Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cost function”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,153 records · Page 64

Cost Optimization and Technology Enablement COTSAT-1

Cost Optimized Test of Spacecraft Avionics and Technologies (COTSAT-1) is an ongoing spacecraft research and development project at NASA Ames Research Center (ARC). The space industry was a hot bed of innovation and development at its birth. Many new technologies were developed for and first demonstrated in space. In the recent past this trend has reversed with most of the new technology funding and research being driven by the private industry. Most of the recent advances in spaceflight hardware have come from the cell phone industry with a lag of about 10 to 15 years from lab demonstration to in space usage. NASA has started a project designed to address this problem. The prototype spacecraft known as Cost Optimized Test of Spacecraft Avionics and Technologies (COTSAT-1) and CheapSat work to reduce these issues. This paper highlights the approach taken by NASA Ames Research center to achieve significant subsystem cost reductions. The COSTAT-1 research system design incorporates use of COTS (Commercial Off The Shelf), MOTS (Modified Off The Shelf), and GOTS (Government Off The Shelf) hardware for a remote sensing spacecraft. The COTSAT-1 team demonstrated building a fully functional spacecraft for $500K parts and $2.0M labor. The COTSAT-1 system, including a selected science payload, is described within this paper. Many of the advancements identified in the process of cost reduction can be attributed to the use of a one-atmosphere pressurized structure to house the spacecraft components. By using COTS hardware, the spacecraft program can utilize investments already made by commercial vendors. This ambitious project development philosophy/cycle has yielded the COTSAT-1 flight hardware. This paper highlights the advancements of the COTSAT-1 spacecraft leading to the delivery of the current flight hardware that is now located at NASA Ames Research Center. This paper also addresses the plans for COTSAT-2.

Spremo, Stevan↗

A procedure for automated land use mapping using remotely sensed multispectral scanner data

A system of processing remotely sensed multispectral scanner data by computer programs to produce color-coded land use maps for large areas is described. The procedure is explained, the software and the hardware are described, and an analogous example of the procedure is presented. Detailed descriptions of the multispectral scanners currently in use are provided together with a summary of the background of current land use mapping techniques. The data analysis system used in the procedure and the pattern recognition software used are functionally described. Current efforts by the NASA Earth Resources Laboratory to evaluate operationally a less complex and less costly system are discussed in a separate section.

Whitley, S. L.↗

Flight test of 4-Hz and 30-Hz Omega receiver front-end

In-flight information was gathered on two Omega receiver analog modules, one having a 4-Hz bandwidth and the other a 30-Hz bandwidth. The Mini-O receiver was also monitored. An improved signal-to-noise characteristic of the narrower bandwidth front-end with negligible loss in dynamic range indicates that the 4-Hz front-end is the more desirable for the prototype Omega receivers. The Mini-O receiver was found to function quite satisfactorily on its second test flight, and has a very real potential for a low-cost, low-power, compact and light-weight Omega receiver.

Wright, L.↗

Economics of ion propulsion for large space systems

This study of advanced electrostatic ion thrusters for space propulsion was initiated to determine the suitability of the baseline 30-cm thruster for future missions and to identify other thruster concepts that would better satisfy mission requirements. The general scope of the study was to review mission requirements, select thruster designs to meet these requirements, assess the associated thruster technology requirements, and recommend short- and long-term technology directions that would support future thruster needs. Preliminary design concepts for several advanced thrusters were developed to assess the potential practical difficulties of a new design. This study produced useful general methodologies for assessing both planetary and earth orbit missions. For planetary missions, the assessment is in terms of payload performance as a function of propulsion system technology level. For earth orbit missions, the assessment is made on the basis of cost (cost sensitivity to propulsion system technology level).

Masek, T. D.↗

The 747 primary flight control systems reliability and maintenance study

The major operational characteristics of the 747 Primary Flight Control Systems (PFCS) are described. Results of reliability analysis for separate control functions are presented. The analysis makes use of a NASA computer program which calculates reliability of redundant systems. Costs for maintaining the 747 PFCS in airline service are assessed. The reliabilities and cost will provide a baseline for use in trade studies of future flight control system design.

