Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “space launch”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,153 records · Page 64

AST Launch Vehicle Acoustics

The liftoff phase induces acoustic loading over a broad frequency range for a launch vehicle. These external acoustic environments are then used in the prediction of internal vibration responses of the vehicle and components which result in the qualification levels. Thus, predicting these liftoff acoustic (LOA) environments is critical to the design requirements of any launch vehicle. If there is a significant amount of uncertainty in the predictions or if acoustic mitigation options must be implemented, a subscale acoustic test is a feasible pre-launch test option to verify the LOA environments. The NASA Space Launch System (SLS) program initiated the Scale Model Acoustic Test (SMAT) to verify the predicted SLS LOA environments and to determine the acoustic reduction with an above deck water sound suppression system. The SMAT was conducted at Marshall Space Flight Center and the test article included a 5% scale SLS vehicle model, tower and Mobile Launcher. Acoustic and pressure data were measured by approximately 250 instruments. The SMAT liftoff acoustic results are presented, findings are discussed and a comparison is shown to the Ares I Scale Model Acoustic Test (ASMAT) results.

Houston, Janice↗

A Systems Approach to Lower Cost Missions: Following the Rideshare Paradigm

Small-satellite rideshare capabilities and opportunities for low-cost access to space have been evolving over the past 10 years. Small space launch vehicle technology is rapidly being developed and demonstrated, including the Minotaur series and the Space X Falcon, among others, along with the lower cost launch facilities at Alaska's Kodiak Launch Complex, NASA's Wallops Flight Facility, and the Reagan Test Site in the Pacific. Demonstrated capabilities for the launch of multiple payloads have increased (and continue to increase) significantly. This will allow more efficient and cost-effective use of the various launch opportunities, including utilizing the excess capacity of the emerging Evolved Expendable Launch Vehicle (EELV)-based missions. The definition of standardized interfaces and processes, along with various user guides and payload implementation plans, has been developed and continues to be refined. Top-level agency policies for the support of low-cost access to space for small experimental payloads, such as the DoD policy structure on auxiliary payloads, have been defined and provide the basis for the continued refinement and implementation of these evolving technologies. Most importantly, the coordination and cooperative interfaces between the various stakeholders continues to evolve. The degree of this coordination and technical interchange is demonstrated by the wide stakeholder participation at the recent 2008 Small Payload Rideshare Workshop, held at NASA's Wallops Flight Facility. This annual workshop has been the major platform for coordination and technical interchange within the rideshare community and with the various sponsoring agencies. These developments have provided the foundation for a robust low-cost small payload rideshare capability. However, the continued evolution, sustainment, and utilization of these capabilities will require continued stakeholder recognition, support, and nourishing. Ongoing, coordinated effort, partnering, and support between stakeholders is essential to acquire the improved organizational processes and efficiencies required to meet the needs of the growing small payload community for low-cost access to space. Further, a mix of capabilities developed within the space community for Operationally Responsive Space, an international committee investigating space systems cross-compatibility, and an industry-based organization seeking small satellite "standardization" all work toward a new paradigm: sharing or leveraging resources amongst multiple users. The challenge: where are those users, and what is the best way to leverage them? What is leveraged-mass, power, cost-sharing? And how does one sort through these options? What policies may prevent the use of some options? Who are the "other users" that might share or leverage capabilities? This paper presents a systematic look at both the users and the launch options, and suggests a way forward.

