Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “process integration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,153 records · Page 64

MO-AB-204-03: Profile Development and IHE Process

You’ve experienced the frustration: vendor A’s device claims to work with vendor B’s device, but the practice doesn’t match the promise. Getting devices working together is the hidden art that Radiology and Radiation Oncology staff have to master. To assist with that difficult process, the Integrating the Healthcare Enterprise (IHE) effort was established in 1998, with the coordination of the Radiological Society of North America. Integrating the Healthcare Enterprise (IHE) is a consortium of healthcare professionals and industry partners focused on improving the way computer systems interconnect and exchange information. This is done by coordinating the use of published standards like DICOM and HL7. Several clinical and operational IHE domains exist in the healthcare arena, including Radiology and Radiation Oncology. The ASTRO-sponsored IHE Radiation Oncology (IHE-RO) domain focuses on radiation oncology specific information exchange. This session will explore the IHE Radiology and IHE RO process for; IHE solicitation process for new profiles. Improving the way computer systems interconnect and exchange information in the healthcare enterprise Supporting interconnectivity descriptions and proof of adherence by vendors Testing and assuring the vendor solutions to connectivity problems. Including IHE profiles in RFPs for future software and hardware purchases. Learning Objectives: Understand IHE role in improving interoperability in health care. Understand process of profile development and implantation. Understand how vendors prove adherence to IHE RO profiles. S. Hadley, ASTRO Supported Activity.

60 APPLIED LIFE SCIENCES↗

MO-AB-204-04: Connectathons and Testing

You’ve experienced the frustration: vendor A’s device claims to work with vendor B’s device, but the practice doesn’t match the promise. Getting devices working together is the hidden art that Radiology and Radiation Oncology staff have to master. To assist with that difficult process, the Integrating the Healthcare Enterprise (IHE) effort was established in 1998, with the coordination of the Radiological Society of North America. Integrating the Healthcare Enterprise (IHE) is a consortium of healthcare professionals and industry partners focused on improving the way computer systems interconnect and exchange information. This is done by coordinating the use of published standards like DICOM and HL7. Several clinical and operational IHE domains exist in the healthcare arena, including Radiology and Radiation Oncology. The ASTRO-sponsored IHE Radiation Oncology (IHE-RO) domain focuses on radiation oncology specific information exchange. This session will explore the IHE Radiology and IHE RO process for; IHE solicitation process for new profiles. Improving the way computer systems interconnect and exchange information in the healthcare enterprise Supporting interconnectivity descriptions and proof of adherence by vendors Testing and assuring the vendor solutions to connectivity problems. Including IHE profiles in RFPs for future software and hardware purchases. Learning Objectives: Understand IHE role in improving interoperability in health care. Understand process of profile development and implantation. Understand how vendors prove adherence to IHE RO profiles. S. Hadley, ASTRO Supported Activity.

61 RADIATION PROTECTION AND DOSIMETRY↗

Integrated Work Management: Overview, Course 31881

Integrated work management (IWM) is the process used for formally implementing the five-step process associated with integrated safety management (ISM) and integrated safeguards and security management (ISSM) at Los Alamos National Laboratory (LANL). IWM also directly supports the LANL Environmental Management System (EMS). IWM helps all workers and managers perform work safely and securely and in a manner that protects people, the environment, property, and the security of the nation. The IWM process applies to all work activities at LANL, from working in the office to designing experiments to assembling and detonating explosives. The primary LANL document that establishes and describes IWM requirements is Procedure (P) 300, Integrated Work Management.

99 GENERAL AND MISCELLANEOUS↗

Recovering Americium and Curium from Mark-42 Target Materials- New Processing Approaches to Enhance Separations and Integrate Waste Stream Disposition - 12228

