Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,153 records · Page 64

A section 110 evaluation of the 10,500-foot blast line civil effects structures and military trenches associated with the apple-2 test, area 1, nevada national security site, nye county, nevada

The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) has tasked Desert Research Institute (DRI) with identifying and evaluating additional resources that contribute to the significance of the Apple-2 Historic District as part of a Section 110 effort. Apple-2 was a 1955 atmospheric test in which the Federal Civil Defense Administration (FCDA) conducted an extensive civil effects program named Operation Cue. The objective of Operation Cue was to understand the blast and thermal effects of the test by using a simulated community of residential buildings, industrial structures, utilities, and commercial equipment arranged at various distances from ground zero (GZ). Military operations conducted by the Department of Defense (DoD) as part of the Desert Rock VI exercise were also associated with the Apple-2 test. The Apple-2 Historic District was originally defined in 2000 by Johnson and Edwards as 15 highly visible contributing elements dispersed across the landscape. Since its original recording, DRI has conducted additional archival research and this report details the identification and evaluation results of testing-related material remains at a distance of 10,500 ft from the Apple-2 GZ. Between 2017 and 2020, DRI conducted fieldwork at 10,500 ft from the Apple-2 GZ, revisited previously recorded contributing elements, and identified and evaluated newly recorded resources associated with Operation Cue as well as DoD operations. In total, DRI revisited or newly identified 15 principal resources. Of these, 13 are located within the historic district and contribute to the district’s significance. A set of military trenches and the associated material remains are discontiguous from the district, but also contribute to the district’s significance.

54 ENVIRONMENTAL SCIENCES↗

On the use of Graphs for Test Sequence Selection

This report demonstrates that applying graph theory techniques provides a way to obtain sufficient statistics in finding errors when testing complex state machines. It discusses how to define the tests, then demonstrates how to automatically generate test suites that diversify test cases, subject to constraints. If included within a continuous integration approach, these constructs provide an unbiased means to systematically check for errors within the latest controller software release.

97 MATHEMATICS AND COMPUTING↗

Using Hardware-In-The-Loop Methodology to Develop Test Systems

Hardware in the Loop (HIL) testing methodologies have become widespread in industry. Typically, they focus on developing control algorithms for systems such as autonomous vehicles or aircraft. An oft overlooked aspect of product development is the design and fabrication of a test system for validating that the product meets requirements. Abstractly, a test system differs little from a control system—testers provide signals to the unit, monitor feedback, and base decisions on the results. While the time scales may differ, the functionalities are conceptually similar. Viewed in this light, it becomes natural to extend HIL approaches to tester development. By replacing a physical unit with a proxy model deployed to a real-time or pseudo real-time target, test systems can be developed in parallel with the design and fabrication of a first production unit. This saves considerable time in the life cycle from conceptual design to realized product. This manuscript demonstrates the process flow using a capacitive discharge unit as an exemplar.

42 ENGINEERING↗

Advanced Diagnosis and Accelerated Testing of Balance of System Components for Utility Scale PV Installations: October 1, 2022-September 30, 2024

A study of the durability of PV Balance of System components was performed. Specifically, wire cable jackets and cable connectors were examined within the direct current (DC) PV Power Transmission Chain (PTC). Degraded and failed samples have been obtained from utility PV installations to provide feedback on the degradation modes and the related damage-enabling considerations in today's PV systems. An industry interface group (including system owners, system inspectors, component manufacturers, and test labs) was used to help identify and obtain field-failed samples, for feedback (including samples and experimental design), and to facilitate the subsequent dissemination of the results of this study. Samples were empirically studied using accelerated stress testing with steady-state conditions (cable jackets) in addition to combined-accelerated stress testing (cable jackets, connectors and uncapped connectors). Steady-state accelerated testing has been performed using at least one applied stressor (e.g. UV light) to aid understanding of jacket durability relative to its application. Component- and material-focused failure analysis was conducted to develop an understanding and advise the PV industry. In-depth characterization will be applied selectively to field- and artificially aged-samples, to gain scientific understanding of the structural, chemical, electrical, mechanical, and thermal properties enabling degradation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

MCNP® Code Version 6.3.1: Verification & Validation Testing (Rev.1)

