in s-wave superconductors, nearly a linear increase of ?(B) with B was observed. It was concluded that this behavior of ?(B) is due to weakly linked grain bound?aries on the polycrystalline Nb3Sn films, which can mimic the NLME expected in a clean d-wave superconductor.

Makita, Junki↗

W.A. Parish Post-Combustion CO 2 Capture and Sequestration Demonstration Project (Final Technical Report)

The Petra Nova Project (Project) is a commercial scale post-combustion carbon capture project developed by a joint venture between NRG Energy, Inc. (NRG) and JX Nippon Oil Exploration (EOR) Limited (JX). The Project is designed to separate and capture carbon dioxide (CO2) from an existing coal-fired unit’s flue gas slipstream at NRG’s W.A. Parish Electric Generating Station (WAP) located southwest of Houston, Texas. The captured CO2 is dried, compressed, and transported via an 81-mile pipeline to the West Ranch oilfield (West Ranch) in Jackson County, Texas, where it is injected to boost oil production. The Project, which is partially funded by a grant (Grant) from the United States (U.S.) Department of Energy (DOE) under the Clean Coal Power Initiative (CCPI) Round 3, uses the Kansai Mitsubishi Carbon Dioxide Recovery advanced amine-based CO 2 absorption technology (KM-CDR Process®), which was jointly developed by Mitsubishi Heavy Industries, Ltd. (MHI) and the Kansai Electric Power Co. Inc., to treat and capture at least ninety percent (90%) of the CO 2 from a 240-megawatt equivalent (MWe) flue gas slipstream off of Unit 8 at WAP. When operating at full capacity, the Project captures approximately 5,200 short tons of CO 2 per day, which would otherwise be emitted into the atmosphere, representing the largest commercial scale deployment of post-combustion CO2 capture technology at a coal power plant to date. Under the Grant, the Project was managed in 3 phases: (1) Phase 1: Project Definition / Front End Engineering Design (FEED) (2) Phase 2: Detailed Engineering, Procurement & Construction (3) Phase 3: Demonstration and Monitoring. On December 29, 2016, commercial operation of the Project was achieved, ending Phase 2 and starting Phase 3, a 3-year demonstration period running from January 1, 2017 through December 31, 2019. The key objectives of Phase 3 were to (a) demonstrate the specific advanced technologies constructed during Phase 2 and (b) monitor the injected CO 2 at West Ranch to demonstrate technologies and protocols for monitoring, verification, and accounting (MVA). As of the end of Phase 3, Petra Nova captured 3,904,978 short tons of CO 2 (3,542,537 metric tons) that was transported to West Ranch. To support the DOE obligation to monitor, verify, and account for the sequestered CO 2 at West Ranch, Petra Nova contracted with the Bureau of Economic Geology (in the Jackson School of Geosciences at The University of Texas at Austin) to (a) design a monitoring program, (b) draft an MVA Plan for DOE review and approval, and (c) working with Petra Nova and the operator of West Ranch to manage and report on the MVA activity. This report discussed the technical aspects of the project during each of the 3 phases of the project as identified above.

01 COAL, LIGNITE, AND PEAT↗

Studies of surface adsorbate electronic structure and femtochemistry at the fundamental length and time scales. Final report

The electronic structure and ultrafast (10-15 s-femtosecond timescale) electron dynamics were investigated for clean and atom/molecule covered metal surfaces. The studies were performed by scanning tunneling microscopy (STM) to measure the structure of adsorbed atoms and molecules on metal surfaces, and to investigate their electronic properties. The electronic structure of the observed molecular networks was calculated by electronic structure theory in collaboration with Prof. Jin Zhao, who is a long-time collaborator, a Professor at the University of Science and Technology of China, and holds an Adjunct Professorship at the University of Pittsburgh. We also investigated the electronic properties of C60 molecules when they are templated by corrugated black phosphorous surfaces. We found unexpected charge delocalization that is enabled by the templating. This research was done in collaboration with Professor Min Feng at the Wuhan University, and who also holds an Adjunct Professorship at the University of Pittsburgh. Moreover, the electronic structure and electron dynamics in metal surfaces were investigated by time-resolved photoemission electron spectroscopy. The focus of ultrafast spectroscopy has been on the plasmonic response of silver surfaces. One direction has been to develop multidimensional (energy, momentum, and time) photoelectron spectroscopy of the coherent response of solid surfaces. This method was applied to study the collective electron excitations known generally as plasmons, which screen optical fields from penetration into metals. Although this collective response has been known for more than 60 years and is used extensively to deposit optical energy into metals, how this happens is poorly known. We investigated the plasmonic response of silver at the point where the dielectric response passes through zero and bulk plasmon is excited by light. We discovered that the plasmon excitation decays by exciting electrons from the Fermi level of a metal, which is contrary to what is believed in the plasmonic science community. This research has been performed in collaboration with Dr. Marcel Reutzel, who was a postdoctoral fellow working on this research at the University of Pittsburgh, and now has a faculty position at the University of Göttingen in Germany. Prof. Branko Gumhalter from the Institute of Physics in Zagreb contributed on the theory of plasmonic decay processes. Furthermore, we investigated the Floquet engineering of electronic bands in metals leading to multiphoton photoemission and above threshold photoemission. Finally, we demonstrated that it is possible to change the electronic structure of metals by application of optical fields. Our studies indicated that this happens on subfemtosecond time scale and could potentially be used in ultrafast information processing and quantum computation. Related document information

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Wear in particle based CSP systems from particle abrasion and attrition at high temperature

