Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “launch software”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,153 records · Page 64

Non-Deterministic, Non-Traditional Methods (NDNTM)

The review effort identified research opportunities related to the use of nondeterministic, nontraditional methods to support aerospace design. The scope of the study was restricted to structural design rather than other areas such as control system design. Thus, the observations and conclusions are limited by that scope. The review identified a number of key results. The results include the potential for NASA/AF collaboration in the area of a design environment for advanced space access vehicles. The following key points set the context and delineate the key results. The Principal Investigator's (PI's) context for this study derived from participation as a Panel Member in the Air Force Scientific Advisory Board (AF/SAB) Summer Study Panel on 'Whither Hypersonics?' A key message from the Summer Study effort was a perceived need for a national program for a space access vehicle whose operating characteristics of cost, availability, deployability, and reliability most closely match the NASA 3rd Generation Reusable Launch Vehicle (RLV). The Panel urged the AF to make a significant joint commitment to such a program just as soon as the AF defined specific requirements for space access consistent with the AF Aerospace Vision 2020. The review brought home a concurrent need for a national vehicle design environment. Engineering design system technology is at a time point from which a revolution as significant as that brought about by the finite element method is possible, this one focusing on information integration on a scale that far surpasses current design environments. The study therefore fully supported the concept, if not some of the details of the Intelligent Synthesis Environment (ISE). It became abundantly clear during this study that the government (AF, NASA) and industry are not moving in the same direction in this regard, in fact each is moving in its own direction. NASA/ISE is not yet in an effective leadership position in this regard. However, NASA does have complementary software interoperability efforts that should be a part of any major ISE program. Software standards that assure interoperability of data systems and modeling representations are enabling for the proposed research advocated herein and should be a major element in the ISE initiative. The international standard for data interchange is known by the acronym 'STEP.' The NASA participation and lead for that effort is at the Goddard Space Flight Center. NASA/GRC is leading an effort to define CAD geometry standards through the Object Management Group (OMG). To enable the design environment so necessary to the above national vision for a unique space vehicle will require an integrating software environment with interoperability standards that allow the development and widespread deployment of tools and toolsets, rather than traditional "shrink-wrapped" software used by engineers today.

Cruse, Thomas A.↗

Mars Science Laboratory Entry Descent and Landing Simulation Using DSENDS

The most recent planetary science mission to Mars is Mars Science Laboratory (MSL) with the Curiosity rover, launched November 26, 2011 and landed at Gale Crater on August 6, 2012. This spacecraft was the first use at Mars of a complete closed-loop Guidance Navigation and Control (GN&C) system, including guided entry with a lifting body that greatly reduces dispersions during the Entry, Descent and Landing (EDL) phase to achieve a 25 km x 20 km landing error relative to the selected Gale Crater landing target. In order to confirm meeting the above landing criteria, high-fidelity simulation of the EDL phase is required. The tool used for 6DOF EDL trajectory verification analysis is Dynamics Simulator for Entry, Descent and Surface landing (DSENDS), which is a high-fidelity simulation tool from JPLs Dynamics and Real-Time Simulation Laboratory for the development, test and operations of aero-flight vehicles. DSENDS inherent capability is augmented for MSL with project-specific models of atmosphere, aerodynamics, sensors and thrusters along with GN&C flight software to enable high-fidelity trajectory simulation. This paper will present the model integration and independent verification experience of the JPL EDL trajectory analysis team.

Mars↗

Mars Science Laboratory Entry Descent and Landing Simulation Using DSENDS

The most recent planetary science mission to Mars was Mars Science Laboratory (MSL) with the Curiosity rover, launched November 26, 2011 and landed at Gale Crater on August 6, 2012. This spacecraft was the first use at Mars of a complete closed-loop Guidance Navigation and Control (GN&C) system, including guided entry with a lifting body that greatly reduces dispersions during the Entry, Descent and Landing (EDL) phase to achieve a 25 km X 20 km landing error relative to the selected Gale Crater landing target. In order to confirm meeting the above landing criteria, high-fidelity simulation of the EDL phase is required. The tool used for 6DOF EDL trajectory verification analysis is Dynamics Simulator for Entry, Descent and Surface landing (DSENDS), which is a high-fidelity simulation tool from JPLs Dynamics and Real-Time Simulation Laboratory for the development, test and operations of aero-flight vehicles. DSENDS inherent capability is augmented for MSL with project-specific models of atmosphere, aerodynamics, sensors and thrusters along with GN&C flight software to enable high-fidelity trajectory simulation. This paper will present the model integration and independent verification experience of the JPL EDL trajectory analysis team.

