Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Space Operations Center”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,153 records · Page 64

Assessments of Physiology And Cognition in Hybrid-reality Environments (APACHE) – Physical Workload Approximation

The Human Physiology, Performance, Protection & Operations Laboratory (H-3PO) at NASA Johnson Space Center (JSC) is developing a hybrid reality exploration surface analog, “Assessments of Physiology and Cognition in Hybrid-reality Environments” (APACHE). The goal of APACHE is to create a planetary extravehicular activity (EVA) simulation environment that provides a representative physical and cognitive workload approximation using a combination of virtual reality (VR), physical reality, and hybrid reality (HR) techniques. To develop and characterize the physical workload approximation within the APACHE environment, a two-part approach was implemented. In part 1, baseline physical work load during ambulation within APACHE was evaluated and compared with that in other planetary EVA analog environments and with existing data sets from Apollo planetary EVAs and reduced gravity testing of prototype planetary spacesuits. For this evaluation, 10 subjects were asked to ambulate in three surface analog environments: a passive treadmill in APACHE, natural terrain in an outdoor field environment, and a standard motorized treadmill. Subjects’ heart rate and metabolic rate (VO2/VCO2) were measured and compared among the different test conditions and existing data sets. Gait parameters were also collected to compare with suited mechanics and to understand the role of gait kinematics in physical workload. In part 2, the aim is to evaluate the addition of a custom weighted body suit to the aforementioned surface analog environments and the ability to titrate the suit configuration to provide the best possible physical workload approximation for simulation of lunar and Martian EVAs.

Alex Baughman↗

ISRU Pilot Excavator: Bucket Drum Scaling Experimental Results

NASA’s Space Technology Mission Directorate (STMD) is funding the development of a robotic excavator called the “ISRU Pilot Excavator” (IPEx) which will be a technology demonstration of excavating and transporting 10 metric tons of lunar regolith on the surface of the moon with a 30kg-class robotic excavator. IPEx will be the next generation of robotic excavators to use bucket drums as excavation tools. This is an evolution of the Regolith Advanced Surface Systems Operations Robot (RASSOR) developed at NASA’s Kennedy Space Center (KSC). Bucket drums are hollow cylinders with regularly spaced scoops around the perimeter. The drums rotate in one direction to collect regolith with the scoops. The regolith slides down an internal baffling system inside the drum which prevents the regolith from falling back out of the scoops (see Figure 1). The captured regolith can then be transported while held in the drum and then deposited by rotating the drum in the opposite direction allowing the regolith to slide back down the baffling and out of the excavation scoops. Bucket drums were developed by Lockheed Martin in 2008 and used on multiple robotic excavator prototypes ever since. However, the forces on a bucket drum and considerations for scaling have not been measured in detail. Bucket drums are challenging to model using classical blade\bucket equations because of their unique geometry. Therefore, this experiment was performed to measure the forces on three bucket drums of the same geometry at different scales. Small: 9.4” (239mm) dia. x 8.1” (206mm) width, Medium: 11.6” (294mm) dia. x 10” (254mm) width, and Large: 17” (432mm) dia. x 14.1” (358mm) width. The test stand consisted of an actuated gantry with controlled motion in the vertical (Z) and horizontal (X) axes and a single rotation axis (R). The bucket drums were individually mounted to the rotary axis of the test stand and translated across a prepared bed of BP-1 lunar regolith simulant at a specified linear speed and cutting depth. The test stand was outfitted with a torque sensor in line with the rotation of the drum (R) and a 3 axis (X, Y, and Z) load cell. In addition to the three sizes of bucket drums the linear excavation speed and cutting depth were test variables. The results of these experiments show the relationship between the three scales of bucket drums for factors such as: excavation force, torque due to regolith rotation inside the drum, excavation energy, time to fill, etc. and will be discussed in detail in this paper. This fundamental data will be used in the design of IPEx and can inform the design of future bucket drum excavators.

