Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Projection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,153 records · Page 64

Managing Subsurface Pressure Buildup and Interference in Commercial-Scale CO 2 Storage Project with Proximal Injection Wells

Large-scale decarbonization using carbon capture and storage (CCS) is likely to involve many commercial-scale CO 2 storage projects located in close proximity to each other. This close proximity raises concerns over pressure interference among the storage projects. Pressure interference between injection and storage efforts can reduce the practicable CO 2 storage resource and force wells to inject CO 2 at a lower rate to avoid the fracture pressure thresholds per United States Environmental Protection Agency (EPA) Class VI well regulations to preserve injection and confining zone integrity and potentially mitigate against inducing seismic activity. These analyses employ numerical full-physics reservoir modeling to evaluate how pressure buildup fronts and CO 2 plumes evolve under commercial-scale injection volumes of CO 2 in which multiple storage sites located in close proximity occur in tandem. The simulation models mimic injection at pseudo basin-scale and assume homogeneous saline formation(s) as storage targets with a pair of upper and lower homogeneous seal layer/s. These analyses specifically investigate the efficacy of two basin-wide reservoir pressure management strategies in addressing the technical challenges associated with pressure buildup and CO 2 plume commingling. The strategies explored include: 1) enlarging the area of injection well spacing (WS) and 2) storing CO 2 in a stacked sequence (SSS) of saline formations compared to a single formation. The storage and confining zones properties assumed were held common across the scenarios, unless specified otherwise. Analyses results show that after injecting 4 million tons per year for 30 years using 4 separate wells (each injecting 1 million metric tons per year), the radius of CO 2 plume extends to a mere 3 km or less from injection wells. Meanwhile, the radius of pressure buildup ranges on the order of tens to a few hundreds of kilometers, depending on the magnitude of pressure buildup threshold that one would use to define the front. CO 2 plume commingling from different injection wells appears to occur 50 years post-injection, especially under scenarios with narrowly spaced (i.e., < 5 km apart) injection well locations. Findings from sensitivity cases on the well spacing suggest that storage formations modeled would require different well spacing to avoid fracture pressure thresholds. For instance, modeled storage formations with high fracture gradients (i.e., 0.8 psi/ft) would need less than 5–km well spacing, whereas those with lower fracture gradients (i.e., 0.7 psi/ft) would need approximately 20–km well spacing, based on assumed modeling parameters. Under stacked injection, the pressure challenges (described above) still exist but are more alleviated due to distributing the same injection volume across more available reservoir volume. These analyses demonstrate that stacked-sequence storage can effectively address the challenges, while still providing the same target CO 2 storage volumes and allowing a large number of storage projects to be deployed in the same basin by better utilizing the available storage resource across different reservoir depths. Among cases modeled, the resulting pressure buildup front is most suppressed when each storage project distributes injection volumes over several wells, each of which injects a portion of the total CO 2 across the stacked sequence. This strategy results in the smallest CO 2 aerial footprint amongst scenarios evaluated but also shows the largest reduction in the pressure buildup at the top of perforation at the injection wells (upwards of approximately 42 percent compared to the commercial-scale single-formation storage), the result of which is crucial to maintain caprock integrity. The findings presented by this research draw attention to the importance of greater coordination among storage operators and regulatory stakeholders to foster the upscaling and deployment of CCS. These analyses provide insights into required decision-making when considering multi-project deployment in a shared basin. Because these analyses evaluate a very specific geologic situation, they bear further investigations across other geologic situations.