Source record↗

Assembling the basic structure

Specific tasks to be undertaken by the NASA-Johnson, Phase B management of the manned Space Station are described. These tasks include the analysis, definition, and design of the following systems: assembly trusses and structures; interconnection modules; airlock system; heat rejection and transport; guidance, navigation and control systems; mechanical systems; resource integration; data management; communication and tracking; habitat for the crew; hardware need for cost-effective EVA; interface and berthing for compatible space-transportation system; and software development environment. The components, functions, and the key design goals of each of these systems are discussed.

Covington, C.↗

Strategies for a permanent lunar base

One or more of three possible objectives, encompassing scientific research, lunar resource exploitation for space infrastructure construction, and lunar environment self-sufficiency refinement with a view to future planetary habitation, may be the purpose of manned lunar base activities. Attention is presently given to the possibility that the early phases of all three lunar base orientations may be developed in such a way as to share the greatest number of common elements. An evaluation is made of the cost and complexity of the lunar base, and the Space Transportation System used in conjunction with it, as functions of long term base use strategy.

Duke, M. B.↗

Mission analysis and phased development of a lunar base

Planned activities at a manned lunar base can be categorized as supporting one or more of three possible objectives: scientific research, exploitation of lunar resources for use in building a space infrastructure, or attainment of self-sufficiency in the lunar environment as a first step in planetary habitation. Scenarios constructed around each of the three goals have many common elements, particularly in the early phases. In addition, the process of constructing the scenario clearly demonstrated that later phases were critically dependent on technologies, systems, and elements developed during the early phases. The cost and the complexity of the base, as well as the structure of the Space Transportation System, are functions of the chosen long-term strategy. A real lunar base will manifest some combination of characteristics from these idealized end members.

Roberts, Barney B.↗

Gripper for truss structure assembly

The CIRSSE two-finger gripper is designed to be used with a 6-axis wrist-mounted force-torque sensor as part of an experimental testbed for cooperative robotic manipulation. The gripper system consists of a dedicated controller and a pneumatic powered gripper that is servoed in position or grasping force. The gripper also has a between fingertip light beam sensor. The major features of this new design are: high grasping force to weight ratio (25::1) and compactness (14 cm base-fingertip, 0.8 kilograms); low cost dedicated slave controller; and simple host-controller communications protocol to minimize command interpretation delay. Shared software functions between the host and the controller processor permit the host to select servo mode, servo gain-parameter values, and calibration offsets. Hidden primitive self-test, calibration and servo confidence functions are included.

Kelley, Robert B.↗

Fuzzy control system for a remote focusing microscope

Space Station Crew Health Care System procedures require the use of an on-board microscope whose slide images will be transmitted for analysis by ground-based microbiologists. Focusing of microscope slides is low on the list of crew priorities, so NASA is investigating the option of telerobotic focusing controlled by the microbiologist on the ground, using continuous video feedback. However, even at Space Station distances, the transmission time lag may disrupt the focusing process, severely limiting the number of slides that can be analyzed within a given bandwidth allocation. Substantial time could be saved if on-board automation could pre-focus each slide before transmission. The authors demonstrate the feasibility of on-board automatic focusing using a fuzzy logic ruled-based system to bring the slide image into focus. The original prototype system was produced in under two months and at low cost. Slide images are captured by a video camera, then digitized by gray-scale value. A software function calculates an index of 'sharpness' based on gray-scale contrasts. The fuzzy logic rule-based system uses feedback to set the microscope's focusing control in an attempt to maximize sharpness. The systems as currently implemented performs satisfactorily in focusing a variety of slide types at magnification levels ranging from 10 to 1000x. Although feasibility has been demonstrated, the system's performance and usability could be improved substantially in four ways: by upgrading the quality and resolution of the video imaging system (including the use of full color); by empirically defining and calibrating the index of image sharpness; by letting the overall focusing strategy vary depending on user-specified parameters; and by fine-tuning the fuzzy rules, set definitions, and procedures used.

