Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,153 records · Page 64

Lunar Water Extraction Via Lunar Auger Dryer ISRU (LADI)

In 2009, the Lunar Reconnaissance Orbiter (LRO) and Lunar Crater Observation and Sensing Satellite (LCROSS) provided definitive proof of water in the Lunar’s southern permanently shadowed region (PSR)1. Both the 2020 NASA Technology Taxonomy2 and the Lunar Surface Innovation Initiative (LSII) team identified capability gaps in icy regolith transfer and reactor processing in Permanently Shadowed Region (PSR) environmental conditions. A water processing plant operating inside the PSR can continuously process water (and volatiles) for both breathable air and propellant. NASA’s Johnson Space Center (JSC) fabricated a unique breadboard test stand for validating the feasibility of this concept,developed a lunar auger dryer sizing tool, and identified the physical flow and thermal models required to design an Engineering Development Unit (EDU) for environmental testing. Over the two years this project was active, models were developed including: a) a sizing tool that scales the auger parameters based on production targets, b) accurate thermal models in both lab and lunar conditions, c) a Discreet Element Model (DEM) for observing particle effects in low-g, and d) incorporated these subsystem models into a MATLAB parametric Modular Open System Approach (MOSA) system model. These models were validated by testing the auger in both a mechanical and thermal system configuration. The results of this testing increased the Technology Readiness Level (TRL) of the Lunar Auger Dryer ISRU (LADI) system to TRL 4.

Lunar↗

Additively Manufactured Photovoltaic Inverter (AMPVI)

Successful integration of hundreds of gigawatts of solar photovoltaics (PV) into the electric power system requires transformative power conversion system design that optimizes various trade-offs among conflicting objectives, such as performance, reliability, functionality, and cost. To address this need, National Renewable Energy Laboratory, Oak Ridge National Laboratory, and Purdue University teamed up to develop a unique PV inverter design. The Additively Manufactured Photovoltaic Inverter (AMPVI) combines newer wide bandgap high-voltage silicon carbide (SiC) semiconductor devices with revolutionary concepts such as additive manufacturing and multi-objective magnetic design optimization. The AMPVI will not only provide superior technical capabilities in terms of energy conversion but also mitigate market barriers for SiC-based PV inverters. The benefits for this design will include better utilization of PV power due to higher DC voltage, lower operations and maintenance costs, better system efficiency, longer system lifetime, and advanced grid support functionalities for easier grid integration. All these advantages will lead to a significant reduction of the levelized cost of energy for PV systems. Activities in Budget Period 1 (BP1) of this 3-year integrated project were focused on development and component-level validation of the foundational building blocks needed for the AMPVI. Multiple interrelated tasks were completed in parallel during work towards the initial development of the high-voltage SiC-based power block, gate driver, controller board, and control algorithms. Initial development of magnetic design tools and initial inverter thermal and mechanical design was also completed in this period. All these activities ensured that the initial prototype (called “alpha-prototype”) power block and controller would be ready after BP1 for integration into the first inverter prototype (i.e., the alpha-prototype inverter) in BP2.

14 SOLAR ENERGY↗

Enabling Coal Technology with Carbon Capture for Future Markets with Flameless Pressurized Oxy-Combustion (FPO)