High temperature particle-based receivers offer distinct advantages over conventional molten salt receivers due to their ability to achieve temperatures above 700 ºC, direct absorption of solar energy as they fall through a beam of concentrated sunlight, and the relative ease of storage (and retrieval using a secondary working fluid) in insulated storage tanks. The use of particles, however, also raises concerns with material degradation from the flow of hot or cold particles through discharge hoppers or along the inner receiver surfaces and other system components (e.g. tubes, valves etc.), depending on operating mode of the receiver. The flow of particles over surfaces may result in loss of material from abrasive wear, impact erosion from impingement under gravitational fall and particle attrition as particles fall and move on top of each other. In the present study, the performance of candidate materials and particles were evaluated through a series of abrasion erosion and particle attrition experiments at room temperature as well as at 800 °C. Candidate materials were subject to abrasive wear from particles at low particle to material velocities inside a resistance heated kiln, and analyzed for changes in mass and surface morphology using cross-sectional scanning electron microscopy (SEM) and energy dispersive x-ray spectroscopy (EDS) tests. The wear rate for different specimens was noted to be largely driven by the strength of chromia scales built on the specimens from exposure to high temperature. Particle attrition measurements explored the susceptibility of particles to breakdown from particle to particle interaction and the generation of fines from this process. At the low velocities expected in particle based CSP plants, the particles tested exhibited near negligible breakdown. However, changes in the particle hardness at 800 ºC resulted in a significantly higher particle breakdown to sizes <40 microns raising potential environmental concerns. In addition to particle breakdown, it was also noted that the sample had oxides from the stainless steel test setup mixed in with the particles. Similar oxides can be expected to turn up in the utility scale particle based CSP plants as well. The presence of oxide was also noted to affect the solar absorptivity of the mixture compared to a clean initial specimen, potentially resulting in a change in the overall efficiency of the CSP plant.

14 SOLAR ENERGY↗

Development of Remote Cutting Tools for use at ATR - 20438

As a result of years of operations of the Advanced Test Reactor (ATR) at the Idaho National Lab (INL), the ATR canal has become congested due to the storage of materials including waste consisting of highly irradiated remote handled (RH) metals. In order to support its continuing nuclear mission the ATR requires canal space to support fuel storage and future core internal change out (CIC) components. INL staff determined that the canal must be cleaned out and waste removed to efficiently utilize the valuable canal floor space. It was determined that a methodology for processing, packaging, characterizing, and removing current and future irradiated hardware from the ATR canal is needed. Orano Federal Services (OFS) and its subcontractor Babcock Services Inc. (BSI) were selected to provide remote tooling in order to safely and efficiently size reduce the material currently stored in the ATR canal. INL developed detailed requirements that established the design and performance requirements for the tooling. Orano TN and BSI had recently successfully completed similar tasks in clearing highly activated materials from spent fuel pools and canals at commercial nuclear plants. That experience directly translated into a proven approach that could be used at the ATR thereby saving time and money and lowering risks. Based on BSI's demonstrated proficiency in the design and deployment of remote size reduction specialty tooling at comparable commercial facilities, Orano Federal Services was confident that a solution to INL's requirements could be delivered. The tooling had to be designed to be compatible with the operational requirements of the ATR canal as well as the functionality needed by the facility operators that will use the equipment. Some of the major design requirements and functions of the equipment included remote operations, capability to shear highly irradiated sections of aluminum and steel tubing, pipe, and components ranging in size from 0.6 cm to 16.5 cm diameter into 1.5 m -1.8 m lengths, utilizing buoyancy compensation to assist with underwater operations, and use commercially available existing technology and components as much as practical. The design team evaluated and selected commercially available equipment that could be modified to meet the design and performance specifications. In addition, a waste sizing table (WST) was designed and fabricated to further ensure the size reduction equipment would perform as expected and give the facility operators a stable and usable remote, underwater work platform. After successful development of the tooling, a mock up test and operator training was conducted to ensure the tooling performed as expected and met the requirements of INL. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Optimization Approach to Support Science Decision Making for Lunar Surface Exploration

Introduction: Scientific exploration is one of the three pillars of NASA’s Moon2Mars architecture, with crew surface extra vehicular activities (EVA) serving a critical enabling function. Development of surface EVA operational planning and execution, specifically integrating science and flight control teams (FCT), is currently being explored through analog scenarios. This integration, exercised, for example, through the Joint EVA and Hu-man Surface Mobility Test Team (JETT), allows for science input on EVA activities in near real-time through a Science Evaluation Room (SER), or Arte-mis science backroom, which integrates with the broader FCT through the Science Officer. The SER works within the FCT to support dynamic EVA planning in response to changes in operational constraints as well as science opportunities and re-prioritization, increasing the mission science return and accelerating the accomplishment of the Moon2Mars science objectives. The SER works within the FCT to provide recommendations to traverse execution in near real-time. One challenge is the requirement to deliver SER inputs to the FCT on operationally relevant timelines. Failure to do so may result in suboptimal execution of science exploration EVAs or even loss of key science objectives. To close this gap, we present a network optimization tool to allow the SER to provide rapid input to the FCT in response to changes in operational constraints or science opportunities. Inputs are predicated on approved science objectives, and clear rationale must be provided to the FCT for any requested change. Accordingly, this tool incorporates the Science Traceability Matrix (STM), SER prioritization scheme, and station characterization and action planning with operational constraints such as duration, traverse speed, and distance to maximize science objectives based on SER priorities, consistent with FCT operational requirements. Method: As a proof of concept, we used an existing linear programing software package used to simulate optimal routes through cellular metabolism. We built a Demonstrative Model with three STM objectives and four stations on a region of the Moon. The objectives were given an arbitrary prioritization and mapped to the stations through four possible crew actions. (Figs. 1 and 2). This station to STM mapping is consistent with the method used by the JETT5 Science Team to develop analog surface EVA science planning. We used a grid system with the landing site at the origin and the four stations placed across the positive x,y quadrant. Actions were assigned to each station and the accomplishment of those actions resulted in a numerical “reward” based on the ability of that action to achieve science objectives. The aggregate reward from each individual STM objective contributes to a global score (Science Yield), weighted by its priority. Operational constraints included a requirement to start and end at the landing site, 5 minutes each for initial station characterization and “clean up,” and variable total EVA time, traverse rate (fixed to 0.5 meters per second in our example), and time to perform each action (10, 5, 7, and 15 min for actions 1, 2, 3, and 4, respectively). Additional constraints and variables will be added in the future (e.g., sample mass, number of stations, traverse route constraints, illumination). Optimization. We converted the connections (arcs) between these stations (nodes) into a mixed integer linear programming optimization problem (arcs = constraints, nodes = variables) with the objective to maximize Science Yield. For any action, the Science Yield is equal to the relevance of that action to an STM objective [3, 2, and 1 point(s) for High, Med., and Low relevance, respectively], multiplied by the STM Objective Priority [3, 2, and 1 point(s) for High, Med., and Low priority, respectively]. This resulted in a model that computes the optimal station and action combination to maximize the Science Yield. These weightings can be adjusted by the SER as desired. Results: We explored three test cases for the Demonstrative Model. First, we set the maximum EVA duration to 120 minutes and computed the optimal route (Fig. 3A). The model suggested per-forming Actions 1 and 2 at Station P01, followed by Actions 1 and 2 at Station P02, and finally Actions 1 and 3 at Station P04 before returning to the Landing Site. Second, we adjusted the STM Objective Priori-ty order and computed the new optimal route (Fig. 3B). Under this situation, the model suggested per-forming all Actions at Station P02 followed by all Actions at Station P03. The previous test cases were relevant to SER planning activities. Next, we explored providing mid-EVA replanning input to the FCT. Scenario: While executing the Route in Fig. 3A the crew finishes at Station P01 and FCT decides that the EVA needs to finish in 45 minutes back at the Landing Site. FCT asks SER to recommend changes to the plan to accommodate this operation-al change. Using the model and incorporating these new constraints (start at Station P01, max. time of 45 min), the model suggested performing Actions 2 and 4 at Station P03 (Fig. 4), requiring 41 minutes to complete and return to the Landing Site. Interestingly, Station 3 was not part of the original route. Using the model, we determined the EVA would need 66 minutes, instead of 45, in order for the original Station P04 to yield a larger Science Yield than Station P03. The parametrization and simulation was per-formed in less than a minute, demonstrating the operational relevance of the approach. Future Efforts: The results from the Demonstrative Model suggest this tool can accelerate SER decision making on operationally relevant timelines. Use in analog activities, such as JETT5 or follow-ons, which have over a dozen stations for a crew to explore and over a dozen actions per station, will provide needed validation of the utility of this tool for planning EVAs, replanning mid-EVA, or planning follow-on EVAs based on previous results. Further integration with FCT execution monitoring tools may provide additional efficiency gains, al-lowing rapid and iterative exploration of operation-al and science decision space by the FCT and SER.