RASSOR↗

Assessments of Physiology And Cognition in Hybrid-reality Environments (APACHE) – Physical Workload Approximation

The Human Physiology, Performance, Protection & Operations Laboratory (H-3PO) at NASA Johnson Space Center (JSC) is developing a hybrid reality exploration surface analog, “Assessments of Physiology And Cognition in Hybrid-reality Environments” (APACHE). The goal of APACHE is to create a planetary extravehicular activity (EVA) simulation environment that provides a representative physical and cognitive workload approximation using a combination of virtual reality (VR), physical reality, and hybrid reality (HR) techniques. To develop and characterize the physical workload approximation within the APACHE environment, a two-part approach was implemented. In part 1, baseline physical workload during ambulation within APACHE was evaluated and compared with that in other planetary EVA analog environments and with existing data sets from Apollo planetary EVAs and reduced gravity testing of prototype planetary spacesuits. For this evaluation, 10 subjects were asked to ambulate in three surface analog environments: a passive treadmill in APACHE, natural terrain in an outdoor field environment, and a standard motorized treadmill. Subjects’ heart rate and metabolic rate (VO2/VCO2)were measured and compared among the different test conditions and existing data sets. Gait parameters were also collected to compare with suited mechanics and to understand the role of gait kinematics in physical workload. In part 2, the aim is to evaluate the addition of a custom weighted body suit to the aforementioned surface analog environments and the ability to titrate the suit configuration to provide the best possible physical workload approximation for simulation of lunar and Martian EVAs.

Alexander J Baughman↗

Developing a Hybrid Space Suit Simulator as a Research Tool for Assessing Extravehicular Activity Relevant Workload

Suited testing time is limited and hard to come by, expensive, and requires a whole team to operate and monitor the suit; however, pressurized spacesuits are not always necessary for initial developmental efforts or assessment of informatics. The Human Physiology, Performance, Protection & Operations Laboratory (H-3PO) at NASA Johnson Space Center (JSC) is developing a Hybrid Space Suit Simulator (HS3) to support characterization of human performance during planetary surface exploration analogs. The primary goal of HS3 is to create a low cost, modular, and unpressurized suit simulator for use as a research tool which provides relevant physical and cognitive workload approximations with EVA-like immersion during planetary extravehicular activity (EVA) simulations. HS3 consists of a soft suit, communication, thermal control, gloves, boots, helmet, and integrated bioinformatics/sensors. The modular design of HS3 allows it to be modified to support test objectives as needed. HS3 enables H-3PO and NASA to complete critical human health and performance testing to address open risks and knowledge gaps in a timely, repeatable, and controlled manner. Four engineering runs were completed with HS3 as a baseline for capability. General workload was assessed while traversing on a passive treadmill and conducting geology tasks. Liquid cooling temperature, suit temperature, and metabolic rates were collected during one extended three-hour engineering run. For the duration of the engineering run the suit temperature was 26.6 ± 1.58 °C while suit humidity was 53.7 ± 5.11 %. Helmet temperature was higher than suit temperature at 27.8 ± 1.58 °C. Helmet humidity was lower than average suit humidity at 50.12 ± 11.3 °C. The liquid cooling temperature remained stable at 22.4 ± 1.62 °C. Resting metabolic rate was 597 ± 88 BTU/hr while metabolic rate increased during traverse tasks at 1500 ± 319 BTU/hr and geology tasks at 921 ± 129 BTU/hr. Following the engineering runs, a characterization study will be conducted. The subjects will perform EVA-like scenarios in both a shirtsleeve only and donned HS3, consisting of EVA task circuit focused on traversing, geological rock sampling, and task board manipulation. The characterization study will provide data capability for implementing HS3 in analog EVA testing environments.

Monica Hew↗

Application of Regolith Polymer Composite FFF Construction in Simulated Lunar Conditions