Future markets for power are expected to require more load following power plants, which reduces output during the night and early morning. This is when the demand for electricity is the lowest, so plants must respond rapidly at any time to peak loads resulting from the variable output of wind and solar power. A coal power plant based on Flameless Pressurized Oxy-combustion (FPO) can go from 5% to 100% of capacity rate in less than 30 minutes in response to fluctuating demand, operating at capacity when power prices are highest. FPO is a proven oxy-combustion technology that was developed to recover energy from low ranking coal, other brown fuels and wastes. ITEA began developing FPO in 2003 on a 5-MWth pilot in Gioia del Colle, Italy, to destroy hazardous industrial waste and as such, design objectives were very high combustion efficiencies and capture of metals in the fuel in the vitreous slag. The technology was subsequently deployed in 2009 at the 15-MWth scale at the Jurong Island petrochemical cluster in Singapore for waste incineration. FPO is an oxy-combustion process whereby oxygen is separated from the air, and it is used in combustion with recirculated flue gas to maintain combustion temperatures at acceptable levels. The resultant flue gas is primarily CO 2 and water, which allows for a relatively simple and cheap CO 2 capture process. This is in contrast to air-combustion systems which require a complex and costly post-combustion capture (PCC) process. Coal is fed to the combustor slurried in water, and the combustor operates at elevated pressure (approximately 12 bar) which improves the overall efficiency and reduces the size and cost of the combustor. Notably, the FPO cycle maintains high efficiency by recovering most of the heat of vaporisation of the contained water. The combustor is designed to coalesce the molten ash particles so that they settle to the chamber walls and drain to the outlet, significantly reducing the particulate content in the exhaust gas and allowing the use of coals with up to 40% alkaline ash content. FPO is a low-emission technology: zero thermal NOx minimises overall NOx; any organic nitrogen is converted to elemental nitrogen (N2). Total organic content (TOC) at combustor exit is hundreds of times lower than for traditional combustion processes, with dioxin and furans close to zero. Work commenced on a DOE funded pilot demonstration project in October 2016 to provide the design for a 50-MWth FPO pilot plant that can fire a wide range of high-to-low rank coals. The project will investigate updating and improving the cycle for power generation with CO 2 capture by incorporating a turbo-expander with a principal steam power island that utilizes a heat recovery steam generator, increasing the overall efficiency of the cycle. A cost study is also performed on the updated FPO design as part of the project. The FPO pilot plant built based on the design will then be demonstrated over a 3-year test program to generate data for the design of a commercial-scale 500 MWth firing module commercial power plant with integral carbon capture and sequestration (CCS), which could start construction in 2025. A discussion of the levelized cost of electricity (LCOE) of various cases are presented, including a comparison of established supercritical with PCC (SCPC) technologies with FPO fitted with CO 2 compression and liquefaction, and FPO ready for carbon capture and sequestration (CCS-ready). This would enable CO 2 capture for use in enhanced oil recovery (EOR) or sequestration when market conditions make it attractive to do so. In addition, a comparison of LCOE of FPO and conventional processes for firing low-ranking coals with high water and ash content will be provided.

01 COAL, LIGNITE, AND PEAT↗

Developing Technology Performance Level Assessments for Early-Stage Wave Energy Converter Technologies: Preprint

The advantage of using Technology Performance Level (TPL) in conjunction with Technology Readiness Level (TRL) assessments in guiding technology development trajectories to successful outcomes in less time, at less overall cost, and with less encountered risk has been well articulated in the literature. In partnership with industry and international collaborators, a TPL assessment methodology for grid-connected applications has been developed through the application of the systems engineering approach. Metrics under seven different categories have been developed, weighted based on their relative relevance, and combined to yield a composite score. The methodology has been implemented in a spreadsheet tool plus a web application specifically aimed at assessing early stage (TRL 1-3) concepts. The target use cases are (a) technology developers improving their design, to find fatal flaws early, to get feedback on current design, to identify areas of improvement that will yield the highest return on investment, (b) reviewers assessing technologies in competitions or for making funding decisions, (c) investor or project developer doing due diligence, (d) policy makers landscaping the technology domain for formulating R&D strategy. The methodology and the tools are undergoing continuous improvement based on the experience and lessons learnt from applying it to internal and external marine energy technology development projects. The methodology is also being adapted for assessing WECs servicing markets outside the continental grid - broadly categorized as Powering the Blue Economy (PBE) applications. Such applications have vastly different functional requirements entailing a modification of the methodology to account for their higher risk tolerance, reduced price sensitivities, lower power needs, different permitting protocols, etc. This paper presents the latest status of the TPL assessment methodology and tools, describes its adaptation to select PBE markets, and explores its extension to other domains where it could provide a comprehensive and holistic measure of a nascent or disruptive technology's technoeconomic performance potential.

metrics↗

Developing Technology Performance Level Assessments for Early-Stage Wave Energy Converter Technologies