Science Operations↗

High Force Spring Clamp System

This is the Final Technical Report for the work by Hyperboloid LLC using SBIR Grant # DE-SC0019579. The work responded to US DOE SBIR Topics FY2019, Phase 1, Release 1, August 13 2018, Topic: 30. a. (2) SRF cavity joining techniques that create vacuum seals without resorting to the use of bolted flanges in order to minimize particulates. Hyperboloid LLC designed, developed and tested the High Force Spring Clamp System characterized in Patent US 9756715 that is aimed at solving this topic. The patent is held by Thomas Jefferson National Accelerator Facility. The flange bolts are substituted with exceptionally high force, binder-clip-like “C” Clamps. The clamps are opened and applied by hydraulic based tooling called “Clamp Openers” using particle minimization methods. Model 1 Clamp reached the goal of sealing the SRF industry standard hexagonal section, aluminum alloy gasket, leak-free on a research cavity as determined by a superfluid helium challenge, at 2 K for 2 assembly cycles. Descriptions include the ANSYS calculations that determine the size and shape of the clamp, the details of the Clamp Opener construction, particle counts from sealing flanges using both bolts and clamps. Model 2 Clamp, at half the size, needing a softer metallic gasket to be successful, is more readily adaptable to Cryomodule designs. It was tested, but a needs soft gasket development to be successful.

43 PARTICLE ACCELERATORS↗

Performance Testing of a Moving-Bed Gasifier Using Coal, Biomass, and Waste Plastic Blends with Washed and Unwashed Legacy Coals and Other Waste Fuels to Generate White Hydrogen

The objective of this effort, primarily funded by the United States Department of Energy (DOE), and led by the Electric Power Research Institute, Inc. (EPRI), with support by Hamilton Maurer International (HMI) and Sotacarbo S.p.A. (Sotacarbo), has been to qualify coal, biomass, and plastic waste blends based on performance testing of selected fuel pellet compositions in a pilot-scale updraft moving-bed (UDMB) gasifier. The testing provided relevant data to advance the commercial-scale design of the moving-bed gasifier to be able to successfully use these feedstocks to produce hydrogen. In particular, the effects of waste plastics on feedstock development (i.e., blending and pelletizing) and the resulting products (i.e., syngas compositions, organic condensate production, and ash characteristics) are the focus. The gasifier used for testing is HMI’s moving-bed gasifier, which has been proven capable of gasifying nearly all coal ranks. It has also shown the ability in prior testing work to gasify wood chips (biomass). However, mixtures of these fuels with plastic wastes have not been prepared and gasified together. The three feedstocks were densified and pelletized by California Pellet Mill (CPM) to meet the feedstock size required by Sotacarbo’s 30mm ID UDMB gasifier, under contract to HMI. The technical tasks and results from this two-year research project included: (1) Feed Procurement and Preparation: Nine different tri-fuel pellets were prepared from varying compositions of fresh mined PRB coal, corn stover biomass, and car fluff waste plastics. Tri-fuel pellets were produced by CPM and shipped to Sotacarbo’s test facility in Carbonia, Sardinia, Italy. (2) Test Plan Development: A test plan was created to define the test runs to be performed. The test plan detailed the different UDMB gasification tests to be performed in Sotacarbo’s 12-inch ID pilot scale gasifier, the process monitoring instrumentation used, and the extractive samples recovered for analysis of the total gasification process mass and energy balance. (3) Gasifier Testing: Nine different gasification runs were performed in the pilot-scale gasifier at Sotacarbo using nine different fuel feedstock compositions generated from varying mixtures of PRB coal, biomass, and plastic wastes. The testing generated performance data on gasification reaction efficiency and performance, yielding relevant data for models used to scale up the gasifier design. This task also included work to refurbish and reassemble the pilot gasifier at Sotacarbo and perform a baseline 100% PRB coal run. (4) Data Analysis and Reporting: Review of the data, determination of figures of merit, and interpretation of the results are reported in the project’s final report, published in March 2024. The results show that all tri-fuel pellets gasified well and maintained structural integrity throughout the gasification process. The syngas generated can be shifted to hydrogen by using commercial syngas shifting technologies. (5) High Fidelity computational fluid dynamics (CFD) Simulation: The National Energy Technology Laboratory (NETL) team performed CFD simulations of the UDMB gasifier for two of the tri-fuel pellets gasified in Sotacarbo’s pilot scale gasifier. The kinetic mechanisms for the pyrolysis of each constituent, PRB coal, corn stover biomass, and waste plastics are based on thermogravimetric analysis performed by Sotacarbo. The gasification model was validated by comparing the predicted syngas composition at the exit of the gasifier with the measured syngas composition. In addition, the reactor’s measured internal temperature profile agreed well with the predicted internal reactor temperature profile. These results validate that the model can be used to predict the performance of the updraft moving bed gasifier for different feedstocks and operating conditions. This paper summarizes the results of the completed work in which the pelletizing procedure was validated to ensure the viability of the tri-fuel pellets for the gasification runs performed at Sotacarbo’s 30 mm UDMB gasifier. The gasification performance data from this series of nine runs will enable modeling of a full-scale HMI industrial scale gasifier supporting both combined heat and power, and Hydrogen production from coal (both fresh mined and legacy) combined with various biomass and waste plastics. Additionally, plans and progress on a follow-up project, being executed by the same project team, will be presented. In this project, a total of twenty (20) different feedstocks are being prepared from varying compositions of biomass (both woody biomass and corn stover) with a mixture of legacy coal waste, plastic waste, and refuse-derived fuel (RDF). The testing will provide information on gasification reaction efficiency/performance, yielding relevant data for models used to scale up the gasifier design to 50 megawatt electric (MWe) (equivalent hydrogen production). Tests will also be performed on a bench-scale fluidized-bed gasifier for comparison purposes. The results of this testing will be used to specify the range of feedstock blends that can be successfully gasified as well as quantify gasifier outputs based on specific blends.