Burkhart, P. Daniel↗

Digital Human Modeling

The development of models to represent human characteristics and behaviors in human factors is broad and general. The term "model" can refer to any metaphor to represent any aspect of the human; it is generally used in research to mean a mathematical tool for the simulation (often in software, which makes the simulation digital) of some aspect of human performance and for the prediction of future outcomes. This section is restricted to the application of human models in physical design, e.g., in human factors engineering. This design effort is typically human interface design, and the digital models used are anthropometric. That is, they are visual models that are the physical shape of humans and that have the capabilities and constraints of humans of a selected population. They are distinct from the avatars used in the entertainment industry (movies, video games, and the like) in precisely that regard: as models, they are created through the application of data on humans, and they are used to predict human response; body stresses workspaces. DHM enable iterative evaluation of a large number of concepts and support rapid analysis, as compared with use of physical mockups. They can be used to evaluate feasibility of escape of a suited astronaut from a damaged vehicle, before launch or after an abort (England, et al., 2012). Throughout most of human spaceflight, little attention has been paid to worksite design for ground workers. As a result of repeated damage to the Space Shuttle which adversely affected flight safety, DHM analyses of ground assembly and maintenance have been developed over the last five years for the design of new flight systems (Stambolian, 2012, Dischinger and Dunn Jackson, 2014). The intent of these analyses is to assure the design supports the work of the ground crew personnel and thereby protect the launch vehicle. They help the analyst address basic human factors engineering questions: can a worker reach the task site from the work platform provided; can she or he see the task site; can she or he control tools, which, if dropped, might damage the system? Figure 7.3.1 provides an example of such analysis for a future NASA launch vehicle. [figure 7.3.1 here] In-space systems for operation by astronauts have long been targets for DHM analysis, given the focus on mission success and concerns for astronaut safety. Figure 7.3.2 illustrates the analysis of the design to support astronaut tasks for an International Space Station glovebox. [Figure 7.3.2 here] Use by

Dischinger, H. Charles, Jr.↗

Spacecraft Observatory Benchmark Problem for Optical Disturbance Rejection

Since mid-1980s NASA has launched several first-generation interplanetary observatory missions. A salient feature of these missions has been the mounting of the optical payload on top of a large flexible space structure. This imposes challenging control-structure interaction problems (CSI) that have been studied over several decades. The Dec. 2021 launch of the James Webb Telescope marks the latest example of such a mission. One way to encourage development of novel control methods is to provide a benchmark problem for researchers. By the mid-2000s, there were a few well-known benchmark problems developed by the control community with a focus on CSI applications. However, in the past 15 years, the control challenges in optical observation missions have shifted from CSI to line-of-sight (LOS) precision pointing. This is because popular designs of the second-generation (Gen II) space earth missions have eliminated the large structure interface by mounting the optical payload directly on top of a rigid bus platform. The focus now is to achieve accurate pointing with maximum rejection of the surrounding disturbances. The NASA Safety and Engineering Center (NESC) has tasked T he Aerospace Corporation to develop a Benchmark Problem to study the challenging control issues that Gen II observatory missions encounter. This software tool is to be released as a public domain platform aimed at government, academic, and industry researchers. The focus of this benchmark problem is for researchers to design a set of innovative payload control laws with the maximum Optical Disturbance Rejection (ODR) capability to meet a set of pre-defined μrad-level of LOS jitter requirements. This paper describes the development of the benchmark problem. Aerospace/NASA will provide an integrated LOS plant model and disturbance/command profiles for users to run their design and simulation with as well as a user’s guide describing the required interfaces. The Aerospace Corp is also working to develop a hardware fast steering mirror testbed for users to demonstrate their innovative design in real hardware, if so desired.