NASA’s Artemis program has the lofty goal of creating a sustained lunar presence to provide unprecedented opportunities for scientific discovery and to ensure American industry’s access to the unlimited resources and commercial potential in space. To achieve this goal, NASA must incrementally develop and expand its capabilities beyond the short lunar stays of the Apollo program to a robust continued presence with infrastructure and equipment to reduce mission risk by providing safer and more reliable access to the surface, its resources, and protection from the environment. Kennedy Space Center’s Swamp Works Granular Mechanics and Regolith Operations laboratory has partnered with AI SpaceFactory to develop the architectural and structural design of a robotically constructable unpressurized shelter. The shelter, called Lina is designed to protect astronauts and surface assets from radiation, meteoroid impact, moon quakes and thermal gradients. A Fused Filament Fabrication (FFF) construction process using regolith polymer composites was developed. The construction system and associated print parameters are discussed along with the environmental simulation equipment and a summary of test conditions. Test samples were printed in simulated lunar dirty thermal vacuum conditions (~-180 C, ~10-3 torr) and subjected to a series of tests. The resulting strength properties are summarized here, the full details of the material characteristics are provided in a related paper. Lina’s structural design criteria and the resulting initial structure design are detailed in two related papers, this paper presents an update to Lina’s design based on the achieved material strength properties. Finally, a scaled down version of the updated Lina was built on a regolith simulant surface using a novel anchoring technique in simulated lunar vacuum conditions.

lunar infrastructure↗

Comparison of Physical Workload Across Eva-Simulation Analog Environments: Hybrid Space Suit Simulator and Pressurized Suit Testing

NASA conducts research, testing, and training across a variety of analog environments to support characterization of human performance during Extravehicular Activities (EVAs). Time utilizing pressurized suits in an offloaded environment is both limited and expensive, making it challenging to carry out extensive research with these suits. The Human Physiology, Performance, Protection, and Operations (H-3PO) Laboratory at NASA Johnson Space Center designed a Hybrid Space Suit Simulator (HS3) as a low-cost, workload approximator and easy access research tool to provide relevant physical and cognitive workloads during simulated EVAs. A pilot study was conducted in a 1g analog environment where six healthy subjects (3 male, 3 female) underwent simulated 5-hour EVAs in the HS3. This study used a COSMED K5 portable metabolic analyzer and a Polar H10 heart rate monitor to evaluate physical workload during the EVAs. For direct comparison, EVA tasks and timelines were modeled after a similar study conducted in pressurized suits (Mark-III spacesuit, n=3 male; small xPGS spacesuit, n=3 female) at NASA’s Active Response Gravity Offload System (ARGOS) offloaded to Lunar gravity (1/6 g). The 1g HS3 data demonstrated increased metabolic rate when compared to pressurized, Lunar-offloaded suited simulated EVAs for certain tasks including the kneeling scoop (HS3: 1194±199 BTU/hr, ARGOS: 860±170 BTU/hr, p < 0.05) and 20 lb object relocation (HS3: 1651±136 BTU/hr, ARGOS: 1048±252.8 BTU/hr, p < 0.05), but it did not demonstrate any significant differences in heart rate (p > 0.05). Other simulated EVA tasks, such as a 500 m traverse (HS3: 1431±177 BTU/hr, ARGOS: 1212±294 BTU/hr, p > 0.05), showed similar workload profiles with no significant workload differences between HS3 and ARGOS. The HS3 is a useful research tool for increasing workloads in EVA research without pressurized suits, though it may overestimate workload during certain EVA tasks when used in 1g environments.

Zachary Wusk↗

Temporal Activation of Extravehicular Activity Science and Operations Data: How Rise2's Enablement of a Novel Data Management Prototype Influenced ISS and Artemis Advancements

SSERVI's RIS4E and Rise2 nodes provided early and repeated opportunities to prototype the organization and visualization of science and field operations data together via temporal vs. type-indexing. This data management approach was first explored in our Apollo in Real Time initiative through its meticulous reconciliation and integration of Apollo 11, 13, and 17 mission data, providing an unparalleled temporal and contextual understanding of these historic missions. The positive results from these prototypes served as pre-cursor examples of what eventually became the Collaborative Operations Data Activation (CODA) application at NASA Johnson Space Center (JSC).

