Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “launch software”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,153 records · Page 64

Research and technology 1995 annual report

As the NASA Center responsible for assembly, checkout, servicing, launch, recovery, and operational support of Space Transportation System elements and payloads, the John F. Kennedy Space Center is placing increasing emphasis on its advanced technology development program. This program encompasses the efforts of the Engineering Development Directorate laboratories, most of the KSC operations contractors, academia, and selected commercial industries - all working in a team effort within their own areas of expertise. This edition of the Kennedy Space Center Research and Technology 1995 Annual Report covers efforts of all these contributors to the KSC advanced technology development program, as well as technology transfer activities. Major areas of research include environmental engineering, automation, robotics, advanced software, materials science, life sciences, mechanical engineering, nondestructive evaluation, and industrial engineering.

Source record↗

X-33 Telemetry Best Source Selection, Processing, Display, and Simulation Model Comparison

The X-33 program requires the use of multiple telemetry ground stations to cover the launch, ascent, transition, descent, and approach phases for the flights from Edwards AFB to landings at Dugway Proving Grounds, UT and Malmstrom AFB, MT. This paper will discuss the X-33 telemetry requirements and design, including information on fixed and mobile telemetry systems, best source selection, and support for Range Safety Officers. A best source selection system will be utilized to automatically determine the best source based on the frame synchronization status of the incoming telemetry streams. These systems will be used to select the best source at the landing sites and at NASA Dryden Flight Research Center to determine the overall best source between the launch site, intermediate sites, and landing site sources. The best source at the landing sites will be decommutated to display critical flight safety parameters for the Range Safety Officers. The overall best source will be sent to the Lockheed Martin's Operational Control Center at Edwards AFB for performance monitoring by X-33 program personnel and for monitoring of critical flight safety parameters by the primary Range Safety Officer. The real-time telemetry data (received signal strength, etc.) from each of the primary ground stations will also be compared during each nu'ssion with simulation data generated using the Dynamic Ground Station Analysis software program. An overall assessment of the accuracy of the model will occur after each mission. Acknowledgment: The work described in this paper was NASA supported through cooperative agreement NCC8-115 with Lockheed Martin Skunk Works.

Burkes, Darryl A.↗

Automatic Alignment of Displacement-Measuring Interferometer

A control system strives to maintain the correct alignment of a laser beam in an interferometer dedicated to measuring the displacement or distance between two fiducial corner-cube reflectors. The correct alignment of the laser beam is parallel to the line between the corner points of the corner-cube reflectors: Any deviation from parallelism changes the length of the optical path between the reflectors, thereby introducing a displacement or distance measurement error. On the basis of the geometrical optics of corner-cube reflectors, the length of the optical path can be shown to be L = L(sub 0)cos theta, where L(sub 0) is the distance between the corner points and theta is the misalignment angle. Therefore, the measurement error is given by DeltaL = L(sub 0)(cos theta - 1). In the usual case in which the misalignment is small, this error can be approximated as DeltaL approximately equal to -L(sub 0)theta sup 2/2. The control system (see figure) is implemented partly in hardware and partly in software. The control system includes three piezoelectric actuators for rapid, fine adjustment of the direction of the laser beam. The voltages applied to the piezoelectric actuators include components designed to scan the beam in a circular pattern so that the beam traces out a narrow cone (60 microradians wide in the initial application) about the direction in which it is nominally aimed. This scan is performed at a frequency (2.5 Hz in the initial application) well below the resonance frequency of any vibration of the interferometer. The laser beam makes a round trip to both corner-cube reflectors and then interferes with the launched beam. The interference is detected on a photodiode. The length of the optical path is measured by a heterodyne technique: A 100- kHz frequency shift between the launched beam and a reference beam imposes, on the detected signal, an interferometric phase shift proportional to the length of the optical path. A phase meter comprising analog filters and specialized digital circuitry converts the phase shift to an indication of displacement, generating a digital signal proportional to the path length.

Halverson, Peter↗

IV&V Project Assessment Process Validation

The Space Launch System (SLS) will launch NASA's Multi-Purpose Crew Vehicle (MPCV). This launch vehicle will provide American launch capability for human exploration and travelling beyond Earth orbit. SLS is designed to be flexible for crew or cargo missions. The first test flight is scheduled for December 2017. The SLS SRR/SDR provided insight into the project development life cycle. NASA IV&V ran the standard Risk Based Assessment and Portfolio Based Risk Assessment to identify analysis tasking for the SLS program. This presentation examines the SLS System Requirements Review/System Definition Review (SRR/SDR), IV&V findings for IV&V process validation correlation to/from the selected IV&V tasking and capabilities. It also provides a reusable IEEE 1012 scorecard for programmatic completeness across the software development life cycle.

