Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Strategic Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,153 records · Page 64

ETM Industry: Tabletop Defining Notions for Cooperative Operating Practices

This tabletop plans to cover 3 main topics in regards to the research that NASA has conducted for High-E Traffic Management (ETM), as well as implementing it to stand up an ETM system in the Airspace Operations Lab to invite industry participants to join us in a collaborative evaluation at the end of 2023. (Or earlier for system architectural connectivity). Working to define the notions that go into Cooperative Operating Practices for a collaborative traffic management process, we will be showing and training to some of our early prototype concepts and discussing: 1. Operational Intent: We have built an OI generation tool and would like to discuss specifics to the requirements of OI size, update rates, and duration. 2. Strategic Conflict Detection: We have built a concept to detect overlapping OI’s and would like to discuss the output information; time horizon, geometry and confidence level of intersection. In addition we are looking at a service that would provide all users with additional information in regards to the probability of your actual flight intent getting within a specified separation envelope. 3. Cooperative Operating Practices (COPS): Specifically looking at COPs for strategic deconfliction, we are looking to industry to build the actual COPS based on various criteria; vehicle-to-vehicle interactions, or company to company agreements. What is the strategy when OIs intersect; wait and see, take a pre-negotiated COPS action, or ad-hoc negotiation and discuss what that looks like.

High-E Traffic Management (ETM)↗

Future Model-Based Systems Engineering Vision and Strategy Bridge for NASA

A vision for the future of model-based systems engineering (MBSE) at NASA in 2029 and a strategy bridge towards that future are presented. Strategic thinking and leading change concepts were used to analyze reports and presentations on global trends and visionary thinking about the future of systems and digital engineering. The context, strategic time horizon, stakeholders, strategic challenges, strategic advantages, driving forces, and opportunities were considered. The analysis resulted in a future vision of MBSE that shows what NASA systems engineers and digital machines will do to perform rapid, extraordinary, and unprecedented missions. The NASA systems engineer, in this future vision, works with a global project team in a virtual and collaborative environment, engineers the system, and uses digital approaches as the routine and default way of working. The digital machines provide data-driven and automated mission designs; have a backbone of program and project management, systems engineering, and product life-cycle management; and are a knowledge-sharing infrastructure. The NASA systems engineer and the systems engineering team are envisioned to use digital machines to plan and perform rapid exploration missions, develop a digital twin that lasts across the life cycle, and develop enduring and adaptable systems. NASA has an engineering enterprise and a life-cycle management framework that endure, adapt, and respond. A strategy bridge based on the Baldrige Criteria for Performance Excellence Framework and lessons learned from a recent MBSE initiative illuminates a way forward from today to this desired future. The bridge lays out a strategy for leaders and recommends investments of today for immediate benefits and for benefits in 2029.

model-based systems engineering, digital engineeri↗

In Situ Resource Utilization (ISRU) Envisioned Future Priorities

The National Aeronautics and Space Administration (NASA) of the United States of America (US) has initiated the Artemis Moon to Mars program to send astronauts (the first woman and person of color) back to the lunar surface, create a sustainable human lunar exploration program, and lead the first human exploration mission to the Mars surface in the 2030’s. A major objective of this program is to characterize the resources that exist on the Moon and Mars, and learn how to utilize them for sustained and affordable exploration. Commonly known as In Situ Resource Utilization (ISRU), the search for, acquisition, and processing of resources in space has the potential to greatly reduce the dependency on transporting mission consumables and infrastructure from Earth, thereby reducing mission costs, risks, and dependency on Earth. Through the extraction and processing of resources into mission commodities such as rocket propellants, life support consumables, and fuel cell reactants, ISRU enhances and evolves the cis-lunar, lander, and surface transportation systems required for human exploration; expanding and ehancing HOW humans get to, explore, and return from the Moon. Through the extraction and processing of resources into metals, silicon, and other manufacturing and construction feedstock, ISRU enhances and allows for the expansion of critical infrastructure through in situ manufacturing and construction capabilities needed for WHAT humans do on the Moon and in cis-lunar space. Because of this, ISRU supports and enables commercial involvement beyond NASA and governmental agencies by both lowering the cost of sustained transportation to/from/on the Moon as well as supporting the market required for needing these transportation systems. To achieve this vision, NASA’s Space Technology Mission Directorate (STMD) ensures the coordinated development of ISRU and other critical space and surface infrastructure elements such as propulsion, power, manufacturing, construction, and robotics through the Strategic Technology Architecture Roundtable (STAR) process. Through STAR, an integrated framework and process has been created allowing for capabilities and technologies to be linked and assessed, gaps to be identified, specifications and metrics to be established, and provide a means to prioritize and implement technology development and missions. For lunar ISRU, three primary areas of development have been initiated, (1) understanding, mapping, extracting, and processing water and other volatiles found in polar permanently shadowed regions (PSRs), (2) methods, technologies to extract oxygen from regolith, and (3) methods, technologies, and use cases for metals, silicon, and other feedstock commodities extracted and produced from lunar resources. This presentation will briefly discuss the STAR process and elaborate on the current status and future plans for ISRU development, demonstration, and architecture implementation of NASA’s Envisioned Future Priorities plan for ISRU.

