Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Synchronization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,153 records · Page 64

Low cost management of replicated data in fault-tolerant distributed systems

Many distributed systems replicate data for fault tolerance or availability. In such systems, a logical update on a data item results in a physical update on a number of copies. The synchronization and communication required to keep the copies of replicated data consistent introduce a delay when operations are performed. A technique is described that relaxes the usual degree of synchronization, permitting replicated data items to be updated concurrently with other operations, while at the same time ensuring that correctness is not violated. The additional concurrency thus obtained results in better response time when performing operations on replicated data. How this technique performs in conjunction with a roll-back and a roll-forward failure recovery mechanism is also discussed.

Joseph, Thomas A.↗

High-speed analog fiber optic links for satellite communication

Large-aperture phased array antennas operating at millimeter wave frequencies are designed for space-based communications and imaging. Array elements are comprised of active transmit/receive (T/R) modules which are linked to the central processing unit through a high-speed fiberoptic network. This paper demonstrates optical control of active modules for satellite communication at 24 GHz. An approach called T/R level data mixing, which utilizes fiberoptic transmission of a data signal to individual T/R modules to be upconverted by an optically synchronized local oscillator, is demonstrated at 24 GHz. A free-running HEMT oscillator, used as local oscillator at 24 GHz, is synchronized using indirect subharmonic optical injection locking over a locking range of 14 MHz. Results of data link performance over 500-1000 MHz is also reported in terms of gain-bandwidth, linearity and third-order intercept, sensitivity, and dynamic range.

Daryoush, A. S.↗

Satellite range delay simulator for a matrix-switched time division multiple-access network simulation system

The Systems Integration, Test, and Evaluation (SITE) facility at NASA Lewis Research Center is presently configured as a satellite-switched time division multiple access (SS-TDMA) network simulator. The purpose of SITE is to demonstrate and evaluate advanced communication satellite technologies, presently embodied by POC components developed under NASA contracts in addition to other hardware, such as ground terminals, designed and built in-house at NASA Lewis. Each ground terminal in a satellite communications system will experience a different aspect of the satellite's motion due mainly to daily tidal effects and station keeping, hence a different duration and rate of variation in the range delay. As a result of this and other effects such as local oscillator instability, each ground terminal must constantly adjust its transmit burst timing so that data bursts from separate ground terminals arrive at the satellite in their assigned time slots, preventing overlap and keeping the system in synchronism. On the receiving end, ground terminals must synchronize their local clocks using reference transmissions received through the satellite link. A feature of the SITE facility is its capability to simulate the varying propagation delays and associated Doppler frequency shifts that the ground terminals in the network have to cope with. Delay is ahcieved by means of two NASA Lewis designed and built range delay simulator (RDS) systems, each independently controlled locally with front panel switches or remotely by an experiment control and monitor (EC/M) computer.

Nagy, Lawrence A.↗

A burst compression and expansion technique for variable-rate users in satellite-switched TDMA networks

A burst compression and expansion technique is described for asynchronously interconnecting variable-data-rate users with cost-efficient ground terminals in a satellite-switched, time-division-multiple-access (SS/TDMA) network. Compression and expansion buffers in each ground terminal convert between lower rate, asynchronous, continuous-user data streams and higher-rate TDMA bursts synchronized with the satellite-switched timing. The technique described uses a first-in, first-out (FIFO) memory approach which enables the use of inexpensive clock sources by both the users and the ground terminals and obviates the need for elaborate user clock synchronization processes. A continuous range of data rates from kilobits per second to that approaching the modulator burst rate (hundreds of megabits per second) can be accommodated. The technique was developed for use in the NASA Lewis Research Center System Integration, Test, and Evaluation (SITE) facility. Some key features of the technique have also been implemented in the ground terminals developed at NASA Lewis for use in on-orbit evaluation of the Advanced Communications Technology Satellite (ACTS) high burst rate (HBR) system.

