Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “S PROCESS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,153 records · Page 64

WE-AB-201-03: TPS Commissioning and QA: Incorporating the Entire Planning Process

Treatment planning systems (TPS) are a cornerstone of modern radiation therapy. Errors in their commissioning or use can have a devastating impact on many patients. To support safe and high quality care, medical physicists must conduct efficient and proper commissioning, good clinical integration, and ongoing quality assurance (QA) of the TPS. AAPM Task Group 53 and related publications have served as seminal benchmarks for TPS commissioning and QA over the past two decades. Over the same time, continuing innovations have made the TPS even more complex and more central to the clinical process. Medical goals are now expressed in terms of the dose and margins around organs and tissues that are delineated from multiple imaging modalities (CT, MR and PET); and even temporally resolved (i.e., 4D) imaging. This information is passed on to optimization algorithms to establish accelerator movements that are programmed directly for IMRT, VMAT and stereotactic treatments. These advances have made commissioning and QA of the TPS much more challenging. This education session reviews up-to-date experience and guidance on this subject; including the recently published AAPM Medical Physics Practice Guideline (MPPG) #5 “Commissioning and QA of Treatment Planning Dose Calculations: Megavoltage Photon and Electron Beams”. Treatment Planning System Commissioning and QA: Challenges and Opportunities (Greg Salomons) This session will provide some key background and review publications describing prominent incidents relating to TPS commissioning and QA. Traditional approaches have been hardware and feature oriented. They aim to establish a functional configuration and establish specifications for regular testing of features (like dose calculation) to assure stable operation and detect failures. With the advent of more complex systems, more patient-specific testing has also been adopted. A number of actual TPS defects will be presented along with heuristics for identifying similar defects in the future. Finally, the Gamma test has become a popular metric for reporting TPS Commissioning and QA results. It simplifies complex testing into a numerical index, but noisy data and casual application can make it misleading. A brief review of the issues around the use of the Gamma test will be presented. TPS commissioning and QA: A process orientation and application of control charts (Michael Sharpe) A framework for commissioning a treatment planning system will be presented, focusing on preparations, practical aspects of configuration, priorities, specifications, and establishing performance. The complexity of the modern TPS make modular testing of features inadequate, and modern QA tools can provide “too much information” about the performance of techniques like IMRT and VMAT. We have adopted a process orientation and quality tools, like control charts, for ongoing TPS QA and assessment of patient-specific tests. The trending nature of these tools reveals the overall performance of the TPS system, and quantifies the variations that arise from individual plans, discrete calculations, and experimentation based on discrete measurements. Examples demonstrating application of these tools to TPS QA will be presented. TPS commissioning and QA: Incorporating the entire planning process (Sasa Mutic) The TPS and its features do not perform in isolation. Instead, the features and modules are key components in a complex process that begins with CT Simulation and extends to treatment delivery, along with image guidance and verification. Most importantly, the TPS is used by people working in a multi-disciplinary environment. It is very difficult to predict the outcomes of human interactions with software. Therefore, an interdisciplinary approach to training, commissioning and QA will be presented, along with an approach to the physics chart check and end-to-end testing as a tool for TPS QA. The role of standardization and automation in QA will also be discussed. The recommendations of MPPG #5 and practical implementation strategies (Jennifer Smilowitz) The recently published recommendations from Task Group No. 244, Medical Physics Practice Guideline on Commissioning and QA of Treatment Planning Dose Calculations: Megavoltage Photon and Electron Beams will be presented. The recommendations focus on the validation of commissioning data and dose calculations. Tolerance values for non-IMRT beam configurations are summarized based on established criteria and data collected by the IROC. More stringent evaluation criteria for IMRT dose calculations are suggested to test the limitations of the TPS dose algorithms for advanced delivery conditions. The MPPG encourages users to create a suite of validation tests for dose calculation for various conditions for static photon beams, heterogeneities, IMRT/VMAT and electron beams. This test suite is intended to be used for subsequent testing, including TPS software upgrades. In the past, the recommendations of some reports have not been widely implemented due to practical limitations. Implementation strategies, tools and processes developed by multiple centers for efficient and “do-able” MPPG #5 testing will be presented, as well as a discussion on the overall validation experience. Learning Objectives: Identify some of the key documents relevant for TPS commissioning and QA Understand strategies for testing TPS software Gain a practical knowledge of the Gamma test criteria Increase familiarity with the process of commissioning a TPS Learn about the use of Control Charts for TPS QA Review the role of the TPS in the overall planning process Increase awareness of the link between TPS QA and chart checking Gain an increased appreciation for the importance of interdisciplinary communication Understand the new recommendations from MPPG #5 on TPS Dose Algorithm Commissioning and QC/QA Learn practical implementation processes and tools for MPPG #5 validation recommendations.