In Situ Resource Utilization↗

Stochastic Modeling of Airlines' Scheduled Services Revenue

Airlines' revenue generated from scheduled services account for the major share in the total revenue. As such, predicting airlines' total scheduled services revenue is of great importance both to the governments (in case of national airlines) and private airlines. This importance stems from the need to formulate future airline strategic management policies, determine government subsidy levels, and formulate governmental air transportation policies. The prediction of the airlines' total scheduled services revenue is dealt with in this paper. Four key components of airline's scheduled services are considered. These include revenues generated from passenger, cargo, mail, and excess baggage. By addressing the revenue generated from each schedule service separately, air transportation planners and designers are able to enhance their ability to formulate specific strategies for each component. Estimation results clearly indicate that the four stochastic processes (scheduled services components) are represented by different Box-Jenkins ARIMA models. The results demonstrate the appropriateness of the developed models and their ability to provide air transportation planners with future information vital to the planning and design processes.

Hamed, M. M.↗

Stochastic Modeling of Airlines' Scheduled Services Revenue

Airlines' revenue generated from scheduled services account for the major share in the total revenue. As such, predicting airlines' total scheduled services revenue is of great importance both to the governments (in case of national airlines) and private airlines. This importance stems from the need to formulate future airline strategic management policies, determine government subsidy levels, and formulate governmental air transportation policies. The prediction of the airlines' total scheduled services revenue is dealt with in this paper. Four key components of airline's scheduled services are considered. These include revenues generated from passenger, cargo, mail, and excess baggage. By addressing the revenue generated from each schedule service separately, air transportation planners and designers arc able to enhance their ability to formulate specific strategies for each component. Estimation results clearly indicate that the four stochastic processes (scheduled services components) are represented by different Box-Jenkins ARIMA models. The results demonstrate the appropriateness of the developed models and their ability to provide air transportation planners with future information vital to the planning and design processes.

Hamed, M. M.↗

Implementing NASA's Capability-Driven Approach: Insight into NASA's Processes for Maturing Exploration Systems

NASA is engaged in transforming human spaceflight. The Agency is shifting from an exploration-based program with human activities focused on low Earth orbit (LEO) and targeted robotic missions in deep space to a more sustainable and integrated pioneering approach. Through pioneering, NASA seeks to address national goals to develop the capacity for people to work, learn, operate, live, and thrive safely beyond the Earth for extended periods of time. However, pioneering space involves more than the daunting technical challenges of transportation, maintaining health, and enabling crew productivity for long durations in remote, hostile, and alien environments. This shift also requires a change in operating processes for NASA. The Agency can no longer afford to engineer systems for specific missions and destinations and instead must focus on common capabilities that enable a range of destinations and missions. NASA has codified a capability driven approach, which provides flexible guidance for the development and maturation of common capabilities necessary for human pioneers beyond LEO. This approach has been included in NASA policy and is captured in the Agency's strategic goals. It is currently being implemented across NASA's centers and programs. Throughout 2014, NASA engaged in an Agency-wide process to define and refine exploration-related capabilities and associated gaps, focusing only on those that are critical for human exploration beyond LEO. NASA identified 12 common capabilities ranging from Environmental Control and Life Support Systems to Robotics, and established Agency-wide teams or working groups comprised of subject matter experts that are responsible for the maturation of these exploration capabilities. These teams, called the System Maturation Teams (SMTs) help formulate, guide and resolve performance gaps associated with the identified exploration capabilities. The SMTs are defining performance parameters and goals for each of the 12 capabilities, developing maturation plans and roadmaps for the identified performance gaps, specifying the interfaces between the various capabilities, and ensuring that the capabilities mature and integrate to enable future pioneering missions. By managing system development through the SMTs instead of traditional NASA programs and projects, the Agency is shifting from mission-driven development to a more flexible, capability-driven development. The process NASA uses to establish, integrate, prioritize, and manage the SMTs and associated capabilities is iterative. NASA relies on the Human Exploration and Operation Mission Directorate's SMT Integration Team within Advanced Exploration Systems to coordinate and facilitate the SMT process. The SMT Integration team conducts regular reviews and coordination meetings among the SMTs and has developed a number of tools to help the Agency implement capability driven processes. The SMT Integration team is uniquely positioned to help the Agency coordinate the SMTs and other processes that are making the capability-driven approach a reality. This paper will introduce the SMTs and the 12 key capabilities they represent. The role of the SMTs will be discussed with respect to Agency-wide processes to shift from mission-focused exploration to a capability-driven pioneering approach. Specific examples will be given to highlight systems development and testing within the SMTs. These examples will also show how NASA is using current investments in the International Space Station and future investments to develop and demonstrate capabilities. The paper will conclude by describing next steps and a process for soliciting feedback from the space exploration community to refine NASA's process for developing common exploration capabilities.