The advantage of using Technology Performance Level (TPL) in conjunction with Technology Readiness Level (TRL) assessments in guiding technology development trajectories to successful outcomes in less time, at less overall cost, and with less encountered risk has been well articulated in the literature. In partnership with industry and international collaborators, a TPL assessment methodology for grid-connected applications has been developed through the application of the systems engineering approach. Metrics under seven different categories have been developed, weighted based on their relative relevance, and combined to yield a composite score. The methodology has been implemented in a spreadsheet tool plus a web application specifically aimed at assessing early stage (TRL 1-3) concepts. The target use cases are (a) technology developers improving their design, to find fatal flaws early, to get feedback on current design, to identify areas of improvement that will yield the highest return on investment, (b) reviewers assessing technologies in competitions or for making funding decisions, (c) investor or project developer doing due diligence, (d) policy makers landscaping the technology domain for formulating R&D strategy. The methodology and the tools are undergoing continuous improvement based on the experience and lessons learnt from applying it to internal and external marine energy technology development projects. The methodology is also being adapted for assessing WECs servicing markets outside the continental grid - broadly categorized as Powering the Blue Economy (PBE) applications. Such applications have vastly different functional requirements entailing a modification of the methodology to account for their higher risk tolerance, reduced price sensitivities, lower power needs, different permitting protocols, etc. This paper presents the latest status of the TPL assessment methodology and tools, describes its adaptation to select PBE markets, and explores its extension to other domains where it could provide a comprehensive and holistic measure of a nascent or disruptive technology's technoeconomic performance potential.

metrics↗

Safety Characteristics in System Application of Software for Human Rated Exploration Missions for the 8th IAASS Conference

NASA and its industry and international partners are embarking on a bold and inspiring development effort to design and build an exploration class space system. The space system is made up of the Orion system, the Space Launch System (SLS) and the Ground Systems Development and Operations (GSDO) system. All are highly coupled together and dependent on each other for the combined safety of the space system. A key area of system safety focus needs to be in the ground and flight application software system (GFAS). In the development, certification and operations of GFAS, there are a series of safety characteristics that define the approach to ensure mission success. This paper will explore and examine the safety characteristics of the GFAS development. The GFAS system integrates the flight software packages of the Orion and SLS with the ground systems and launch countdown sequencers through the 'agile' software development process. A unique approach is needed to develop the GFAS project capabilities within this agile process. NASA has defined the software development process through a set of standards. The standards were written during the infancy of the so-called industry 'agile development' movement and must be tailored to adapt to the highly integrated environment of human exploration systems. Safety of the space systems and the eventual crew on board is paramount during the preparation of the exploration flight systems. A series of software safety characteristics have been incorporated into the development and certification efforts to ensure readiness for use and compatibility with the space systems. Three underlining factors in the exploration architecture require the GFAS system to be unique in its approach to ensure safety for the space systems, both the flight as well as the ground systems. The first are the missions themselves, which are exploration in nature, and go far beyond the comfort of low Earth orbit operations. The second is the current exploration system will launch only one mission per year even less during its developmental phases. Finally, the third is the partnered approach through the use of many different prime contractors, including commercial and international partners, to design and build the exploration systems. These three factors make the challenges to meet the mission preparations and the safety expectations extremely difficult to implement. As NASA leads a team of partners in the exploration beyond earth's influence, it is a safety imperative that the application software used to test, checkout, prepare and launch the exploration systems put safety of the hardware and mission first. Software safety characteristics are built into the design and development process to enable the human rated systems to begin their missions safely and successfully. Exploration missions beyond Earth are inherently risky, however, with solid safety approaches in both hardware and software, the boldness of these missions can be realized for all on the home planet.

capability↗

Global Response of the Space Shuttle External Tank with the Presence of Intertank Stringer Cracks and Radius Blocks