access to space↗

Command and Control Software Development

As NASA’s role in spaceflight operations change, so too does its design priorities. NASA’s flagship venture, the Space Launch System (SLS), is being created primarily to explore deep space. While commercial partners conduct low Earth orbit resupplies, tests, and even transportation of astronauts, NASA can divert more resources to more exciting projects - going back to the moon, or onwards to Mars. In the short term, this goal manifests in the upcoming Exploration Mission-1 (EM-1) test of the SLS, slated for as early as 2019. SLS, with the Orion capsule, will travel farther than any human-rated spacecraft has gone before. As the most powerful launch vehicle ever created, SLS requires many new innovations to ensure mission success. One such technology is the launch control software, which is the focus of this internship. The SLS launch control software is composed of many functions, all of which require rigorous testing to meet the standard of life-critical code. To facilitate easier testing, the first project I undertook was to customize the open-source tool Wireshark to the software team’s needs. Wireshark is a network protocol analyzer that can take in information about custom information packets. The launch control software will have several protocols that are custom to NASA. I ensured that all necessary component files were the correct file type and in the correct structure for Wireshark to compile. Having allowed Wireshark access to understand custom NASA data packets, testers of the launch control software will be able to find anomalies easier.

Wang, Zhengdong↗

Beyond Gravity Single Launch Payload Accommodations Shock Testing

The Vulcan Centaur launch vehicle is purpose-built to meet all the U.S. government’s National Security Space Launch (NSSL) needs. A shock test for the Centaur V’s payload accommodations (PLA), single launch (SL) configuration was successfully conducted at NASA’s Marshall Space Flight Center (MSFC) in Huntsville, Alabama, in May 2021. This test was a joint effort between MSFC, Beyond Gravity and United Launch Alliance. The primary purpose of the shock test was to characterize the shock environment induced by the separation event on components attached to the PLA and its interfaces. Additional test requirements included: (1) verifying the payload fairing (PLF) did not contact the flight hardware during the mechanical separation of the PLF horizontal separation system (HSS) and (2) evaluating the performance of the HSS spring packages during jettison. The data acquired during the PLF SL shock test will be used to validate the shock predictions from pre-test analysis of the launch vehicle and the PLF separation analysis. This paper provides an overview of the PLA SL shock test planning and execution as well as the required catch system, instrumentation and results.

separation↗

Beyond Gravity Single Launch Payload Accommodations Shock Testing

The Vulcan Centaur launch vehicle is purpose-built to meet all the U.S. government’s National Security Space Launch (NSSL) needs. A shock test for the Centaur V’s payload accommodations (PLA), single launch (SL) configuration was successfully conducted at NASA’s Marshall Space Flight Center (MSFC) in Huntsville, Alabama, in May 2021. This test was a joint effort between MSFC, Beyond Gravity and United Launch Alliance. The primary purpose of the shock test was to characterize the shock environment induced by the separation event on components attached to the PLA and its interfaces. Additional test requirements included: (1) verifying the payload fairing (PLF) did not contact the flight hardware during the mechanical separation of the PLF horizontal separation system (HSS) and (2) evaluating the performance of the HSS spring packages during jettison. The data acquired during the PLF SL shock test will be used to validate the shock predictions from pre-test analysis of the launch vehicle and the PLF separation analysis. This paper provides an overview of the PLA SL shock test planning and execution as well as the required catch system, instrumentation and results.

separation↗

Beyond Gravity Single Launch Payload Accommodations Shock Testing

The Vulcan Centaur launch vehicle is purpose-built to meet all the U.S. government’s National Security Space Launch (NSSL) needs. A shock test for the Centaur V’s payload accommodations (PLA), single launch (SL) configuration was successfully conducted at NASA’s Marshall Space Flight Center (MSFC) in Huntsville, Alabama, in May 2021. This test was a joint effort between MSFC, Beyond Gravity and United Launch Alliance. The primary purpose of the shock test was to characterize the shock environment induced by the separation event on components attached to the PLA and its interfaces. Additional test requirements included: (1) verifying the payload fairing (PLF) did not contact the flight hardware during the mechanical separation of the PLF horizontal separation system (HSS) and (2) evaluating the performance of the HSS spring packages during jettison. The data acquired during the PLF SL shock test will be used to validate the shock predictions from pre-test analysis of the launch vehicle and the PLF separation analysis. This paper provides an overview of the PLA SL shock test planning and execution as well as the required catch system, instrumentation and results.

separation↗

Software and Human-Machine Interface Development for Environmental Controls Subsystem Support