Driskell, Stephen↗

Functional evaluation of the Galileo attitude and articulation control subsystem using FUNSIM

The functional performance of the Galileo spacecraft's attitude and articulation control subsystem is evaluated. The tests are performed utilizing the simulation program developed on an IBM 370 system known as the Functional Simulation (FUNSIM). FUNSIM is an entirely software-based simulation which uses the actual flight software in HAL/S and simulated spacecraft dynamics in FORTRAN language. A description of how the test cases were selected to verify that the algorithms perform functionally correctly, and a summary of the problems encountered are included in the paper. The benefits of having an alternative test bed such as FUNSIM to the real-time simulation test beds which utilize the spacecraft hardware components in discovering the problems are described. A sample test case which shows that the desired tasks were performed functionally correctly is included in the paper. The commands in this test are selected to start the dual-spin spacecraft initially in launch mode and lead it all the way to inertial mode. Major attitude control algorithms such as rotor and platform attitude estimators, clock and core platform attitude estimators, clock and core platform controllers, and the command turn and burn are examined.

Namiri, M. K.↗

The Development of a Data Archive and Analysis Tools for WIRE

Although a number of missions to perform asteroseismology from orbit are planned, such as the French COROT (currently scheduled for launch in 2004), the Canadian MOST (2002), and the Danish MONS (2003), none has yet been successfully flown. However, from May 1999 through September 2000, the PI of this proposal initiated a program using the star camera on board the WIRE spacecraft to perform high-precision photometry of solar-like and giant stars. This program relied on the on-board star camera, which consists of a 50mm f/1.75 telescope feeding a 512(sup 2) SITe CCD, which can be read out at rates as high as 10 Hz. The high cadence of observations available with this star camera is made possible by software that locates the 5 brightest stars in the field and reads only an 8x8 pixel box around one selected image. An additional mode of operation, available since November 1999, makes count rate data available on all five stellar images, with a consequent loss of read rate (to 2 Hz for 5 stars). Stellar images are defocused (to allow for more accurate image centroiding), but the entire stellar image lies within the 64-pixel box. we note that in many ways, this instrument is similar to the French instrument EVRIS, which was intended to perform asteroseismology with a 90 mm telescope, but which unfortunately flew as part of the failed Russian MARS 96 spacecraft.

Buzasi, Derek L.↗

Results from the Radio Frequency Mass Gauge Technology Demonstration on the Intuitive Machines Nova-C Lunar Lander

A cryogenic propellant mass gauge known as the Radio Frequency Mass Gauge (RFMG) was integrated into the Intuitive Machines (IM) Nova-C lunar lander and provided an estimate of the liquid oxygen and liquid methane mass in the lander propellant tanks throughout the IM-1 mission, including during microgravity coast phases. An RFMG electronics controller was used to measure and record the spectrum of the RF signal reflected from an antenna sensor in each tank over the frequency range 100 to 1,300 MHz. The RF spectrum of each of the tanks is unique and is sensitive to the index of refraction of the propellants and the spatial distribution of the liquid within the tanks. Electromagnetic simulation software was used to simulate the antenna response spectra for a given tank geometry, fluid properties, and liquid–vapor configurations within the tank. Over 10,000 antenna response simulations were completed for each propellant tank prior to the IM-1 mission and represented various volumetric fill levels and fluid configurations. The simulated spectra served as a database against which measured tank spectra were compared. For analysis, a spectral matching algorithm was used to find the best match between measured and simulated spectra, and the gauged mass was calculated from the most highly correlated fluid mass simulations. RFMG measurements were recorded during tank loading on the launch pad and during translunar coast, lunar orbit insertion, low lunar orbit, powered descent to the lunar surface, and postlanding on the Moon. This paper describes the RF and fluid simulations, the RFMG measurements and analysis of spectral data, the RFMG instrument, and the gauged results throughout all phases of the IM-1 mission.

lunar lander↗

Results from the Radio Frequency Mass Gauge Technology Demonstration on the Intuitive Machines Nova-C Lunar Lander