60 APPLIED LIFE SCIENCES↗

Top-Down Proteomics of Mouse Islets With Beta Cell CPE Deletion Reveals Molecular Details in Prohormone Processing

Altered prohormone processing, such as with proinsulin and pro-islet amyloid polypeptide (proIAPP), has been reported as an important feature of prediabetes and diabetes. Proinsulin processing includes removal of several C-terminal basic amino acids and is performed principally by the exopeptidase carboxypeptidase E (CPE), and mutations in CPE or other prohormone convertase enzymes (PC1/3 and PC2) result in hyperproinsulinemia. A comprehensive characterization of the forms and quantities of improperly processed insulin and other hormone products following Cpe deletion in pancreatic islets has yet to be attempted. In the present study we applied top-down proteomics to globally evaluate the numerous proteoforms of hormone processing intermediates in a β-cell-specific Cpe knockout mouse model. Increases in dibasic residue–containing proinsulin and other novel proteoforms of improperly processed proinsulin were found, and we could classify several processed proteoforms as novel substrates of CPE. Interestingly, some other known substrates of CPE remained unaffected despite its deletion, implying that paralogous processing enzymes such as carboxypeptidase D (CPD) can compensate for CPE loss and maintain near normal levels of hormone processing. In summary, our quantitative results from top-down proteomics of islets provide unique insights into the complexity of hormone processing products and the regulatory mechanisms.

59 BASIC BIOLOGICAL SCIENCES↗

AN OVERVIEW OF PLASMA PROCESSING OF SRF CAVITIES AT JLAB

Plasma processing is a common technique where the free oxygen produced in a low-pressure RF plasma breaks down and removes hydrocarbons from surfaces. This increases the work function and reduces the secondary emission coefficient of the treated surfaces. Jefferson Lab has an ongoing R&D program in plasma processing. The experimental program investigated processing using argon/oxygen and helium/oxygen gas mixtures. The initial focus of the effort was processing C100 cavities by injecting RF power into the HOM coupler ports. We also developed the methods for establishing a plasma C75 cavities where the RF power is injected via the fundamental power-coupler. As part of the process development we processed, three C100 cryomodules in our off-line cryomodule test facility. In May 2023 we processed four C100 cryomodules in-situ in the CEBAF accelerator with the cryomodules returning to an operational status in Sept. 2023. The cumulative improvement in field emission free operation, as measured on a cavity by cavity basis, was 59 MeV or 24%. We recently started processing 7 cryomodules in the CEBAF accelerator in August 2024. Methods systems and results from processing cryomodules and individual cavities in the vertical test will be presented. Current status and future plans will also be presented.

Ganey, Tiffany↗

A design for a V&V and UQ discovery process.

There is currently sparse literature on how to implement systematic and comprehensive processes for modern V&V/UQ (VU) within large computational simulation projects. Important design requirements have been identified in order to construct a viable 'system' of processes. Significant processes that are needed include discovery, accumulation, and assessment. A preliminary design is presented for a VU Discovery process that accounts for an important subset of the requirements. The design uses a hierarchical approach to set context and a series of place-holders that identify the evidence and artifacts that need to be created in order to tell the VU story and to perform assessments. The hierarchy incorporates VU elements from a Predictive Capability Maturity Model and uses questionnaires to define critical issues in VU. The place-holders organize VU data within a central repository that serves as the official VU record of the project. A review process ensures that those who will contribute to the record have agreed to provide the evidence identified by the Discovery process. VU expertise is an essential part of this process and ensures that the roadmap provided by the Discovery process is adequate. Both the requirements and the design were developed to support the Nuclear Energy Advanced Modeling and Simulation Waste project, which is developing a set of advanced codes for simulating the performance of nuclear waste storage sites. The Waste project served as an example to keep the design of the VU Discovery process grounded in practicalities. However, the system is represented abstractly so that it can be applied to other M&S projects.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Novel Membranes and Processes for Oxygen Enrichment