B Feist↗

Launch Complex 34 SWMU CC054 Hot Spot Area 6 Expansion - Phase Three Implementation Work Plan

This Hot Spot (HS) Area 6 Air Sparge Expansion – Phase Three Implementation Work Plan (IWP) was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under the Indefinite Delivery Indefinite Quantity Contract 80KSC019D0011-80KSC019F0067, for the implementation of an Air Sparging (AS) Interim Measure (IM) at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. LC34 has been designated as Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) operating permit. Expansion of the HS 6 IM will include installation of an additional 192 AS wells to depths of approximately 40 feet below land surface (bls) to remediate contaminated groundwater within two areas located west and northeast of the existing HS 6 AS treatment area. These areas were delineated via direct push technology investigations in September and October 2023. The expansion will target “hot spot” concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC), which are the contaminants of concern in these areas with concentrations greater than 10-times Florida Department of Environmental Protection Natural Attenuation Default Concentrations. The highest cDCE and VC concentrations detected in the proposed phase three expansion area were 58,000 micrograms per liter (μg/L) (32 to 36 feet bls) and 12,000 μg/L (23 to 27 feet bls), respectively. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to support transition to long-term monitoring. This phase three expansion will add an additional 9.4 acres of treatment area to the HS 6 IM, which currently covers approximately 26.9 acres.

Launch Complex 34↗

Building a QC Database of Meteorological Data from NASA KSC and the United States Air Force's Eastern Range

The National Aeronautics and Space Administration's (NASA) Marshall Space Flight Center (MSFC) Natural Environments Branch (EV44) provides atmospheric databases and analysis in support of space vehicle design and day-of-launch operations for NASA and commercial launch vehicle programs launching from the NASA Kennedy Space Center (KSC), co-located on the United States Air Force's Eastern Range (ER) at the Cape Canaveral Air Force Station. The ER complex is one of the most heavily instrumented sites in the United States with over 31 towers measuring various atmospheric parameters on a continuous basis. An inherent challenge with large datasets consists of ensuring erroneous data are removed from databases, and thus excluded from launch vehicle design analyses. EV44 has put forth great effort in developing quality control (QC) procedures for individual meteorological instruments, however no standard QC procedures for all databases currently exists resulting in QC databases that have inconsistencies in variables, development methodologies, and periods of record. The goal of this activity is to use the previous efforts to develop a standardized set of QC procedures from which to build meteorological databases from KSC and the ER, while maintaining open communication with end users from the launch community to develop ways to improve, adapt and grow the QC database. Details of the QC procedures will be described. As the rate of launches increases with additional launch vehicle programs, It is becoming more important that weather databases are continually updated and checked for data quality before use in launch vehicle design and certification analyses.

Brenton, J. C.↗

ISS Payload Operations Training During the COVID-19 Pandemic: Impacts and Solutions

The onset of the COVID-19 pandemic brought a dramatic and rapid transformation to almost every aspect of humanity in 2020. The world’s space agencies and their missions were not immune to the wide-sweeping changes. One discipline principally affected was mission operations and the various groups supporting that function. Mission support teams, especially for complex and crewed missions like the International Space Station were forced to rapidly rethink how and where control center staff performed their vital work. Operations training – an essential element to mission ops, had unique hurdles to overcome. Operations training is responsible for preparing astronaut crews for their missions, providing training to flight controllers, as well as ensuring that new team members are ready to join their colleagues. Every element of training was impacted by COVID restrictions. From orientation and introductory classes for new controllers, simulations and advanced lessons, On the Job Training and final evaluations; all aspects faced new challenges. Trainers at NASA’s Marshall Space Flight Center in Huntsville, Alabama, were forced to become more efficient with trainees and resources to continue supporting payload operations. The pandemic started in the USA in March 2020. Immediately, NASA mandated that the support for ISS real-time operations was critical. As a result, physical access to key facilities was restricted. Trainers and trainees had to quickly shift to 100 percent remote learning. In the short term, this was not a problem. However, instructors discovered lessons that they were accustomed to delivering in a classroom environment did not translate to remote teaching. Another hurdle to operations training was the mandate that all simulations could only be held remotely. The logistics of even small simulations proved to be challenging due to IT restrictions and public internet limitations. With simulations essentially stopped, as well as the restrictions on most OJT, trainees were essentially stopped in their advancement towards certification. Once limitations were identified, trainers prioritized new options. Transitioning to all electronic learning materials was a relatively easy fix. Teaching to large groups took additional shifts in the training paradigm. Methods for preparing astronauts for their missions were revised. Simulation supervisors found more efficient techniques to provide realistic training experience. Communication and approvals from management was essential. In every case, the payload operations instructors found novel solutions to all functions listed. This paper will discuss the factors and solutions payloads operations trainers found to keep scientific research on the ISS flying forward to mission success.