Williams-Byrd, Julie↗

Rendezvous radar for the orbital maneuvering vehicle

The Rendezvous Radar Set (RRS) was designed at Motorola's Strategic Electronics Division in Chandler, Arizona, to be a key subsystem aboard NASA's Orbital Maneuvering Vehicle (OMV). The unmanned OMV, which was under development at TRW's Federal Systems Division in Redondo Beach, California, was designed to supplement the Shuttle's satellite delivery, retrieval, and maneuvering activities. The RRS was to be used to locate and then provide the OMV with vectoring information to the target satellite (or Shuttle or Space Station) to aid the OMV in making a minimum fuel consumption approach and rendezvous. The OMV development program was halted by NASA in 1990 just as parts were being ordered for the RRS engineering model. The paper presented describes the RRS design and then discusses new technologies, either under development or planned for development at Motorola, that can be applied to radar or alternative sensor solutions for the Automated Rendezvous and Capture problem.

Locke, John W.↗

Implementation of a Relay Coordination System for the Mars Network

Mars network relay operations involve the coordination of lander and orbiter teams through long-term and short-term planning, tactical changes and post-pass analysis. Much of this coordination is managed through email traffic and point-to-point file data exchanges. It is often difficult to construct a complete and accurate picture of the relay situation at any given moment, as there is no centralized store of correlated relay data. The Mars Relay Operations Service (MaROS) is being implemented to address the problem of relay coordination for current and next-generation relay missions. The service is provided for the purpose of coordinating communications sessions between landed spacecraft assets and orbiting spacecraft assets at Mars. The service centralizes a set of functions previously distributed across multiple spacecraft operations teams, and as such greatly improves visibility into the end-to-end strategic coordination process. Most of the process revolves around the scheduling of communications sessions between the spacecraft during periods of time when a landed asset on Mars is geometrically visible by an orbiting spacecraft. These "relay" sessions are used to transfer data both to and from the landed asset via the orbiting asset on behalf of Earth-based spacecraft operators. This paper will discuss the relay coordination problem space, overview the architecture and design selected to meet system requirements, and describe the first phase of system implementation

Allard, Daniel A.↗

Net Zero Labs Pilot: NREL Roadmap to Decarbonization

NREL's Roadmap to decarbonize its campus aligns with Executive Order (EO) 14008, Tackling the Climate Crisis at Home and Abroad and EO 14057 Catalyzing America's Clean Energy Industries and Jobs through Federal Sustainability. NREL's strategic approach to reach net-zero emissions for its operational footprint and will occur in phases over the next decade. Decarbonizing NREL's footprint will require the elimination of greenhouse gas (GHG) emissions from all campus facilities' energy use and will be achieved through energy efficiency enhancements and the increased integration of clean energy sources. Engaging the private sector through an energy savings performance contract (ESPC) and relationships with NREL's utility providers will be crucial to NREL's implementation strategy.

decarbonize↗

Achieving Energy Savings in Small- and Medium-Sized Public Facilities: A Strategic Approach to Prioritizing and Financing