The overall goal of this project is to develop a membrane process that produces air containing 25-35% oxygen, at a cost of $25-40/ton of equivalent pure oxygen (EPO2). Oxygen-enriched air at such a low cost will allow existing air-fueled furnaces to be converted economically to oxygen-enriched furnaces, which in turn will improve the economic and energy efficiency of combustion processes significantly, and reduce the cost of CO{sub 2} capture and sequestration from flue gases throughout the U.S. manufacturing industries. During the 12-month Concept Definition project: We identified a series of perfluoropolymers (PFPs) with promising oxygen/nitrogen separation properties, which were successfully made into thin film composite membranes. The membranes showed oxygen permeance as high as 1,200 gpu and oxygen/nitrogen selectivity of 3.0, and the permeance and selectivity were stable over the time period tested (60 days). We successfully scaled up the production of high-flux PFP-based membranes, using MTR's commercial coaters. Two bench-scale spiral-wound modules with countercurrent designs were made and parametric tests were performed to understand the effect of feed flow rate and pressure, permeate pressure and sweep flow rate on the membrane module separation properties. At various operating conditions that modeled potential industrial operating conditions, the module separation properties were similar to the pure-gas separation properties in the membrane stamps. We also identified and synthesized new polymers [including polymers of intrinsic microporosity (PIMs) and polyimides] with higher oxygen/nitrogen selectivity (3.5-5.0) than the PFPs, and made these polymers into thin film composite membranes. However, these membranes were susceptible to severe aging; pure-gas permeance decreased nearly six-fold within two weeks, making them impractical for industrial applications of oxygen enrichment. We tested the effect of oxygen-enriched air on NO{sub x} emissions using a Bloom baffle burner at GTI. The results are positive and confirm that oxygen-enriched combustion can be carried out without producing higher levels of NOx than normal air firing, if lancing of combustion air is used and the excess air levels are controlled. A simple economic study shows that the membrane processes can produce O{sub 2} at less than $40/ton EPO{sub 2} and an energy cost of 1.1-1.5 MMBtu/ton EPO{sub 2}, which are very favorable compared with conventional technologies such as cryogenics and vacuum pressure swing adsorption processes. The benefits of integrated membrane processes/combustion process trains have been evaluated, and show good savings in process costs and energy consumption, as well as reduced CO{sub 2} emissions. For example, if air containing 30% oxygen is used in natural gas furnaces, the net natural gas savings are an estimated 18% at a burner temperature of 2,500 F, and 32% at a burner temperature of 3,000 F. With a 20% market penetration of membrane-based oxygen-enriched combustion in all combustion processes by 2020, the energy savings would be 414-736 TBtu/y in the U.S. The comparable net cost savings are estimated at $1.2-2.1 billion per year by 2020, calculated as the value of fuel savings subtracted from the cost of oxygen production. The fuel savings of 18%-32% by the membrane/oxygen-enriched combustion corresponds to an 18%-32% reduction in CO{sub 2} emissions, or 23-40 MM ton/y less CO{sub 2} from natural gas-fired furnaces by 2020. In summary, results from this project (Concept Definition phase) are highly promising and clearly demonstrate that membrane processes can produce oxygen-enriched air in a low cost manner that will lower operating costs and energy consumption in industrial combustion processes. Future work will focus on proof-of-concept bench-scale demonstration in the laboratory.

03 NATURAL GAS↗

Development and Evaluation of a Novel Integrated Vacuum Carbonate Absorption Process

This project was aimed at obtaining process engineering and scale-up data at a laboratory scale to investigate the technical and economic feasibility of a patented post-combustion carbon dioxide (CO 2 ) capture process-the Integrated Vacuum Carbonate Absorption Process (IVCAP). Unique features of the IVCAP include its ability to be fully-integrated with the power plant's steam cycle and potential for combined sulfur dioxide (SO 2 ) removal and CO 2 capture. Theoretical and experimental studies of this project were aimed at answering three major technical questions: 1) What additives can effectively reduce the water vapor saturation pressure and energy requirement for water vaporization in the vacuum stripper of the IVCAP? 2) What catalysts can promote CO 2 absorption into the potassium carbonate (PC) solution to achieve an overall absorption rate comparable to monoethanolamine (MEA) and are the catalysts stable at the IVCAP conditions and in the flue gas environment? 3) Are any process modifications needed to combine SO 2 and CO 2 removal in the IVCAP? Lab-scale experiments and thermodynamic and process simulation studies performed to obtain detailed information pertinent to the above three technical questions produced the following results: 1) Two additives were identified that lower the saturation pressure of water vapor over the PC solution by about 20%. 2) The carbonic anhydrase (CA) enzyme was identified as the most effective catalyst for promoting CO 2 absorption. The absorption rate into the CO 2 -lean PC solution promoted with 300 mg/L CA was several times slower than the corresponding 5 M MEA solution, but absorption into the CO 2 -rich PC solution was comparable to the CO 2 -rich MEA solution. The tested CA enzymes demonstrated excellent resistance to major flue gas impurities. A technical-grade CA enzyme was stable at 40°C (104°F) over a six-month test period, while its half-life was about two months at 50°C (122°F). Enzyme immobilization improved the CA enzyme's thermal stability by up to three times compared to its free counterpart. 3) Two process modifications were proposed to improve the technical performance of the IVCAP for combined SO 2 removal and CO 2 capture. The results from a techno-economic study of a 528 MWe (gross) pulverized coal-fired, subcritical steam power plant revealed that the cost of CO 2 avoidance with the IVCAP was about 30% lower than conventional MEA-based processes. The levelized cost of electricity (LCOE) of the IVCAP ranged from $\$$40 to 46/MWh, an increase of 60 to 70% compared to a reference power plant without CO 2 capture. The overall conclusion of this study is that the IVCAP is a technically feasible and economically more attractive process than available MEA-based processes. A scale-up study using the slipstream of an actual coal-derived flue gas and development of a more stable CA enzyme are recommended for future studies.

