Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Requirements Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,153 records · Page 64

Modular Energy Storage System for Alternative Energy Vehicles

An electrical vehicle environment was established to promote research and technology development in the area of high power energy management. The project incorporates a topology that permits parallel development of an alternative energy delivery system and an energy storage system. The objective of the project is to develop technologies, specifically power electronics, energy storage electronics and controls that provide efficient and effective energy management between electrically powered devices in alternative energy vehicles plugin electric vehicles, hybrid vehicles, range extended vehicles, and hydrogen-based fuel cell vehicles. In order to meet the project objectives, the Vehicle Energy Management System (VEMS) was defined and subsystem requirements were obtained. Afterwards, power electronics, energy storage electronics and controls were designed. Finally, these subsystems were built, tested individually, and integrated into an electric vehicle system to evaluate and optimize the subsystems performance. Phase 1 of the program established the fundamental test bed to support development of an electrical environment ideal for fuel cell application and the mitigation of many shortcomings of current fuel cell technology. Phase 2, continued development from Phase 1, focusing on implementing subsystem requirements, design and construction of the energy management subsystem, and the integration of this subsystem into the surrogate electric vehicle. Phase 2 also required the development of an Alternative Energy System (AES) capable of emulating electrical characteristics of fuel cells, battery, gen set, etc. Under the scope of the project, a boost converter that couples the alternate energy delivery system to the energy storage system was developed, constructed and tested. Modeling tools were utilized during the design process to optimize both component and system design. This model driven design process enabled an iterative process to track and evaluate the impact of design alternatives and the impact of changes. Refinement of models was accomplished through correlation studies to measured data obtained from functioning hardware. Specifically, correlation and characterization of the boost converter resulted in a model that was effectively used to determine overall VEMS performance. The successful development of the boost converter can be attributed to utilization of previously proven technologies and adapting to meet the VEMS requirements. This program provided significant improvement in development time of various generations of boost converters. The software strategies and testing results support the development of current energy management systems and directly contribute to the future of similar, commercial products at Magna E-Car Systems. Because of this development project, Magna E-Car Systems is able to offer automotive customers a boost converter system with reduced time to market and decreased product cost, thus transferring the cost and timing benefits to the end use consumer.

25 ENERGY STORAGE↗

Materials And Processes Technical Information System (MAPTIS) LDEF materials database

The Materials and Processes Technical Information System (MAPTIS) is a collection of materials data which was computerized and is available to engineers in the aerospace community involved in the design and development of spacecraft and related hardware. Consisting of various database segments, MAPTIS provides the user with information such as material properties, test data derived from tests specifically conducted for qualification of materials for use in space, verification and control, project management, material information, and various administrative requirements. A recent addition to the project management segment consists of materials data derived from the LDEF flight. This tremendous quantity of data consists of both pre-flight and post-flight data in such diverse areas as optical/thermal, mechanical and electrical properties, atomic concentration surface analysis data, as well as general data such as sample placement on the satellite, A-O flux, equivalent sun hours, etc. Each data point is referenced to the primary investigator(s) and the published paper from which the data was taken. The MAPTIS system is envisioned to become the central location for all LDEF materials data. This paper consists of multiple parts, comprising a general overview of the MAPTIS System and the types of data contained within, and the specific LDEF data element and the data contained in that segment.

Davis, John M.↗

DMS Advanced Applications for Accommodating High Penetrations of DERs and Microgrids: Preprint

Efficient and effective management of the electrical distribution system requires an integrated system approach for Distribution Management Systems (DMS), Distributed Energy Resources (DERs), Distributed Energy Resources Management System (DERMS), and microgrids to work in harmony. This paper highlights some of the outcomes from a U.S. Department of Energy (DOE), Office of Electricity (OE) project, including 1) Architecture of these integrated systems, and 2) Expanded functions of two example DMS applications, Volt-VAR optimization (VVO) and Fault Location, Isolation and Service Restoration (FLISR), to accommodate DER. For these two example applications, the relevant DER Group Functions necessary to support communication between DMS and Microgrid Controller (MC) in grid-tied mode are identified.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Salt Waste Processing Facility Project (SWPF) project management improvements: Working under a cost cap contract - 15523