This resource is for state, local government, and K-12 school staff managing small- and medium-sized facilities. Readers will learn to address the unique challenges of smaller energy-saving projects and make informed decisions about financing. Section 1 provides tools for obtaining the information required to prioritize potential energy upgrades. Section 2 presents financing options for energy upgrades, as well as insights that will help decision makers select the right financing model for their project and jurisdiction. Section 3 summarizes key takeaways and highlights additional resources for small- and medium-sized public facilities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Renewable Energy for Industrial Environmental Management

Costs for renewable energy technologies have declined rapidly in the past decade and their use for residential, commercial, and utility scale electricity has grown exponentially as they become cost competitive. Simultaneously, industrial and manufacturing processes have been increasingly seeking ways to reduce emissions and operational costs in highly competitive sectors. With these combined drivers of lower cost and reduced environmental impact, renewable energy may become a viable energy provider for industrial processes such as oil and gas, mining, chemical refining, food production, and manufacturing. Renewable energy technologies may also partner with other reduced emission energy sources, such as small modular nuclear reactors and carbon capture and utilization, to create cleaner and circular industrial systems for reduced resource use. The Joint Institute for Strategic Energy Analysis (JISEA), which is a partnership of the National Renewable Energy Laboratory (NREL) and five universities and others, has been studying to potential for application of clean energy technologies to the heterogenous energy demands in industry. Dr. Jill Engel-Cox will present an overview of NREL and JISEA, the status and potential future of renewable energy technologies, and collaborations with the oil and gas industry and other industrial sectors to improve their environmental performance and reduce operational costs.

ENERGY PLANNING, POLICY, AND ECONOMY↗

NASA's Efforts to Commercialize Communications Services for Mission in Near-Earth Space

The National Aeronautics and Space Administration (NASA) Space Communications and Navigation (SCaN)Program enables high speed, robust, secure and cost-effective space communications and navigation services to current and future science and exploration missions. Consistent with National Space Policy, NASA is pursuing the use of demonstrated commercial services for all its future near-Earth requirements through a flexible, multi-provider approach that minimizes risks to the user missions and ensures costs to user missions are reasonable. Progress toward this goal is advancing in multiple key areas including direct to Earth (DTE), space-based relay, technology investments, required spectrum regulatory changes and mission engagement and infusion. The transition to commercial DTE services is already underway, with a target for transition by 2024. The primary functions to execute SCaN’s DTE strategy include increasing commercial service allocations by leveraging current commercial network providers and enabling seamless onboarding of additional providers into the network. Furthermore, moving away from government DTE services will allow operational costs to be optimized. A more gradual approach is planned for the transition to commercial space-based relay services to allow for demonstration and operationalization of commercial services for future users by 2030. In June of 2022, six American SATCOM vendors were awarded a combined $278.5 million through Funded Space Act Agreements (FSAAs) for the first cycle of demonstration and validation activities. The end-to-end service capabilities being targeted are based on existing NASA mission operational needs. Accordingly, each company has proposed a technical approach to lower costs, increase flexibility, and improve performance for a broad range of missions. Successful user mission transition to commercial services, both DTE and space-based relay, are dependent on the technologies and capabilities that address gaps in commercial capability. NASA is investing in technology development and pursuing a new strategic approach to the creation or adoption of space communications standards to move the agency toward a commercial paradigm. Wideband and multi-lingual user terminals are being developed to bridge differences in industry services. Building on ground demonstrations completed in 2021, the Johns Hopkins Applied Physics Lab (APL) will be flight testing a multi-lingual wideband terminal (payload) and demonstrating connectivity to both government and commercial relay services. NASA holds a leadership role in multiple civil space standards bodies and international coordination groups to ensure that standards supporting interoperability are developed with defined functions, interfaces, and performance. However, to successfully meet commercialization objectives, NASA seeks to collaborate with industry, and as applicable adopt or adapt to commercially defined standards. As such, NASA joined the 3rd Generation Partnership Project (3GPP) as an official member in 2021 to advocate for the inclusion of space missions as a unique user segment in future 5G non-terrestrial networks, and to better understand the scope of 3GPP releases and implications for space users. Further, engagement in Spectrum regulatory bodies is being undertaken to augment existing space-Earth and inter-satellite frequency allocations available for both government and commercial space systems. This paper addresses the recent progress toward NASA’s commercial space communications transition objectives and how key challenges are being navigated.