20 FOSSIL-FUELED POWER PLANTS↗

Feasibility Studies on Process Coupling of Transesterification and Methanol Synthesis Using Cellulose and Bio-oil

The Sponsored Programs of WKU is the compliance management for the entire campus. They are responsible for both the fiscal compliance, in addition to the coordination and implementation of pre and post-award documentation. Dr. Wei-Ping Pan is the Principal Investigator of the project, and is responsible for the carrying out of the objectives outlined in this proposal. Dr. Yan Cao, serve as the Co-Principal Investigator, who is responsible for directing the team in carrying out the objectives outlined. This project investigates feasibilities of combining the transesterification bio-diesel production into the traditional methanol production process. In this process, the raw materials for process feedstock will be completely the biomass, include cellulose fractions of biomass and bio-oil fractions of biomass. The process product will be either the bio-diesel or mixed bio-diesel and bio-methanol, which both can be directly fed as the alterative liquid fuel and also has some improvement on fuel handling. Since its capability of the complete utilization of every part of biomass (both cellulose biomass and bio-oils) and capability of the in-site optimization of reaction heat transfer and thermodynamics equilibrium shift and instant separation of process product, the proposed process can better balance several drawbacks of individual process during production of bio-diesel. This is a totally “green” process with almost all aspects of process to embody the characterization of renewable, compatibility and economic.

10 SYNTHETIC FUELS↗

Novel Magnetically Fluidized Bed Reactor Development for the Looping Process: Coal to Hydrogen Production R&D

The coal to hydrogen project utilizes the iron/iron oxide looping process to produce high purity hydrogen. The input energy for the process is provided by syngas coming from gasification process of coal. The reaction pathways for this process have been studied and favorable conditions for energy efficient operation have been identified. The Magnetically Stabilized Porous Structure (MSPS) is invented. It is fabricated from iron and silica particles and its repeatable high performance has been demonstrated through many experiments under various conditions in thermogravimetric analyzer, a lab-scale reactor, and a large scale reactor. The chemical reaction kinetics for both oxidation and reduction steps has been investigated thoroughly inside MSPS as well as on the surface of very smooth iron rod. Hydrogen, CO, and syngas have been tested individually as the reducing agent in reduction step and their performance is compared. Syngas is found to be the most pragmatic reducing agent for the two-step water splitting process. The transport properties of MSPS including porosity, permeability, and effective thermal conductivity are determined based on high resolution 3D CT x-ray images obtained at Argonne National Laboratory and pore-level simulations using a lattice Boltzmann Equation (LBE)-based mesoscopic model developed during this investigation. The results of those measurements and simulations provide necessary inputs to the development of a reliable volume-averaging-based continuum model that is used to simulate the dynamics of the redox process in MSPS. Extensive efforts have been devoted to simulate the redox process in MSPS by developing a continuum model consist of various modules for conductive and radiative heat transfer, fluid flow, species transport, and reaction kinetics. Both the Lagrangian and Eulerian approaches for species transport of chemically reacting flow in porous media have been investigated and verified numerically. Both approaches lead to correct prediction of hydrogen production rates over a large range of experimental conditions in the laboratory scale reactor and the bench-scale reactor. In the economic analysis, a comparison of the hydrogen production plants using iron/iron oxide looping cycle and the conventional process has been presented. Plant configurations are developed for the iron/iron oxide looping cycle. The study suggests a higher electric power generation but a lower hydrogen production efficiency comparing with the conventional process. Additionally, it was shown that the price of H 2 obtained from our reactor can be as low as $\$$1.7/kg, which is 22% lower than the current price of the H 2 obtained from reforming plants.