Oak Ridge National Laboratory (ORNL) is investigating flowsheets to enhance processing efficiencies and to address waste streams associated with recovery of americium (Am) and curium (Cm) from Mark-42 (Mk-42) target materials stored at ORNL. The objective of this work was to identify the most effective flowsheet with which to process the 104 Mk-42 oxide capsules holding a total of 80 g of plutonium (Pu), 190 g of Cm, 480 g of Am, and 5 kg of lanthanide (Ln) oxides for the recovery and purification of the Am/Cm for future use as feedstock for heavy actinide production. Studies were also conducted to solidify the process flowsheet waste streams for disposal. ORNL is investigating flowsheets to enhance processing efficiencies and address waste streams associated with recovery of Am and Cm from Mk-42 target materials stored at ORNL. A series of small-scale runs are being performed to demonstrate an improved process to recover Am/Cm and to optimize the separations of Ln fission products from the Am/Cm constituents. The first of these runs has been completed using one of the Am/Cm/Ln oxide capsules stored at ORNL. The demonstration run showed promising results with a Ln DF of 40 for the Am/Cm product and an Am/Cm DF of 75 for the Ln product. In addition, the total losses of Am, Cm, and Ln to the waste solvents and raffinates were very low at <0.2%, 0.02%, and 0.04%, respectively. However, the Ln-actinide separation was less than desired. For future Reverse TALSPEAK demonstration runs, several parameters will be adjusted (flow rates, the ratio of scrub to strip stages, etc.) to improve the removal of Ln from the actinides. The next step will also include scale-up of the processing flowsheet to use more concentrated solutions (15 g/L Ln versus 5 g/L) and larger volumes and to recycle the HDEHP solvent. This should improve the overall processing efficiency and further reduce losses to waste streams. Studies have been performed with simulated wastes to develop solidification processes for disposal of the secondary waste streams generated by this flowsheet. Formulations were successfully developed for all the waste simulants. Additional tests with actual waste will be the next step in this effort. Future plans are to process all of the remaining 103 capsules in storage at ORNL. A nine-capsule test is now under way to provide additional information to scale-up the process to a target 20-capsule batch size for future processing runs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The TAME Project: Towards improvement-oriented software environments

Experience from a dozen years of analyzing software engineering processes and products is summarized as a set of software engineering and measurement principles that argue for software engineering process models that integrate sound planning and analysis into the construction process. In the TAME (Tailoring A Measurement Environment) project at the University of Maryland, such an improvement-oriented software engineering process model was developed that uses the goal/question/metric paradigm to integrate the constructive and analytic aspects of software development. The model provides a mechanism for formalizing the characterization and planning tasks, controlling and improving projects based on quantitative analysis, learning in a deeper and more systematic way about the software process and product, and feeding the appropriate experience back into the current and future projects. The TAME system is an instantiation of the TAME software engineering process model as an ISEE (integrated software engineering environment). The first in a series of TAME system prototypes has been developed. An assessment of experience with this first limited prototype is presented including a reassessment of its initial architecture.

Basili, Victor R.↗

Sustainable Triacetic Acid Lactone Production from Sugarcane by Fermentation and Crystallization

Triacetic acid lactone (TAL) has the potential to serve as a bioderived platform chemical for commercial products including sorbic acid and recyclable polydiketoenamine plastics. In this study, we leveraged BioSTEAM to design, simulate, and evaluate (via techno-economic analysis, TEA, and life cycle assessment, LCA) TAL production from sugarcane. We experimentally characterized TAL solubility, calibrated solubility models, and designed a process to separate TAL from fermentation broths by crystallization. The biorefinery could produce TAL at a minimum product selling price (MPSP) of $\$3.73$–5.86·kg –1 (5th–95th percentiles; baseline at $\$4.60$·kg –1 ) and a carbon intensity (CI) of 5.31 [2.60–8.71] kg CO 2 -eq·kg –1 , which could enable financially viable, low-CI production of sorbic acid and polydiketoenamines. To drive down costs and CI, we explored the theoretical fermentation space (titer, yield, productivity combinations), operation scheduling and capacity expansion strategies (e.g., integrated sorghum processing), and potential separation improvements (mitigating TAL loss through pH control). Advancements in key design and technological parameters could further reduce MPSP by 51% to $\$2.26$·kg –1 [$\$1.97$–2.80·kg –1 ] and CI by 43% to 3.05 [1.91–4.15] kg CO 2 -eq·kg –1 . This research highlights the ability of agile TEA-LCA to screen promising designs, navigate sustainability trade-offs, prioritize research needs, and chart quantitative roadmaps to advance bioproducts and biofuels.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

How systems engineering and human factors can assist SMR vendors with the licensing process - 345