42 ENGINEERING↗

ULTIMATE Phase I project: Development of Niobium-based alloys for Turbine Applications

Current Ni-based alloys used in turbine blade applications are operating at 1100°C which is approximately 90% of the solidus of Ni-based alloys. Further increases in temperature can be achieved only through the use of alloys with higher solidus temperatures such as refractory alloys which include Mo, Nb, W, Ta alloys. Niobium has a unique combination of physical properties that include a high melting point (2468°C), lowest density (8.57 g/cc), and the lowest modulus amongst refractory alloys, a good thermal conductivity that increases from 45 W/mK at room temperature to 62 W/mK at 1093°C, good ductility with fabricability using traditional techniques, high strength, good creep resistance, and general chemical inactivity. Hence niobium alloys offer many advantages for use at the desired temperature of 1300°C. One of the major deterrents to the use of niobium and its alloys at high temperatures is achieving good oxidation resistance. In addition, achieving balanced properties of room temperature strength, ductility, fracture toughness, high temperature strength, and creep resistance required for 1300°C operation at a density of 9 g/cm 3 is extremely challenging since the addition of W which is a potent strengthener increases the density of the alloy. This project seeks to enable the development of a tri-layered turbine blade that can operate continuously at 1300°C with the core of the turbine blade providing good creep resistance, the second layer providing improved oxidation resistance over the core layer, and the third layer being an environmental barrier providing oxidation resistance. The objective of this Phase 1 project was to use computational modeling and advanced characterization tools to develop two classes of Nb alloys which could be used as the core layer and the transition layer. The first class of alloys developed in this project was a Nb-alloy designed to serve as the turbine blade core with excellent room temperature strength, ductility, and high temperature strength and creep resistance required for 1300°C operation. These alloys were designed to contain sufficient solute solution strengthening elements (W, Mo) but constrained by the density of alloy, along with the addition of elements such as Zr, Hf, Ta, C, and N to achieve a combination of primary and secondary carbide precipitation. A total of 38 “creep-resistant” alloys were designed and cast during the duration of the project. Processing techniques were developed to keep the oxygen contents as low as possible with typical oxygen contents less than 250 ppm. One alloy with a density of < 9.5 g/cc was successful in meeting the Phase 2 intermediate project mechanical property milestone requirements of room temperature ductility greater than 1.0%, 1200°C creep strain of less than 3% at 150 MPa and 100 hours in vacuum, and with solidus temperature greater than 1500ᵒC. The second class of alloys was designed to be a Nb-rich alloy with improved oxidation resistance when compared to the core layer and was designed specifically to be compatible with the core layer and the outer environmental barrier coating. This Nb- alloy will be specifically designed to be microstructurally stable at these temperatures when in contact with the core alloy and provide protection against catastrophic failure of the barrier coating. Two alloys were cast and processed but further development was discontinued to focus on the development of the creep resistant alloy.

36 MATERIALS SCIENCE↗

Exploring Professor Motivations and Implementations of a Real-World Problem-Solving Project

Engineering education literature offers a variety of theoretical and conceptual frameworks for project-based learning. This study explores the implementation of real-world problem-solving projects in engineering education. The research team analyzed the motivations and methods behind professors' adoption of such projects through exploratory qualitative interviews with seven professor participants who integrated a nation-wide student competition into their courses. We analyzed the resulting data using a constructivist grounded theory approach to identify key themes of professor practices. Findings reveal that the real-world aspect of the projects and alignment with values and research interests were primary motivators for implementation. While implementation methods varied significantly based on context (i.e., university setting, course type), we found that these projects could be effectively integrated into various classroom settings. The findings support the recommendation for non-academic institutions to develop and manage competitions that can be integrated into classrooms and which offer a point of engagement that is available to professors from a wide range of disciplines.