01 COAL, LIGNITE, AND PEAT↗

Energy Efficiency Improvement and Cost Saving Opportunities for the Dairy Processing Industry: An ENERGY STAR? Guide for Energy and Plant Managers

The U.S. dairy processing industry—defined in this Energy Guide as facilities engaged in the conversion of raw milk to consumable dairy products—consumes around $1.5 billion worth of purchased fuels and electricity per year. Energy efficiency improvement is an important way to reduce these costs and to increase predictable earnings, especially in times of high energy price volatility. There are a variety of opportunities available at individual plants in the U.S. dairy processing industry to reduce energy consumption and greenhouse gas emissions in a cost-effective manner. This Energy Guide discusses energy efficiency practices and energy-efficient technologies that can be implemented at the component, process, facility, and organizational levels. A discussion of the trends, structure, and energy consumption characteristics of the U.S. dairy processing industry is provided along with a description of the major process technologies used within the industry. Next, a wide variety of energy efficiency measures applicable to dairy processing plants are described. Many measure descriptions include expected savings in energy and energy-related costs, based on case study data from real-world applications in dairy processing facilities and related industries worldwide. Typical measure payback periods and references to further information in the technical literature are also provided, when available. Given the importance of water in dairy processing, a summary of basic, proven measures for improving water efficiency are also provided. The information in this Energy Guide is intended to help energy and plant managers in the U.S. dairy processing industry reduce energy and water consumption in a cost-effective manner while maintaining the quality of products manufactured. Further research on the economics of all measures—as well as on their applicability to different production practices—is needed to assess their cost effectiveness at individual plants.

25 ENERGY STORAGE↗

Evaluation of the Relative Merits of Herbaceous and Woody Crops for Use in Tunable Thermochemical Processing

This report summarizes the work and findings of the grant work conducted from January 2009 until September 2011 under the collaboration between Ceres, Inc. and Choren USA, LLC. This DOE-funded project involves a head-to-head comparison of two types of dedicated energy crops in the context of a commercial gasification conversion process. The main goal of the project was to gain a better understanding of the differences in feedstock composition between herbaceous and woody species, and how these differences may impact a commercial gasification process. In this work, switchgrass was employed as a model herbaceous energy crop, and willow as a model short-rotation woody crop. Both crops are species native to the U.S. with significant potential to contribute to U.S. goals for renewable liquid fuel production, as outlined in the DOE Billion Ton Update (http://www1.eere.energy.gov/biomass/billion_ton_update.html, 2011). In some areas of the U.S., switching between woody and herbaceous feedstocks or blending of the two may be necessary to keep a large-scale gasifier operating near capacity year round. Based on laboratory tests and process simulations it has been successfully shown that suitable high yielding switchgrass and willow varieties exist that meet the feedstock specifications for large scale entrained flow biomass gasification. This data provides the foundation for better understanding how to use both materials in thermochemical processes. It has been shown that both switchgrass and willow varieties have comparable ranges of higher heating value, BTU content and indistinguishable hydrogen/carbon ratios. Benefits of switchgrass, and other herbaceous feedstocks, include its low moisture content, which reduce energy inputs and costs for drying feedstock. Compared to the typical feedstock currently being used in the Carbo-V® process, switchgrass has a higher ash content, combined with a lower ash melting temperature. Whether or not this may cause inefficiencies in the process, needs to be verified by long term test runs. Currently, there are not sufficient operational test data available for the Carbo-V® process for the utilization of higher ash content feedstocks. The application of currently evolving biomass pretreatment technologies, such as pelletization and torrefaction, will be able to expand the portfolio of biomass varieties and species acceptable in gasification processes. Tests showed that 6 mm diameter pellets of switchgrass were superior to 8 mm diameter pellets produced in a flat dye press, and that torrefaction of switchgrass produced an excellent (but currently costly) feedstock that could be handled, crushed, and combusted in a manner compatible with any coal-fed gasification facility. Ceres will use this information in the development of high yielding, dedicated energy crops specifically tailored for thermochemical conversion. CHOREN will make use of the information for improvement or development of low cost, highly efficient biomass gasification processes that convert a wide variety of biomass feedstocks to fuels, chemicals, heat and power via the production of tar free green syngas on an industrial scale.

09 BIOMASS FUELS↗

Processing of Municipal Solid Waste (MSW) to Hydrogen Final Report CRADA No. TC-0989-94

The project objective was to develop a two-stage process for the conversion of municipal solid waste (MSW) to hydrogen. The first stage or the pre-treatment process stage was the main technical focus of the work because the overall processing approach was to use Texaco's existing gasification process with only minor modifications as the main processing stage. LLNL's main task was to develop the pre-treatment process through a scale of about 1 ton/day of feed capacity. Texaco's main task was to integrate the new pre-treatment process with its commercial gasification process and thus scale up the combined process to commercial size.