The Salt Waste Processing Facility (SWPF), located at the Savannah River Site (SRS) in Aiken, South Carolina, is a multi-billion dollar LRW processing facility that represents the keystone for the U.S. Department of Energy (DOE)-EM clean-up mission at SRS. In June 2013, DOE and Parsons agreed to Contract Modification 0116 that definitized the remaining work to achieve Construction Complete with a target schedule and a cost cap contract structure. The SWPF project is currently 85 percent complete with construction, and approximately 10 percent complete with commissioning. To date there have been numerous lessons learned with regard to contract and project management, procurement, construction, safety and quality assurance approaches (both good practices and mistakes). These lessons learned are considered to be of significant value in improving the state of major project execution within the DOE-EM clean-up program as well as to the wider DOE complex. An overview of the current SWPF project status is provided, along with challenges associated with operating under a cost cap environment within a cost-plus contract structure. Key lessons learned will be discussed including contract management, baseline development and acceptance under DOE O 413.3, Program and Project Management for the Acquisition of Capital Assets requirements, cost and schedule control, change management and risk strategies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bridging the gap between sustainable technology adoption and protecting natural resources: Predicting intentions to adopt energy management technologies in California

To achieve energy savings, emerging energy management technologies and programs require customer adoption. Although a variety of models can be used to explain the adoption of energy management technologies and programs, they overlook the seemingly unconventional element of level of affiliation with nature. In fact, connectedness to nature has been identified as an important driver of many pro-environmental behaviors, but its role in pro-environmental technology adoption is also not well understood. Can affiliation with nature help to bridge the apparent gap—and complex chain of events—between sustainable technology adoption and protecting natural resources? Based on survey data from 856 southern California residents, this study investigated the influence of connectedness to nature and other factors on intentions to adopt five energy management technologies and programs: using three platforms to monitor home energy use (website, mobile phone application, in-home display); signing up for a time-of-use pricing plan; and participating in demand response events. Regression results showed that nature connectedness was the strongest predictor of all outcomes such that higher nature connectedness predicted greater likelihood of technology and program adoption. In conclusion, these findings suggest that connectedness to nature may facilitate “bridging the logic gap” between sustainable innovation adoption and environmental protection.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Wildfire management decisions outweigh mechanical treatment as the keystone to forest landscape adaptation

Modern land management faces unprecedented uncertainty regarding future climates, novel disturbance regimes, and unanticipated ecological feedbacks. Mitigating this uncertainty requires a cohesive landscape management strategy that utilizes multiple methods to optimize benefits while hedging risks amidst uncertain futures. We used a process-based landscape simulation model (LANDIS-II) to forecast forest management, growth, climate effects, and future wildfire dynamics, and we distilled results using a decision support tool allowing us to examine tradeoffs between alternative management strategies. We developed plausible future management scenarios based on factorial combinations of restoration-oriented thinning prescriptions, prescribed fire, and wildland fire use. Results were assessed continuously for a 100-year simulation period, which provided a unique assessment of tradeoffs and benefits among seven primary topics representing social, ecological, and economic aspects of resilience. Projected climatic changes had a substantial impact on modeled wildfire activity. In the Wildfire Only scenario (no treatments, but including active wildfire and climate change), we observed an upwards inflection point in area burned around mid-century (2060) that had detrimental impacts on total landscape carbon storage. While simulated mechanical treatments (~ 3% area per year) reduced the incidence of high-severity fire, it did not eliminate this inflection completely. Scenarios involving wildland fire use resulted in greater reductions in high-severity fire and a more linear trend in cumulative area burned. Mechanical treatments were beneficial for subtopics under the economic topic given their positive financial return on investment, while wildland fire use scenarios were better for ecological subtopics, primarily due to a greater reduction in high-severity fire. Benefits among the social subtopics were mixed, reflecting the inevitability of tradeoffs in landscapes that we rely on for diverse and countervailing ecosystem services. This study provides evidence that optimal future scenarios will involve a mix of active and passive management strategies, allowing different management tactics to coexist within and among ownerships classes. Our results also emphasize the importance of wildfire management decisions as central to building more robust and resilient future landscapes.