This report describes the verification and validation testing performed on MCNP® code version 6.3.1. The purpose of this report is to act as a compendium of test suite descriptions and results. Accordingly the document is divided into two parts. Part I (this part) describes each test suite in the following sections. Part II provides the results of testing each suite and comparisons to experimental and/or alternative computational results, as appropriate.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

High Energy Arcing Fault (HEAF) Photometrics 2022 Test Report

High Energy Arcing Faults (HEAFs) are hazardous events in which an electrical arc leads to the rapid release of energy in the form of heat, vaporized metal, and mechanical force. In Nuclear Power Plants, these events are often accompanied by loss of essential power and complicated shutdowns. To confirm the probabilistic risk analysis (PRA) methodology in NUREG/CR-6850, which was formulated based on limited observational data, the NRC led an international experimental campaign from 2014 to 2016. The results of these experiments uncovered an unexpected hazard posed by aluminum components in or near electrical equipment and the potential for unanalyzed equipment failures. Sandia National Laboratories (SNL), in support of the NRC work, collaborated with NIST, BSI, KEMA, and NRC to support the full-scale HEAF test campaign in 2022. SNL provided high speed visible and infrared video/data of ten tests that collected data from HEAFs originated on copper and aluminum buses inside switchgears and bus ducts. Part of the SNL scope was to place cameras with high-speed data collection at different vantage points within the test facility to provide NRC a more complete and granular view of the test events.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

PACT Perovskite PV Module Outdoor Test Protocol (Version 0.2)

The purpose of this protocol is to define procedures and practices to be used by the PACT center for field testing of metal halide perovskite (MHP) photovoltaic (PV) modules. The protocol defines the physical, electrical, and analytical configuration of the tests and applies equally to mounting systems at a fixed orientation or sun tracking systems. While standards exist for outdoor testing of conventional PV modules, these do not anticipate the unique electrical behavior of perovskite cells. Further, the existing standards are oriented toward mature, relatively stable products with lifetimes that can be measured on the scale of years to decades. The state of the art for MHP modules is still immature with considerable sample to sample variation among nominally identical modules. Version 0.0 of this protocol does not define a minimum test duration, although the intent is for modules to be fielded for periods ranging for weeks to months. This protocol draws from relevant parts of existing standards, and where necessary includes modifications specific to the behavior of perovskites.

14 SOLAR ENERGY↗

Sierra/SD Verification Test Manual (V.5.24)

Tests from the Sierra Structural Dynamics verification test suite are reviewed. For each of the tests presented in this document the test setup, derivation of the analytic solution, and comparison of the Sierra code results to the analytic solution is provided. This document can be used to confirm that a given code capability is verified or referenced as a compilation of example problems.

97 MATHEMATICS AND COMPUTING↗

ORNL Package Testing Program Software Quality Assurance Plan

The Oak Ridge National Laboratory (ORNL) Package Testing Program (PTP) uses commercial off-the-shelf (COTS) software in performing data collection of thermal test results for package designs that contain radioactive materials. Specifically, this software is used to collect temperature data from the furnace, packages, and ambient air to prepare and execute the thermal test specified in 10 CFR 71.73, “Thermal Test.” This software quality assurance (SQA) plan sets forth the guidelines, standards, and procedures that shall be used to provide SQA for PTP software applications. This is a living document that will be maintained for the lifecycle of the PTP program. The SQA plan follows the requirements set forth in ORNL Standards Based Management System (SBMS): Information Technology; Subject Area: Software Quality Assurance. When applicable to the requirements as described in ORNL SBMS, Software Quality Assurance, the software shall be listed in the ORNL Software Registration System (SRS). Exemptions to this SBMS are COTS and firmware that are not modified; spreadsheet applications and personal productivity tools that do not have a utility or safety application, research applications, legacy software, system software, vendor-supplied software used to interface with the vendor’s services, software used within the organization to facilitate processing or management of information, and software developed for applications not specific to the US Department of Energy (DOE).