08 HYDROGEN↗

Antifoam Development for Eliminating Flammability Hazards and Decreasing Cycle Time in the Defense Waste Processing Facility

Foam, due to the high gas generation rates of boiling and chemical reaction offgasing, requires control measures to prevent the foam from contaminating the condensate and to facilitate efficient plant operation. Antifoam was utilized to minimize foam production during chemical processing in the DWPF and during High-Level Waste (HLW) evaporation at SRS and Hanford. However, the current antifoam used in the SRS DWPF increases flammability risk during chemical processing (generates three flammable degradation products) and while feeding the melter (can decompose to CO/hydrogen). It is also the likely source of methyl functional groups for the organo-mercury present in the tank farm and excessive mercury in Saltstone. Additionally, the planned startup of Salt Waste Processing Facility (SWPF), with much higher throughput, will challenge DWPF to process at higher gas generation rates. DWPF employs Antifoam 747, a superspreader produced by Momentive Performance Materials, as an antifoaming agent during waste processing. During DWPF chemical processing, antifoam must be effective up to boiling (i.e., up to 103°C) and between a pH of 3-13. Antifoam 747 is most effective at a pH range of 6-8 and degrades as pH deviates. In addition, SRNL identified three flammable antifoam degradation products using mass spectrometer (MS) and fourier transform infrared (FTIR) offgas analyzers during simulations. A new antifoam or a new method to control foam is needed to minimize DWPF processing time and reduce the risk of contamination. In addition, testing should be completed to ensure that other antifoams used in HLW processing do not have similar flammability hazards or cause unintended impacts in downstream processing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Testing to Evaluate Processes Expected to Occur during MSR Salt Spill Accidents

Obtaining a license for a new nuclear reactor requires the identification and assessment of the potential consequences of specified accident scenarios, which are achieved using accident progression models. Those models need to be parameterized and validated using experimental data, but existing experimental data addressing processes relevant to molten salt reactor accidents are sparse. Specifically, experimental data that quantify the sensitives of important processes to the initial conditions of the spill, the ambient environment, and the containment features are needed to parameterize individual process models. Integrated experiments that simulate accident scenarios are also needed to provide data for model validation, but these experiments will require the use of proven methods to quantify the processes under evaluation. The overarching objectives of this work are to develop the methods for simulating the targeted processes, to determine the effectiveness of the methods in producing the data required for model development, to generate data that can be used to parameterize individual process models, and to provide key insights into the behavior of spilled molten salt that should be considered in models. Experimental methods were designed to quantify aspects of individual processes expected to occur during or after a molten salt spill accident that will affect the fate of spilled molten salt and the radionuclides within. These processes include 1) molten salt spreading and heat transfer, 2) molten salt flowing and freezing in tubing, 3) stainless steel corrosion kinetics in molten salt, and 4) molten salt splashing and aerosol generation. The initial tests described in this report were conducted using eutectic FLiNaK to demonstrate the test methods, the data that are generated, and the analyses of the data to derive values needed for modeling. The primary variables that were tested include initial salt temperature and the presence of volatile surrogate fission products (e.g., cesium and iodine). The developed methods are shown to be effective in quantifying the desired processes and can be applied to study more complex salt compositions of interest to molten salt reactor developers, a wide range of environmental conditions of interest to modelers, and additional variables relevant to salt spill accidents. The developed methods and insights gained from laboratory tests can also be incorporated in future large-scale integrated tests used to simulate molten salt spill accidents.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Revisions of ORNL 188 W Process Based on Nonradiological Experiments