54 ENVIRONMENTAL SCIENCES↗

A proposed group management scheme for XTP multicast

The purpose of a group management scheme is to enable its associated transfer layer protocol to be responsive to user determined reliability requirements for multicasting. Group management (GM) must assist the client process in coordinating multicast group membership, allow the user to express the subset of the multicast group that a particular multicast distribution must reach in order to be successful (reliable), and provide the transfer layer protocol with the group membership information necessary to guarantee delivery to this subset. GM provides services and mechanisms that respond to the need of the client process or process level management protocols to coordinate, modify, and determine attributes of the multicast group, especially membership. XTP GM provides a link between process groups and their multicast groups by maintaining a group membership database that identifies members in a name space understood by the underlying transfer layer protocol. Other attributes of the multicast group useful to both the client process and the data transfer protocol may be stored in the database. Examples include the relative dispersion, most recent update, and default delivery parameters of a group.

Dempsey, Bert J.↗

Required Time of Arrival as a Control Mechanism to Mitigate Uncertainty in Arrival Traffic Demand Management

The objective of this study is to explore the use of Required Time of Arrival (RTA) capability on the flight deck as a control mechanism on arrival traffic management to improve traffic delivery accuracy by mitigating the effect of traffic demand uncertainty. The uncertainties are caused by various factors, such as departure error due to the difference between scheduled departure and the actual take-off time. A simulation study was conducted using the Multi Aircraft Control System (MACS) software, a comprehensive research platform developed in the Airspace Operations Laboratory (AOL) at NASA Ames Research Center. The Crossing Time (CT) performance (i.e. the difference between target crossing time and actual crossing time) of the RTA for uncertainty mitigation during cruise phase was evaluated under the influence of varying two main factors: wind severity (heavy wind vs. mild wind), and wind error (1 hour, 2 hours, and 5 hours wind forecast errors). To examine the CT performance improvement made by the RTA, the comparison to the CT of the aircraft that were not assigned with RTA (Non-RTA) under the influence of the selected factors was also made. The Newark Liberty International Airport (EWR) was chosen for this study. A total 66 inbound traffic to the EWR (34 of them were airborne when the simulation was initiated, 32 were pre-departures at that time) was simulated, where the pre-scripted departure error was assigned to each pre-departure (61 conform to their Expected Departure Clearance Time, which is +-300 seconds of their scheduled departure time). The results of the study show that the delivery accuracy improvement can be achieved by assigning RTA, regardless of the influence of the selected two factors (the wind severity and the wind information inaccuracy). Across all wind variances, 66.9 (265 out of 396) of the CT performance of the RTA assigned aircraft was within +- 60 seconds (i.e. target tolerance range) and 88.9 (352 out of 396) aircraft met +-300 seconds marginal tolerance range, while only 33.6 (133 out of 396) of the Non-RTA assigned aircrafts CT performance achieved the target tolerance range and 75.5 (299 out of 396) stayed within the marginal. Examination of the impact of different error sources i.e. departure error, wind severity, and wind error suggest that although large departure errors can significantly impact the CT performance, the impacts of wind severity and errors were modest relative the targeted +- 60 second conformance range.

required time of arrival (RTA)↗

OMS FDIR: Initial prototyping

The Space Station Freedom Program (SSFP) Operations Management System (OMS) will automate major management functions which coordinate the operations of onboard systems, elements and payloads. The objectives of OMS are to improve safety, reliability and productivity while reducing maintenance and operations cost. This will be accomplished by using advanced automation techniques to automate much of the activity currently performed by the flight crew and ground personnel. OMS requirements have been organized into five task groups: (1) Planning, Execution and Replanning; (2) Data Gathering, Preprocessing and Storage; (3) Testing and Training; (4) Resource Management; and (5) Caution and Warning and Fault Management for onboard subsystems. The scope of this prototyping effort falls within the Fault Management requirements group. The prototyping will be performed in two phases. Phase 1 is the development of an onboard communications network fault detection, isolation, and reconfiguration (FDIR) system. Phase 2 will incorporate global FDIR for onboard systems. Research into the applicability of expert systems, object-oriented programming, fuzzy sets, neural networks and other advanced techniques will be conducted. The goals and technical approach for this new SSFP research project are discussed here.