Spacecraft Observatory Benchmark Problem↗

NASA Tech Briefs, January 2012

Contents of this issue are: (1) Energy-Based Tetrahedron Sensor for High-Temperature, High-Pressure Environments (2) Handheld Universal Diagnostic Sensor (3) Large-Area Vacuum Ultraviolet Sensors (4) Fiber Bragg Grating Sensor System for Monitoring Smart Composite Aerospace Structures (5) Health-Enabled Smart Sensor Fusion Technology (6) Extended-Range Passive RFID and Sensor Tags (7) Hybrid Collaborative Learning for Classification and Clustering in Sensor Networks (8) Self-Healing, Inflatable, Rigidizable Shelter (9) Improvements in Cold-Plate Fabrication (10) Technique for Radiometer and Antenna Array Calibration - TRAAC (11) Real-Time Cognitive Computing Architecture for Data Fusion in a Dynamic Environment (12) Programmable Digital Controller (13) Use of CCSDS Packets Over SpaceWire to Control Hardware (14) Key Decision Record Creation and Approval Module (15) Enhanced Graphics for Extended Scale Range (16) Debris Examination Using Ballistic and Radar Integrated Software (17) Data Distribution System (DDS) and Solar Dynamic Observatory Ground Station (SDOGS) (18) Integration Manager (19) Eclipse-Free-Time Assessment Tool for IRIS (20) Automated and Manual Rocket Crater Measurement Software (21) MATLAB Stability and Control Toolbox Trim and Static Stability Module (22) Patched Conic Trajectory Code (23) Ring Image Analyzer (24) SureTrak Probability of Impact Display (25) Implementation of a Non-Metallic Barrier in an Electric Motor (26) Multi-Mission Radioisotope Thermoelectric Generator Heat Exchangers for the Mars Science Laboratory Rover (27) Uniform Dust Distributor for Testing Radiative Emittance of Dust-Coated Surfaces (28) MicroProbe Small Unmanned Aerial System (29) Highly Stable and Active Catalyst for Sabatier Reactions (30) Better Proton-Conducting Polymers for Fuel-Cell Membranes (31) CCD Camera Lens Interface for Real-Time Theodolite Alignment (32) Peregrine 100-km Sounding Rocket Project (33) SOFIA Closed- and Open-Door Aerodynamic Analyses (34) Sonic Thermometer for High-Altitude Balloons (35) Near-Infrared Photon-Counting Camera for High-Sensitivity Observations (36) Integrated Optics Achromatic Nuller for Stellar Interferometry (37) High-Speed Digital Interferometry (38) Ultra-Miniature Lidar Scanner for Launch Range Data Collection (39) Shape and Color Features for Object Recognition Search (40) Explanation Capabilities for Behavior-Based Robot Control (41) A DNA-Inspired Encryption Methodology for Secure, Mobile Ad Hoc Networks (42) Quality Control Method for a Micro-Nano-Channel Microfabricated Device (43) Corner-Cube Retroreflector Instrument for Advanced Lunar Laser Ranging (44) Electrospray Collection of Lunar Dust (45) Fabrication of a Kilopixel Array of Superconducting Microcalorimeters with Microstripline Wiring Spacecraft Attitude Tracking and Maneuver Using Combined Magnetic Actuators (46) Coherent Detector for Near-Angle Scattering and Polarization Characterization of Telescope Mirror Coatings

Source record↗

Digital Image Correlation Data Processing and Analysis Techniques to Enhance Test Data Assessment and Improve Structural Simulations