Tungsten-188 is in widespread use in the 188 W(t 1/2 = 69 d)/ 188 Re(t 1/2 =16.9 h) biomedical generator. Oak Ridge National Laboratory (ORNL) has been providing this product to the world since 1999. At ORNL, 188 W is produced via irradiation in ORNL’s High Flux Isotope Reactor (HFIR). Enriched 186 W targets in the form of sintered metallic pellets or rings achieve a compact loading in the irradiation vessel, providing a high yield per unit target. The enrichment of the target is >90% 186 W and this isotope undergoes double neutron capture to produce the desired 188W product. While 188 W is produced by neutron bombardment, 191 Os(t 1/2 = 15.4 d) is simultaneously produced as a byproduct requiring separation from 188 W by post irradiation treatment. In the current processing pathway, the irradiated W metal pellets or rings are first converted into an oxide form of WO 3 by heating the irradiated W metal target at 750°C in a quartz reaction vessel inside a vertical furnace under a constant flow of air. During heating, W metal reacts with oxygen in the air to produce WO 3 , which is soluble in 6 M NaOH for later purification process. This oxidation process also converts 188 Os (the decay daughter of 188 W) and 191 Os (the irradiation produced byproduct) into OsO 4 , a highly volatile and toxic gas. The gaseous effluents driven from the quartz reaction vessel are passed through a scrubbing array to remove OsO 4 before the air is discharged from the process. This heterogeneous oxidation method simultaneously achieves two goals: 1). converting metal target to a soluble oxide form and 2). separating volatile OsO 4 away from the solid WO 3 product, although harmful 191 OsO 4 is unfavorable but being taken care of by the down road scrubbing array. In the past twenty years the existing OsO 4 scrubbing array served well in preventing OsO 4 from being released into the environment, until July of 2020 when a minor amount of 191 Os was found to have been released into the environment which resulted in a standby of building 4501 from July 2020 to February 2021.Since October 20 of 2020 a team of researchers from groups of RSTD and NEFD were organized to work for the following tasks: (1) Fully understand the root causes of the July incident of 191 Os release and create a redesigned 191 Os scrubbing array to eliminate the possibility of 191 Os release in future 188 W processes; (2) In Phase-1 tests, select a correct air (O 2 ) flow rate in 188 W process, that provides sufficient oxygen for the oxidation of tungsten metal, while still allowing sufficient resonance time for 191 Os removal by the scrubbers; (3) In Phase-2 tests, confirm the efficiency of the redesigned scrubbing array to absorb excessive amount of non-rad OsO 4 (generated from Os metal powder) at the selected air flow; (4) In Phase-3 tests, simulate the hot cell 188 W process by heating pressed non-rad W-Os pellets in a quartz vessel of new design and the new array under operation parameters selected in Phase-1 and -2; (5) Complete a new operation procedure for 188 W process in hot cell and a TM report as a summary of the Os Mitigation Project. This TM report summarizes the investigation on root causes from technical aspects in July 191 Os release and the correspondent improvement towards the redesigned 191 Os scrubbing system. The report presents the efforts made on selection of optimal operational parameter with the new scrubbing array and the quartz vessel of new design, based on experiment data obtained in Phase-1, -2 and -3 tests. Further renovations for 188 W process and additional improvement of W target treatment will also be discussed.

07 ISOTOPE AND RADIATION SOURCES↗

Ion Exchange Processing of AP-105 Hanford Tank Waste through Crystalline Silicotitanate in a Staged 2- then 3-Column System (Rev.1)

The Tank Side Cesium Removal (TSCR) system, under development by Washington River Protection Solutions LLC (WRPS), will send initial low-activity Hanford waste tank supernate feeds to the Hanford Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) Facility. In addition to entrained solids removal from the supernate, the primary goal of TSCR is to remove cesium-137 ( 137 Cs) by ion exchange, allowing contact handling of the liquid effluent product at the WTP. Crystalline silicotitanate (CST) ion exchange media, manufactured by Honeywell UOP, LLC (product IONSIVTM R9140-B), was selected as the ion exchange media at TSCR. CST is a non-elutable inorganic material that has demonstrated robust chemical, physical, and radiation tolerance while maintaining functionality. However, exchange kinetics of Cs onto CST is slow, resulting in low utilization of the CST Cs load capacity before unacceptable Cs breakthrough. Two process flow designs have been tested, as follows. 1. Lead-lag column processing: The lead column was removed after the lag column effluent reached the waste acceptance criteria (WAC) limit, the lag column was moved into the lead position, and a new lag column was installed. This format used ~52% Cs load capacity on the lead column. 2. Lead-lag-polish column processing: The processing was stopped when the polish column effluent reached the WAC limit. This format resulted in 81% Cs load capacity on the lead column. Testing with diluted feed from Hanford tank AP-105 (AP-105DF) incorporated a nuanced change to the lead-lag-polish column system where the polish column was inserted when the lag column effluent reached WAC limit. A 10.9-L volume of AP-105DF (diluted to 5.6 M Na) was processed through the Direct Feed Test Platform system, established at Pacific Northwest National Laboratory to support small-scale waste qualification efforts. The columns consisted of 10-mL CST beds (CST Lot 2002009604, sieved to screen out >30-mesh particles) placed in 1.5-cm-inner-diameter columns. Feed was processed at 1.83 bed volumes (BV) per hour; the flowrate, in terms of contact time with the CST bed, matched the expected flowrate at TSCR. The <30-mesh CST sieve cut was expected to provide appropriate performance scaling to a full-height column. The installation of the polish column later in processing (after processing 523 BVs) did not appear to fundamentally change the utilization of the lead column for Cs exchange nor did it extend the total feed processing volume when compared to the previous test with AP-107 feed. Table ES.1 and Figure ES.1 summarize the measured AP-105DF Cs load performance.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Zero-Emission Process for Direct Reduction of Iron by Hydrogen Plasma in a Rotary Kiln Reactor