Taylor, Eric W.↗

A Model-Based Framework for NASA Science Mission Formulation

This paper details an effort to implement NASA systems engineering standards and practices using a Digital System Model (DSM), which we also refer to as the system architecture model (SAM). Creating a SAM at the beginning of a design effort helps systems engineer identify errors, inconsistencies, and miscommunications as early as possible. Such issues can then be resolved before it becomes costly and requires significant rework to do so. A pre-formulation SAM also enables advanced trade studies at the earliest stage of concept development. This results in “win-wins” where architecture changes can reduce cost without decreasing effectiveness, or increase effectiveness without increasing cost. SAMs also streamline the creation of project documentation and facilitate superior dialogue between science, engineering, and management stakeholders. Common artifacts such as Master Equipment Lists (MELs), Science Traceability Matrices (STMs), and Mission Traceability Matrices (MTMs), can be automatically maintained through requirements and structural models in the SAM. Key performance parameters (and changes to them) can be tied to simulations in the SAM, allowing far more rapid and extensive trade space exploration. As will be shown in this work, these advantages have been realized for the first time in an actual NASA Goddard Space Flight Center (GSFC) pre-phase A and phase A concept study. Modelbased design tools have been developed in a general, modular manner to maximize reuse on future programs. Focus is placed on structural and requirements architecture modeling. Data is ingested into the SAM from existing discipline model outputs (e.g. MS Excel spreadsheets) and used to update a SysML structural model. A mission requirements model is created within the SAM, containing mission specific as well as standard GSFC mission requirements. With the linked requirements model and structural model, automated compliance checking will be performed as mission parameters evolve without the need for discipline engineers to work directly with the SAM in SysML.

MBSE↗

Institutional Control Policies and Implementation for the Area 5 and Area 3 Radioactive Waste Management Sites

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) has implemented varying institutional control policies in performance assessment/composite analysis (PA/CA) calculations for the Area 5 and Area 3 Radioactive Waste Management Sites (RWMSs) (Shott et al., 1998; 2000; Bechtel Nevada [BN] and Neptune and Company Inc. [Neptune], 2006). The facilities are within the actively maintained boundaries of the Nevada Test Site (NTS) that are enforced by NNSA/NSO. Under current policies, access required for exposure of the member of public (MOP) or the inadvertent human intruder (IHI) is prohibited. Uncertainties affecting institutional control policies are the duration and effectiveness of the controls during the post-closure period. Implementing a uniform set of institutional control policies for the RWMSs that encompasses waste management and environmental restoration programs and is consistent with the end-state vision for the environmental management programs for the NTS (DOE, 2006) is a primary goal of the maintenance program. The NNSA/NSO Performance Management Plan (DOE, 2002) complies with DOE Policy P455.1, 'Use of Risk-Based End States' (DOE, 2003a). Expected future land uses are a driver in selecting acceptable end state conditions and clean-up goals for the NTS. NNSA/NSO Environmental Management's (EM's) land management assumptions and framework for Environmental Management activities are as follows: The NTS will remain under federal control in perpetuity as an NNSA test site, and the large buffer zone surrounding the NTS (the Nevada Test and Training Range) is assumed to remain under the control of the U.S. Air Force. There are no plans for transfer of any NTS lands to other agencies or public entities. Access will continue to be restricted to the NTS and the surrounding areas. For management purposes, NNSA/NV EM activities have been established based on the source of contamination and type of waste requiring management. Environmental Restoration activities within the State of Nevada fall under the purview of a formal regulatory agreement, the Federal Facility Agreement and Consent Order (FFACO); Environ-mental Restoration activities outside the State of Nevada fall under the purview of each affected State's regulatory framework but are planned and negotiated with the State using the FFACO Corrective Action Strategy framework for applicable activities. Waste Management activities are governed by the Federal Facility Compliance Act and Consent Order (and the Mutual Consent Agreement (MCA)). A Joint Low-Level Waste Oversight Agreement is in place to allow state of Nevada representatives to participate in review and approval processes associated with waste receipt and disposal operations (DOE, 2002). The purpose of this document is to describe institutional control policies implemented in the past PA/CA documentation, to discuss concerns noted in reviews of PA/CA documents, and to describe a new basis for institutional control at NTS disposal facilities. The new basis uses combined controls based on policies identified in the end-state vision (DOE, 2006); policies established through the FFACO, (1996) for Hazard Area 1, the Underground Test Area (UGTA) Project, and newly established NNSA policies for the Nevada Site Office.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Energy-aware Thread and Data Management in Heterogeneous Multi-core, Multi-memory Systems