Weiss, Jonathan J.↗

High efficiency low cost monolithic module for SARSAT distress beacons

The program objectives were to develop a highly efficient, low cost RF module for SARSAT beacons; achieve significantly lower battery current drain, amount of heat generated, and size of battery required; utilize MMIC technology to improve efficiency, reliability, packaging, and cost; and provide a technology database for GaAs based UHF RF circuit architectures. Presented in viewgraph form are functional block diagrams of the SARSAT distress beacon and beacon RF module as well as performance goals, schematic diagrams, predicted performances, and measured performances for the phase modulator and power amplifier.

Petersen, Wendell C.↗

Integration and evaluation of a simulator designed to be used within a dynamic prototyping environment

The human computer interface (HCI) prototyping environment is designed to allow developers to rapidly prototype systems so that the interface and functionality of a system can be evaluated and iteratively refined early in the development process. This keeps development costs down by modifying the interface during the requirements definition phase, thus minimizing changes that need to be made during and after flight code development. Problems occur within a system when the user interface is not adequately developed and when designers and developers have an incomplete understanding of the system requirements. A process has been developed for prototyping on-board payload displays for Space Station Freedom. This prototyping process consists of five phases: identification of known requirements, analysis of the requirements, development of a formal design representation and specification, development of the prototype, and evaluation of the prototype. The actual development of the prototype involves prototyping the displays, developing a low fidelity simulator, building of an interface (or communication) between the displays and the simulator, integration of these components, and testing to ensure that the interface does what the developer expects. This research integrates and evaluates a software tool which has been developed to serve as a simulator within the prototyping environment. The tool is being evaluated to determine whether or not it meets the basic requirements which are needed for a low fidelity simulator within this environment. In order to evaluate the architecture and its components, a human computer interface for and a simulator of an automobile have been developed as a prototype. The individual components (i.e., the interface and simulator) have been developed, and the current research was designed to integrate and test the complete working system within the prototyping environment. The following sections will describe the architecture and components of the rapid prototyping environment, the development of a system to assess the environment, and the integration and evaluation of PERCNET.

Moore, Loretta A.↗

Understanding and Predicting the Process of Software Maintenance Releases

One of the major concerns of any maintenance organization is to understand and estimate the cost of maintenance releases of software systems. Planning the next release so as to maximize the increase in functionality and the improvement in quality are vital to successful maintenance management. The objective of this paper is to present the results of a case study in which an incremental approach was used to better understand the effort distribution of releases and build a predictive effort model for software maintenance releases. This study was conducted in the Flight Dynamics Division (FDD) of NASA Goddard Space Flight Center(GSFC). This paper presents three main results: 1) a predictive effort model developed for the FDD's software maintenance release process; 2) measurement-based lessons learned about the maintenance process in the FDD; and 3) a set of lessons learned about the establishment of a measurement-based software maintenance improvement program. In addition, this study provides insights and guidelines for obtaining similar results in other maintenance organizations.

Basili, Victor↗

Internal Plasma Properties and Enhanced Performance of an 8 cm Ion Thruster Discharge

There is a need for a lightweight, low power ion thruster for space science missions. Such an ion thruster is under development at NASA Glenn Research Center. In an effort to better understand the discharge performance of this thruster. a version of this thruster with an anode containing electrically isolated electrodes at the cusps was fabricated and tested. Discharge characteristics of this ring cusp ion thruster were measured without ion beam extraction. Discharge current was measured at collection electrodes located at the cusps and at the anode body itself. Discharge performance and plasma properties were measured as a function of discharge power, which was varied between 20 and 50 W. It was found that ion production costs decreased by as much as 20 percent when the two most downstream cusp electrodes were allowed to float. Floating the electrodes did not give rise to a significant increase in discharge power even though the plasma density increased markedly. The improved performance is attributed to enhanced electron containment.

