Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “VisIt”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,153 records · Page 64

Froth Flotation

Mined crude ore to rare earth concentrate froth flotation process for Mountain Pass, CA. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=619B68DE-5A43-483F-8BDC-3F494872AF90

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Fuel Assembly Facility, Operation

This unit process estimates input and output flows for assembling enriched UF6 into UO2 fuel assemblies for loading into nuclear reactors, including electricity, natural gas, and water use; air, water, solid waste, and radionuclide emissions. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=0A3C1D7F-234C-477E-AB7F-979CFCA690FD

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fuel Fabrication Facility, Construction

This process encompasses the material inputs required for the construction of a representative fuel assembly fabrication facility. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=47D776D9-6D96-40C5-99E2-604B56B0C43B

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Gas Centrifuge Uranium Enrichment, Operations

This process receives UF6 from a conversion facility and enriches by use of a gas centrifuge. This process includes stack emissions and natural gas boiler emissions. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=C1984348-C472-4372-9622-2C4475F738E4

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Gaseous Diffusion Enrichment Facility, Decommissioning

This process accounts for the energy consumption, material requirements, and emissions for the decommissioning of a gaseous diffusion uranium enrichment plant. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=A38B3739-C714-44B0-AF5F-F5AFEFAC4936

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Gaseous Diffusion Uranium Enrichment, Operations

This process receives UF6 from a conversion facility and enriches the percent composition of uranium-235 in the fuel. This process includes energy consumption, air emissions, water use, water emissions, and solid waste. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=9EE93E12-0CAC-4232-AE74-427D617204E6

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Grapple Skidder, 172 HP, Construction

This unit process quantifies the materials required for the construction of a single grapple skidder, used for dragging cut trees from the harvester to the on-site chipper at the harvesting site. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=189F4D59-2961-4A11-8F60-2BCCC0129B1F

42 ENGINEERING↗

Gravity Separation

Mined crude ore to rare earth concentrate gravity separation process for Mountain Pass, CA. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=2C31C28E-C6D0-41A8-A419-3DB9628F8C22

58 GEOSCIENCES↗

Harvester, 300-Bushel Capacity, 6 Cylinder, Construction

Harvester based on manufacturer specifications for a John Deere Model 9770 STS Combine, 300-bushel capacity, and a John Deere Model 612c Stalkmaster corn header. Assumes combine and corn header constructed entirely of steel plate. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=B7647951-27F4-4A1D-B161-BB9DDF529A58

42 ENGINEERING↗

Hydraulic Fracturing Water Delivery

Water sourcing and delivery to a Marcellus Shale well. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=D2829F66-1BF0-48A8-B649-45B48C85676A

58 GEOSCIENCES↗

Hydraulic Shield, 28.2 Tons, 2 Meter, Construction

Based on specifications for a 2-meter-wide hydraulic shield. Assumes shield constructed entirely of steel plate with negligible amounts of other materials. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=D0B996CF-4329-48E3-869E-344A88A68809

42 ENGINEERING↗

Illinois No. 6 Coal Preparation Facility Assembly, Construction

Calculates the number of each type of equipment required to prepare Illinois No. 6 bituminous coal for transport from an underground coal mine. Includes the following facilities: silo, stacker, crusher facility, cleaning facility, and WWTP. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=723EEC87-361E-4ACC-89AB-5E885F9A079A

01 COAL, LIGNITE, AND PEAT↗

Illinois No. 6 Underground Bituminous Coal Mine Site, Construction

Construction materials for concrete structures and asphalt paving for an Illinois No. 6 coal mine site. Assumes concrete structures and paving are composed entirely of cement or asphalt, respectively. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=7A80A4B3-6CC8-4168-8FA1-BC6231AF9089

01 COAL, LIGNITE, AND PEAT↗

Illinois No. 6 Underground Coal Mine Assembly, Construction

Calculates the number of each piece of equipment included in an underground, Illinois No. 6 bituminous coal mine. Includes life expectancy and replacement rates for the longwall mining system, continuous miner, conveyor system, and shuttle car. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=E1F4C19D-E7C9-4385-914A-7432869882D5

01 COAL, LIGNITE, AND PEAT↗

In Situ Uranium Mine Construction

This process encompasses the materials, drilling energy, and consequent emissions for the construction of a representative in situ mine used to extract uranium, normalized to 1 kg of produced uranium. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=A27D2D79-AF9D-4043-9F7C-8825073CB4A4

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

In-Situ Leach Mining and Processing, Uranium

This unit process includes in-situ mining of uranium and associated processing activities, including milling and groundwater remediation. Data are based primarily on U.S. in-situ leach (ISL) mines. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=4625868C-66BB-4356-8EE6-93B9AC7DEEF3

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Line Pan, 2.5 Tons, Construction

Based on specifications for a Joy Mining line pan. Assumes line pan constructed entirely of steel plate, with negligible amounts of other materials. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=4050177E-246E-494D-9890-4EBB4CB5C388

01 COAL, LIGNITE, AND PEAT↗