After propellant was loaded into the external tank (ET), the November 5, 2010 launch of Space Shuttle mission STS-133 was scrubbed due to a gaseous hydrogen leak located in a vent line near the ground umbilical and ET connection. Subsequent visual inspections identified cracks in the sprayed-on foam insulation in the forward end of the ET intertank segment, adjacent to the liquid oxygen (LOX) tank, as shown in Figure 1. These cracks necessitated repair of the foam due to debris concerns that violated launch constraints. As part of the repair process, the affected foam was removed to reveal cracks in the underlying external hat stiffeners on the intertank, as shown in Figure 2. Ultimately, five stiffeners were discovered to be cracked adjacent to the LOX tank. As the managing center for the ET Project, NASA Marshall Space Flight Center (MSFC) coordinated failure investigation and repair activities among multiple organizations, which included the ET prime contractor (Lockheed Martin Space Systems Michoud Operations), the Space Shuttle Program Office at the NASA Johnson Space Center (JSC), the NASA Kennedy Space Center (KSC), and the NASA Engineering and Safety Center (NESC). STS-133 utilized the external tank designated as ET-137. Many aspects of the investigation have been reported previously in Refs. 1-7, which focus on the root cause of the failures, the flight readiness rationale and the local analyses of the stringer failures and repair. This paper summarizes the global analyses that were conducted on ET-137 as part of the NESC effort during the investigation, which was conducted primarily to determine if the repairs that were introduced to the stringers would alter the global response of the ET. In the process of the investigation, a new STAGS tabular input capability was developed to more easily introduce the aerodynamic pressure loads using a method that could easily be extended to incorporate finite element property data such as skin and stiffener thicknesses and beam cross-sectional properties.

Lovejoy, Andrew E.↗

40 Years of Processing Pieces of Space

This year marks the 40th year anniversary for the Antarctic Search for Meteorite (ANSMET) program. In 1976, the ANSMET program led the first expedition to Antarctica. The ANSMET program is a US-led field-based science project that recovers meteorite samples from Antarctica. Once a year from late November to late January, a field team consisting of 8 to 12 people, spends 6-8 weeks camping on the ice and collecting meteorites. Since 1976, more than 22,000 meteorite samples have been recovered. These meteorites come from asteroids, planets and other bodies of the solar system. Once collected, the Antarctic meteorites are shipped to NASA/Johnson Space Center (JSC) Houston, TX. in a refrigerated truck and are kept frozen to minimize oxidation until they are ready for initial processing. In Antarctica each meteorite is given a field tag which consists of numbers, once in the lab, this is replaced by an official tag, consisting of the Antarctic field location and year collected. The types and numbers of meteorites that have been classified include 849 carbonaceous chondrites, 135 enstatites, 512 achondrites, 64 stony, 115 irons, 48 others (27 R chondrites, 7 ungrouped), 6,161 H chondrites, 7,668 L chondrites, and 4,589 LL chondrites. Although 80-85 percent of the collected meteorites fall in the ordinary chondrite group, the other approximately 15 percent represent rare types of achondrites and carbonaceous chondrites. These rare meteorites include 25 lunar meteorites, 15 Martian meteorites, scores of various types of carbonaceous chondrites, and unique achondrites. The Antarctic meteorites that have been collected are processed in the Meteorite Processing Lab at JSC in Houston, TX. Initial processing of the meteorites begins with thawing/drying the meteorites in a nitrogen glove box for 24 to 48 hours. The meteorites are then photographed, measured, weighed and a description of the interior and exterior of each meteorite is written. The meteorite is broken and a representative sample, either a 1-3 gram chip or thin section is sent to the Smithsonian Institution for classification. After Antarctic meteorites have been classified and approved by the Nomenclature Committee of the Meteoritical Society, they are announced in the Antarctic Meteorite Newsletter, which is published twice per year (fall and spring) so that scientists may review which meteorites are available to study. Requests for Antarctic Meteorite samples are welcomed from research scientists, regardless of their current state of funding for meteorite studies. Since its inception over 3,300 requests have been made for pieces of these meteorites and over 400 investigators worldwide are active in the study of meteorites.. Research on these samples has been published in more than1500 peer reviewed articles; a listing of papers for any meteorite sample can be generated by accessing http://curator.jsc.nasa.gov/antmet/referencesearch.cfm. Antarctic meteorite samples requested by scientists are prepared several different ways. Most samples are prepared as chips, either using a rock splitter or using a chisel and chipping bowl. In special situations, a researcher may request a meteorite slab in which case the samples are cut using a diamond-bladed bandsaw inside of a dry nitrogen glove box. The meteorites are always cut in a 100 percent liquid-free environment. Additionally, thin/thick sections of Antarctic meteorites are also prepared at JSC. The meteorite thin section lab at JSC can prepare standard 30-micron thin sections, thick sections of variable thickness (100 to 200 microns), or demountable sections using superglue, all section are prepared without using water. Although many of the techniques used back in the '70's are still used today, advances in computers, software, databases, available tools and instrumentation have helped to streamline and shorten the duration of the classification process. In conjunction with present day missions to asteroids and other planets, meteorite studies have not only led to a better understanding of the complex histories of these bodies but have also tied certain meteorite groups to particular asteroid bodies. New meteorite discoveries by the ANSMET program provide a cost effective method for obtaining samples of previously unsampled bodies, allowing scientists to learn more about the origin, composition, and evolution of the solar system. Preservation in our cleanrooms at NASA allows material to be archived for future generations and advances in instrumentation and analysis.