The NASA Shell Buckling Knockdown Factor Project (SBKF) was established in 2007 by the NASA Engineering and Safety Center (NESC) with the primary goal to develop new analysis-based buckling design factors (a.k.a. knockdown factors) and high-fidelity buckling simulations for selected launch-vehicle-like cylindrical shell structures. A series of tests are being conducted on large-scale metallic and composite cylindrical shells in order to provide validation data for these new factors and simulations. However, the validation of these new factors and simulations is quite demanding and requires test data that is commensurate with their fidelity. Traditional instrumentation, such as linear variable displacement transducers (LVDTs) and electrical-resistance strain gages serve a critical role in providing accurate displacement and strain measurements in these tests, but only allow for data to be recorded at a select number of point locations and are not sufficient to provide all the necessary validation data. Advanced measurement technologies can be used effectively to complement traditional instrumentation and gather additional data required to validate these structural simulations. In particular, three-dimensional digital image correlation (DIC) was implemented during SBKF cylinder testing to characterize the full-field displacement and strain behavior. Commercially available VIC-3DTM software and user-written data processing scripts were used to generate valuable data and insight into the complex buckling response of the cylinders that otherwise would be impossible to gather using traditional instrumentation. In addition, the measured data from DIC was used to verify measured test data obtained from other instrumentation, enhance test and analysis correlation, and help identify the root cause of anomalous test results that may have gone unexplained if only traditional instrumentation was used. Selected test results that demonstrate the use of DIC on the SBKF cylinders are presented and a portion of the data processing methods are described.

Gardner, Nathaniel W.↗

VISUALIZING INTERANNUAL TO DECADAL COASTAL VARIABILITY NEAR VULNERABLE NASA INFRASTRUCTURE UTILIZING VIDEOS PRODUCED FROM REMOTELY SENSED DATA AT CAPE CANAVERAL, FL AND WALLOPS ISLAND, VA

Coastlines represent an interesting convolution of intense anthropogenic development superimposed onto morphologies that are among the most dynamic on the planet. Two of NASA’s critical facilities are particularly vulnerable to coastal change, Kennedy Space Center, Cape Canaveral, FL and Wallops Flight Facility, Wallops Island, VA. With continuing global sea level rise and increasing storminess coastal vulnerabilities at these facilities will only be exacerbated. These launch centers a subject to multiple coastal hazards including, flooding, episodic coastal erosion, saltwater intrusion, and coastal morphological changes. Although rapid change is readily observed during large storms or hurricanes, long term annual to decadal coastal change is much harder to visualize and conceptualize. The authors use videos developed from remotely sensed data to enhance conceptualization of coastal processes for planning and management stakeholders at these NASA facilities. Near or better than decadal coastal imagery has been available through high altitude photogrammetry efforts since the 1930’s. A significant amount of additional imagery was acquired through other federal, state, and local government agencies such as the USGS, NOAA, State DOT, and local Assessors Offices providing annual and inter annual images at spatial resolutions of 10cm – 1m. With the advent of GIS systems these images could be rectified and then layered to better understand change through time using a multitude of visual base shoreline proxies. With the increased awareness and use of video editing software the rectified images can be used to create videos. These videos can then be used to conceptualize a multitude of coastal processes including: performance of coastal restoration efforts, rapid change in sedimentation rates due to storms or other geomorphic processes, loss of protective barrier islands as sea level rises and lower sedimentation rates occur. The videos are also useful as a tool for verification and comparison to coastal models and provide an easy to understand educational resource for stakeholder engagement at these NASA centers, and other vulnerable coastal populations.