Foster, John E.↗

Modular, Adaptive, Reconfigurable Systems: Technology for Sustainable, Reliable, Effective, and Affordable Space Exploration

In order to execute the Vision for Space Exploration, we must find ways to reduce cost, system complexity, design, build, and test times, and at the same time increase flexibility to satisfy multiple functions. Modular, Adaptive, Reconfigurable System (MARS) technologies promise to set the stage for the delivery of system elements that form the building blocks of increasingly ambitious missions involving humans and robots. Today, space systems are largely specialized and built on a case-by-case basis. The notion of modularity however, is nothing new to NASA. The 1970's saw the development of the Multi-Mission Modular spacecraft (MMS). From 1980 to 1992 at least six satellites were built under this paradigm, and included such Goddard Space Flight Center missions as SSM, EUVE, UARS, and Landsat 4 and 5. Earlier versions consisted of standard subsystem "module" or "box" components that could be replaced within a structure based on predefined form factors. Although the primary motivation for MMS was faster/cheaper integration and test, standardization of interfaces, and ease of incorporating new subsystem technology, it lacked the technology maturity and programmatic "upgrade infrastructure" needed to satisfy varied mission requirements, and ultimately it lacked user buy-in. Consequently, it never evolved and was phased out. Such concepts as the Rapid Spacecraft Development Office (RSDO) with its regularly updated catalogue of prequalified busses became the preferred method for acquiring satellites. Notwithstanding, over the past 30 years since MMS inception, technology has advanced considerably and now modularity can be extended beyond the traditional MMS module or box to cover levels of integration, from the chip, card, box, subsystem, to the space system and to the system-of-systems. This paper will present the MARS architecture, cast within the historical context of MMS. Its application will be highlighted by comparing a state-of-the-art point design vs. a MARS-enabled lunar mission, as a representative robotic case design.

Esper, Jaime↗

Phonesat In-flight Experience Results

Consumer technology, over the last decade, has begun to encompass devices that enable us to figure out where we are, which way we are pointing, observe the world around us, and store and transmit this information to wherever we want. Once separate consumer products such as GPS units, digital cameras and mobile phones are now combined into the modern day Smartphone. Since these capabilities are remarkably similar to those required for the multi-million dollar satellites - so why not use a multihundred dollar Smartphone instead? The PhoneSat project of NASA Ames Research Center is developing technology demonstrations utilizing these extraordinary advances to show just how simple and cheap Space can be. The style of development revolves around the "release early, release often" Silicon Valley mentality. PhoneSat is a series of 1U CubeSat size spacecrafts that use an off-the-shelf Smartphone as their onboard computer. By doing so, PhoneSat takes advantage of the high computational capability, large memory as well as ultra-tiny sensors like high-resolution cameras and navigation devices that Smartphones offer. Along with a Smartphone, PhoneSat is equipped with other commercially available technology products, such as medical brushless motors that are used as reaction wheels. Over the four years that NASA Ames Research Center has been developing the PhoneSat project, different suborbital and orbital flight activities have proven the validity of this revolutionary approach. In early 2013, the PhoneSat project launched the first triage of PhoneSats into LEO. In the five day orbital life time, the nano-satellites flew the first functioning Smartphone based satellites (using the Nexus One and Nexus S phones), the cheapest satellite (a total parts cost below $3,500) and one of the fastest on-board processors (CPU speed of 1GHz). In late 2013, the PhoneSat project launched an improved version of its bus to a higher altitude orbit which provided data about the overall system's tolerance to the space environment. In this paper, an overview of the PhoneSat project as well as a summary of the in-flight experimental results is presented. NASA Ames Research Center is carrying on its effort to bring a paradigm shift in the way we conceive Space exploration, this new approach is certainly incarnated by PhoneSat. A set of eight PhoneSat-based CubeSats is manifested to launch in 2014 with the purpose of demonstrating new technical capabilities and being a pathfinder for future Spacecraft technology missions.

CubeSat↗

Managing Fault Management Development

As the complexity of space missions grows, development of Fault Management (FM) capabilities is an increasingly common driver for significant cost overruns late in the development cycle. FM issues and the resulting cost overruns are rarely caused by a lack of technology, but rather by a lack of planning and emphasis by project management. A recent NASA FM Workshop brought together FM practitioners from a broad spectrum of institutions, mission types, and functional roles to identify the drivers underlying FM overruns and recommend solutions. They identified a number of areas in which increased program and project management focus can be used to control FM development cost growth. These include up-front planning for FM as a distinct engineering discipline; managing different, conflicting, and changing institutional goals and risk postures; ensuring the necessary resources for a disciplined, coordinated approach to end-to-end fault management engineering; and monitoring FM coordination across all mission systems.

McDougal, John M.↗