42 ENGINEERING↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS), Task 5.0 Deliverable: Infrastructure Assessment Report

The “Optimizing Alabama’s CO 2 Storage in Shelby County: Project OASIS” CarbonSAFE Phase II Project seeks to build on regional data sets that demonstrate that the subsurface within Shelby County, Alabama has the potential to store commercial volumes of CO 2 safely, permanently, and economically. This work builds on the initiatives of the Southeast Regional Carbon Utilization and Storage Acceleration Partnership (SECARB-USA, DE-FE0031830) that identified nearly 500 million metric tonnes of CO 2 emitted on an annual basis that is not collocated with prospective storage geology (the Coastal Plain of the Southeastern U.S. in this context). This observation suggests costly investments in connective infrastructure (e.g., pipelines) or exploratory well drilling campaigns to identify CO 2 storage opportunities in under explored areas. While not traditionally thought of for saline storage, these studies suggest that storage prospects in the Valley and Ridge Province occur in relatively flat lying structural panels between thrust faults. For the Project OASIS region, available geologic studies related to hydrocarbon exploration suggest that Cambro-Ordovician carbonates and Cambrian clastic units offer multiple potential storage intervals, and that regional confining systems are present, such as the tectonically thickened Floyd-Parkwood Shale. The Project OASIS surface property is owned by a timber and land stewardship company, The Westervelt Company, Inc., who worked with the Project Team to select and prepare adequate sites for geologic assessment.

20 FOSSIL-FUELED POWER PLANTS↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS): Task 6.0 Deliverable – CarbonSAFE Phase III Readiness

The OASIS CarbonSAFE Phase II Project OASIS (Optimizing Alabama’s CO 2 Storage in Shelby County) is a geologic and reservoir characterization study designed to evaluate deep saline formations for potential long-term carbon dioxide (CO 2 ) storage in central Alabama near the National Carbon Capture Center (NCCC) and Alabama Power’s Plant Gaston. The project centers on understanding the potential of the Cambro-Ordovician Knox Group and underlying strata such as the Conasauga and Rome Formations for geologic storage of CO 2 . These formations were investigated as part of SECARB-USA (DE-FE0031830) and Project OASIS through the drilling of two stratigraphic test wells to obtain electronic well logs, core, and sidewall core plugs. These data provide direct measurements of porosity, permeability, and lithologic variability critical for reservoir characterization. Complementing the well program, a limited 2D seismic survey was conducted to help select the site for Westover #2 as part of SECARB-USA (DE-FE0031830), and a more regional Seismic Exchange (SEI) seismic survey was licensed and interpreted to define structural and stratigraphic frameworks in a new Static Earth Model (SEM), map reservoir continuity, and to identify potential sealing intervals. Integrated with geologic and reservoir modeling, these datasets form the basis for evaluating storage capacity, injectivity, and containment. While this document endeavors to provide readers with a high-level overview of Project OASIS activities and its suitability for subsequent CarbonSAFE Phases, such as a Phase III effort. Other project deliverables and milestones will provide more details on individual subjects.

20 FOSSIL-FUELED POWER PLANTS↗

Lighting for Health and Wellness Recommendations in Offices: A Circadian Lighting Pilot Project in Chicago, IL

In 2019 Cook County initiated a request for proposals for a pilot project aimed at designing and specifying an advanced tunable lighting system for government offices in Chicago, Illinois. The primary goal of the project was to replace the existing tubular LED (TLED) lighting system with a lighting system that supported the circadian rhythms and wellbeing their office employees. A secondary goal was to evaluate the potential impacts of the new lighting system, informing Cook County’s internal workplace design standards. Schuler Shook, a Chicago-based lighting design firm, was awarded the Circadian Lighting Pilot Project in October 2019 and invited Pacific Northwest National Laboratory (PNNL) to contribute as a research partner. Based on the initial project goals, Schuler Shook and PNNL established design objectives that would enable a human factors study in the office spaces, investigating the benefits and drawbacks of using a tunable LED lighting system to meet existing recommendations for lighting and health. The following report details the lighting design process through design development, with summaries of the relevant circadian lighting metrics, simulation tools, energy considerations, and research plan for the Circadian Lighting Pilot Project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2006