Budinger, James M.↗

Word timing recovery in direct detection optical PPM communication systems with avalanche photodiodes using a phase lock loop

A technique for word timing recovery in a direct-detection optical PPM communication system is described. It tracks on back-to-back pulse pairs in the received random PPM data sequences with the use of a phase locked loop. The experimental system consisted of an 833-nm AlGaAs laser diode transmitter and a silicon avalanche photodiode photodetector, and it used Q = 4 PPM signaling at source data rate 25 Mb/s. The mathematical model developed to describe system performance is shown to be in good agreement with the experimental measurements. Use of this recovered PPM word clock with a slot clock recovery system caused no measurable penalty in receiver sensitivity. The completely self-synchronized receiver was capable of acquiring and maintaining both slot and word synchronizations for input optical signal levels as low as 20 average detected photons per information bit. The receiver achieved a bit error probability of 10 to the -6th at less than 60 average detected photons per information bit.

Sun, Xiaoli↗

A tone-aided dual vestigial sideband system for digital communications on fading channels

A spectrally efficient tone-aided dual vestigial sideband (TA/DVSB) system for digital data communications on fading channels is presented and described analytically. This PSK (phase-shift-keying) system incorporates a feed-forward, tone-aided demodulation technique to compensate for Doppler frequency shift and channel- induced, multipath fading. In contrast to other tone-in-band-type systems, receiver synchronization is derived from the complete data VSBs. Simulation results for the Rician fading channel are presented. These results demonstrate the receiver's ability to mitigate performance degradation due to fading and to obtain proper data carrier synchronization, suggesting that the proposed TA/DVSB system has promise for this application. Simulated BER (bit-error rate) data indicate that the TA/DVSB system effectively alleviates the channel distortions of the land mobile satellite application.

Hladik, Stephen M.↗

Minimizing selective availability error on Topex GPS measurements

GPS measurements made at Topex/Poseidon and the accompanying ground tracking sites will be affected by the selective availability. Although in principle the effects may be removed by differencing between receivers observing the same GPS satellites, this requires accurate synchronization of all receiver clocks. In the case of Topex/Poseidon application, there are two sources of imperfect clock synchronization. The first and larger is due to the constantly drifting clock onboard Topex, which may cause a residual effect as large as 10 cm on Topex carrier phase and 1 m on Topex pseudorange. The second is due to light-time differences between receivers observing the same GPS satellites, which may amount to a few mm error. In this paper a data reduction scheme which incorporates a low-order polynomial interpolation and carrier phase smoothing on pseudorange acquired at Topex and ground receivers is described; a simulation analysis is given demonstrating the effectiveness of the scheme for reducing the GPS S/A effects; and comparison with other schemes is discussed.

Wu, S. C.↗

System Decommutes And Displays Telemetry Data

TDPlus computer program software system for decommutation of pulse-code-modulation (PCM) telemetry signals. Provides synchronization, conversion into engineering units, and display of serial bit streams. Transforms IBM PC-compatible computer into PCM-telemetry-decommutation system. Synchronizes telemetric signals data and enables conversion back into such meaningful forms as voltage, current, pressure, and the like. Also controls operation of digital-to-analog converters to ship data to paper strip charts or to parallel digital ports for offloading to other computers. Software used to process actual data only when telemetry-data-processing computer modified in accordance with specifications contained in "TDPlus TM Data Processor" (GSC-13291). Written in Turbo C and 8088 Assembly language.

Massey, D. E.↗

Conservative parallel simulation of priority class queueing networks

A conservative synchronization protocol is described for the parallel simulation of queueing networks having C job priority classes, where a job's class is fixed. This problem has long vexed designers of conservative synchronization protocols because of its seemingly poor ability to compute lookahead: the time of the next departure. For, a job in service having low priority can be preempted at any time by an arrival having higher priority and an arbitrarily small service time. The solution is to skew the event generation activity so that the events for higher priority jobs are generated farther ahead in simulated time than lower priority jobs. Thus, when a lower priority job enters service for the first time, all the higher priority jobs that may preempt it are already known and the job's departure time can be exactly predicted. Finally, the protocol was analyzed and it was demonstrated that good performance can be expected on the simulation of large queueing networks.