The Space Launch System (SLS) is the next premier launch vehicle for NASA. It is the next stage of manned space exploration from American soil, and will be the platform in which we push further beyond Earth orbit. In preparation of the SLS maiden voyage on Exploration Mission 1 (EM-1), the existing ground support architecture at Kennedy Space Center required significant overhaul and updating. A comprehensive upgrade of controls systems was necessary, including programmable logic controller software, as well as Launch Control Center (LCC) firing room and local launch pad displays for technician use. Environmental control acts as an integral component in these systems, being the foremost system for conditioning the pad and extremely sensitive launch vehicle until T-0. The Environmental Controls Subsystem (ECS) required testing and modification to meet the requirements of the designed system, as well as the human factors requirements of NASA software for Validation and Verification (V&V). This term saw significant strides in the progress and functionality of the human-machine interfaces used at the launch pad, and improved integration with the controller code.

Dobson, Matthew↗

Design and Development of NEA Scout Solar Sail Deployer Mechanism

The 6U (approx.10 cm x 20 cm x 30 cm) cubesat Near Earth Asteroid (NEA) Scout1, projected for launch in September 2018 aboard the maiden voyage of the Space Launch System, will utilize a solar sail as its main method of propulsion throughout its approx.3-year mission to a Near Earth Asteroid. Due to the extreme volume constraints levied onto the mission, an acutely compact solar sail deployment mechanism has been designed to meet the volume and mass constraints, as well as provide enough propulsive solar sail area and quality in order to achieve mission success. The design of such a compact system required the development of approximately half a dozen prototypes in order to identify unforeseen problems, advance solutions, and build confidence in the final design product. This paper focuses on the obstacles of developing a solar sail deployment mechanism for such an application and the lessons learned from a thorough development process. The lessons presented will have significant applications beyond the NEA Scout mission, such as the development of other deployable boom mechanisms and uses for gossamer-thin films in space.

Sobey, Alexander R.↗

Design and Development of NEA Scout Solar Sail Deployer Mechanism

The 6U (approximately 10cm x 20cm x 30cm) cubesat Near Earth Asteroid (NEA) Scout1, projected for launch in September 2018 aboard the maiden voyage of the Space Launch System (SLS), will utilize a solar sail as its main method of propulsion throughout its approximately 3 year mission to a Near Earth Asteroid (NEA). Due to the extreme volume constraints levied onto the mission, an acutely compact solar sail deployment mechanism has been designed to meet the volume and mass constraints, as well as provide enough propulsive solar sail area and quality in order to achieve mission success. The design of such a compact system required the development of approximately half a dozen prototypes in order to identify unforeseen problems, advance solutions, and build confidence in the final design product. This paper focuses on the obstacles of developing a solar sail deployment mechanism for such an application and the lessons learned from a thorough development process. The lessons presented will have significant applications beyond the NEA Scout mission, such as the development of other deployable boom mechanisms and uses for gossamer-thin films in space.

Sobey, Alexander R.↗

Design and Development of NEA Scout Solar Sail Deployer Mechanism

The 6U (approximately10cm x 20cm x 30cm) cubesat Near Earth Asteroid (NEA) Scout, projected for launch in September 2018 aboard the maiden voyage of the Space Launch System (SLS), will utilize a solar sail as its main method of propulsion throughout its approximately 3 year mission to a near earth asteroid. Due to the extreme volume constraints levied onto the mission, an acutely compact solar sail deployment mechanism has been designed to meet the volume and mass constraints, as well as provide enough propulsive solar sail area and quality in order to achieve mission success. The design of such a compact system required the development of approximately half a dozen prototypes in order to identify unforeseen problems and advance solutions. Though finite element analysis was performed during this process in an attempt to quantify forces present within the mechanism during deployment, both the boom and the sail materials do not lend themselves to achieving high-confidence results. This paper focuses on the obstacles of developing a solar sail deployment mechanism for such an application and the lessons learned from a thorough development process. The lessons presented here will have significant applications beyond the NEA Scout mission, such as the development of other deployable boom mechanisms and uses for gossamer-thin films in space.