This report is the third annual report of a six-year project to evaluate the cumulative effects of habitat restoration action in the Columbia River Estuary (CRE). The project is being conducted for the U.S. Army Corps of Engineers (Corps) by the Marine Sciences Laboratory of the Pacific Northwest National Laboratory, the Pt. Adams Biological Field Station of the National Marine Fisheries Service, and the Columbia River Estuary Study Taskforce. Measurement of the cumulative effects of ecological restoration projects in the Columbia River estuary is a formidable task because of the size and complexity of the estuarine landscape and the meta-populations of salmonids in the Columbia River basin. Despite the challenges presented by this system, developing and implementing appropriate indicators and methods to measure cumulative effects is the best way to enable estuary managers to track the overall effectiveness of investments in estuarine restoration projects. This project is developing methods to quantify the cumulative effects of multiple restoration activities in the CRE. The overall objectives of the 2006 study were to continue to develop techniques to assess cumulative effects, refine the standard monitoring protocols, and initiate development of an adaptive management system for Corps of Engineers’ habitat restoration monitoring efforts in the CRE. (The adaptive management effort will be reported at a later date.) Field studies during 2006 were conducted in tidal freshwater at Kandoll Farm on the lower Grays River and tidal brackish water at Vera Slough on Youngs Bay. Within each of area, we sampled one natural reference site and one restoration site. We addressed the overall objectives with field work in 2006 that, coupled with previous field data, had specific objectives and resulted in some important findings that are summarized here by chapter in this report. Each chapter of the report contains data on particular monitored variables for pre- and post-restoration conditions at both the Kandoll and Vera study areas.

54 ENVIRONMENTAL SCIENCES↗

Risk Management on the National Compact Stellarator Project (NCSX)

In its simplest form, risk management is a continuous assessment from project start to completion that identifies what can impact your project (i.e., what the risks are)., which of these risks are important, and identification and implementation of strategies to deal with these risks (both threats and opportunities). The National Compact Stellerator Experiment (NCSX) Project was a "first-of-a-kind" fusion experiment that was technically very challenging, primarily resulting from the complex component geometries and tight tolerances. Initial risk quantification approaches proved inadequate and contributed to the escalation of costs as the design evolved and construction started. After the Project was well into construction, a new risk management plan was adopted. This plan was based on successful Department of Energy (DOE) and industrial risk management precepts. This paper will address the importance of effective risk management processes and lessons learned. It is of note that a steady reduction of risk was observed in the last six months of the project.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Hellsgate Big Game Winter Range Wildlife Mitigation Project : Annual Report 2008.

The Hellsgate Big Game Winter Range Wildlife Mitigation Project (Hellsgate Project) was proposed by the Confederated Tribes of the Colville Reservation (CTCR) as partial mitigation for hydropower's share of the wildlife losses resulting from Chief Joseph and Grand Coulee Dams. At present, the Hellsgate Project protects and manages 57,418 acres (approximately 90 miles2) for the biological requirements of managed wildlife species; most are located on or near the Columbia River (Lake Rufus Woods and Lake Roosevelt) and surrounded by Tribal land. To date we have acquired about 34,597 habitat units (HUs) towards a total 35,819 HUs lost from original inundation due to hydropower development. In addition to the remaining 1,237 HUs left unmitigated, 600 HUs from the Washington Department of Fish and Wildlife that were traded to the Colville Tribes and 10 secure nesting islands are also yet to be mitigated. This annual report for 2008 describes the management activities of the Hellsgate Big Game Winter Range Wildlife Mitigation Project (Hellsgate Project) during the past year.

13 HYDRO ENERGY↗

Kalispel Non-Native Fish Suppression Project 2007 Annual Report.