Richard A. MacKenzie III↗

Mars Exploration Rovers navigation results

The twin Mars Exploration Rovers, Spirit and Opportunity, were launched on June 10, 2003, and July 8, 2003, from Cape Canaveral, Florida. Spirit and Opportunity were targeted for landings at Gusev Crater (arrival on January 4, 2004) and Meridiani Planum (arrival on January 25, 2004). The primary navigation challenge was to deliver each spacecraft to the desired atmospheric entry interface point with sufficient accuracy such that each lander would touch down within a specified landing ellipse (about 70 km x 5 km) determined to be safe for landing and also judged to be scientifically interesting. In order to achieve landing within the target ellipse, precise control of the inertial entry flight path angle (FPA) at atmospheric entry was required. The maximum allowable errors in FPA following TCM-5 (trajectory correction maneuver #5) at Entry (E) -2 days were +/-0.12 deg(3 sigma) for Spirit and +/-0.14 deg(3 sigma) for Opportunity. Achieving these entry delivery accuracies necessitated significant improvements to the interplanetary navigation system used for MER. These improvements included new processes and software for orbit determination, propulsive maneuver design, and entry, descent, and landing (EDL) trajectory simulation. The actual achieved atmospheric entry accuracies for Spirit and Opportunity significantly exceeded the requirements. At the navigation data cutoff for the TCM-5 final design, the orbit determination FPA knowledge error was 0.028 deg(3 sigma) for Spirit and 0.035 deg(3 sigma) for Opportunity. Because of exceptionally accurate navigation performance, TCM-5 (E - 2 days) and TCM-6 (E - 4 hours) were canceled for both Spirit and Opportunity. The actual landing locations (determined from in-situ Doppler tracking between the MER rovers and the Mars Odyssey orbiter) differed from the target landing points by 10.1 km (downtrack) for Spirit and 24.6 km (downtrack) for Opportunity. The majority of the landing position offsets for both landers was primarily caused by variations in atmosphere and spacecraft aerodynamic modeling from what was predicted. The amount of the landing position offset caused by navigation-only errors was only 3.3 km (uptrack) for Spirit and 9.7 km (downtrack) for Opportunity.

Mars Exploration Rover (MER)↗

NASA Gateway Refueling Architecture and Concept of Operation

The Lunar Gateway is a deep space orbiting outpost being developed by NASA in partnership with ESA and other domestic and international partners. It is a critical component of NASA’s Artemis program supporting long-term human exploration of the moon and is designed to be refueled, requiring the on-orbit transfer of propellants. The first two modules of Gateway to be launched will be the Power and Propulsion Element (PPE) and the Habitation and Logistics Outpost (HALO). The PPE contains the bipropellant chemical and electrical propulsion systems that will provide attitude control and orbit raising capability for Gateway. The reaction control system (RCS) utilizes monomethylhydrazine (MMH) and mixed oxides of nitrogen-3 (MON-3) as the fuel and oxidizer, respectively. Helium is used as a pressurant. The Advanced Electric Propulsion Systems (AEPS) and Busek hall thrusters that comprise the solar electric propulsion (SEP) system use xenon as the propellent. The ESPRIT Refueling Module, provided by ESA, will supply the propellant refueling function to Gateway’s propulsion systems. On-orbit refueling is a complex, technically challenging operation that is key to enabling sustainable crewed Lunar and Martian exploration. Numerous systems may be involved in the refueling operation. Also numerous systems are required to enable the successful ability for Gateway to refuel such as, SEP, RCS, Structure & Mechanisms (S&M), Guidance, Navigation and Control (GNC), Thermal, Software, Vehicle System Manager (VSM), Flight Ops, Extra Vehicular Robotics (EVR), Communication and Tracking (C&T), Avionics, and more. This paper will detail the design architecture, concept of operations, and challenges associated with the Gateway refueling system. The methodologies used in Gateway will be compared to those implemented in OSAM-1 and the best practices documented by AIAA and CONFERS (Consortium For Execution Of Rendezvous And Servicing Operations).

Brandie L. Rhodes↗

Mars Exploration Rovers navigation results

The twin Mars Exploration Rovers, Spirit and Opportunity, were launched on June 10, 2003(dagger), and July 8, 2003, from Cape Canaveral, Florida. Spirit and Opportunity were targeted for landings at Gusev Crater (arrival on January 4, 2004) and Meridiani Planum (arrival on January 25, 2004). The primary navigation challenge was to deliver each spacecraft to the desired atmospheric entry interface point with sufficient accuracy such that each lander would touch down within a specified landing ellipse (about 70 km x 5 km) determined to be safe for landing and also judged to be scientifically interesting. In order to achieve landing within the target ellipse, precise control of the inertial entry flight path angle (FPA) at atmospheric entry was required. The maximum allowable errors in FPA following TCM-5 (trajectory correction maneuver #5) at Entry (E) - 2 days were +/-0.12(deg) (3(sigma)) for Spirit and +/-0.14(deg) (3(sigma)) for Opportunity. Achieving these entry delivery accuracies necessitated significant improvements to the interplanetary avigation system used for MER. These improvements included new processes and software for orbit determination, propulsive maneuver design, and entry, descent, and landing (EDL) trajectory simulation. The actual achieved atmospheric entry accuracies for Spirit and Opportunity significantly exceeded the requirements. At the navigation data cutoff for the TCM-5 final design, the orbit determination FPA knowledge error was +/-0.028(deg) (3(sigma) ) for Spirit and +/-0.035(deg) (3(sigma)) for Opportunity. Because of exceptionally accurate navigation performance, TCM-5 (E - 2 days) and TCM-6 (E - 4 hours) were canceled for both Spirit and Opportunity. The actual landing locations (determined from in-situ Doppler tracking between the MER rovers and the Mars Odyssey orbiter) differed from the target landing points by 10.1 km (downtrack) for Spirit and 24.6 km (downtrack) for Opportunity. The majority of the landing position offsets for both landers was primarily caused by variations in atmosphere and spacecraft aerodynamic modeling from what was predicted. The amount of the landing position offset caused by navigation-only errors was only 3.3 km (uptrack) for Spirit and 9.7 km (downtrack) for Opportunity.