Nicol, David M.↗

Satellite orbit considerations for a global change technology architecture trade study

A study was conducted to determine satellite orbits for earth observation missions aimed at obtaining data for assessing data global climate change. A multisatellite system is required to meet the scientific requirements for temporal coverage over the globe. The best system consists of four sun-synchronous satellites equally spaced in local time of equatorial crossing. This system can obtain data every three hours for all regions. Several other satellite systems consisting of combinations of sun-synchronous orbits and either the Space Station Freedom or a mid-altitude equatorial satellite can provide three to six hour temporal coverage, which is sufficient for measuring many of the parameters required for the global change monitoring mission. Geosynchronous satellites are required to study atmospheric and surface processes involving variations on the order of a few minutes to an hour. One or two geosynchronous satellites can be relocated in longitude to study processes over selected regions of earth.

Harrison, Edwin F.↗

Delivery and application of precise timing for a traveling wave powerline fault locator system

The Bonneville Power Administration (BPA) has successfully operated an in-house developed powerline fault locator system since 1986. The BPA fault locator system consists of remotes installed at cardinal power transmission line system nodes and a central master which polls the remotes for traveling wave time-of-arrival data. A power line fault produces a fast rise-time traveling wave which emanates from the fault point and propagates throughout the power grid. The remotes time-tag the traveling wave leading edge as it passes through the power system cardinal substation nodes. A synchronizing pulse transmitted via the BPA analog microwave system on a wideband channel sychronizes the time-tagging counters in the remote units to a different accuracy of better than one microsecond. The remote units correct the raw time tags for synchronizing pulse propagation delay and return these corrected values to the fault locator master. The master then calculates the power system disturbance source using the collected time tags. The system design objective is a fault location accuracy of 300 meters. BPA's fault locator system operation, error producing phenomena, and method of distributing precise timing are described.

Street, Michael A.↗

Transportable telemetry workstation

The goal was to complete the design of a prototype for a Transportable Telemetry Workstation (TTW). The Macintosh 2 is used to provide a low-cost system which can house real-time cards mounted on the NuBus inside the Macintosh 2 plus provide a standardized user interface on the Macintosh 2 console. Prior to a telemetry run, the user will be able to configure his real-time telemetry processing functions from the Macintosh 2 console. During a telemetry run, the real-time cards will store the telemetry data directly on a hard disk while permitting viewing of the data cards on the Macintosh 2 console on various selectable formats. The user will view the cards in terms of the functions they perform and the selectable paths through the cards, it is not required to become involved directly in hardware issue except in terms of the functional configuration of the system components. The TTW will accept telemetry data from an RS422 serial input data bus, pass it through a frame synchronizer card and on to a real time controller card via a telemetry backplane bus. The controller card will then route the data to a hard disk through a SCSI interface, and/or to a user interface on the Macintosh 2 console by way of the Macintosh 2 NuBus. The three major components to be designed, therefore, are the TTW Controller Card, the TTW Synchronizer Card, and the NuBus/Macintosh 2 User Interface. Design and prototyping of this state-of-the-art, transportable, low-cost, easy-to-use multiprocessor telemetry system is continuing. Other functions are planned for the future.

Collins, Aaron S.↗

A comparative study of seminiferous tubular epithelium from rats flown on Cosmos 1887 and SL3

Space flight, with its unique environmental constraints such as immobilization, decreased and increased pressures, and radiation, is known to affect testicular morphology and spermatogenesis. Among the several biological experiments and animals on board COSMOS 1887 Biosputnik flight were 10 rats, from which were collected testicular tissue. Average weights of flight tests were 6.4 pct. below that of the vivarium control when normalized for weight loss/100 grams body weight. Counts of surviving spermatogonia per tubule cross section indicated an average of 39 spermatogonia for flight animals, 40 for synchronous controls and 44 for the vivarium controls. Serum testosterone was significantly decreased when compared to basal controls but the decrease was not significant when compared in vivarium and synchronous control groups. The significant decrease in spermatogonia and the decrease in serum testosterone are similar to that in animals flown on Space Lab 3 (Challenger Shuttle).