ISS↗

Testing of Full Scale Flight Qualified Kevlar Composite Overwrapped Pressure Vessels

Many decades ago NASA identified a need for low-mass pressure vessels for carrying various fluids aboard rockets, spacecraft, and satellites. A pressure vessel design known as the composite overwrapped pressure vessel (COPV) was identified to provide a weight savings over traditional single-material pressure vessels typically made of metal and this technology has been in use for space flight applications since the 1970's. A typical vessel design consisted of a thin liner material, typically a metal, overwrapped with a continuous fiber yarn impregnated with epoxy. Most designs were such that the overwrapped fiber would carry a majority of load at normal operating pressures. The weight advantage for a COPV versus a traditional singlematerial pressure vessel contributed to widespread use of COPVs by NASA, the military, and industry. This technology is currently used for personal breathing supply storage, fuel storage for auto and mass transport vehicles and for various space flight and aircraft applications. The NASA Engineering and Safety Center (NESC) was recently asked to review the operation of Kevlar 2 and carbon COPVs to ensure they are safely operated on NASA space flight vehicles. A request was made to evaluate the life remaining on the Kevlar COPVs used on the Space Shuttle for helium and nitrogen storage. This paper provides a review of Kevlar COPV testing relevant to the NESC assessment. Also discussed are some key findings, observations, and recommendations that may be applicable to the COPV user community. Questions raised during the investigations have revealed the need for testing to better understand the stress rupture life and age life of COPVs. The focus of this paper is to describe burst testing of Kevlar COPVs that has been completed as a part of an the effort to evaluate the effects of ageing and shelf life on full scale COPVs. The test articles evaluated in this discussion had a diameter of 22 inches for S/N 014 and 40 inches for S/N 011. The time between manufacture and burst was 28 and 22 years. Visual inspection, shearography, heat soak thermography and borescope inspection were performed on vessel S/N 011 and all but shearography was performed on S/N 014 before they were tested and details of this work can be found in a companion paper titled, "Nondestructive Methods and Special Test Instrumentation Supporting NASA Composite Overwrapped Pressure Vessel Assessments." The vessels were instrumented so that measurements could be made to aid in the understanding of vessel response. Measurements made on the test articles included girth, boss displacement, internal volume, multiple point strain, full field strain, eddy current, acoustic emission (AE) pressure and temperature. The test article before and during burst is shown with the pattern used for digital image correlation full field strain measurement blurring as the vessel fails.

Greene, Nathanael↗

Study of geopotential error models used in orbit determination error analysis

The uncertainty in the geopotential model is currently one of the major error sources in the orbit determination of low-altitude Earth-orbiting spacecraft. The results of an investigation of different geopotential error models and modeling approaches currently used for operational orbit error analysis support at the Goddard Space Flight Center (GSFC) are presented, with emphasis placed on sequential orbit error analysis using a Kalman filtering algorithm. Several geopotential models, known as the Goddard Earth Models (GEMs), were developed and used at GSFC for orbit determination. The errors in the geopotential models arise from the truncation errors that result from the omission of higher order terms (omission errors) and the errors in the spherical harmonic coefficients themselves (commission errors). At GSFC, two error modeling approaches were operationally used to analyze the effects of geopotential uncertainties on the accuracy of spacecraft orbit determination - the lumped error modeling and uncorrelated error modeling. The lumped error modeling approach computes the orbit determination errors on the basis of either the calibrated standard deviations of a geopotential model's coefficients or the weighted difference between two independently derived geopotential models. The uncorrelated error modeling approach treats the errors in the individual spherical harmonic components as uncorrelated error sources and computes the aggregate effect using a combination of individual coefficient effects. This study assesses the reasonableness of the two error modeling approaches in terms of global error distribution characteristics and orbit error analysis results. Specifically, this study presents the global distribution of geopotential acceleration errors for several gravity error models and assesses the orbit determination errors resulting from these error models for three types of spacecraft - the Gamma Ray Observatory, the Ocean Topography Experiment, and the Cosmic Background Explorer.