08 HYDROGEN↗

Spin-orbit-proximitized ferromagnetic metal by monolayer transition metal dichalcogenide: Atlas of spectral functions, spin textures, and spin-orbit torques in Co/MoSe 2 , Co/WSe 2 and Co/TaSe 2 heterostructures

In this work, the heterostructures composed of an ultrathin ferromagnetic metal (FM) and a material hosting strong spin-orbit (SO) coupling are the principal resource for SO torque and spin-to-charge conversion nonequilibrium effects in spintronics. The key quantity in theoretical description of these effects is nonequilibrium spin density, which can appear on any monolayer of the heterostructure through which the current is flowing as long as the monolayer bands are affected by the native or proximity induced SO coupling. Here we demonstrate how hybridization of wave functions of Co layer and a monolayer of transition metal dichalcogenides (TMDs)—such as semiconducting MoSe 2 and WSe 2 or metallic TaSe 2 —can lead to dramatic transmutation of electronic and spin structure of Co within some distance away from its interface with TMD, when compared to the bulk of Co or its surface in contact with a vacuum. This is due to proximity induced SO splitting of Co bands encoded in the spectral functions and spin textures on its monolayers, which we obtain using noncollinear density functional theory (ncDFT) combined with equilibrium Green function (GF) calculations. In fact, SO splitting is present due to structural inversion asymmetry of the bilayer—i.e., just the presence of the interface—even if SO coupling within TMD monolayer is artificially switched off in ncDFT calculations. However, switching it on makes the effects associated with proximity SO coupling within Co layer about five times larger. Injecting spin-unpolarized charge current through SO-proximitized monolayers of Co generates nonequilibrium spin density over them, so that its cross product with the magnetization of Co determines SO torque. The SO torque computed via first-principles quantum transport methodology, which combines ncDFT with nonequilibrium GF calculations, can be used as the screening parameter to identify optimal combination of materials and their interfaces for applications in spintronics. In particular, we identify heterostructure two-monolayer-Co/monolayer-WSe 2 as the most optimal one, at least in the clean limit.

2-dimensional systems↗

KSC Headquarters Building Area SWMU 104 Soil Interim Measure Report for LOC 2D and LOC 2E Kennedy Space Center, Florida

This Interim Measure (IM) Report for Location of Concern (LOC) 2D and LOC 2E summarizes the activities associated with implementation of an IM to address soil and concrete contamination at the Kennedy Space Center (KSC) Headquarters Building Area (KHQA) located at KSC, Florida. KHQA has been designated Solid Waste Management Unit (SWMU) 104 under KSC’s Resource Conservation and Recovery Act Corrective Action Program. The IM consisted of excavating/removing residual polychlorinated biphenyl (PCB) contamination in soil and concrete from two separate areas, LOC 2D and LOC 2E, which were associated with electrical transformer locations. IM activities were conducted in accordance with the Interim Measure Work Plan (IMWP), Revision 1, for KHQA dated June 2018, which was approved by the Florida Department of Environmental Protection in a correspondence letter dated April 2016 and the United States Environmental Protection Agency in a correspondence letter dated August 2018. The objective of the IM was to remove all remaining contaminated media with total PCB concentrations greater than the State of Florida Residential Soil Cleanup Target Level (RSCTL) (0.5 milligrams per kilogram [mg/kg]). This cleanup goal meets unrestrictive re-use conditions in Florida, and is below federal regulations for PCB Bulk Remediation Waste Cleanup of 1 mg/kg for high occupancy, unrestricted use areas, as outlined in 40 Code of Federal Regulations (CFR) 761.61(a). The timeline of the IM was coordinated with demolition of the former KSC Headquarters Building (demolished in 2021) in order to safely remove contaminated media after electrical equipment was de-energized and removed from the site. Excavation activities were conducted between January 10, 2022, and February 8, 2022, and included two waste streams for off-site disposal: (1) PCB-remediation waste greater than or equal to 50 mg/kg, and (2) PCB-remediation waste less than 50 mg/kg. A total of approximately 347 cubic yards (478 tons) of PCB-contaminated soil and concrete was initially removed from the LOC 2D and LOC 2E areas, as defined in the IMWP. An additional 4.35 tons of soil and concrete were removed based on verification sampling, which was conducted until the cleanup goal was achieved. The total area of excavation from both LOC 2D and LOC 2E was approximately 5,186 square feet (0.12 acres), and excavation depths ranged from 0.5 to 4.0 feet below land surface Excavated soils and concrete were stockpiled based on waste stream and subsequently transported and disposed of at Waste Connections of Osceola County, LLC – JED Landfill in St. Cloud, Florida (PCBs less than 50 mg/kg) or the Chemical Waste Management Landfill in Emelle, Alabama (PCBs greater than or equal to 50 mg/kg). Following excavation, clean backfill was brought to the site and provided to the Demolition Contractor to complete backfill and grading in conjunction with their final site restoration activities from building demolition. Post-IM groundwater sampling was conducted in May 2022 at three monitoring wells installed in April 2022 to confirm that PCBs did not leach into groundwater. These wells were installed where the highest PCB concentrations were detected at LOC 2D, LOC 2E, and from the Building Perimeter IM (previously completed in 2020). All PCB results in groundwater were non-detect. Volatile organic compounds were also analyzed based on potential past use of solvents in transformers with PCB-dielectric fluids and the potential release of dielectric fluids containing volatile organic compounds, and all results were non-detect. Based on completion of a successful IM at LOC 2D and LOC 2E, as well as previous remedial actions that have addressed other contamination at KHQA (SWMU 104), No Further Action without controls will be recommended for SWMU 104. NASA will submit separate Site Rehabilitation Completion Order request documentation for SWMU 104 to support an NFA without controls recommendation.