97 MATHEMATICS AND COMPUTING↗

Impact Testing of Heat Source Exemplars

This report details the heat source impact testing performed at the Shock Thermodynamics Applied Research Facility (STAR). The purpose of these tests were to measure the impact behavior of a heated Ta-10W tantalum/tungsten alloy heat source exemplar. Each exemplar resembled a cylinder with a rectangular through-hole orthogonal to the cylinder axis-of-symmetry. In each test, the exemplar was impacted by a hardened steel impactor accelerated using the STAR air gun. The exemplars were impacted perpendicular to the through-hole and at an an angle to the cylindrical axis-of-symmetry. The exemplar bar stock source, impact angle, and impact velocity were varied throughout the testing series. High-speed video was used to measure dynamic impact behavior while photon doppler velocimetry (PDV) and shorting pins were used to measure the impact velocity. Foam support structures were used to thermally isolate the exemplar and provide a support structure which was non-perturbative to the impact event. Soft-catch techniques were used to minimize secondary impacts and enable recovery for detailed post-shot analysis. Results indicate positive correlation between exemplar fracture and the variables of impact velocity and impact angle. Exemplar fracture occurred consistently along a single corner of the through-hole.

36 MATERIALS SCIENCE↗

Destructive PIE and Safety Testing of Six AGR-5/6/7 Capsule 2 Compacts

This study evaluates fission product retention and particle failure mechanisms in AGR-5/6/7 Capsule 2 uranium carbide and uranium oxide (UCO) tristructural isotropic (TRISO) fuel under high-temperature gas reactor accident-relevant conditions using high-temperature safety tests and destructive postirradiation examination. Three Capsule 2 compacts were held isothermally at 1600°C for approximately 300 hours and one compact at 1800°C for approximately 300 hours; two additional compacts were examined in the as-irradiated state. Post-test deconsolidation–leach–burn–leach (DLBL) quantified nuclide inventories in matrix and particles. Individual particles were surveyed for radioisotope inventories, and microanalytical approaches resolved microstructural evolution and fission product distributions within the coating layers. At 1600°C, no krypton was detected above the minimum detectable limit, and cesium releases were far below a single particle equivalent, indicating the absence of full TRISO failure or SiC failures. Silver releases were limited and primarily reflected depleted postirradiation inventories, consistent with prior compact-level exams indicating substantial in-pile 110mAg loss. At 1800°C, cumulative 134Cs release of approximately 2.5 particle equivalents and delayed 85Kr totaling approximately 0.53 particle equivalents were consistent with one full TRISO failure and two SiC failures. Europium and strontium releases were roughly one order of magnitude higher than at 1600°C and comparable to AGR-1/AGR-2 high-temperature tests, with sustained late-hold rates indicating diffusion through intact coatings coupled with matrix depletion. Overall, AGR-5/6/7 Capsule 2 UCO fuel demonstrated fission product retention during safety testing consistent with prior AGR campaigns, while distinctive in-pile 110mAg depletion and measurable 1600°C europium loss motivate targeted follow-on studies.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Lessons from Testing the First Three US HL-LHC Cryo-Assemblies at FNAL

The US High-Luminosity LHC Accelerator Upgrade Project (AUP) collaborates with CERN to deliver 10 cryo-assemblies for the High-Luminosity LHC upgrade at CERN. Those comprise the Q1/Q3 quadrupole optical elements in the accelerator and are based on Nb3Sn technology, for the first time in a large particle accelerator. So far three cryo-assemblies were tested at the Fermilab’s horizontal magnet test facility, specifically redesigned to serve those needs. This work gives an overview of the facility and its necessary evolution as the campaign progressed; main results and observations from the cryo-assembly tests are presented and discussed in the context of overall performance and expectations toward the completion of efforts. Lessons learned after multiple cryo-assembly tests by the same team are critical to ensure continuous success of the whole enterprise – those are openly shared.