Gregory W Heckler↗

A Photo Album of Earth Scheduling Landsat 7 Mission Daily Activities

Landsat7 is a member of a new generation of Earth observation satellites. Landsat7 will carry on the mission of the aging Landsat 5 spacecraft by acquiring high resolution, multi-spectral images of the Earth surface for strategic, environmental, commercial, agricultural and civil analysis and research. One of the primary mission goals of Landsat7 is to accumulate and seasonally refresh an archive of global images with full coverage of Earth's landmass, less the central portion of Antarctica. This archive will enable further research into seasonal, annual and long-range trending analysis in such diverse research areas as crop yields, deforestation, population growth, and pollution control, to name just a few. A secondary goal of Landsat7 is to fulfill imaging requests from our international partners in the mission. Landsat7 will transmit raw image data from the spacecraft to 25 ground stations in 20 subscribing countries. Whereas earlier Landsat missions were scheduled manually (as are the majority of current low-orbit satellite missions), the task of manually planning and scheduling Landsat7 mission activities would be overwhelmingly complex when considering the large volume of image requests, the limited resources available, spacecraft instrument limitations, and the limited ground image processing capacity, not to mention avoidance of foul weather systems. The Landsat7 Mission Operation Center (MOC) includes an image scheduler subsystem that is designed to automate the majority of mission planning and scheduling, including selection of the images to be acquired, managing the recording and playback of the images by the spacecraft, scheduling ground station contacts for downlink of images, and generating the spacecraft commands for controlling the imager, recorder, transmitters and antennas. The image scheduler subsystem autonomously generates 90% of the spacecraft commanding with minimal manual intervention. The image scheduler produces a conflict-free schedule for acquiring images of the "best" 250 scenes daily for refreshing the global archive. It then equitably distributes the remaining resources for acquiring up to 430 scenes to satisfy requests by international subscribers. The image scheduler selects candidate scenes based on priority and age of the requests, and predicted cloud cover and sun angle at each scene. It also selects these scenes to avoid instrument constraint violations and maximizes efficiency of resource usage by encouraging acquisition of scenes in clusters. Of particular interest to the mission planners, it produces the resulting schedule in a reasonable time, typically within 15 minutes.

Potter, William↗

Preliminary Benefits Assessment of Traffic Aware Strategic Aircrew Requests (TASAR)

While en route, aircrews submit trajectory change requests to air traffic control (ATC) to better meet their objectives including reduced delays, reduced fuel burn, and passenger comfort. Aircrew requests are currently made with limited to no information on surrounding traffic. Consequently, these requests are uninformed about a key ATC objective, ensuring traffic separation, and therefore less likely to be accepted than requests informed by surrounding traffic and that avoids creating conflicts. This paper studies the benefits of providing aircrews with on-board decision support to generate optimized trajectory requests that are probed and cleared of known separation violations prior to issuing the request to ATC. These informed requests are referred to as traffic aware strategic aircrew requests (TASAR) and leverage traffic surveillance information available through Automatic Dependent Surveillance Broadcast (ADS-B) In capability. Preliminary fast-time simulation results show increased benefits with longer stage lengths since beneficial trajectory changes can be applied over a longer distance. Also, larger benefits were experienced between large hub airports as compared to other airport sizes. On average, an aircraft equipped with TASAR reduced its travel time by about one to four minutes per operation and fuel burn by about 50 to 550 lbs per operation depending on the objective of the aircrew (time, fuel, or weighted combination of time and fuel), class of airspace user, and aircraft type. These preliminary results are based on analysis of approximately one week of traffic in July 2012 and additional analysis is planned on a larger data set to confirm these initial findings.