Non-native salmonids are impacting native salmonid populations throughout the Pend Oreille Subbasin. Competition, hybridization, and predation by non-native fish have been identified as primary factors in the decline of some native bull trout (Salvelinus confluentus) and westslope cutthroat trout (Oncorhynchus clarki lewisi) populations. In 2007, the Kalispel Natural Resource Department (KNRD) initiated the Kalispel Nonnative Fish Suppression Project. The goal of this project is to implement actions to suppress or eradicate non-native fish in areas where native populations are declining or have been extirpated. These projects have previously been identified as critical to recovering native bull trout and westslope cutthroat trout (WCT). Lower Graham Creek was invaded by non-native rainbow (Oncorhynchus mykiss) and brook trout (Salvelinus fontinalis) after a small dam failed in 1991. By 2003, no genetically pure WCT remained in the lower 700 m of Graham Creek. Further invasion upstream is currently precluded by a relatively short section of steep, cascade-pool stepped channel section that will likely be breached in the near future. In 2008, a fish management structure (barrier) was constructed at the mouth of Graham Creek to preclude further invasion of non-native fish into Graham Creek. The construction of the barrier was preceded by intensive electrofishing in the lower 700 m to remove and relocate all captured fish. Westslope cutthroat trout have recently been extirpated in Cee Cee Ah Creek due to displacement by brook trout. We propose treating Cee Cee Ah Creek with a piscicide to eradicate brook trout. Once eradication is complete, cutthroat trout will be translocated from nearby watersheds. In 2004, the Washington Department of Fish and Wildlife (WDFW) proposed an antimycin treatment within the subbasin; the project encountered significant public opposition and was eventually abandoned. However, over the course of planning this 2004 project, little public involvement or education was conducted prior to the planned implementation. Therefore, in 2007 we implemented an extensive process to provide public education, address public concerns and provide opportunity for public involvement in implementing piscicides and other native fish recovery actions in the subbasin.

13 HYDRO ENERGY↗

Pile Structure Program, Projected Start Date : January 1, 2010 (Implementation).

The 2008 Federal Columbia River Power System Biological Opinion includes Reasonable and Prudent Alternative 38-Piling and Piling Dike Removal Program. This RPA directs the Action Agencies to work with the Estuary Partnership to develop and implement a piling and pile dike removal program. The program has since evolved to include modifying pile structures to enhance their habitat value and complexity by adding large woody debris. The geographic extent of the Pile Structure Program (PSP) includes all tidally-influenced portions of the lower Columbia River below Bonneville Dam; however, it will focus on the mainstem. The overarching goal of the PSP is to enhance and restore ecosystem structure and function for the recovery of federally listed salmonids through the active management of pile structures. To attain this goal, the program team developed the following objectives: (1) Develop a plan to remove or modify pile structures that have lower value to navigation channel maintenance, and in which removal or modification will present low-risk to adjacent land use, is cost-effective, and would result in increased ecosystem function. (2) Determine program benefits for juvenile salmonids and the ecosystem through a series of intensively monitored pilot projects. (3) Incorporate best available science and pilot project results into an adaptive management framework that will guide future management by prioritizing projects with the highest benefits. The PSP's hypotheses, which form the basis of the pilot project experiments, are organized into five categories: Sediment and Habitat-forming Processes, Habitat Conditions and Food Web, Piscivorous Fish, Piscivorous Birds, and Toxic Contaminant Reduction. These hypotheses are based on the effects listed in the Estuary Module (NOAA Fisheries in press) and others that emerged during literature reviews, discussions with scientists, and field visits. Using pilot project findings, future implementation will be adaptively managed to maximize program benefits and address limiting factors.

13 HYDRO ENERGY↗

Radionuclide Inventory Distribution Project Data Evaluation and Verification White Paper