There is growing interest in the development of small modular reactors (SMRs) as a cost-effective renewable source of energy. Most of the current conceptual designs propose advanced and automated control and monitoring technologies which would require complex human system interfaces. The proposals also include a reduction in the number of staff, and partial or full remote control of the facilities. The human factors challenges of such a design philosophy range from identification of information requirements of users to assessing workload to deciding on best information visualization techniques to ensure situation awareness is maintained in a remote control facility. Addressing these challenges will require a systems engineering approach where user requirements are identified through a systematic approach for various contexts, including normal, abnormal, and accident conditions. A systems engineering process will integrate human factors as well as other specialty disciplines such as reliability and design optimization in a coherent fashion that would lead to realization of a successful system that addresses user requirements. The licensing model in Canada is based upon a graded approach and is largely technology neutral. A key factor in ensuring effective licensing effort is identification of regulatory requirements. This paper discusses how adopting a systems engineering approach and early consideration of human factors principles and requirements will not only ensure an efficient design process, but will also help with developing a design that meets the regulatory requirements. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Transitioning from Construction to Startup for the Waste Treatment and Immobilization Plant's Low-Activity Waste Facility - 17284

The original design of the Waste Treatment and Immobilization Plant (WTP) required all waste be processed through the Pretreatment (PT) Facility in order to separate the low-activity waste and high-level waste streams. The U.S. Department of Energy (DOE), Office of River Protection (ORP) has developed a sequenced approach to completing the WTP Project, beginning with delivering some liquid waste directly to the Low-Activity Waste (LAW) Facility, bypassing the PT Facility. This operating configuration is referred to as direct-feed LAW (DFLAW). The primary driver for the DFLAW approach is to enable startup and commissioning of the LAW Facility for low-activity waste processing prior to the completion and availability of the PT and High-Level Waste facilities. In March 2016, a federal judge amended the Consent Decree between DOE and the State of Washington to require completion of hot commissioning for the LAW Facility no later than December 31, 2023. During the next few years ORP and the WTP contractor will transition the project from completion of construction to the startup and commissioning phase for the LAW Facility and the associated support facilities. The WTP contractor has developed an integrated management process to successfully conduct facility startup testing for the WTP facilities required to support DFLAW. The WTP contractor will also develop a commissioning plan and facility transition plan. These plans will describe the strategy; schedule; and requirements for safe, efficient, and sequential startup, commissioning, and transfer of the WTP facilities to an operations contractor. The WTP contractor has also established a strategy to achieve operational readiness for the facilities required to support DFLAW consistent with DOE O 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities and DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets. ORP has established a strategy for oversight of the WTP contractor's startup, commissioning, and readiness activities. The strategy also encompasses ORP's own activities to achieve readiness. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sean Michaletz Directors Post Doc Fellow Report

Predicting climate change effects on plant function is a central challenge of global change biology and a primary mission of DOE. Although increasing temperatures and drought have been associated with reduced growth and increased mortality of plants, accurate prediction of such responses is limited by a lack of process-based theory linking climate and whole-plant physiology. This inability to predict forest mortality can cause significant biases in climate forecasts. One way forward is metabolic scaling theory (MST), which proposes that physiologic rates – from cells to the globe – are governed by the rates of resource distribution through vascular networks and the kinetics of resource utilization by metabolic reactions. MST has traditionally not considered rates of resource acquisition from organism-environment interactions, but it has an ideal mechanistic basis for doing so. As a first step towards integrating these processes, Sean has extended MST to characterize effects of temperature and precipitation on plant growth and ecosystem production. Sean’s post doc fellowship aimed to address a remaining shortcoming in that the new theory does not yet consider the physical processes of resource acquisition, and thus cannot mechanistically predict plant performance in a changing climate.

54 ENVIRONMENTAL SCIENCES↗

Activation and Conversion of Methane to Syngas over ZrO 2 /Cu(111) Catalysts near Room Temperature

Enzymatic systems achieve the catalytic conversion of methane at room temperature under mild conditions. Here, in this study, varying thermodynamic and kinetic parameters, we show that the reforming of methane by water (MWR, CH 4 + H 2 O → CO + 3H 2 ) and the water-gas shift reaction (WGS, CO + H 2 O → H 2 + CO 2 ), two essential processes to integrate fossil fuels toward a H2 energy loop, can be achieved on ZrO 2 /Cu(111) catalysts near room temperature. Measurements of ambient-pressure X-ray photoelectron spectroscopy and mass spectrometry, combined with density functional calculations and kinetic Monte Carlo simulations, were used to study the behavior of the inverse oxide/metal catalysts. The superior performance is associated with a unique zirconia-copper interface, where multifunctional sites involving zirconium, oxygen, and copper work coordinatively to dissociate methane and water at 300 K and move forward the MWR and WGS processes.