Henderson, Jeff↗

North Dakota Integrated Carbon Storage Complex Feasibility Study. Final report

In spring 2017, the Energy & Environmental Research Center (EERC) initiated an effort to determine the feasibility of developing a commercial-scale CO 2 geologic storage complex able to store 50+ million tonnes (Mt) of CO 2 in central North Dakota safely, permanently, and economically. The objective was to fulfill the goals of the U.S. Department of Energy (DOE) Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative and address technical and nontechnical challenges specific to commercial-scale deployment of a CO2 storage project. The findings clearly show that the concept of capturing CO 2 from a lignite-fired electrical generation facility in central North Dakota and safely and permanently storing the CO 2 in the deep subsurface is indeed technically, economically, and socially feasible. This project evaluated two study areas and their respective geologic storage complexes located adjacent to separate coal-fired facilities in North Dakota: the Basin Electric Power Cooperative (BEPC)-owned Great Plains Synfuels Plant (GPSP) and the Minnkota Power Cooperative (Minnkota)-owned Milton R. Young Station (MRYS). These locations, one with CO 2 capture in place and an existing CO 2 pipeline, are bolstered by progressive North Dakota pore space ownership and long-term liability laws. These elements and a motivated team created an ideal synergistic scenario for ensuring success of the CarbonSAFE Initiative and promoting North Dakota’s statewide vision for carbon management. The project included drilling two new geologic characterization wells, integrating an existing 3-D seismic survey, creating a geologic model subsequently used for injection simulation, a risk assessment, public outreach, and generating a site development plan based on results. In addition, the performance of select National Risk Assessment Partnership tools was evaluated. The geologic characterization wells were drilled ~5600 feet deep to the Broom Creek Formation; ~350 feet of core was retrieved from each well. The core included the Broom Creek (targeted injection zone) and a portion of the overlying Opeche Shale (seal). The Flemmer-1 well, west of Beulah, North Dakota, yielded 169 feet of sandstone. The BNI-1 well located south of Center, North Dakota, yielded 124 feet of sandstone. In each case, laboratory analysis of the sandstone showed permeability in the 300–1000-mD range, with porosity of 20%–30%. The Flemmer-1 well was sited within the boundaries of an existing 3-D seismic survey. Colocating the well with the seismic survey maximized the relationship between new and legacy data and developed a first-of-its-kind interpretation of the geologic fabric of the Broom Creek. Geologic characterization data were integrated into a 5544-mi 2 geocellular model that encompassed both new wells and stratigraphy from the surface to the Amsden Formation (underlying the Broom Creek). The model was later expanded vertically to include the deeper Black Island–Deadwood interval to examine its potential viability as a storage target. The geocellular model provided the foundation for dynamic simulation of CO 2 into the Broom Creek. Results of the simulation suggest that the Broom Creek could accept the DOE target rate of 2 Mt/yr of CO 2 into as few as two wells. To bracket the expected capture from MRYS, simulations were also investigated for a 4-Mt/yr rate near MRYS. Although more wells are needed (two additional), the Broom Creek still has the storage resource to accept the CO 2 at the increased rate. A risk assessment exercise was conducted to identify and assess technical and nontechnical risks that could prevent potential candidate storage complexes within the study area from serving as commercial storage sites. The assessment identified and evaluated six technical risk categories: 1) CO 2 injectivity, 2) storage capacity, 3) lateral migration of CO 2 , 4) lateral pressure propagation, 5) vertical migration of CO 2 or formation brine, and 6) induced seismicity. Following two rounds of analysis and scoring, no risks were determined to preclude continued efforts to develop carbon capture, utilization, and storage (CCUS) in central North Dakota. The risk assessment results will be used to guide future site characterization, modeling and simulation, and monitoring activities. A specific nontechnical strategic risk based on challenges that may be realized in amalgamation of pore space resulted in vertically expanding the geologic model to incorporate the potential for stacked storage in multiple saline reservoirs. By including the Black Island–Deadwood interval (the basal sedimentary reservoir in this region), the amalgamated areal extent could be reduced by as much as 45%. Working with a smaller geographic area reduces risks and costs associated with monitoring and pore space leasing. An economic evaluation incorporating capture; transport (<5 mi); Class VI wells; permitting; and monitoring, verification, and accounting suggests implementing commercial-scale CCUS is economically attractive if the federal tax benefits of 45Q are included. This is validated by Minnkota’s continued pursuit of CO 2 capture and geologic storage at MRYS through its Project Tundra initiative, indicating that there is a business case for CCUS in central North Dakota. Currently, North Dakota is the only state with underground injection control (UIC) Class VI primacy. Built into the North Dakota Century Code is a series of regulatory requirements that guide the process to obtain a Class VI CO 2 storage facility permit. As part of this project, a site development plan was compiled to assure compliance with North Dakota’s requirements to permit a commercial-scale CO 2 storage operation and includes a prospective time line encompassing a general breakdown of activities. In total, an estimated 30 months would be needed to execute the necessary steps to attain a North Dakota CO 2 storage facility permit. Outreach was an integral part of the project and encompassed any project-related activity that had contact or exposure beyond the project team. The goals of outreach were to foster an environment from which stakeholders could make informed decisions about the project and gauge community receptiveness to a CCUS project. A consistent set of messages and outreach products were developed in conjunction with an outreach advisory board that integrated project partners and team members. To gauge public acceptability of geologically storing CO 2 , 5611 households in the project area were invited to participate in an online survey. The survey results indicate that the public attitude regarding CCUS is neutral to positive, with strong sentiment that CO 2 capture and storage may be an approach to maintain the economic vitality of the region. To achieve project objectives, critical support in the form of financial backing, engineering evaluations, site access, outreach collaboration, operations data, risk assessment/evaluation, and software access was provided by BEPC, the North Dakota Industrial Commission Lignite Research Council, ALLETE Clean Energy, BNI Energy, North American Coal Corporation, Minnkota, Prairie Public Broadcasting, Computer Modelling Group Ltd., and Schlumberger.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Requirements, Resource Planning and Management for Decrewing/Recrewing Scenarios of the International Space Station