Sobey, Alexander R.↗

CFD 2030 Grand Challenge: CFD-in-the-Loop Monte Carlo Flight Simulation for Space Vehicle Design

Flight qualification of space vehicles is markedly different from those typically employed for aircraft. The concept of an extensive flight test campaign for a space vehicle does not exist, and vehicle designers must look to alternative techniques for demonstrating robust and reliable performance of their vehicles prior to operational flight. A space vehicle may undergo only a handful of flight tests in its development cycle, with each flight representing a drastically different flight phase or flight configuration. For instance, NASA’s Space Launch System (SLS) launch vehicle and Orion spacecraft will only see a total of four flight demonstrations before flying a crew on its first operational mission, and each flight demonstrates a unique vehicle configuration and/or set of flight conditions. The SLS will be flown only one time before it becomes operational (Artemis 1). The Orion spacecraft Crew Module (CM) will have been tested twice, once on a Delta IV launch vehicle (Exploration Flight Test 1) and once as a fully integrated system with the SLS launch vehicle (Artemis 1). The Orion Launch abort system will have been tested twice, once in a pad abort scenario (Pad Abort 1) and once in an inflight abort scenario (Ascent Abort 2) on a modified Peacekeeper booster. Both of these latter tests involve only a boiler plate CM, not a functional Orion spacecraft. Thus, unlike aircraft, there is very little opportunity for engineers to assess and evaluate their preflight predictions. Instead, space vehicle designers rely on Monte Carlo flight simulations with detailed dispersions of predicted nominal flight behavior to determine how robust their design is to errors and uncertainties in the flight conditions their vehicle may encounter. These Monte Carlo analyses entail thousands of trajectory simulations to demonstrate that the vehicle can meet design requirements at a specified level of reliability. From an aerodynamics and aerothermodynamics perspective, these trajectory simulations are fueled by an extensive aerodynamic database that covers the complete range of expected flight conditions, vehicle configurations, and flight attitudes expected in a given mission. Today, these databases amount to a table of engineering parameters that can be quickly interrogated by the trajectory simulator. The aerodynamic and aerothermodynamic databases are assembled via a series of ground tests, empirical and analytical analysis, physics-based computational analysis, applicable past flight performance data, and in some cases, engineering judgment. These databases generally take years to assemble for a new space vehicle system and in the case of SLS/Orion, over a decade of test and analysis have been expended to develop the extensive databases required to cover the myriad of configurations and potential flight conditions required for the system. Recently, it has been proposed that Computational Fluid Dynamic (CFD) and computing capability may be reaching a point where it is foreseeable that CFD could be integrated directly into the production trajectory simulation tools used to design NASA’s space vehicles. To demonstrate this, NASA has embarked on two demonstrations of this type of capability, one where six degree of freedom flight trajectory simulation equations are embedded in an existing CFD solver and another where a production CFD solver is loosely coupled with a production trajectory simulation tool. These efforts represent an initial demonstration of a future approach to flight trajectory simulation, but they are a far cry from the capability required to perform a full-up CFD-in-the-loop Monte Carlo trajectory simulation. Therefore, this represents a viable grand challenge for computational methods addressing space vehicle design and development. The final paper/presentation will discuss the many hurdles, beyond simply raw computational power, to realizing this grand challenge and how they map directly to the CFD Vision 2030 ojectives. Among these are the wide range of flight conditions, including accelerating/decelerating flight, encountered by a space vehicle during launch and/or entry. The vehicle can also encounter numerous configuration changes, some of which can be quite drastic, during the course of its flight, so robust, automated geometry modeling, grid generation, and adaptation will play a huge role in reaching this goal. Multiply this by 1000’s of trajectory simulations occurring simultaneously in a given Monte Carlo analysis, and the problem readily scales to absorb virtually any size of supercomputer envisioned today. The concept of CFD-in-the-loop Monte Carlo trajectory simulation poses a formidable challenge for emerging and future computing systems, and it has the potential to shave years off the development cycle for aerodynamic and aerothermodynamic performance predictions as compared to today’s space vehicle design approach.