PCB↗

Preliminary Analysis of Nuclear-Powered Data Center Scenarios

This report provides a comprehensive analysis of the potential for nuclear energy to meet the growing energy demands of data centers (DCs). It evaluates the technical, economic, and socio-environmental implications of coupling Nuclear Power Plants (NPPs) with DCs, providing initial responses to several key research questions: What is the potential increased energy demand from DCs in the U.S., in the short, medium and long term? The U.S. is experiencing a rapid increase in energy demand from DCs, with projections indicating a total increase of 24-74 GWy(e) by 2028. Meeting this demand with nuclear energy would require 27–85 GWe of installed capacity. While this surge is expected to slow in the long term, the DC industry needs reliable, scalable, and clean energy sources. How much nuclear capacity can be deployed to meet DC demand and in which timeframe? Several pathways for increasing nuclear capacity were identified, including uprates, restarts of recently retired reactors, power purchase agreements with existing fleet, and new construction. Approximately 20‒28 GWe of nuclear capacity could be dedicated to DCs by the early 2030s. How much High Assay Low Enriched Uranium (HALEU) would be needed to support some nuclear deployment scenarios for DCs? Meeting the deployment targets announced by Google and Amazon for the Kairos Power Fluoride-Salt-Cooled High-Temperature Reactor or KP-FHR (~500 MWe by 2035) and the Xe-100 (~1 GWe by 2040), respectively, requires ramping up 19.75% enriched HALEU production to ~6 t/yr by 2040. What types of nuclear energy/DC coupling options exist, and what are the different benefits/challenges? Five coupling options were analyzed, ranging from grid-connected configurations to colocated, behind-the-meter setups. Key design considerations include the proximity to high- and/or medium-voltage transmission lines, the desired internal fault tolerance, and the sources of alternative/backup power during outages. Each coupling option offers unique benefits and challenges in terms of reliability, system costs, regulation, timeline, etc. A list of NPP/DC deployment scenarios was developed, considering existing or newly built NPP or DC projects. Colocated DCs with new small modular reactors or large reactors on greenfield and brownfield sites are the focus of this report. What types of reactors, especially what size, may be incentivized by DCs? Reactor sizing optimization revealed that the ideal reactor size and number of units depend on DC demand, coupling configurations defined in this report, and other economic factors. Larger reactors are preferred for high-demand DCs and grid-connected systems, while larger number of smaller reactors are better suited for DC configurations without grid backup. Which sites may be compatible with co-located nuclear-powered DCs? Siting those projects is a complicated evaluation factoring local water resources, grid connection availability and reliability, IT infrastructure, local work force, proximity to population zones, etc. For this effort greenfield and brownfield sites such as retired coal-fired plants were used to evaluate this question. This evaluation is not meant to recommend any particular site but it highlights key siting criteria and demonstrates large-scale site availability. What are the socio-economic impacts of co-located nuclear-powered DCs? Those projects generate substantial economic benefits to the local economy, particularly in urban settings. Hyperscale DCs colocated with nuclear power plants (sized around 1 GW of power) can create nearly 1,700 jobs for annual operations and more than 7,300 jobs among the supply chain and local businesses as a result of increased household spending. Rural projects also provide significant benefits, but at lower magnitudes compared to urban deployments.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Valuing Resilience for Microgrids: Challenges, Innovative Approaches, and State Needs