Satterwhite, C. E.↗

Observational Data for Next-Generation Climate Model Evaluation: Requirements, Considerations, and Best Practices

Climate model simulations are an important source of information about our planet’s climate system and also enable informed decision-making under different future scenarios. As a new archive of results from the next generation of climate models is anticipated to become available with the Coupled Model Intercomparison Project phase 7 (CMIP7), the need to develop efficient and robust methods to evaluate models is paramount. Observations are an integral part of model evaluation, providing a means to quantify and understand the degree to which climate models can faithfully reproduce Earth system processes. Such analysis is critical for constraining climate projections, identifying areas of focus for model development, and assisting analysts in deciphering the utility of models for specific applications. Observations of Earth system come from a diversity of sources, span different space–time domains, and are produced by different communities, and each dataset features different data structures and formats, metadata standards, and its own unique uncertainties. Uncertainties in an observational dataset may stem from gaps in temporal and spatial coverage, instrumentation errors, or assumptions in retrieval and processing methods. How then does one ensure that observational data are ready for use and utilized in the most appropriate way for robust, rapid, and routine climate model evaluation? The CMIP7 Model Benchmarking Task Team with input from the broader climate modeling, model evaluation, and observational data communities present a vision and considerations for best practices toward the optimal and appropriate use of observational data to support next-generation climate model evaluation.

Climate models↗

The Point-Focusing Thermal and Electric Applications Project - A progress report

The paper discusses the Point-Focusing Thermal and Electric Applications Project which encompasses three primary activities: (1) applications analysis and development, in which potential markets for small power systems (less than 10 MWe) are identified and characterized in order to provide requirements for design and information for activities relating to market development; (2) systems engineering and development, for analyses that will define the most appropriate small power system designs based on specific user requirements; and (3) experiment implementation and test, which deals with the design and placement of engineering experiments in various applications environments in order to test the readiness of the selected technology in an operational setting. Progress to date and/or key results are discussed throughout the text.

Marriott, A. T.↗

On the Road to Achieving Safety Excellence at the Idaho Cleanup Project: The Initial Challenges, Solutions, and Positive Results of Striving to be the Best and Safest in the DOE Complex - 20518