CFD 2030↗

Space Shuttle Main Engine (SSME) Evolution

The SSME when developed in the 1970's was a technological leap in space launch propulsion system design. The engine has safely supported the space shuttle for the last two decades and will be required for at least another decade to support human space flight to the international space station. This paper discusses the continued improvements and maturing of the system to its current state and future considerations for its critical role in the nations space program. Discussed are the initiatives of the late 1980's, which lead to three major upgrades through the 1990's. The current capabilities of the propulsion system are defined in the areas of highest programmatic importance: ascent risk, in-flight abort thrust, reusability, and operability. Future initiatives for improved shuttle safety, the paramount priority of the Space Shuttle program are discussed.

Worlund, Len A.↗

Evaluation of the Spherical Flange Concept for a Rocket Engine

Due to the inherent tolerance variability of hardware, flange misalignments occur during installation of mating components for a liquid propellant rocket engine. Flange misalignments include axial, lateral, and angular offsets. If these misalignments are high, they can impart significant loads into the two mating components. These significant loads can then be a driver in the design of the propellant ducts. Such was the case for the Rocketdyne RS-83 engine design for the Space Launch Initiative Program. To address this flange misalignment issue, Marshall Space Flight Center joined with Rocketdyne to develop and test a spherical flange system that allows for misalignment, yet reduces loads imparted, and at the same time provides sufficient sealing against leakage. The flange design was tested to evaluate and compare performance parameters such as misalignment and leakage. The environmental conditions ranged from -100 to 400 degrees Fahrenheit (F) with 1000 to 4000 pounds per square inch gage (psig) pressure. The desirable design features will be extracted and synthesized into a new flange design concept. This paper will address the spherical flange design and the test results.

Nichols, Jay↗

Space Commercialization

A robust and competitive commercial space sector is vital to continued progress in space. The United States is committed to encouraging and facilitating the growth of a U.S. commercial space sector that supports U.S. needs, is globally competitive, and advances U.S. leadership in the generation of new markets and innovation-driven entrepreneurship. Energize competitive domestic industries to participate in global markets and advance the development of: satellite manufacturing; satellite-based services; space launch; terrestrial applications; and increased entrepreneurship. Purchase and use commercial space capabilities and services to the maximum practical extent Actively explore the use of inventive, nontraditional arrangements for acquiring commercial space goods and services to meet United States Government requirements, including measures such as public-private partnerships, . Refrain from conducting United States Government space activities that preclude, discourage, or compete with U.S. commercial space activities. Pursue potential opportunities for transferring routine, operational space functions to the commercial space sector where beneficial and cost-effective.

Martin, Gary L.↗

Consolidated Development Objectives Document (CDOD) For MB-60

This document defines the objectives related to liquid rocket engine system development to be undertaken by JAXA in support of the Space Launch System (SLS) Program managed out of the NASA Marshall Space Flight Center (MSFC). These objectives include furnishing the necessary management, labor, facilities, tools, equipment, and materials required to execute the specified activities. 1.1 Project Scope: The scope of this effort is to develop a rocket engine and associated products per the objectives and technical requirements established in this document. This engine, minus the engine controller, designated here as MB ]60, is to be developed through to a prequalification point of maturity. It is assumed that should JCNE ]1 development proceed beyond this maturity point towards actual flight qualification, the engine controller will be supplied and integrated by NASA. 1.2 Document Structure: The structure of this Consolidated Development Objectives Document (CDOD) includes a traditional description of objectives in a SOO, plus the associated Data Products Document (DPD) in an attached appendix, and then Engine Requirements Document (ERD) as another attached appendix. It is the intent that this document, in conjunction with the cited applicable documents, should constitute a complete programmatic and technical description of the development effort to be pursued.