The United States depends on the delivery of reliable, affordable, clean, and safe electricity. Electric utilities invest billions of dollars each year in generation, transmission, and distribution assets to meet this need. However, experiences with recent natural disasters of increasing frequency and duration demonstrate the shortcomings of this approach in the face of modern threats. Further, as customers rely on electricity for a broader range of important needs, such as transportation, as well as critical life-saving services and mission critical facilities such as water treatment, medical care, shelters, telecommunications, and more, the need to minimize the likelihood and impacts of outages grows. Against this backdrop, resilience has emerged as a key consideration to guide electricity spending, whether from utilities, customers, or taxpayers. Although reliability has been defined and measured for decades with broadly accepted metrics that measure how many customers lose power and at what frequency and duration, resilience considers the electricity system’s response to a disruption and its subsequent impacts on customers. Developing tools and methods to accurately assess the costs and benefits of resilience investments is a critical step toward the goal of mitigating the impacts of outages on customers and society. Today, electric system resilience is largely treated as an externality due to challenges estimating the costs of long-duration outages, impacts of outages on society, and increasing reliance on electricity for a growing set of interdependent services. These interdependencies include the water, wastewater, telecommunications, natural gas, and health sectors. Without knowing how much a given resilience investment will benefit customers or society more broadly, investors, policymakers, and regulators are less likely to make or approve such investments, and less able to prioritize those investments. State Energy Offices and public utility commissions (PUCs) lead the development of state-level energy policy and utility regulation, respectively, and each has interests in encouraging appropriate public and private investments in resilience. To this end, the National Association of State Energy Officials (NASEO) and National Association of Regulatory Utility Commissioners (NARUC), with the support of the U.S. Department of Energy (DOE) Office of Electricity (OE), formed a joint Microgrids State Working Group to explore the costs and benefits of microgrids, barriers to broader deployment of microgrids to meet resilience and other objectives, and policy and regulatory strategies to optimize investments in resilience, including but not limited to microgrids. Although no universally accepted valuation tool for resilience exists, National Laboratories, utilities, researchers, and state and federal agencies have collaborated to develop, apply, and improve a number of approaches to quantify resilience, several of which are still in progress at the time this report is published. This report seeks to share these important advances by discussing current definitions of resilience (Section 1), how microgrids are defined and used to meet resilience objectives (Section 2), new approaches to valuing resilience (Section 3), steps State Energy Offices and PUCs have taken to further resilience valuation efforts (Section 4), and finally, considerations and suggested next steps for State Energy Offices and PUCs (Section 5). Relevant examples of specific microgrid projects and resilience valuation efforts are included throughout the report. While this report is written specifically for NASEO and NARUC members, it may be useful for utilities, local governments, and individual customers interested in improving the way public and private dollars are spent to achieve resilience outcomes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Clean Condensing Gas Furnace

Natural gas furnaces are the most common space heating equipment in the U.S. residential and commercial building markets. However, current residential natural gas condensing furnaces generate substantial acidic condensate as well as significant emissions of sulfur oxides (SOx), nitrogen oxides (NOx), carbon monoxide (CO), hydrocarbons (HC), and methane (CH 4 ) contributing to environmental degradation of air, water, and soil. This report describes a novel solution to reduce the environmental impact of natural gas condensing furnaces based on the technology of a monolithic acidic gas reduction (AGR) catalyst for SOx trapping, NOx redox to nitrogen, and oxidation of formic acid, CO, HC, and CH 4 . The AGR technology offers the following benefits: (1) a neutral furnace condensate with a pH of ~7, allowing its safe release into the sewer system thus eliminating a second drainage system; (2) trapping and removing nearly all SOx emissions; (3) NOx emissions nearly at nearly 1-2 ng/J, more than 95% lower than new emissions standards in California; (4) the use of a low-cost heat exchanger as a condensing heat exchanger (HX) since the condensate is not acidic, avoiding the need for expensive stainless steel alloys; and (5) unburnt fuel energy recovery to boost efficiency.The AGR component and AGR-enabled furnace performance were broadly tested to determine their effects on long-term reliability and durability, as well as SOx storage and regeneration activity. The AGR regeneration does not impair the performance in achieving neutral condensate and ultra-low NOx emissions, and the AGR catalyst subjected to regeneration activities continued to function well and achieved slightly better annual fuel utilization efficiency (AFUE). The 400-hour reliability and durability test of the retrofitted condensing furnace with the AGR component shows that the furnace unit still achieves a neutral furnace condensate with a pH of ~7 and enables 0~3 ng/J of NOx emissions. However, the 400-hour operation slightly degraded the AFUE because of soot particle accumulation caused by frequent incomplete combustion owing to inappropriate condensate drainage during testing. Thus, proper condensate drainage is critical for AGR-enabled furnaces. Furthermore, neutron computed tomography was employed to survey the aged AGR component and demonstrate high-resolution 2D and 3D representations for the nondestructive diagnosis of the AGR component. The tomography showed that the AGR component did not deform or suffer broken AGR channels. A new AGR catalyst with low precious metal loading was preliminarily explored to identify a pathway of optimizing AGR material loading and maximizing acidic gas reduction at low cost. The new AGR component can reduce precious metal loading by 38% and still achieve neutral condensate and ultralow NOx emissions. The furnace with the AGR component of low Pt/Rh loading enables a maximum AFUE of 97%, which is meaningfully higher than the original furnace. Long-duration testing for the furnace enabled with the low precious metal loading AGR component will be vital in future research. Although the current work demonstrates a proof of concept for the AGR-enabled furnace, the AGR assembly needs to be optimized and integrated into the design of new OEM furnace products. Furthermore, the AGR technology can be applied not only for residential gas furnaces, but also for commercial rooftop units, gas heat pumps, gas-fired water heaters, combustion boilers, and other systems.

03 NATURAL GAS↗

Microbial Monitoring of the International Space Station

Humans living and working in the harsh environment of space present many challenges for habitability engineers and microbiologists. Spacecraft must provide an internal environment in which physical (gas composition, pressure, temperature, and humidity), chemical, and biological environmental parameters are maintained at safe levels. Microorganisms are ubiquitous and will accompany all human-occupied spacecraft, but if biological contamination were to reach unacceptable levels, long-term human space flight would be impossible. Prevention of microbiological problems, therefore, must have a high priority. Historically, prevention of infectious disease in the crew has been the highest priority, but experience gained from the NASA-Mir program showed that microbial contamination of vehicle and life-support systems, such as biofouling of water and food, are of equal importance. The major sources of microbiological risk factors for astronauts include food, drinking water, air, surfaces, payloads, research animals, crew members, and personnel in close contact with the astronauts. In our efforts to eliminate or mitigate the negative effects of microorganisms in spacecraft, the National Aeronautics and Space Administration (NASA) implemented comprehensive microbial analyses of the major risk factors. This included the establishment of acceptability requirements for food, water, air, surfaces, and crew members. A robust monitoring program was then implemented to verify that the risks were within acceptable limits. Prevention of microbiological problems is preferred over mitigation of problems during flight, and preventive steps must begin very early in the design phase. Spacecraft development must include requirements to control free water from humidity, condensate, hygiene activities, and other releases. If water is available, microbes are likely to grow because sufficient nutrients are potentially available. Materials selected for the spacecraft must not promote or support microbial growth. Air filtration can dramatically reduce the number of airborne bacteria, fungi, and particulates in spacecraft breathing air. Waterborne bacteria can be reduced to acceptable levels by thermal inactivation of bacteria during water processing, along with a residual biocide, and filtration at the point of use can ensure safety. System design must include onboard capability to achieve recovery of the system from contamination. Robust housekeeping procedures that include periodic cleaning and disinfection will prevent high levels of microbial growth on surfaces. Food for consumption in space must be thoroughly tested for excessive microbial content and pathogens before launch. Thorough preflight examination of flight crews, consumables, payloads, and the environment can greatly reduce pathogens in spacecraft. Many of the lessons learned from the Space Shuttle and previous programs were applied in the early design phase of the International Space Station, resulting in the safest space habitat to date. This presentation describes the monitoring program for the International Space Station and will summarize results from preflight and on-orbit monitoring.