This project’s goal was to demonstrate a hydrogen plasma (H-plasma)-rotary kiln process for reducing iron ore to iron as part of the steel manufacturing process. The H-plasma provides a greater thermodynamic driving force for reducing iron ores than thermal processes such as the DRI process, enabling lower reaction temperatures. We estimated that our process technology can reduce energy consumption by 45% compared to the blast furnace process and ~15% compared to the DRI process. Steel manufacturing produces about 1.8 tons of CO2/ton of steel with iron ore reduction accounting for about one-third of the CO2 produced in the overall manufacturing process. We estimated our process has the potential to reduce GHG emissions from ironmaking by 35% with today’s grid and by up to 88% with a future low-carbon grid while being cost competitive with the current blast furnace route. We demonstrated reduction of hematite and magnetite rich materials at temperatures from 600 to 800°C. We achieved 90-95% metallization on 100 gr samples in batch reduction experiments in the H-plasma rotary kiln furnace at 600-650°C. Attempts to perform tests in a continuous operation mode identified problems with the ore feed mechanism. We identified solutions but there was not time nor budget to correct these for this project

36 MATERIALS SCIENCE↗

A Zero-Emission Process for Direct Reduction of Iron by Hydrogen Plasma in a Rotary Kiln Reactor

This project’s goal was to demonstrate a hydrogen plasma (H-plasma)-rotary kiln process for reducing iron ore to iron as part of the steel manufacturing process. The H-plasma provides a greater thermodynamic driving force for reducing iron ores than thermal processes such as the DRI process, enabling lower reaction temperatures. We estimated that our process technology can reduce energy consumption by 45% compared to the blast furnace process and ~15% compared to the DRI process. Steel manufacturing produces about 1.8 tons of CO2/ton of steel with iron ore reduction accounting for about one-third of the CO2 produced in the overall manufacturing process. We estimated our process has the potential to reduce GHG emissions from ironmaking by 35% with today’s grid and by up to 88% with a future low-carbon grid while being cost competitive with the current blast furnace route. We demonstrated reduction of hematite and magnetite rich materials at temperatures from 600 to 800°C. We achieved 90-95% metallization on 100 gr samples in batch reduction experiments in the H-plasma rotary kiln furnace at 600-650°C. Attempts to perform tests in a continuous operation mode identified problems with the ore feed mechanism. We identified solutions but there was not time nor budget to correct these for this project

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Machine Learning-Based Process Control for Injection Molding of Recycled Polypropylene

The increased interest in artificial intelligence in manufacturing has driven the adoption of machine learning to optimize processes and improve efficiency. A key challenge in injection molding is the variability of recycled materials, which affects part quality and processing stability. This study presents a novel closed-loop process control approach for injection molding, leveraging machine learning to adaptively predict processing inputs and quality outcomes. The methodology was tested on five blends of recycled polypropylene (rPP), using artificial neural networks (ANNs), linear regression, and polynomial regression to model the relationships between material properties and process parameters. The dataset was split 80/20 into training and testing sets. The ANN model was implemented using TensorFlow and Keras, with six hidden layers of 32 neurons per layer, ReLU activation, and an Adam optimizer. Empirical tuning and early stopping were used to optimize performance and prevent overfitting. Predictions were evaluated based on mean absolute error (MAE), mean squared error (MSE), and percentage error. The results showed that yield stress, ultimate elongation, and part weight were accurately predicted within a 5% error for linear and polynomial regression models and within a 10% error for the ANN. However, modulus predictions were less reliable, with errors of ~11% for ANN and linear regression and ~40% for polynomial regression, reflecting the inherent variability of this property in rPP blends. Predictions of processing inputs had errors ranging from 3% to 25%, depending on the model and response variable. No single modeling approach was consistently superior across all responses, highlighting the complexity of the relationship between material properties, process parameters, and quality metrics. Overall, the work demonstrates that closed-loop process control, powered by machine learning, can effectively predict key quality parameters in injection molding of recycled materials. The proposed approach can improve process stability and material utilization, facilitating increased adoption of sustainable materials.

Krantz, Joshua↗