Following the failure of 44P on launch in August 2011, and the subsequent grounding of all Russian Soyuz rocket based launches, the ISS ground teams engaged in an effort to determine how long the ISS could remain crewed, what would be required to safely configure the ISS for decrewing, and what would be required to recrew the ISS upon resumption of Soyuz rocket launches if decrewing became necessary. This White Paper was written to capture the processes and lessons learned from real-time time events and to provide a reference and training document for ISS Program teams in the event decrewing of the ISS is needed. Through coordination meetings and assessments, teams identified six decrewing priorities for ground and crew operations. These priorities were integrated along with preflight priorities through the Increment replanning process. Additionally, the teams reviewed, updated, and implemented changes to the governing documentation for the configuration of the ISS for a contingency decrewing event. Steps were taken to identify critical items for disposal prior to decrewing, as well as identifying the required items to be strategically staged or flown with the astronauts and cosmonauts who would eventually recrew the ISS. After the successful launches and dockings of both 45P and 28S, the decrewing team transitioned to finalizing and publishing the documentation for standardizing the decrewing flight rules. With the continued launching of crews and cargo to the ISS, utilization and science is again a high priority, with the Increment pairs 29 and 30, and 31 and 32 reaching the milestone of at least 35 hours per week average utilization.

Bach, David A.↗

Working Toward A National Coordinated Soil Moisture Monitoring Network: Vision, Progress, and Future Directions

Soil moisture is a critical land surface variable, impacting the water, energy, and carbon cycles. While in situ soil moisture monitoring networks are still developing, there is no cohesive strategy or framework to coordinate, integrate, or disseminate these diverse data sources in a synergistic way that can improve our ability to understand climate variability at the national, state, and local levels. Thus, a national strategy is needed to guide network deployment, sustainable network operation, data integration and dissemination, and user-focused product development. The National Coordinated Soil Moisture Monitoring Network (NCSMMN) is a federally led, multi-institution effort that aims to address these needs by capitalizing on existing wide-ranging soil moisture monitoring activities, increasing the utility of observational data, and supporting their strategic application to the full range of decision-making needs. The goals of the NCSMMN are to 1) establish a national “network of networks” that effectively demonstrates data integration and operational coordination of diverse in situ networks; 2) build a community of practice around soil moisture measurement, interpretation, and application—a “network of people” that links data providers, researchers, and the public; and 3) support research and development (R&D) on techniques to merge in situ soil moisture data with remotely sensed and modeled hydrologic data to create user-friendly soil moisture maps and associated tools. The overarching mission of the NCSMMN is to provide coordinated high-quality, nationwide soil moisture information for the public good by supporting applications like drought and flood monitoring, water resource management, agricultural and forestry planning, and fire danger ratings.

C. Bruce Baker↗

Poster: Responsible Adoption of Artificial Intelligence (AI) in Electric Grid Operations

The rapid integration of artificial intelligence (AI) in the utility transmission and distribution (T&D) sector is revolutionizing traditional grid management practices. As utilities encounter complexities from evolving consumer behaviors and energy integration, AI becomes a critical solution for enhancing grid monitoring, fault detection, and operational optimization. However, increased reliance on interconnected technologies introduces significant cybersecurity risks, regulatory compliance challenges, and human factors concerns. This study proposes a strategic, responsible and consequence-driven approach to AI implementation, examining the dual nature of AI adoption by highlighting its transformative benefits for utilities and associated risks. It provides utilities with a framework for evaluating AI integration, enabling them to navigate challenges and capitalize on opportunities to achieve greater reliability, efficiency, and resilience in an increasingly complex energy landscape.

24 - POWER TRANSMISSION AND DISTRIBUTION↗