A cryogenic propellant mass gauge known as the Radio Frequency Mass Gauge (RFMG) was integrated into the Intuitive Machines (IM) Nova-C lunar lander and provided an estimate of the liquid oxygen and liquid methane mass in the lander propellant tanks throughout the IM-1 mission, including during microgravity coast phases. An RFMG electronics controller was used to measure and record the spectrum of the RF signal reflected from an antenna sensor in each tank over the frequency range 100 to 1,300 MHz. The RF spectrum of each of the tanks is unique and is sensitive to the index of refraction of the propellants and the spatial distribution of the liquid within the tanks. Electromagnetic simulation software was used to simulate the antenna response spectra for a given tank geometry, fluid properties, and liquid–vapor configurations within the tank. Over 10,000 antenna response simulations were completed for each propellant tank prior to the IM-1 mission and represented various volumetric fill levels and fluid configurations. The simulated spectra served as a database against which measured tank spectra were compared. For analysis, a spectral matching algorithm was used to find the best match between measured and simulated spectra, and the gauged mass was calculated from the most highly correlated fluid mass simulations. RFMG measurements were recorded during tank loading on the launch pad and during translunar coast, lunar orbit insertion, low lunar orbit, powered descent to the lunar surface, and postlanding on the Moon. This paper describes the RF and fluid simulations, the RFMG measurements and analysis of spectral data, the RFMG instrument, and the gauged results throughout all phases of the IM-1 mission.

lunar lander↗

Flight dynamics facility operational orbit determination support for the ocean topography experiment

The Ocean Topography Experiment (TOPEX/POSEIDON) mission is designed to determine the topography of the Earth's sea surface across a 3 yr period, beginning with launch in June 1992. The Goddard Space Flight Center Dynamics Facility has the capability to operationally receive and process Tracking and Data Relay Satellite System (TDRSS) tracking data. Because these data will be used to support orbit determination (OD) aspects of the TOPEX mission, the Dynamics Facility was designated to perform TOPEX operational OD. The scientific data require stringent OD accuracy in navigating the TOPEX spacecraft. The OD accuracy requirements fall into two categories: (1) on orbit free flight; and (2) maneuver. The maneuver OD accuracy requirements are of two types; premaneuver planning and postmaneuver evaluation. Analysis using the Orbit Determination Error Analysis System (ODEAS) covariance software has shown that, during the first postlaunch mission phase of the TOPEX mission, some postmaneuver evaluation OD accuracy requirements cannot be met. ODEAS results also show that the most difficult requirements to meet are those that determine the change in the components of velocity for postmaneuver evaluation.

Bolvin, D. T.↗

Mission planning and scheduling concept for the Advanced X-ray Astrophysics Facility (AXAF)

Projected for launch in the latter part of 1998, the Advanced X-ray Astrophysics Facility (AXAF), the third satellite in the Great Observatory series, promises to dramatically open the x-ray sky as the Hubble and Compton observatories have done in their respective realms. Unlike its companions, however, AXAF will be placed in a high altitude, highly elliptical orbit (10,000 x 100,000 km), and will therefore be subject to its own unique environment, spacecraft and science instrument constraints and communication network interactions. In support of this mission, ground operations personnel have embarked on the development of the AXAF Offline System (OFLS), a body of software divided into four basic functional elements: (1) Mission Planning and Scheduling, (2) Command Management, (3) Altitude Determination and Sensor Calibration and (4) Spacecraft Support and Engineering Analysis. This paper presents an overview concept for one of these major elements, the Mission Planning and Scheduling subsystem (MPS). The derivation of this concept is described in terms of requirements driven by spacecraft and science instrument characteristics, orbital environment and ground system capabilities. The flowdown of these requirements through the systems analysis process and the definition of MPS interfaces has resulted in the modular grouping of functional subelements depicted in the design implementation approach. The rationale for this design solution is explained and capabilities for the initial prototype system are proposed from the user perspective.

Newhouse, M.↗

Integrated Systems Health Management for Space Exploration

Integrated Systems Health Management (ISHM) is a system engineering discipline that addresses the design, development, operation, and lifecycle management of components, subsystems, vehicles, and other operational systems with the purpose of maintaining nominal system behavior and function and assuring mission safety and effectiveness under off-nominal conditions. NASA missions are often conducted in extreme, unfamiliar environments of space, using unique experimental spacecraft. In these environments, off-nominal conditions can develop with the potential to rapidly escalate into mission- or life-threatening situations. Further, the high visibility of NASA missions means they are always characterized by extraordinary attention to safety. ISHM is a critical element of risk mitigation, mission safety, and mission assurance for exploration. ISHM enables: In-space maintenance and repair; a) Autonomous (and automated) launch abort and crew escape capability; b) Efficient testing and checkout of ground and flight systems; c) Monitoring and trending of ground and flight system operations and performance; d) Enhanced situational awareness and control for ground personnel and crew; e) Vehicle autonomy (self-sufficiency) in responding to off-nominal conditions during long-duration and distant exploration missions; f) In-space maintenance and repair; and g) Efficient ground processing of reusable systems. ISHM concepts and technologies may be applied to any complex engineered system such as transportation systems, orbital or planetary habitats, observatories, command and control systems, life support systems, safety-critical software, and even the health of flight crews. As an overarching design and operational principle implemented at the system-of-systems level, ISHM holds substantial promise in terms of affordability, safety, reliability, and effectiveness of space exploration missions.