03 NATURAL GAS↗

Cell output, cell cycle duration and neuronal specification: a model of integrated mechanisms of the neocortical proliferative process

The neurons of the neocortex are generated over a 6 day neuronogenetic interval that comprises 11 cell cycles. During these 11 cell cycles, the length of cell cycle increases and the proportion of cells that exits (Q) versus re-enters (P) the cell cycle changes systematically. At the same time, the fate of the neurons produced at each of the 11 cell cycles appears to be specified at least in terms of their laminar destination. As a first step towards determining the causal interrelationships of the proliferative process with the process of laminar specification, we present a two-pronged approach. This consists of (i) a mathematical model that integrates the output of the proliferative process with the laminar fate of the output and predicts the effects of induced changes in Q and P during the neuronogenetic interval on the developing and mature cortex and (ii) an experimental system that allows the manipulation of Q and P in vivo. Here we show that the predictions of the model and the results of the experiments agree. The results indicate that events affecting the output of the proliferative population affect both the number of neurons produced and their specification with regard to their laminar fate.

Evaluation Studies↗

Novel Approach to Conformal FINFET Extension Doping

This paper presents a novel strategy to achieve conformal FINFET extension doping with low tilt-angle beam-line ion implantation. The process relies on the self-aligned cap layer formation exclusively on top of the FIN to tune doping levels in this particular area by partial dopant trapping. The conformality itself is evaluated for n- and p-type dopants by a novel extraction method applied to FIN resistor test structures. Furthermore, the process was integrated into a full NMOS device flow and compared to a highly tilted and more conformal As implant condition.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Enabling 10mol/kg Swing Capacity via Heat Integrated Sub-ambient Pressure Swing Adsorption

This project focused on the development of a post-combustion CO 2 capture technology for coal-fired power stations. The core concept of the technology was the combination of an adsorption-based separation with combustion flue gas cooling, compression followed by heat and power recovery. The key features of the adsorption unit (which captures and purifies the CO 2 ) are the use of high flow fiber-based adsorption systems that incorporate materials that manage the significant amounts of heat released during the adsorption separation. The adsorbent material utilized was a hybrid organic-inorganic material (a metal-organic framework) that had the proper combination of separation selectivity and CO 2 capture capacity. In this case, record-setting, process-relevant CO 2 capture capacities (approximately 8-10 mol of CO 2 per kg of adsorbent “swing capacities”) were observed in experimental measurements of the adsorptive separation. The experimental work was accompanied by detailed multi-level simulation works, which investigated the molecular mechanism for the high CO 2 capture efficiencies, the heat and mass transport dynamics within the separation system, and the process-level integration of the various systems associated with the technology. Overall, the analysis conducted in this work indicates that this technology can potentially reach CO 2 capture costs as low as 40-50 dollars/tonne with capital costs of 250M-400M dollars for the 550 MW e basecase established by the National Energy Technology Laboratory.

20 FOSSIL-FUELED POWER PLANTS↗

Electrical and morphological characterization of transfer-printed Au/Ti/TiO{sub x}/p{sup +}-Si nano- and microstructures with plasma-grown titanium oxide layers

Highly-ordered, sub-70 nm-MOS-junctions of Au/Ti/TiO{sub x}/p{sup +}-Si were efficiently and reliably fabricated by nanotransfer-printing (nTP) over large areas and their functionality was investigated with respect to their application as MOS-devices. First, we used a temperature-enhanced nTP process and integrated the plasma-oxidation of a nm-thin titanium film being e-beam evaporated directly on the stamp before the printing step without affecting the p{sup +}-Si substrate. Second, morphological investigations (scanning electron microscopy) of the nanostructures confirm the reliable transfer of Au/Ti/TiO{sub x}-pillars of 50 nm, 75 nm, and 100 nm size of superior quality on p{sup +}-Si by our transfer protocol. Third, the fabricated nanodevices are also characterized electrically by conductive AFM. Fourth, the results are compared to probe station measurements on identically processed, i.e., transfer-printed μm-MOS-structures including a systematic investigation of the oxide formation. The jV-characteristics of these MOS-junctions demonstrate the electrical functionality as plasma-grown tunneling oxides and the effectivity of the transfer-printing process for their large-scale fabrication. Next, our findings are supported by fits to the jV-curves of the plasma-grown titanium oxide by kinetic-Monte-Carlo simulations. These fits allowed us to determine the dominant conduction mechanisms, the material parameters of the oxides and, in particular, a calibration of the thickness depending on applied plasma time and power. Finally, also a relative dielectric permittivity of 12 was found for such plasma-grown TiO{sub x}-layers.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Operation of Argonne's Liquid Salt-Liquid Metal Separation Testbed for U/TRU Product Processing