Testing of nuclear explosives caused widespread contamination of surface soils on the Nevada Test Site (NTS). Atmospheric tests produced the majority of this contamination. The Radionuclide Inventory and Distribution Program (RIDP) was developed to determine distribution and total inventory of radionuclides in surface soils at the NTS to evaluate areas that may present long-term health hazards. The RIDP achieved this objective with aerial radiological surveys, soil sample results, and in situ gamma spectroscopy. This white paper presents the justification to support the use of RIDP data as a guide for future evaluation and to support closure of Soils Sub-Project sites under the purview of the Federal Facility Agreement and Consent Order. Use of the RIDP data as part of the Data Quality Objective process is expected to provide considerable cost savings and accelerate site closures. The following steps were completed: - Summarize the RIDP data set and evaluate the quality of the data. - Determine the current uses of the RIDP data and cautions associated with its use. - Provide recommendations for enhancing data use through field verification or other methods. The data quality is sufficient to utilize RIDP data during the planning process for site investigation and closure. Project planning activities may include estimating 25-millirem per industrial access year dose rate boundaries, optimizing characterization efforts, projecting final end states, and planning remedial actions. In addition, RIDP data may be used to identify specific radionuclide distributions, and augment other non-radionuclide dose rate data. Finally, the RIDP data can be used to estimate internal and external dose rates. The data quality is sufficient to utilize RIDP data during the planning process for site investigation and closure. Project planning activities may include estimating 25-millirem per industrial access year dose rate boundaries, optimizing characterization efforts, projecting final end states, and planning remedial actions. In addition, RIDP data may be used to identify specific radionuclide distributions, and augment other non-radionuclide dose rate data. Finally, the RIDP data can be used to estimate internal and external dose rates.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Engineering Environment FY09/10 pilot project.

The Advanced Engineering Environment (AEE) project identifies emerging engineering environment tools and assesses their value to Sandia National Laboratories and our partners in the Nuclear Security Enterprise (NSE) by testing them in our design environment. This project accomplished several pilot activities, including: the preliminary definition of an engineering bill of materials (BOM) based product structure in the Windchill PDMLink 9.0 application; an evaluation of Mentor Graphics Data Management System (DMS) application for electrical computer-aided design (ECAD) library administration; and implementation and documentation of a Windchill 9.1 application upgrade. The project also supported the migration of legacy data from existing corporate product lifecycle management systems into new classified and unclassified Windchill PDMLink 9.0 systems. The project included two infrastructure modernization efforts: the replacement of two aging AEE development servers for reliable platforms for ongoing AEE project work; and the replacement of four critical application and license servers that support design and engineering work at the Sandia National Laboratories/California site.

99 GENERAL AND MISCELLANEOUS↗

Observable-projected ensembles

Measurements in many-body quantum systems can generate non-trivial phenomena, such as preparation of long-range entangled states, dynamical phase transitions, or measurement-altered criticality. Here, we introduce a new measurement scheme that produces an ensemble of mixed states in a subsystem, obtained by measuring a local Hermitian observable on part of its complement. We refer to this as the observable-projected ensemble . Unlike standard projected ensembles-where pure states are generated by projective measurements on the complement-our approach involves projective partial measurements of specific observables. This setup has two main advantages: theoretically, it is amenable to analytical computations, especially within conformal field theories. Experimentally, it requires only a linear number of measurements, rather than an exponential one, to probe the properties of the ensemble. As a first step in exploring the observable-projected ensemble, we investigate its entanglement properties in conformal field theory and perform a detailed analysis of the free compact boson.

Milekhin, Alexey [California Institute of Technolo↗

Vision of Genesis of Presentation of Hi-Tech Project during Competitive Selection

The presentation of high-tech projects (including research and development projects) submitted to funding competitions is considered. Two-stage development of such presentations is proposed. The first step is to ensure that the selected set of characteristics is representative and may be estimated with sufficient precision. The next step is to introduce a mathematically formalized business model of the project, permitting its financial evaluation. This model must adequately and transparently identify the financial potential of the economic cluster that will implement the submitted project. Embodied in software, this model must support stress testing of the high-technology project and optimization of its characteristics.