Sapp, Walter J.↗

Solving the BM Camelopardalis puzzle

BM Camelopardalis (=12 Cam) is a chromospherically active binary star with a relatively large orbital eccentricity. Systems with large eccentricities usually rotate pseudosynchronously. However, BM Cam has been a puzzle since its observed rotation rate is virtually equal to its orbital period indicating synchronization. All available photometry data for BM Cam have been collected and analyzed. Two models of modulated ellipticity effect are proposed, one based on equilibrium tidal deformation of the primary star and the other on a dynamical tidal effect. When the starspot variability is removed from the data, the dynamical tidal model was the better approximation to the real physical situation. The analysis indicates that BM Cam is not rotating pseudosynchronously but rotating in virtual synchronism after all.

Teke, Mathias↗

COSMOS 2044: Lung morphology study, experiment K-7-28

Researchers examined the effect of microgravity during spaceflight on lung tissue. The ultrastructure of the left lungs of 5 Czechoslovakian Wister rats flown on the 13 day, 19+ hour Cosmos 2044 mission was examined and compared to 5 vivarium and 5 synchronous controls at 1-g conditions, and 5 rats exposed to 14 days of tail suspension. Pulmonary hemorrage and alveolar adema of unknown origin occurred to a greater extent in the flight, tail-suspended, and synchronous control animals, and in the dorsal regions of the lung when compared with the vivarium controls. The cause of these changes, which are possibly due to an increase in pulmonary vascular pressure, requires further investigation.

Elliott, Ann R.↗

A carrier-arraying demonstration at Goldstone for receiving Pioneer 11 signals

A carrier arraying technique was demonstrated at Goldstone. The Block III receivers of two 34-m antennas, Deep Space Station 12 and 15, were arrayed together to receive S band (2.3 GHz) signals from the Pioneer 11 spacecraft. Carrier phases in the two receivers were synchronized by the analog phase lock loops, and carrier signals were added at an intermediate frequency to enhance tracking performance. The receiver at DSS 15, which has been unable to lock up and track the Pioneer 11 signal by itself due to a wider tracking loop bandwidth and a higher system temperature, was now able to track the carrier and produce usable baseband signals. The receiver at DSS 12 achieved a reduction of the rms phase error, increasing the telemetry symbol SNR by an average of 0.35 dB. The baseband signals from both antennas were then synchronized and combined using the existing Baseband Assembly, thereby achieving a total symbol SNR increase of 2.5 + or - 0.7 dB relative to DSS 12 alone. A more comprehensive model is presented to permit evaluation of both thermal and phase noise effects. The analysis agrees well with observed data.

Pham, T. T.↗

The Galileo Orbiter - Command and telemetry subsystems on their way to Jupiter

An overview is given of the Galileo command and telemetry subsystems, which exemplify the rigid time-synchronized systems required by TDM (time division multiplexing). The spacecraft clock is examined, along with some of the rationale for the development of the clock structure and timing to give a sense of the design imperatives for rigidly synchronized systems. Additional subjects include the structure of the science and engineering frames, emphasizing the subcommutated structure of the engineering frame and its relationship to the spacecraft clock; ground processing for and basic uses of the telemetry; the various message types used to transmit commands to the spacecraft; and the generation processes for the command message types.

Erickson, James K.↗

Evolution of starspots in the long-period RS CVN binary V1817 Cygni = HR 7428

Photometry between 1982 and 1989, published and unpublished, is analyzed. The ellipticity effect produces variability with a full amplitude of 0.033 m in V. A recent time of light minimum (JD 2445988.0 + or - 0.3 d) combined with an old spectroscopic time of conjunction from the 1920's yields a much improved orbital period (108.854 + or - 0.003). Removal of the ellipticity effect reveals starspot variability. Four different spots were observed at various times, two of them present simultaneously in the light curve during 1985. Mean spot lifetimes were around 2 years and the largest amplitude attributed to starspots was 0.04 m in V during 1986. Derived rotation periods for two spots were 5.3 + or - 1.2 percent slower than synchronous and 3.0 + or - 0.4 percent faster. The differential rotation coefficient for the K2 giant is k = 0.25 + or - 0.04, compared to k = 0.186 for the sun. V1817 Cygni has the longest orbital period of any binary known to execute synchronous rotation.

Hall, Douglas S.↗