By 2004, microprocessor design focused on multicore scaling—increasing the number of cores per die in each generation—as the primary strategy for improving performance. These multicore processors typically equip multiple memory subsystems to improve data throughput. In addition, these systems employ heterogeneous processors such as GPUs and heterogeneous memories like non-volatile memory to improve performance, capacity, and energy efficiency. With the increasing volume of hardware resources and system complexity caused by heterogeneity, future systems will require intelligent ways to manage hardware resources. Early research to improve performance and energy efficiency on heterogeneous, multi-core, multi-memory systems focused on tuning a single primitive or at best a few primitives in the systems. The key limitation of past efforts is their lack of a holistic approach to resource management that balances the tradeoff between performance and energy consumption. In addition, the shift from simple, homogeneous systems to these heterogeneous, multicore, multi-memory systems requires in-depth understanding of efficient resource management for scalable execution, including new models that capture the interchange between performance and energy, smarter resource management strategies, and novel low-level performance/energy tuning primitives and runtime systems. Tuning an application to control available resources efficiently has become a daunting challenge; managing resources in automation is still a dark art since the tradeoffs among programming, energy, and performance remain insufficiently understood. In this dissertation, I have developed theories, models, and resource management techniques to enable energy-efficient execution of parallel applications through thread and data management in these heterogeneous multi-core, multi-memory systems. I study the effect of dynamic concurrent throttling on the performance and energy of multi-core, non-uniform memory access (NUMA) systems. I use critical path analysis to quantify memory contention in the NUMA memory system and determine thread mappings. In addition, I implement a runtime system that combines concurrent throttling and a novel thread mapping algorithm to manage thread resources and improve energy efficient execution in multi-core, NUMA systems.

97 MATHEMATICS AND COMPUTING↗

Opportunities for an Integrated Web-Based Workbench for Data Access and Analysis - 20244

Management of environmental issues can require integration of multiple types of data and information, conducting data analysis and interpretation, and providing data visualization for effective communications. These data elements are important for site management to support regulator interactions and provide defensibility for remedial decisions. Databases and information repositories are core elements of managing data; however, efficient data access and analysis also enable effective site management. The U.S. Department of Energy (DOE) Hanford Site is an example of a complex site with a voluminous quantity of environmental data and a need for efficient site management. Different tiers of data and information tools have been developed and deployed to address site needs. These tools are configured for ready access via the web site interfaces and meet the rigorous quality requirements for environmental site management. Evolving efforts are focused on an integrated platform to meet site environmental management needs. In this platform, users can access site information at multiple levels of detail based on their need and permissions, so that data and associated analyses are presented within the context of the site mission and the user's management or technical needs. This concept is not only applicable at individual sites like Hanford but also applicable at other sites within the DOE complex. An integrated web-based architecture that links data visualization, data analytics, and management tools can provide holistic access to large data sets, minimize complexity, and maximize interactivity and technical communication. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation of Timing Properties for an Event Driven with Access and Reset Decoder Readout Architecture for a Pixel Array

The large number of data generating sources (data channels) on a single chip requires appropriate techniques to manage a readout from these channels. One of the main methods is sharing a medium of transmission, which requires arbitration to avoid collisions or deadlocks. Existing solutions face several problems such as a dead time, unintended prioritization or metastability. That is why we decided to create a new readout architecture named EDWARD i.e., Event Driven with Access and Reset Decoder. The EDWARD architecture gets rid of the earlier mentioned problems and mitigates the other ones. However, due to the use of logic circuits outside a standard cell library, which are hard to characterize, we were challenged to perform an additional transient analysis to validate the architecture. Here we show a methodology and the results of the simulations. Based on the results obtained we can confirm the functional correctness of the system and plan the optimization of operating conditions in order to achieve better performance. Our goal is to use the EDWARD architecture in the future radiation detectors to be built at Brookhaven National Laboratory.

47 OTHER INSTRUMENTATION↗

Magnetospheric MultiScale (MMS) System Manager

The Magnetospheric MultiScale (MMS) mission is an ambitious NASA space science mission in which 4 spacecraft are flown in tight formation about a highly elliptical orbit. Each spacecraft has multiple instruments that measure particle and field compositions in the Earths magnetosphere. By controlling the members relative motion, MMS can distinguish temporal and spatial fluctuations in a way that a single spacecraft cannot.To achieve this control, 2 sets of four maneuvers, distributed evenly across the spacecraft must be performed approximately every 14 days. Performing a single maneuver on an individual spacecraft is usually labor intensive and the complexity becomes clearly increases with four. As a result, the MMS flight dynamics team turned to the System Manager to put the routine or error-prone under machine control freeing the analysts for activities that require human judgment.The System Manager is an expert system that is capable of handling operations activities associated with performing MMS maneuvers. As an expert system, it can work off a known schedule, launching jobs based on a one-time occurrence or on a set reoccurring schedule. It is also able to detect situational changes and use event-driven programming to change schedules, adapt activities, or call for help.