Stoynev, Stoyan [Fermilab]↗

Destructive PIE and Safety Testing of Six AGR-5/6/7 Capsule 2 Compacts

This study evaluates fission product retention and particle failure mechanisms in AGR-5/6/7 Capsule 2 uranium carbide and uranium oxide (UCO) tristructural isotropic (TRISO) fuel under high-temperature gas reactor accident-relevant conditions using high-temperature safety tests and destructive post-irradiation examination. Three Capsule 2 compacts were held isothermally at 1600°C for approximately 300 hours and one compact at 1800°C for approximately 300 hours; two additional compacts were examined in the as-irradiated state. Post-test deconsolidation–leach–burn–leach (DLBL) quantified nuclide inventories in matrix and particles. Individual particles were surveyed for radioisotope inventories, and microanalytical approaches resolved microstructural evolution and fission product distributions within the coating layers. At 1600°C, no krypton was detected above the minimum detectable limit, and cesium releases were far below a single particle equivalent, indicating the absence of full TRISO failure or SiC failures. Silver releases were limited and primarily reflected depleted post-irradiation inventories, consistent with prior compact-level exams indicating substantial in-pile 110m Ag loss. At 1800°C, cumulative 134 Cs release of approximately 2.5 particle equivalents and delayed 85 Kr totaling approximately 0.53 particle equivalents were consistent with one full TRISO failure and two SiC failures. Europium and strontium releases were roughly one order of magnitude higher than at 1600°C and comparable to AGR-1/AGR-2 high-temperature tests, with sustained late-hold rates indicating diffusion through intact coatings coupled with matrix depletion. Overall, AGR-5/6/7 Capsule 2 UCO fuel demonstrated fission product retention during safety testing consistent with prior AGR campaigns, while distinctive in-pile 110m Ag depletion and measurable 1600°C europium loss motivate targeted follow-on studies.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Conceptual Designs for Irradiation Creep Testing of SiC in HFIR

Understanding irradiation creep of nuclear fuel cladding is important to properly size the initial fuel-cladding gap and understand when pellet-cladding contact is expected to occur due to a combination of fuel swelling and cladding creep-down. Irradiation creep also plays a role in relaxing stresses that develop in-pile. Silicon carbide fiber–reinforced silicon carbide matrix (SiC/SiC) composites are the leading long-term accident-tolerant fuel cladding concept for light-water reactors (LWRs). Although some limited data are available regarding irradiation creep of the individual constituents (fibers, matrix), data regarding irradiation creep of SiC/SiC composites are currently insufficient. Additional data regarding irradiation creep compliance and the rupture lifetime (combination of creep and slow crack growth) are needed to understand material limitations. This work describes the design and development of two irradiation vehicles that are being pursued for testing SiC/SiC concepts in the High Flux Isotope Reactor (HFIR). The first is a passive experiment, referred to as the PRECISE experiment, that leverages the constant coolant pressure of HFIR to compress a metallic bellows and provide a well-characterized load to drive creep in a SiC/SiC dog bone specimen. The total creep strain would be quantified post-irradiation by measuring dimensional changes of the specimen length as well as local dimensional changes within the gauge region. Non-stressed specimens would also be irradiated under the same conditions to provide an indication of dimensional changes due to radiation-induced swelling in the absence of creep. A second, more complex experiment, referred to as the INSITE experiment, is being designed in parallel that would use pneumatics to pressurize a metal bellows and linear variable differential transformers (LVDTs) to measure the specimen displacement in situ during irradiation. Such an experiment would provide significantly more data regarding the evolution of the creep compliance as a function of dose and applied stress within a single experiment but would require significantly more development time and cost to execute. The primary concern with the INSITE experiment is the accuracy, reliability, and expected lifetime of the LVDTs during irradiation at elevated temperatures. Efforts are being made to adjust the experiment design and operating procedure to limit LVDT temperatures and mitigate or otherwise compensate for uncertainties due to factors such as temperature fluctuations, creep in the surrounding structural materials, and drift of the LVDTs. This work describes the experiment designs, thermal and structural analysis that were performed to ensure that the desired temperature and stress conditions can be achieved, some initial sensitivity analyses to predict the evolution of the radiation-induced specimen displacements, and potential sources of uncertainty in the measurements. Out-of-pile testing is being performed in parallel to confirm that the test trains achieve the expected stress states in the specimens and do not result in prohibitive stress concentrators (e.g., in the grip regions) that might risk pre-mature failure. The PRECISE experiments are proceeding toward fabrication and assembly with HFIR insertion planned during fiscal year 2026. The INSITE experiment is progressing toward out-of-pile demonstrations, which will provide more conclusive evidence regarding the feasibility of executing these tests in HFIR or whether alternative displacement monitoring techniques may need to be considered.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Modal Analysis and Testing of a Cantilever Beam: Results and Guide