Argonne National Laboratory has constructed a liquid salt-liquid metal separation testbed for use in the development and advancement of cathode processing of U/TRU co‑deposits generated by pyroprocessing of used nuclear fuel. The U/TRU product recovered from the electrorefiner contains adhered and entrained salt that must be removed prior to consolidation of the U/TRU alloy for use in advanced reactor fuel fabrication. The bottom pour operation utilizes the low melting points of U/TRU co‑deposits and higher densities of molten metals compared to molten salts to separate and consolidate the U/TRU product. Argonne’s testbed is designed to support the development and optimization of bottom-pouring configurations for batch and semi-continuous operations, integration of process monitoring and control technologies, and determination of operational requirements for implementing in an industrial setting. Scoping tests were performed to demonstrate operational aspects of the testbed, including operation using single-pour spout and dual-pour spout configurations, effectiveness of salt containment and extent of salt vaporization, and the use of sensor probes to detect the location of the interface between the metal and salt phases during pouring. Recommendations for process optimization testing for further development of bottom pour processing to separate U/TRU alloys from adhered salt were made based on the results of scoping tests. Completing the recommended activities will increase the technical readiness level (TRL) of the liquid salt-liquid metal separation operation and consolidation of U/TRU alloys to support industrialization of pyroprocessing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

DEFE0023863 Final Report, Technology for GHG Emission Reduction and Cost-Competitive Mil-Spec Jet Fuel Production using CTL

Ceramatec Inc, in collaboration with IntraMicron (IM), the Energy & Environmental Research Center (EERC) and Sustainable Energy Solutions, LLC (SES), have completed a three-year research project integrating their respective proprietary technologies in key areas to demonstrate production of a jet fuel from coal and biomass sources. The project goals and objectives were to demonstrate technology capable of producing a “commercially-viable quantity” of jet fuel and make significant progress toward compliance with Section 526 of the Energy Independence and Security Act of 2007 (EISA 2007 §526) lifecycle greenhouse gas (GHG) emissions requirements. The Ceramatec led team completed the demonstration of nominal 2 bbl/day Fischer-Tropsch (FT) synthesis pilot plant design, capable of producing a nominal 1 bbl/day in the Jet-A/JP-8 fraction. This production rate would have a capacity of 1,000 gallons of jet fuel per month and provide the design basis of a 100 bbl/day module producing over 2,000 gallons of jet fuel per day. Co-gasification of coal-biomass blends enables a reduction of lifecycle greenhouse gas emissions from equivalent conventional petroleum derived fuel basis. Due to limits of biomass availability within an economic transportation range, implementation of a significant biomass feed fraction will require smaller plants than current world scale CTL and GTL FT plants. Hence a down-scaleable design is essential. The pilot plant design leverages Intramicron’s MicroFiber Entrapped Catalyst (MFEC) support which increases the catalyst bed thermal conductivity two orders of magnitude, allowing thermal management of the FT reaction exotherm in much larger reactor tubes. In this project, single tube reactors having 4.5 inch outer diameter and multi-tube reactors having 4 inch outer diameters were operated, with productivities as high as 1.5 gallons per day per linear foot of reactor tube. A significant reduction in tube count results from the use of large diameter reactor tubes, with an associated reduction in reactor cost. The pilot plant was designed with provisions for product collection capable of operating with conventional wax producing FT catalysts but was operated with a Chevron hybrid wax-free FT catalyst. Process simplification enabled by elimination of the wax hydrocracking process unit provides economic advantages in scaling to biomass capable plant sizes. Intramicron also provided a sulfur capture system based on their Oxidative Sulfur Removal (OSR) catalyst process. The integrated sulfur removal and FT systems were operated with syngas produced by the Transport Reactor Development Unit (TRDU) gasifier at the University of North Dakota EERC. SES performed modeling of their cryogenic carbon capture process on the energy, cost and CO2 emissions impact of the Coal-biomass synthetic fuel process.

01 COAL, LIGNITE, AND PEAT↗