Pierson, Duane L.↗

Development of a Reference Dose for Perchlorate: Current Issues and Status

The perchlorate anion (ClO4) is typically manufactured as the ammonium salt. The most common use of ammonium perchlorate is in the aerospace program as a component of solid rocket fuel. The perchlorate anion is exceedingly stable under environmental conditions and has been found in ground and surface waters in CA, NV, UT, AZ, TX, AK, NY, MD, WV and FL. The National Center for Environmental Assessment (NCEA) of the U.S. Environmental Protection Agency (US EPA) is in the process of developing an oral reference dose (RfD) for perchlorate. An oral RfD is a body-weight-adjusted dose that can be consumed daily over an entire lifetime with the expectation of no adverse health effects. Once developed, the new RfD will be used by US EPA as the basis of a safe-drinking-water level (SDWL) guideline. US EPA and regional regulatory agencies will then jointly or separately propose clean-up action levels for ground and surface waters at contaminated sites. The toxicological database on CIO4- as of March 1997 was determined by an expert peer-review panel to be inadequate for the purpose of deriving an oral RfD. For example, little or no experimental data existed on the subchronic, reproductive, or developmental toxicity of perchlorate. To fill gaps in the toxicological database, eight animal studies were designed by a government-industry consortium that included US EPA and AFRL. These studies were performed in 1997-1998. It has been known for many years that in the thyroid, high doses of perchlorate block the function of iodide by competing for iodide binding sites. Perchlorate was used in the 1950s-60s as a treatment for Graves' disease (a hyperthyroid condition). Because of what was already known about the pharmacological mode of action of perchlorate, specific concerns addressed in the design of the recent animal studies included the potential for developmental toxicity, notably neurological development. Upon review of complete study reports from four of the studies and incomplete data from the other two, US EPA/NCEA issued a document in December 1998 stating that the critical effects were hormone and histology data from the neurodevelopmental/behavioral toxicity study that had been performed in rats; an RfD was proposed based upon the observation of thyroid-follicular-cell hypertrophy in the 5-day-old pups (PND) of dams given perchlorate in drinking water at 0.1 mg/kg-day (the lowest dose tested) in this study. US EPA/NCEA also focused attention on a nonsignificant increase in motor activity observed in 14-day-old male pups in the same study at the same dose. In February 1999, a public workshop was convened at which an external peer-review panel determined that there was still insufficient data to support the development of a RfD. Additional studies were recommended. Since that time a clinical study revealed significant depression of thyroidal uptake of iodide in volunteers receiving potassium perchlorate at 10 mg/day for 14 days. Follow-up studies currently underway include a pathology working-group review of histology slides from the all of the previous studies, a motor activity study similar to the first behavioral study, an additional immunotoxicity study, male and female rat kinetic studies, a hormone interlaboratory study, and an effects study for thyroid and brain in developing rats. These studies are expected to be complete by mid-2000. A clinical study is planned to determine inhibition of iodide uptake and kinetic parameters in humans following 14-day perchlorate ingestion. The kinetics studies will provide data for developing physiologically based pharmacokinetic (PBPK) models for rats and humans needed to establish the RfD.

Pleus, R. C.↗

Jet-Intracluster Medium Interactions of the Head Tail Radio Galaxy 3C 129

The 50 ksec XMM observations of the galaxy cluster 3C 129 were taken as scheduled, and the data are of good quality. We analyzed the data in the following way. After standard cleaning, we flat-fielded the XMM surface brightness maps. Combining the data from the EPIC MOS and PN Camera CCDs, we performed a cross-correlation analysis of the X-ray surface brightness distribution with the 1.4 GHz VLA radio map. We found evidence for cavities in the X-ray emitting Intra-Cluster Medium (ICM) associated with the radio tail of the head-tail radio galaxy 3C 129. This discovery is very interesting as it excludes the presence of a large fraction of thermal plasma in the radio tail. Together with the observation of an apparent pressure mismatch between the radio plasma and the ICM, and an upper limit on the magnetic field inside the radio tail (from the radio spectral indices map) the observation implies that the tail pressure is dominated either by low-energy electrons/positrons, or, by relativistic protons. Furthermore, we studied the energy spectrum of an X-ray "hot-spot" associated with the head of the radio galaxy 3C 129. It seems likely that the X-ray hot-spot originates from shocked gas in front of the radio galaxy. , The analysis turned out to be much more difficult than anticipated. The main reason is the lack of a comprehensive, publicly available background model that is key for the analysis of extended sources. Small groups like our do not have the man-power to come up with a background model themselves. We used the model from Read & Ponman (A&A 409, 395, 2003). However, the background subtracted X-ray surface brightness maps show a bright ring in the outer 20% of the camera. We tried to get rid of this ring and contacted the XMM helpdesk and Read & Ponman, the authors of the background paper. However, up to this day, we did not entirely succeed to remove the brightness enhancement at the outer parts of the camera. Unfortunately, our results are somewhat sensitive to the uncertainty, as the radio galaxy 3C 129 is very large and occupies a rather large fraction of the XMM field of view. We are now working on a paper describing the results. The paper will include a detailed discussion of the uncertainties associated with the non- perfect background subtraction.