Uckun, Serdar↗

Eleven Countries, an Integrated Spacecraft: the Story of International Collaboration that Built the Orion Spacecraft and Powered the Success of the Artemis I Mission

The quest to return humans to the Moon in the next step towards humanity's exploration of space is more alive than ever. After a great deal of achievements, failures, and lessons learned, the Artemis I mission set o to the Moon on November 16, 2022, with the goal of testing a new rocket, the Space Launch System, and a new spacecraft, Orion: designed, assembled, and tested across two continents, and 11 countries. Behind this mission, decades of experience with the International Space Station, Autonomous Transfer Vehicle operations, and many other program collaborations built the know-how on how to succeed together in the toughest environment | deep space. The Artemis I mission proved to be an incredible success, meeting 161 total mission objectives, including 21 developed during the flight based on outperforming spacecraft. It was also a case-study in international collaboration, given that ESA, NASA, and industry partners Airbus and Lockheed Martin for the first time had to design, build, test, and fly a fully integrated human-rated spacecraft, with most critical functions dependent and interconnected across U.S. and European systems. The U.S.-built Orion Crew Module and Crew Module Adapter and European-built European Service Module (ESM) shared critical interfaces and commodities, from propulsion, avionics, active/passive thermal, electrical power generation, storage and distribution to the software that managed it all. In this paper, we will describe relevant aspects of the integrated spacecraft design, providing context for the challenges that the team faced in all phases required to get Orion ready to fly, and provide a direct account of how the joint team formed, trained, and supported the operations of the successful Artemis I mission. We will also explore the evolution of the partnerships, given that these allow a multi-national e ort to sustain the program production, share costs, leverage a broader base of engineering expertise, and build more diverse capabilities over the long haul to support the Artemis goals and objectives. Lastly, we will cover critical lessons learned and how the Orion Program has implemented these in preparation of the next Artemis missions to repeat the success of Artemis I. The purpose of this paper is to document knowledge we gained and lessons we learned through the development of an integrated Orion spacecraft, since it is imperative we build on this now, at the dawn of the Artemis Program, an international endeavor to push human space exploration.

Deep Space Exploration↗

Chandra X-Ray Observatory's Radiation Environment and the AP-8/AE-8 Model

The Chandra X-ray Observatory (CXO) was launched on July 23, 1999 and reached its final orbit on August 7, 1999. The CXO is in a highly elliptical orbit, approximately 140,000 km x 10,000 km, and has a period of roughly 63.5 hours (approx. 2.6 days). It transits the Earth's Van Allen belts once per orbit during which no science observations can be performed due to the high radiation environment. The Chandra X-ray Observatory Center (CXC) currently uses the National Space Science Data Center's "near Earth" AP-8/AE-8 radiation belt model to predict the start and end times of passage through the radiation belts. However, our scheduling software only uses a simple dipole model of the Earth's magnetic field. The resulting B, L magnet coordinates, do not always give sufficiently accurate predictions of the start and end times of transit of the Van Allen belts. We show this by comparing to the data from Chandra's on-board radiation monitor, the EPHIN (Electron, Proton, Helium Instrument particle detector) instrument. We present evidence that demonstrates this mis- of the radiation belts as well as data that also demonstrate the significant variability of one radiation belt transit to the next as experienced by the CXO. We present an explanation for why the dipole implementation of the AP-8/AE-8 gives inaccurate results. We are also investigating use of the Magnetospheric Specification and Forecast Model (MSM) - a model that also accounts for radiation belt variability and geometry.

Virani, S. N.↗

Assessment of atomic oxygen erosion of silver interconnects on Intelsat 6, F3

Intelsat 6 F-3 was launched from Cape Canaveral on a Titan 3 launch vehicle. Failure of the launch vehicle resulted in the satellite being marooned in Low Earth Orbit (LEO). During its sojourn in LEO, Intelsat 6 is exposed to an unanticipated environment consisting primarily of atomic oxygen, which will subject the unprotected silver interconnects (nominally 12.5 microns thick) on the solar panel to oxidation and erosion. Rescue by Space Shuttle is being examined. Consequently, Intelsat and Comsat have joined in an effort to determine the condition of the silver interconnects at the anticipated time of reboost and to assess the long term risks to the intended geostationary mission. Ground based tests, theoretical analysis, and a flight experiment aboard STS-41 were executed, and new software was written to calculate the expected total atomic oxygen fluence on the interconnects.