Yee, C.↗

The Deep Impact Network Experiment Operations Center Monitor and Control System

The Interplanetary Overlay Network (ION) software at JPL is an implementation of Delay/Disruption Tolerant Networking (DTN) which has been proposed as an interplanetary protocol to support space communication. The JPL Deep Impact Network (DINET) is a technology development experiment intended to increase the technical readiness of the JPL implemented ION suite. The DINET Experiment Operations Center (EOC) developed by JPL's Protocol Technology Lab (PTL) was critical in accomplishing the experiment. EOC, containing all end nodes of simulated spaces and one administrative node, exercised publish and subscribe functions for payload data among all end nodes to verify the effectiveness of data exchange over ION protocol stacks. A Monitor and Control System was created and installed on the administrative node as a multi-tiered internet-based Web application to support the Deep Impact Network Experiment by allowing monitoring and analysis of the data delivery and statistics from ION. This Monitor and Control System includes the capability of receiving protocol status messages, classifying and storing status messages into a database from the ION simulation network, and providing web interfaces for viewing the live results in addition to interactive database queries.

Delay/Disruption Tolerant Network (DTN)↗

NASA Near Earth Network (NEN), Deep Space Network (DSN) and Space Network (SN) Support of CubeSat Communications

There has been a historical trend to increase capability and drive down the Size, Weight and Power (SWAP) of satellites and that trend continues today. Small satellites, including systems conforming to the CubeSat specification, because of their low launch and development costs, are enabling new concepts and capabilities for science investigations across multiple fields of interest to NASA. NASA scientists and engineers across many of NASAs Mission Directorates and Centers are developing exciting CubeSat concepts and welcome potential partnerships for CubeSat endeavors. From a communications and tracking point of view, small satellites including CubeSats are a challenge to coordinate because of existing small spacecraft constraints, such as limited SWAP and attitude control, low power, and the potential for high numbers of operational spacecraft. The NASA Space Communications and Navigation (SCaN) Programs Near Earth Network (NEN), Deep Space Network (DSN) and the Space Network (SN) are customer driven organizations that provide comprehensive communications services for space assets including data transport between a missions orbiting satellite and its Mission Operations Center (MOC). The NASA NEN consists of multiple ground antennas. The SN consists of a constellation of geosynchronous (Earth orbiting) relay satellites, named the Tracking and Data Relay Satellite System (TDRSS). The DSN currently makes available 13 antennas at its three tracking stations located around the world for interplanetary communication. The presentation will analyze how well these space communication networks are positioned to support the emerging small satellite and CubeSat market. Recognizing the potential support, the presentation will review the basic capabilities of the NEN, DSN and SN in the context of small satellites and will present information about NEN, DSN and SN-compatible flight radios and antenna development activities at the Goddard Space Flight Center (GSFC) and across industry. The presentation will review concepts on how the SN multiple access capability could help locate CubeSats and provide a low-latency early warning system. The presentation will also present how the DSN is evolving to maximize use of its assets for interplanetary CubeSats. The critical spectrum-related topics of available and appropriate frequency bands, licensing, and coordination will be reviewed. Other key considerations, such as standardization of radio frequency interfaces and flight and ground communications hardware systems, will be addressed as such standardization may reduce the amount of time and cost required to obtain frequency authorization and perform compatibility and end-to-end testing. Examples of standardization that exist today are the NASA NEN, DSN and SN systems which have published users guides and defined frequency bands for high data rate communication, as well as conformance to CCSDS standards. The workshop session will also seek input from the workshop participants to better understand the needs of small satellite systems and to identify key development activities and operational approaches necessary to enhance communication and navigation support using NASA's NEN, DSN and SN.