When Fluor Idaho, LLC (Fluor Idaho) assumed the Idaho Cleanup Project Core contract (ICP Core) in mid-2016, it inherited the successful multi-faceted, employee-owned safety programs of two prior contractors supporting cleanup operations at the Idaho National Laboratory Site. Fluor Idaho incorporated the best of both safety programs along with Fluor Corporate's 106-year legacy of safety initiatives and successes. Fluor Idaho integrated the separate programs and cultures under a One Fluor approach - one project, one mission, One Fluor. Job changes, management changes, and procedures, processes, and system changes presented multiple challenges. Those challenges combined with the severe Winter of 2016/2017 resulted in numerous slips, trips, and falls first aids and reportable injuries. The road to safety excellence started off bumpy and stayed that way for some time. Since then, Fluor Idaho has successfully implemented several key initiatives including employee engagement; management engagement and time in the field; communications improvements; safety culture sustainment; injury/illness prevention; organizational learning; and DOE Voluntary Protection Program (VPP) readiness and preparation. Management became more engaged by making more workplace visits and increasing their supervision of 'life critical work' or complex activities. Additional training became mandatory for first-line supervisors and front-line workers. Most recently, Fluor Idaho increased its injury and illness prevention initiatives extensively. In the last year, things have turned around in a dramatic way. This shift is directly attributable to the significant number of initiatives launched in late 2017 and 2018. These initiatives addressed safety performance in the five key areas of the DOE VPP and promoted sustainability of the company's safety culture. The five key areas are: management leadership, employee involvement, work-site analysis, hazard prevention and control, and safety and health training. Employees and managers alike recommitted to making safety the highest value. The result of this laser-like focus on safety and accident and injury prevention is that injuries and first aids are a fraction of what they were. During FY 2019, employees worked more than 4.2 million hours without a serious injury or lost work-day and 1 million hours without a recordable injury. Fluor Idaho is proud of its safety trend. The company invested significant resources in improving its safety record, and that investment is paying off. Other contractors in the DOE Complex can learn and benefit from this discussion of the challenges Fluor Idaho faced, as well as its innovative safety initiatives that are producing results that are being recognized by our U.S. Department of Energy (DOE) customer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Breakup of loosely bound nuclei at intermediate energies for nuclear astrophysics and the development of a position sensitive microstrip detector system and its readout electronics using ASICs technologies

The work performed under this grant has led to the development of a detection system that will be used to measure reaction rates for proton or neutron capture reactions at stellar energies on radioactive ions far from stability. The reaction rates are needed to better understand the physics of nucleosynthesis in explosive stellar processes such as supernovae and x-ray burst events. The radioactive ions will be produced at the Radioactive Ion Beam Facility (RIBF) at RIKEN near Tokyo, Japan. During the course of this work, the group involved in this project has expanded by several institutions in Europe and Japan and now involves collaborators from the U.S., Japan, Hungary, Romania, Germany, Spain, Italy, China, and South Korea. As part of the project, a novel design based on large-area silicon detectors has been built and tested. The work has involved mechanical construction of a special purpose vacuum chamber, with a precision mounting system for the silicon detectors, development of a new ASICs readout system that has applications with a wide variety of silicon detector systems, and the development of a data acquisition system that is integrated into the computer system being used at RIBF. The parts noted above that are needed to carry out the research program are completed and ready for installation. Several approved experiments that will use this system will be carried out in the near future. The experimental work has been delayed due to a large increase in the cost and availability of electrical power for RIBF that occurred following the massive earthquake and tsunami that hit Japan in the spring of 2011. Another component of the research carried out with this grant involved developing the theoretical tools that are required to extract the information from the experiments that is needed to determine the stellar reaction rates. The tools developed through this part of the work will be made freely available for general use.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Development of a Production Ready Automated Wire Delivery System

The current development effort is a Phase 3 research study entitled "A Production Ready Automated Wire Delivery System", contract number NAS8-39933, awarded to Nichols Research Corporation (NRC). The goals of this research study were to production harden the existing Automated Wire Delivery (AWDS) motion and sensor hardware and test the modified AWDS in a range of welding applications. In addition, the prototype AWDS controller would be moved to the VME bus platform by designing, fabricating and testing a single board VME bus AWDS controller. This effort was to provide an AWDS that could transition from the laboratory environment to production operations. The project was performed in two development steps. Step 1 modified and tested an improved MWG. Step 2 developed and tested the AWDS single board VME bus controller. Step 3 installed the Wire Pilot in a Weld Controller with the imbedded VME bus controller.