Krawczynski, Henric S. W.↗

North Dakota Integrated Carbon Storage Complex Feasibility Study. Final report

In spring 2017, the Energy & Environmental Research Center (EERC) initiated an effort to determine the feasibility of developing a commercial-scale CO 2 geologic storage complex able to store 50+ million tonnes (Mt) of CO 2 in central North Dakota safely, permanently, and economically. The objective was to fulfill the goals of the U.S. Department of Energy (DOE) Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative and address technical and nontechnical challenges specific to commercial-scale deployment of a CO2 storage project. The findings clearly show that the concept of capturing CO 2 from a lignite-fired electrical generation facility in central North Dakota and safely and permanently storing the CO 2 in the deep subsurface is indeed technically, economically, and socially feasible. This project evaluated two study areas and their respective geologic storage complexes located adjacent to separate coal-fired facilities in North Dakota: the Basin Electric Power Cooperative (BEPC)-owned Great Plains Synfuels Plant (GPSP) and the Minnkota Power Cooperative (Minnkota)-owned Milton R. Young Station (MRYS). These locations, one with CO 2 capture in place and an existing CO 2 pipeline, are bolstered by progressive North Dakota pore space ownership and long-term liability laws. These elements and a motivated team created an ideal synergistic scenario for ensuring success of the CarbonSAFE Initiative and promoting North Dakota’s statewide vision for carbon management. The project included drilling two new geologic characterization wells, integrating an existing 3-D seismic survey, creating a geologic model subsequently used for injection simulation, a risk assessment, public outreach, and generating a site development plan based on results. In addition, the performance of select National Risk Assessment Partnership tools was evaluated. The geologic characterization wells were drilled ~5600 feet deep to the Broom Creek Formation; ~350 feet of core was retrieved from each well. The core included the Broom Creek (targeted injection zone) and a portion of the overlying Opeche Shale (seal). The Flemmer-1 well, west of Beulah, North Dakota, yielded 169 feet of sandstone. The BNI-1 well located south of Center, North Dakota, yielded 124 feet of sandstone. In each case, laboratory analysis of the sandstone showed permeability in the 300–1000-mD range, with porosity of 20%–30%. The Flemmer-1 well was sited within the boundaries of an existing 3-D seismic survey. Colocating the well with the seismic survey maximized the relationship between new and legacy data and developed a first-of-its-kind interpretation of the geologic fabric of the Broom Creek. Geologic characterization data were integrated into a 5544-mi 2 geocellular model that encompassed both new wells and stratigraphy from the surface to the Amsden Formation (underlying the Broom Creek). The model was later expanded vertically to include the deeper Black Island–Deadwood interval to examine its potential viability as a storage target. The geocellular model provided the foundation for dynamic simulation of CO 2 into the Broom Creek. Results of the simulation suggest that the Broom Creek could accept the DOE target rate of 2 Mt/yr of CO 2 into as few as two wells. To bracket the expected capture from MRYS, simulations were also investigated for a 4-Mt/yr rate near MRYS. Although more wells are needed (two additional), the Broom Creek still has the storage resource to accept the CO 2 at the increased rate. A risk assessment exercise was conducted to identify and assess technical and nontechnical risks that could prevent potential candidate storage complexes within the study area from serving as commercial storage sites. The assessment identified and evaluated six technical risk categories: 1) CO 2 injectivity, 2) storage capacity, 3) lateral migration of CO 2 , 4) lateral pressure propagation, 5) vertical migration of CO 2 or formation brine, and 6) induced seismicity. Following two rounds of analysis and scoring, no risks were determined to preclude continued efforts to develop carbon capture, utilization, and storage (CCUS) in central North Dakota. The risk assessment results will be used to guide future site characterization, modeling and simulation, and monitoring activities. A specific nontechnical strategic risk based on challenges that may be realized in amalgamation of pore space resulted in vertically expanding the geologic model to incorporate the potential for stacked storage in multiple saline reservoirs. By including the Black Island–Deadwood interval (the basal sedimentary reservoir in this region), the amalgamated areal extent could be reduced by as much as 45%. Working with a smaller geographic area reduces risks and costs associated with monitoring and pore space leasing. An economic evaluation incorporating capture; transport (<5 mi); Class VI wells; permitting; and monitoring, verification, and accounting suggests implementing commercial-scale CCUS is economically attractive if the federal tax benefits of 45Q are included. This is validated by Minnkota’s continued pursuit of CO 2 capture and geologic storage at MRYS through its Project Tundra initiative, indicating that there is a business case for CCUS in central North Dakota. Currently, North Dakota is the only state with underground injection control (UIC) Class VI primacy. Built into the North Dakota Century Code is a series of regulatory requirements that guide the process to obtain a Class VI CO 2 storage facility permit. As part of this project, a site development plan was compiled to assure compliance with North Dakota’s requirements to permit a commercial-scale CO 2 storage operation and includes a prospective time line encompassing a general breakdown of activities. In total, an estimated 30 months would be needed to execute the necessary steps to attain a North Dakota CO 2 storage facility permit. Outreach was an integral part of the project and encompassed any project-related activity that had contact or exposure beyond the project team. The goals of outreach were to foster an environment from which stakeholders could make informed decisions about the project and gauge community receptiveness to a CCUS project. A consistent set of messages and outreach products were developed in conjunction with an outreach advisory board that integrated project partners and team members. To gauge public acceptability of geologically storing CO 2 , 5611 households in the project area were invited to participate in an online survey. The survey results indicate that the public attitude regarding CCUS is neutral to positive, with strong sentiment that CO 2 capture and storage may be an approach to maintain the economic vitality of the region. To achieve project objectives, critical support in the form of financial backing, engineering evaluations, site access, outreach collaboration, operations data, risk assessment/evaluation, and software access was provided by BEPC, the North Dakota Industrial Commission Lignite Research Council, ALLETE Clean Energy, BNI Energy, North American Coal Corporation, Minnkota, Prairie Public Broadcasting, Computer Modelling Group Ltd., and Schlumberger.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