Greene, William D.↗

Scale Model Acoustic Test Validation of IOP-SS Water Prediction using Loci-STREAM-VoF

The Scale Model Acoustic Test (SMAT) is a 5% scale test of the Space Launch System (SLS), which is currently being designed at Marshall Space Flight Center (MSFC). SMAT consists of a 5% scale representation of the ignition overpressure sound-suppression system (IOP-SS) that is being tested to quantify the water flow and induced air entrainment in and around the mobile launcher exhaust hole. This data will be compared with computational fluid dynamics (CFD) simulations using the newly developed Loci-STREAM Volume of Fluid (VoF) methods. Compressible and incompressible VoF methods have been formulated, and are currently being used to simulate the water flow of SMAT IOP-SS. The test data will be used to qualitatively and quantitatively assess and validate the VoF methods.

Nielsen, Tanner↗

Characterization of the Scale Model Acoustic Test Overpressure Environment using Computational Fluid Dynamics

The Scale Model Acoustic Test (SMAT) is a 5% scale test of the Space Launch System (SLS), which is currently being designed at Marshall Space Flight Center (MSFC). The purpose of this test is to characterize and understand a variety of acoustic phenomena that occur during the early portions of lift off, one being the overpressure environment that develops shortly after booster ignition. The pressure waves that propagate from the mobile launcher (ML) exhaust hole are defined as the ignition overpressure (IOP), while the portion of the pressure waves that exit the duct or trench are the duct overpressure (DOP). Distinguishing the IOP and DOP in scale model test data has been difficult in past experiences and in early SMAT results, due to the effects of scaling the geometry. The speed of sound of the air and combustion gas constituents is not scaled, and therefore the SMAT pressure waves propagate at approximately the same speed as occurs in full scale. However, the SMAT geometry is twenty times smaller, allowing the pressure waves to move down the exhaust hole, through the trench and duct, and impact the vehicle model much faster than occurs at full scale. The DOP waves impact portions of the vehicle at the same time as the IOP waves, making it difficult to distinguish the different waves and fully understand the data. To better understand the SMAT data, a computational fluid dynamics (CFD) analysis was performed with a fictitious geometry that isolates the IOP and DOP. The upper and lower portions of the domain were segregated to accomplish the isolation in such a way that the flow physics were not significantly altered. The Loci/CHEM CFD software program was used to perform this analysis.

Nielsen, Tanner↗

Computational Fluid Dynamics Study on the Effects of RATO Timing on the Scale Model Acoustic Test

The Scale Model Acoustic Test (SMAT) is a 5% scale test of the Space Launch System (SLS), which is currently being designed at Marshall Space Flight Center (MSFC). The purpose of this test is to characterize and understand a variety of acoustic phenomena that occur during the early portions of lift off, one being the overpressure environment that develops shortly after booster ignition. The SLS lift off configuration consists of four RS-25 liquid thrusters on the core stage, with two solid boosters connected to each side. Past experience with scale model testing at MSFC (in ER42), has shown that there is a delay in the ignition of the Rocket Assisted Take Off (RATO) motor, which is used as the 5% scale analog of the solid boosters, after the signal to ignite is given. This delay can range from 0 to 16.5ms. While this small of a delay maybe insignificant in the case of the full scale SLS, it can significantly alter the data obtained during the SMAT due to the much smaller geometry. The speed of sound of the air and combustion gas constituents is not scaled, and therefore the SMAT pressure waves propagate at approximately the same speed as occurs during full scale. However, the SMAT geometry is much smaller allowing the pressure waves to move down the exhaust duct, through the trench, and impact the vehicle model much faster than occurs at full scale. To better understand the effect of the RATO timing simultaneity on the SMAT IOP test data, a computational fluid dynamics (CFD) analysis was performed using the Loci/CHEM CFD software program. Five different timing offsets, based on RATO ignition delay statistics, were simulated. A variety of results and comparisons will be given, assessing the overall effect of RATO timing simultaneity on the SMAT overpressure environment.

Nielsen, Tanner↗