Source record↗

The Astronaut Glove Challenge: Big Innovation from a (Very) Small Team

Many measurements were taken by test engineers from Hamilton Sundstrand, the prime contractor for the current EVA suit. Because the raw measurements needed to be converted to torques and combined into a final score, it was impossible to keep track of who was ahead in this phase. The final comfort and dexterity test was performed in a depressurized glove box to simulate real on-orbit conditions. Each competitor was required to exercise the glove through a defined set of finger, thumb, and wrist motions without any sign of abrasion or bruising of the competitor's hand. I learned a lot about arm fatigue! This was a pass-fail event, and both of the remaining competitors came through intact. After taking what seemed like an eternity to tally the final scores, the judges announced that I had won the competition. My glove was the only one to have achieved lower finger-bending torques than the Phase VI glove. Looking back, I see three sources of the success of this project that I believe also operate in other programs where small teams have broken new ground in aerospace technologies. These are awareness, failure, and trust. By remaining aware of the big picture, continuously asking myself, "Am I converging on a solution?" and "Am I converging fast enough?" I was able to see that my original design was not going to succeed, leading to the decision to start over. I was also aware that, had I lingered over this choice or taken time to analyze it, I would not have been ready on the first day of competition. Failure forced me to look outside conventional thinking and opened the door to innovation. Choosing to make incremental failures enabled me to rapidly climb the learning curve. Trusting my "gut" feelings-which are really an internalized accumulation of experiences-and my newly acquired skills allowed me to devise new technologies rapidly and complete both gloves just in time. Awareness, failure, and trust are intertwined: failure provides experiences that inform awareness and provide decision-making opportunities that build trust among team members and managers while opening minds to new pathways for development. All three are necessary for teams-large or small-to achieve big innovation.

Homer, Peter↗

Augmented Reality Tool for Operationally Relevant 3D Sensorimotor Assessments

This project will leverage existing capabilities of an augmented reality (AR) sensorimotor assessment tool. Currently, the tool mimics the capabilities of validated 2-dimensional (2D) assessments. While this modality is well-aligned with seated interactions with flight-deck displays, extravehicular activity (EVA) tasks will require full body mobility wherein astronauts reach and bend in a 3-dimensional (3D) space. These types of motions, naturally including head movements, are known to elicit experiences of disorientation. Thus, sensorimotor assessments that include these stimulations and larger movements are important for understanding astronaut readiness prior to initial EVAs. The proposed effort will extend the current 2D eye-hand coordination task in AR to a 3D task designed to evaluate dynamic balance and eye-hand-body coordination. The new module will extend the range of motion and interaction space such that it better aligns with operational task needs for astronaut readiness evaluation.

Sarah Catherine Moudy↗

Mission Architecture for the Green Propulsion Dual Mode Mission

Current spacecraft propulsion technologies are broadly divided into chemical and electric propulsion modes, each of which has unique advantages. It is common for both systems to have a place in interplanetary spacecraft, but the size, weight, and power required to carry two separate propulsion systems is extremely limiting for small spacecraft such as CubeSats. The upcoming NASA STMD-funded Green Propulsion Dual Mode (GPDM) mission will demonstrate on-orbit a novel dual-mode propulsion system known as the GPDM Propulsion System that uses the AF-M315E/ASCENT green monopropellant to feed both a chemical 100 mN monopropellant thruster and four electrospray thrusters. GPDM will fly a 6U CubeSat in low Earth orbit and perform orbit-raising and lowering maneuvers to characterize the performance of this dual-mode propulsion technology, enabling a new generation of future interplanetary small satellite explorers. The Georgia Institute of Technology Space Systems Design Laboratory (SSDL) is conducting the design, assembly, integration, testing, and mission operations of the GPDM host spacecraft, as well as the integration of the GPDM Propulsion System payload, designed by NASA’s Marshall Spaceflight Center (MSFC). The NASA Marshall Space Flight Center is overseeing the overall GPDM project as well as specific technology development activities of the GPDM Propulsion System, while electrospray thrusters are supplied by the MIT Space Propulsion Lab, with additional components supplied by MMA Design, Blue Canyon Technologies, Quasonix, Xiphos, and Rubicon Space Systems. The GPDM spacecraft will carry the GPDM Propulsion System into orbit and use a high-power S-band radio to enable real-time operations in low Earth orbit (LEO) via the NASA Tracking and Data Relay Satellite System (TDRSS). The mission is working towards a tentative launch readiness date of August 2025, in support of launch and operations commencing in January 2026. This paper describes GPDM’s overall mission concept of operations, spacecraft overview, and subsystem breakdown.