Ground System Expert Automation↗

TERSSE: Definition of the Total Earth Resources System for the Shuttle Era. Volume 3: Mission and System Requirements for the Total Earth Resources System

Resource management missions to be performed by TERSSE are described. Mission and user requirements are defined along with information flows developed for each major resource management mission. Other topics discussed include: remote sensing platforms, remote sensor requirements, ground system architecture, and such related issues as cloud cover, resolution, orbit mechanics, and aircraft versus satellite.

Source record↗

System-Level Integration of Modular Language Models for Real-Time Risk Assessment in Third-Party Risk Management Systems

Large enterprises typically rely on dedicated teams to govern and implement security measures throughout their supply chains, ensuring compliance with enterprise security procedures. There is a significant reliance on Third-Party Risk Management (TPRM) platforms, which often require complete, highly structured information from potential vendors. The review and compliance assurance processes are time- and labor intensive, often requiring several rounds of review between the supply chain security risk management teams, business users, and potential vendors, leading to delays in the supply chain processing and consumer experience. Significant challenges in the risk management paradigm include handling unstructured data in various formats and providing real-time feedback to users to reduce the required review time. This paper presents a novel solution to these challenges. A modular multi-step system architecture is proposed using advances in language processing, specifically for unstructured responses and provides real-time feedback (i.e., 3 seconds) so that users can improve their responses before the TPSRM team review. This novel system architecture will increase information accuracy and significantly reduce time and labor during the review process.

99 - GENERAL AND MISCELLANEOUS↗

A step-by-step development of radioactive waste management strategy

Fennovoima is Finland's third nuclear power company founded in 2007. Fennovoima will build a new nuclear power plant, Hanhikivi 1, in Pyhajoki municipality located in Northern Finland. Currently Fennovoima is evaluating bids from reactor suppliers. Originally two suppliers, AREVA and Toshiba Heavy Industries were invited to bid for the plant but later also a bid from Rosatom were invited. The plant supplier will be selected in 2013. Platom is a Finnish company with extensive experience in radioactive waste management. In the beginning of 2008, Platom was assigned by Fennovoima as radioactive waste management consultant and to develop radioactive waste management strategy and to support Fennovoima in negotiations with plant suppliers in waste management aspects. Since Fennovoima has started, there have been some changes to the regulatory requirements which had to be taken into account while developing the strategy. One important change is due to the Government Degree 27.11.2008/736 which establishes a new waste category of very low-level waste following international development and the 'new' IAEA waste classification. Other important change was introduced by the change 342/2008 to the Nuclear Energy Act allowing some nuclear waste to be delivered to another country for treatment. These and many more requirements had to be considered when developing the strategy. Early work by Platom was mostly done to support development of application for Decision-in-Principle. This was the first important licensing step for Fennovoima. Work started with studies and plans which were used by Fennovoima to gather the know-how required to draw up the application. Descriptions of waste streams and waste management technologies were developed as well as preliminary waste inventories and studies for final disposal, including preliminary dimensioning of the repository facilities. Based on these plans nuclear regulator's preliminary safety assessment was performed. The work was successfully completed as in 2010 the Government of Finland granted Fennovoima a permit to build a new nuclear power plant. The work continued in 2012 when bids were received for EPR and ABWR type reactors. Plans developed earlier were elaborated into a detailed strategy and the proposed waste management solutions were evaluated. This allowed feedback from the bids into the strategy and to the bid specification and they both were developed. Also waste inventories were elaborated which allowed development of reactor design specific disposal strategies. The main objective of work has been to establish basis for safe and efficient radioactive waste management which meets all the relevant national and international recommendations, requirements and regulations, takes advantage of best available and state-of-art technologies and offers fit-for-purpose solutions. All the work was performed to accommodate requirement based management system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