Mars Exploration Rover (MER)↗

Operational Experience with Autonomous Star Trackers on ESA Interplanetary Spacecraft

Mars Express (MEX), Rosetta and Venus Express (VEX) are ESA interplanetary spacecrafts (S/C) launched in June 2003, March 2004 and November 2005, respectively. Mars Express was injected into Mars orbit end of 2003 with routine operations starting in spring 2004. Rosetta is since launch on its way to rendezvous comet Churyumov-Gerasimenko in 2014. It has completed several test and commissioning activities and is performing several planetary swingbys (Earth in spring 2005, Mars in spring 2007, Earth in autumn 2007 and again two years later). Venus Express has also started routine operations since the completion of the Venus orbit insertion maneuver sequence beginning of May 2006. All three S/C are three axes stabilized with a similar attitude and orbit control system (AOCS). The attitude is estimated on board using star and rate sensors and controlled using four reaction wheels. A bipropellant reaction control system with 10N thrusters serves for wheel off loadings and attitude control in safe mode. Mars Express and Venus Express have an additional 400N engine for the planetary orbit insertion. Nominal Earth communication is accomplished through a high gain antenna. All three S/C are equipped with a redundant set of autonomous star trackers (STR) which are based on almost the same hardware. The STR software is especially adapted for the respective mission. This paper addresses several topics related to the experience gained with the STR operations on board the three S/C so far.

Lauer, Mathias↗

Voyager Interstellar Mission: Challenges of Flying a Very Old Spacecraft on a Very Long Mission

Two Voyager spacecraft were launched in 1977. After the successful flybys of Jupiter and Saturn by both Voyagers and Uranus and Neptune by Voyager 2, the mission has been extended for another 30 years in search of the transition region between the dominance of the solar energy and interstellar energy. The Voyager Interstellar Mission (VIM) started on January 1, 1990. It can be characterized by several factors including extremely long communication distances, aging hardware, reduced staffing levels and difficulty in obtaining Deep Space Network (DSN) resources necessitated by the increasing distance between the spacecraft and Earth. The mission was redesigned to compensate for such factors while maximizing the science return. After 25 years of VIM and several significant science discoveries, both Voyager spacecraft are still functioning well and the Voyager flight team is preparing for an even longer mission - until the year 2025 and beyond. In order to work around the challenges and to continue the mission even further, the team has been implementing numerous changes, mainly through flight software modifications and hardware reconfiguration. The major drivers for the changes are two-fold: resource constraints (such as decreasing power output and difficulty in obtaining the necessary DSN coverage) and anomalies due to the aging hardware. The majority of changes occur through flight software modifications so the state of the on-board responses is appropriate for the changing space environment and mission phase, and the flight software is compatible in allowing the maximum data gathering. The on-board flight software routines such as baseline sequence, fault protection routines, the High Gain Antenna POINTing to Earth (HPOINT) table, and long-term events table need to be maintained through flight software updates. The changes also occur through hardware reconfiguration such as selecting the backup Hybrid Buffer Interface Circuits (HYBIC) or attitude propulsion thrusters. This paper will describe the challenges of VIM and what has been done to overcome or mitigate those challenges. The primary focus will be the major flight software changes made during VIM and the changes that are in store for the near future in preparation for continuing the extended mission, from the originally projected year of 2020 out to the year 2025 and possibly beyond.