Green Propulsion Dual Mode↗

Seeing the Future of Spaceflight: Applications of Extended Reality (XR) Technologies

INTRODUCTION Advances in Earth Independent Medical Operations (EIMO) focused capabilities will be crucial for completing successful beyond low-earth-orbit (LEO) missions, where traditional Earth-based medical support and near real-time communication are limited, intermittent, or absent. In such restricted or limited communication environments, emerging extended reality (ER or XR) technologies may play a vital role in ensuring crew health and safety. Virtual Reality (VR), Augmented Reality (AR), and Mixed Reality (MR) are common terms used to describe technologies that "generate or modify" while “extended reality” (ER or XR) is often used as an umbrella term for these technologies. This review explores how such cutting-edge “extended reality” information delivery systems are currently applied across various disciplines within NASA. The review focuses on their capabilities, limitations, and prospective future applications as they pertain to Earth-Independent Medical Operations and its components of pre-mission planning, medical decision making, resource management, and task load management. METHODS/DESIGN The review began with a literature search to identify relevant disciplines (e.g., medical education, austere environments) where XR technologies have been studied to highlight areas where evidence is lacking. Previous and current NASA XR projects and applications, as well as commercial partnerships, such as those with Small Business Innovation Research (SBIR), were identified. Discussions with technical experts involved in the design, development, and application of these technologies allowed for classification based on their respective spaceflight applications. RESULTS AND CONCLUSION This review highlights current and emerging XR technologies that have been developed, tested, and implemented both terrestrially and in spaceflight by NASA, its international partners, the U.S. Armed Forces, and various relevant commercial entities. While these novel information delivery systems vary in their respective technology readiness levels (TRL), they have the potential to be implemented on Earth, in LEO, and during deep space exploration. These systems have the potential for impacting and optimizing many aspects of EIMO.

Yevgeniy Zhivotovskiy↗

Advancements in the H-Canyon Exhaust Ventilation System Inspections at the Savannah River Site - 16030

A facility safety envelope requires management of activities to ensure no unacceptable radiological or chemical hazards to the public, site worker and environment occur. While appropriate design and construction methods ensure an initial physical plant configuration, what actions must an operating Facility take to ensure the physical plant continues to meet a safety configuration throughout Facility life? While a physical walk down of the plant is a tried and true method to confirm conditions, what other methods must be used when a walk down is not possible? What inspection methods are used when balancing budget pressures against obtaining inspection data? The periodic inspections of the H-Canyon Exhaust Tunnel are performed remotely. The 2015 remote Tunnel inspection has been the most successful inspection to date. This presentation highlights the continued lessons learned with the most recent 2015 remote Tunnel inspection. These lessons learned are applicable to Facilities considering or performing remote inspections. The Recovery Crawler Project was tasked with determining if the 2014 Inspection Crawler could be retrieved, perform the retrieval if feasible and complete the inspection of the remaining sections of the exhaust tunnel that were not previously performed. The objectives for the project were met, the Inspection Crawler was deemed unusable and left in place and the Recovery Crawler performed the complete 143 meters (470 feet) of tunnel inspection and an additional 55 meters (180 feet) of exhaust tunnel inspection not previously completed. The remote inspection of a 60+ year operating Canyon Exhaust tunnel is a complex endeavor requiring close coordination of multiple organizations, adherence to Conduct of Operations, Radiological Safety, Worker Safety, etc. principles as well as alignment with Facility Safety Basis requirements. This paper discusses the challenges, actions required getting ready for the 2015 recovery and continued inspection and the hazards encountered performing the actual recovery/inspection. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