A. Dunnet↗

An overview of the current state of the art optimization used for trajectory design in the GTS system

The high cost of delivering payloads to orbit demands that launch vehicles be flown in an optimal and reliable manner. Thus, computer simulated trajectories are optimized to obtain maximum vehicle payload capability or a maximum amount of reserve fuel, subject to design constraints. The Generalized Trajectory Simulation (GTS) system developed at The Aerospace Corporation is capable of simulating and optimizing trajectories for a wide variety of boost and reentry problems. Optimization is an integral part of the GTS system. This has resulted in progressive use of optimization. Additionally, the flexibility of the GTS system allows optimum trade studies to be conducted and complicated missions to be designed. This paper describes the integrated and flexible nature of the optimization software in the GTS system. Special features of the NLP2 and NLP3 optimization codes are described. Post optimality, parameter sensitivity analysis and the automatic scaling capability in the GTS system are also described.

Beltracchi, Todd J.↗

Flight Performance of Skylab Attitude and Pointing Control System

In 1967 a paper at the AIAA Guidance, Control and Flight Dynamics Conference in Huntsville, Ala. presented for the first time the prot)osed SKYLAB Attitude and Pointing Control System (APCS) The system requirements, Apollo Telescope Mount (ATM) configuration, control philosophy, and operational modes were presented and the APCS described. The Initial mission and system design requirements changed during the period of time before the SKYLAB was launched. This paper will review the Initial and final APCS requirements and goals and their relationship. The actual flight mission (and Its alterations during the flight) and known achieved APCS performance will then be presented. SKYLAB was a tremendous success in furthering man's scientific knowledge; but perhaps SKYLAB will be remembered more for the anomalies and the efforts undertaken to solve them. On May 14, 1973, the unmanned SKYLAB Orbital Workshop (OWS) was launched from Cape Kennedy. Serious hardware failures began to occur during ascent through the atmosphere and their spectre continued to haunt both the astronauts and their ground based support team. Nor were these the only surprises affecting the design and operation of the APCS. Mission requirements for pointing to various stellar targets and to nadir for earth resources experiments were added after the hardware was designed. The chance appearance of comet Kohoutek during the SKYLAB operational life-time caused NASA to add comet observation to the mission requirements and to adjust the time when the third crew would man the SKYLAB. The development of new procedures and software for the opportunity to observe this visitor to our solar system is described.

Chubb, W. B.↗

Estimating Foreign-Object-Debris Density from Photogrammetry Data

Within the first few seconds after launch of STS-124, debris traveling vertically near the vehicle was captured on two 16-mm film cameras surrounding the launch pad. One particular piece of debris caught the attention of engineers investigating the release of the flame trench fire bricks. The question to be answered was if the debris was a fire brick, and if it represented the first bricks that were ejected from the flame trench wall, or was the object one of the pieces of debris normally ejected from the vehicle during launch. If it was typical launch debris, such as SRB throat plug foam, why was it traveling vertically and parallel to the vehicle during launch, instead of following its normal trajectory, flying horizontally toward the north perimeter fence? By utilizing the Runge-Kutta integration method for velocity and the Verlet integration method for position, a method that suppresses trajectory computational instabilities due to noisy position data was obtained. This combination of integration methods provides a means to extract the best estimate of drag force and drag coefficient under the non-ideal conditions of limited position data. This integration strategy leads immediately to the best possible estimate of object density, within the constraints of unknown particle shape. These types of calculations do not exist in readily available off-the-shelf simulation software, especially where photogrammetry data is needed as an input.

Long, Jason↗

The Second Year of Dawn Mission Operations: Mars Gravity Assist and Onward to Vesta

Dawn launched in September 2007 on a mission to orbit main belt asteroids (4) Vesta in 2011 - 2012 and (1) Ceres in 2015. The mission is enabled by an ion propulsion system, which will be operated for the majority of the interplanetary cruise. Following 10.5 months of thrusting that concluded in October 2008, the spacecraft began a period of optimal coast that ended in June 2009. A Mars gravity assist in February 2009 provided an effective deltav of 2.6 km/s. The mission flexibility afforded by the use of ion propulsion provided relatively simple targeting at Mars. Additional engineering activities were conducted during the coast period after Mars, including loading new software into the spacecraft's central computer. This paper describe the progress of the mission, including the approach to Mars, the encounter itself, special activities conducted prior to the resumption of ion thrusting, and the continuation toward Vesta.

Rayman, Marc D.↗