This report discusses modal analysis and testing of a cantilever beam including an introduction to modal testing, simulation, analysis, and a comparison of results. An accompanying presentation can be found from the LLNL CASIS website. Modal testing and analysis are essential for characterizing the response of a structure during vibration environments. Determining natural frequencies and mode shapes helps determine whether resonances will be reached during operations and if so, how the structure will respond and how the response can be tuned. The goal of this work is to convey the basics of modal testing and analysis through a simple project. This can be applied later to more complex, applicable structures. This includes a variety of work including data collection, finite element analysis and data processing. For this project a cantilever beam was chosen because it is a simple, well-characterized structure.

42 ENGINEERING↗

Flat TBPS Integration Testing for the CMS Outer Tracker Upgrade

The upcoming High-Luminosity (HL) LHC will significantly increase luminosity, introducing more demanding operating conditions for the CMS detector. To meet these challenges, CMS is undergoing major upgrades, including a complete replacement of its tracking detector. This poster presents recent integration testing efforts conducted at Fermilab on the Flat Tracker Barrel with pixel-strip (PS) modules integration test stand, a subcomponent of the outer tracker located in the central barrel region. In this region, PS modules are mounted on structures that provide mechanical support and cooling, called planks. The testing focuses on validating the integrated system’s thermal and electrical performance. Results from these tests will be discussed, highlighting their importance for ensuring reliable tracker operation in the HL-LHC era.

Salazar Segovia, Itzelli [UC, Davis]↗

Digital Grid Twin–Direct Communication Scheme Test Bed for Assessing Relay-to-Relay Radio Antenna and Optical Fiber Performance and Misoperations

This study introduces a novel “Digital Grid Twin–Direct Communication Scheme” test bed. This advanced platform evaluates point-to-point communication between transmitter and receiver relays with optical fiber and radio omnidirectional antenna systems, implemented at the Advanced Protection lab in the Grid Research Innovation and Development Center at Oak Ridge National Laboratory. The increased diversity of energy sources has led to more protective relay misoperations. In North America, microgrid protection schemes now use point-to-point communication along distribution lines between relays to implement advanced logic in nonradial grids that include both high- and low-inertia generators. This trend challenges utilities to minimize misoperations while ensuring rapid fault clearance and accurate selectivity coordination between primary and backup relays. This study assesses relay-to-relay communication schemes by introducing an advanced testing platform based on a digital grid twin protection test bed using a synchronized time source system. The platform evaluates the communication system using radio antennas or optical fiber links by integrating protective relays that operate breakers within the digital twin and record relay events and communication signals. In the experiments, transmitter and receiver relays were configured with inverse time overcurrent and breaker trip detection logic to assess the total time of the communication protection schemes based on the sum of the relay protection element operating time, radio latency, propagation delay, baud rate delay, and relay processing time. These delays were derived from recorded relay events and communication signals from the interface of a real-time simulator set as a digital grid twin. The test bed successfully simulated various electrical faults along a distribution line while ensuring effective and reliable point-to-point communication between transmitter and receiver relays. The radio antenna communication system exhibited latency because of the radio. This latency depends on the baud rate setting and type of radio application; in general, the higher the baud rate, the lower the radio latency. The measured radio latency (for Mirrored Bits with an encryption card at 9,600 bps) was about 9–10 ms. Additionally, calculated propagation delay per mile for radio antennas and optical fiber was 5.36 µs/mi and 8.04 µs/mi, respectively. Optical fiber communication did not demonstrate radio latency. Instead, the protection element operating time depends mainly on the protection logic function set in the relay, and the relay processing time depends on the processing rate of the relay in samples per power system cycle.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Sierra/SD – Verification Test Manual – 5.30

Tests from the Sierra Structural Dynamics verification test suite are reviewed. For each of the tests presented in this document the test setup, derivation of the analytic solution, and comparison of the Sierra code results to the analytic solution is provided. This document can be used to confirm that a given code capability is verified or referenced as a compilation of example problems.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