Telecommunication↗

ISS Payload Operations Training Throughout the COVID-19 Pandemic: Impacts, Opportunities and Solutions

The onset of the COVID-19 pandemic brought a dramatic and rapid transformation to almost every aspect of humanity. The world’s space agencies and their missions were not immune to the wide-sweeping changes. One discipline principally affected was mission operations and the various groups supporting that function. Mission support teams, especially for complex and crewed missions like the International Space Station (ISS) were forced to rethink how and where control center staff performed their vital work. Operations training – an essential element to mission ops, had unique hurdles to overcome. Operations training is responsible for preparing astronaut crews for their missions, training and certifying flight controllers, as well as ensuring that new team members are ready to join their colleagues. Every element of training was impacted during the pandemic. From orientation and introductory classes for new controllers, simulations, and advanced lessons, On the Job Training (OJT) and final evaluations; all aspects faced challenges. Trainers at NASA’s Marshall Space Flight Center in Huntsville, Alabama were forced to become more efficient with trainees and resources to continue supporting ISS payload operations. The pandemic arrived in the USA in March 2020. Immediately, NASA mandated that the support for ISS real-time operations was critical. As a result, physical access to key facilities was restricted. Trainers and trainees had to quickly shift to 100% remote learning. In the short term, this was not a problem. However, instructors discovered lessons they were accustomed to delivering in a classroom environment often did not translate to remote teaching. Another hurdle to operations training was the mandate that all simulations could only be held remotely. The logistics of even small simulations proved to be challenging due to Information Technology (IT) restrictions and public internet limitations. With simulations essentially halted, as well as the restrictions on most OJT, trainees were essentially stopped in their advancement towards certification. Once limitations were identified, trainers prioritized new options. Transitioning to all electronic learning materials was a relatively easy fix. Teaching to large groups took additional shifts in the training paradigm. Methods for preparing astronauts for their missions were revised. Simulation supervisors found efficient techniques to provide realistic training experiences. Communication and coordination with management was essential. In every case, the payload operations instructors found novel solutions to all functions listed. This paper discusses the factors and solutions payloads operations trainers found to keep scientific research on the ISS flying forward to mission success.

ISS↗

Space shuttle maintenance program planning document

A means for developing a space shuttle maintenance program which will be acceptable to the development centers, the operators (KSC and AF), and the manufacturer is presented. The general organization and decision processes for determining the essential scheduled maintenance requirements for the space shuttle orbiter are outlined. The development of initial scheduled maintenance programs is discussed. The remaining maintenance, that is non-scheduled or non-routine maintenance, is directed by the findings of the scheduled maintenance program and the normal operation of the shuttle. The remaining maintenance consists of maintenance actions to correct discrepancies noted during scheduled maintenance tasks, nonscheduled maintenance, normal operation, or condition monitoring.

Brown, D. V.↗

Processing cargoes for the first two operational STS flights at KSC

Payload and spacecraft check-out procedures followed at Kennedy Space Center (KSC) are described, and examples are furnished of Shuttle missions STS-5 and -6. Reliability must be assured in order to account for isolated operation in GEO once the satellites are released from the Orbiter. The spacecraft processing is handled in distinct flows that depend on the type of boost engine attached, e.g., the PAM-A, -D, or the IUS. Interface verification occurs in the Vehicle Processing Facility (VPF), which is equipped to store the payloads until an Orbiter is ready. Spacecraft are assigned to their respective processing lines by the Launch Site Support Manager. The STS-5 Orbiter was fitted with Getaway Specials, the SBS-C satellite, and the Anik-C spacecraft, and STS-6 carried the TDRSS-A spacecraft, which was mated to an IUS, three Getaway Specials, and two experiments for the pressurized cabin. The time necessary for preparing payloads is intended eventually to be reduced to 3 weeks.

Neilon, J. J.↗

Automated space vehicle control for rendezvous proximity operations

Rendezvous during the unmanned space exploration missions, such as a Mars Rover/Sample Return will require a completely automatic system from liftoff to docking. A conceptual design of an automated rendezvous, proximity operations, and docking system is being implemented and validated at the Johnson Space Center (JSC). The emphasis is on the progress of the development and testing of a prototype system for control of the rendezvous vehicle during proximity operations that is currently being developed at JSC. Fuzzy sets are used to model the human capability of common sense reasoning in decision making tasks and such models are integrated with the expert systems and engineering control system technology to create a system that performs comparably to a manned system.

Lea, Robert N.↗