Matsumoto, Sun Kang↗

Enabling Assurance in the MBSE Environment

A number of specific benefits that fit within the hallmarks of effective development are realized with implementation of model-based approaches to systems and assurance. Model Based Systems Engineering (MBSE) enabled by standardized modeling languages (e.g., SysML®) is at the core. These benefits in the context of spaceflight system challenges can include [1]: • Improved management of complex development • Reduced risk in the development process • Improved cost management • Improved design decisions With appropriate modeling techniques the assurance community also can improve early oversight and insight into project development. NASA has shown the basic constructs of SysML in an MBSE environment offer several key advantages, within a Model Based Mission Assurance (MBMA) initiative [2, 3]. These include the following: • Model viewpoints that promote rapid and systematic assessment of requirements coverage, hazard tagging and risk management • Embedded safety assessments for launch vehicles • Deployment of model assisted development of reliability products - Failure Modes and Effects Analyses (FMEAs) and Fault Trees • Test Planning • Validation and Verification of complex functions • Support of Assurance Case development for complex systems In addition, while there are benefits to be harvested, there is a realization that these do not come without effort and cost. Enabling model-based approaches requires structure, not only in an organizational context, but in a modeling context as well. There can be a steep learning curve and costs associated to train skilled modelers. But, on the other hand, not all of the assurance community need to be modelers. Models themselves must conform to ontologies that enable assurance. This places constraints upon the models and modelers. Optimums have yet to be developed where resources and constraints on modeling must be traded off in the organization and modeling efforts for projects. A number of barriers need to be overcome, as well, which pose challenges to the developers of the software that supports MBSE/MBMA. Information and data must be made to flow seamlessly through the life cycle. Because there is a wide variety of tools used in the community, to avoid the problems of the past of silos, delays, and diverging interests, information should flow among these tools to support the “single source of truth” paradigm of MBSE. This will greatly facilitate MBMA and advancement of assurance functions.

Evans, John W.↗

Accessing and Understanding MODIS Data

The National Aeronautics and Space Administration (NASA) launched the Terra satellite in December 1999, as part of the Earth Science Enterprise promotion of interdisciplinary studies of the integrated Earth system. Aqua, the second satellite from the series of EOS constellation, was launched in May 2002. Both satellites carry the MODerate resolution Imaging Spectroradiometer (MODIS) instrument. MODIS data are processed at the Goddard Space Flight Center, Greenbelt, MD, and then archived and distributed by the Distributed Active Archive Centers (DAACs). Data products from the MODIS sensors present new challenges to remote sensing scientists due to specialized production level, data format, and map projection. MODIS data are distributed as calibrated radiances and as higher level products such as: surface reflectance, water-leaving radiances, ocean color and sea surface temperature, land surface kinetic temperature, vegetation indices, leaf area index, land cover, snow cover, sea ice extent, cloud mask, atmospheric profiles, aerosol properties, and many other geophysical parameters. MODIS data are stored in HDF- EOS format in both swath format and in several different map projections. This tutorial guides users through data set characteristics as well as search and order interfaces, data unpacking, data subsetting, and potential applications of the data. A CD-ROM with sample data sets, and software tools for working with the data will be provided to the course participants.

Leptoukh, Gregory↗

Preliminary Sizing Completed for Single- Stage-To-Orbit Launch Vehicles Powered By Rocket-Based Combined Cycle Technology