42 ENGINEERING↗

Intrinsic value of the international benchmark projects, ICSBEP and IRPhEP, for advanced reactor development

The International Criticality Safety Benchmark Evaluation Project, a sanctioned program under the auspices of the Nuclear Energy Agency of the Organisation for Economic Co-operation and Development, has been a highly successful and productive collaboration, now encompassing over 5,000 evaluated experimental benchmarks trusted and relied upon throughout the international nuclear communities. The success of this project led to the development of the International Reactor Physics Experiment Evaluation Project, which is dedicated to the evaluation of benchmark experiment data to sustain current and future reactor physics validation needs. These exemplary programs, and their widely utilized handbooks, serve as gold standards to which other databases strive to emulate. The purpose of the two projects is to preserve modern and legacy experimental data and evaluate it in a standardized handbook format to provide quality benchmarks to support modern and future criticality safety and reactor physics validation. These two projects have often served as the mechanism through which historic and modern neutronics experiments are evaluated and shared across international borders, to best provide unique, high-quality peer-reviewed, and often otherwise unavailable, benchmark data. The contents of these handbooks are utilized not only in validating criticality safety, reactor physics, and advanced reactor calculations, but are used to validate neutronics calculations and nuclear data for most other nuclear applications. This paper discusses both international programs and available content to enable advanced reactor design validation.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Bayesian Spatial Models for Projecting Corn Yields

Climate change is predicted to impact corn yields. Previous studies analyzing these impacts differ in data and modeling approaches and, consequently, corn yield projections. We analyze the impacts of climate change on corn yields using two statistical models with different approaches for dealing with county-level effects. The first model, which is novel to modeling corn yields, uses a computationally efficient spatial basis function approach. We use a Bayesian framework to incorporate both parametric and climate model structural uncertainty. We find that the statistical models have similar predictive abilities, but the spatial basis function model is faster and hence potentially a useful tool for crop yield projections. We also explore how different gridded temperature datasets affect the statistical model fit and performance. Compared to the dataset with only weather station data, we find that the dataset composed of satellite and weather station data results in a model with a magnified relationship between temperature and corn yields. For all statistical models, we observe a relationship between temperature and corn yields that is broadly similar to previous studies. We use downscaled and bias-corrected CMIP5 climate model projections to obtain detrended corn yield projections for 2020–2049 and 2069–2098. In both periods, we project a decrease in the mean corn yield production, reinforcing the findings of other studies. However, the magnitude of the decrease and the associated uncertainties we obtain differ from previous studies.

54 ENVIRONMENTAL SCIENCES↗

A NEW METHOD TO QUANTIFY AND REDUCE THE NET PROJECTION ERROR IN WHOLE-SOLAR-ACTIVE-REGION PARAMETERS MEASURED FROM VECTOR MAGNETOGRAMS

Projection errors limit the use of vector magnetograms of active regions (ARs) far from the disk center. In this Letter, for ARs observed up to 60° from the disk center, we demonstrate a method for measuring and reducing the projection error in the magnitude of any whole-AR parameter that is derived from a vector magnetogram that has been deprojected to the disk center. The method assumes that the center-to-limb curve of the average of the parameter’s absolute values, measured from the disk passage of a large number of ARs and normalized to each AR’s absolute value of the parameter at central meridian, gives the average fractional projection error at each radial distance from the disk center. To demonstrate the method, we use a large set of large-flux ARs and apply the method to a whole-AR parameter that is among the simplest to measure: whole-AR magnetic flux. We measure 30,845 SDO /Helioseismic and Magnetic Imager vector magnetograms covering the disk passage of 272 large-flux ARs, each having whole-AR flux >10{sup 22} Mx. We obtain the center-to-limb radial-distance run of the average projection error in measured whole-AR flux from a Chebyshev fit to the radial-distance plot of the 30,845 normalized measured values. The average projection error in the measured whole-AR flux of an AR at a given radial distance is removed by multiplying the measured flux by the correction factor given by the fit. The correction is important for both the study of the evolution of ARs and for improving the accuracy of forecasts of an AR’s major flare/coronal mass ejection productivity.

79 ASTRONOMY AND ASTROPHYSICS↗