Single-stage-to-orbit (SSTO) propulsion remains an elusive goal for launch vehicles. The physics of the problem is leading developers to a search for higher propulsion performance than is available with all-rocket power. Rocket-based combined cycle (RBCC) technology provides additional propulsion performance that may enable SSTO flight. Structural efficiency is also a major driving force in enabling SSTO flight. Increases in performance with RBCC propulsion are offset with the added size of the propulsion system. Geometrical considerations must be exploited to minimize the weight. Integration of the propulsion system with the vehicle must be carefully planned such that aeroperformance is not degraded and the air-breathing performance is enhanced. Consequently, the vehicle's structural architecture becomes one with the propulsion system architecture. Geometrical considerations applied to the integrated vehicle lead to low drag and high structural and volumetric efficiency. Sizing of the SSTO launch vehicle (GTX) is itself an elusive task. The weight of the vehicle depends strongly on the propellant required to meet the mission requirements. Changes in propellant requirements result in changes in the size of the vehicle, which in turn, affect the weight of the vehicle and change the propellant requirements. An iterative approach is necessary to size the vehicle to meet the flight requirements. GTX Sizer was developed to do exactly this. The governing geometry was built into a spreadsheet model along with scaling relationships. The scaling laws attempt to maintain structural integrity as the vehicle size is changed. Key aerodynamic relationships are maintained as the vehicle size is changed. The closed weight and center of gravity are displayed graphically on a plot of the synthesized vehicle. In addition, comprehensive tabular data of the subsystem weights and centers of gravity are generated. The model has been verified for accuracy with finite element analysis. The final trajectory was rerun using OTIS (Boeing Corporation's trajectory optimization software package), and the sizing output was incorporated into a solid model of the vehicle using PRO/Engineer computer-aided design software (Parametric Technology Corporation, Waltham, MA).

Roche, Joseph M.↗

Telemetry Tracking & Control (TT&C) - First TDRSS, then Commercial GEO & Big LEO and Now Through LEO

The advent of low earth orbit (LEO) commercial communication satellites provides an opportunity to dramatically reduce Telemetry, Tracking and Control (TT&C) costs of launch vehicles, Unpiloted Aerial Vehicles (UAVs), Research Balloons and spacecraft by reducing or eliminating ground infrastructure. Personnel from the Goddard Space Flight Center's Wallops Flight Facility (GSFC\WFF) have successfully used commercial Geostationary Earth Orbit (GEO) and Big LEO communications satellites for Long Duration Balloon Flight TT&C. The Flight Modem is a GSFC\WFF Advanced Range Technology initiative (ARTI) designed to streamline TT&C capability in the user community of these scientific data gathering platforms at low cost. Making use of existing LEO satellites and adapting and ruggedized commercially available components; two-way, over the horizon communications may be established with these vehicles at great savings due to reduced infrastructure. Initially planned as a means for permitting GPS data for tracking and recovery of sounding rocket and balloon payloads, expectations are that the bandwidth can soon be expanded to allow more comprehensive data transfer. The system architecture which integrates antennas, GPS receiver, commercial satellite packet data modem and a single board computer with custom software is described and technical challenges are discussed along with the plan for their resolution. A three-phase testing and development plan is outlined and the current results are reported. Results and status of ongoing flight tests on aircraft and sounding rockets are reported. Future applications on these platforms and the potential for satellite support are discussed along with an analysis of cost effectiveness of this method vs. other tracking and data transmission schemes.

Morgan, Dwayne R.↗

Restoring Redundancy to the MAP Propulsion System

The Microwave Anisotropy Probe is a follow-on to the Differential Microwave Radiometer instrument on the Cosmic Background Explorer. Sixteen months before launch, it was discovered that from the time of the critical design review, configuration changes had resulted in a significant migration of the spacecraft's center of mass. As a result, the spacecraft no longer had a viable backup control mode in the event of a failure of the negative pitch axis thruster. Potential solutions to this problem were identified, such as adding thruster plume shields to redirect thruster torque, adding mass to, or removing it from, the spacecraft, adding an additional thruster, moving thrusters, bending thrusters (either nozzles or propellant tubing), or accepting the loss of redundancy for the thruster. The impacts of each solution, including effects on the mass, cost, and fuel budgets, as well as schedule, were considered, and it was decided to bend the thruster propellant tubing of the two roll control thrusters, allowing that pair to be used for back-up control in the negative pitch axis. This paper discusses the problem and the potential solutions, and documents the hardware and software changes that needed to be made to implement the chosen solution. Flight data is presented to show the propulsion system on-orbit performance.

ODonnell, James R., Jr.↗