Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,153 records · Page 64

How Successful Site Preparation Work at a Large, Commercial, Hazardous and Toxic Waste Site Can Benefit DOE Cleanup Projects - 18111

Jacobs recently completed site preparation work supporting the private commercial development of a world-scale petrochemical complex (an 'ethylene cracker' to produce the primary building block for many forms of plastic) in Monaca, Pennsylvania - the first major U.S. project of its kind outside the Gulf Coast region in 20 years and one of the largest (multi-billion dollar) construction projects in the eastern U.S. Prior to beginning construction on the petrochemical complex, the site's previous large, industrial zinc smelter operations had to be decommissioned and the facilities had to be removed. During the previous 80 years, the smelting operations at the site were used to produce zinc, lead, mercury, and sulfuric acid (a by-product of smelting). The smelting operations left landfills and industrial soil over a large area that had to be removed or closed under regulatory review to allow development across the 81,000 m{sup 2} (200-acre) industrial site located near a major river and local populations. In order to meet Pennsylvania's site-specific Land Recycling Program (commonly referred to as 'Act 2') legislative requirements, the direct contact pathway for landfill soil and slag was removed or mitigated. The site preparation work, or 'Early Works', started in January 2015. As the selected Early Works overall Engineering, Procurement, and Construction Management (EPCM) contractor, Jacobs performed the front end engineering and design. Subsequently, Jacobs had overall responsibility for procurement, construction management, health and safety, quality, security, and environmental services for the entire site and all contractors. The Early Works project included eight separate work scope packages: 1) Site Preparation, 2) Site Development, 3) Marine Works, 4) Rail Works, 5) Road Works and Offsite Utilities, 6) Site Security, 7) Construction Facilities, and 8) High Voltage Line Relocation. The Early Works scope was successfully completed in 2017. The challenges faced by this privately funded commercial project have much in common with large DOE and government construction projects. This paper explores lessons learned from the project and compares how project challenges were addressed on this private commercial project with those anticipated at large DOE/government construction and remediation sites, particularly those in the areas of Safety, Logistics, Infrastructure, and Stakeholder Involvement. The identification of best practices demonstrated on this successful project are shared for the purpose of bringing outside, commercial perspectives to ongoing or planned DOE/government construction projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PIP-II Project Overview and Status

The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab’s particle accelerator complex to enable the world’s most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come. PIP-II will deliver 1.2 MW of proton beam power from the Main Injector, upgradeable to multi-MW capability. The central element of PIP-II is an 800 MeV superconducting radio frequency (SRF) linac, which comprises a room temperature front end followed by an SRF section. The SRF section consists of five different flavors of cavities/cryomodules, including Half Wave Resonators (HWR), Single Spoke and elliptical resonators operating at, or above, state-of-the-art parameters. The first two PIP-II cryomodules, Half Wave Resonator (HWR) and Single Spoke Resonator 1 (SSR1) were installed in the PIP-II Injector Test facility (PIP2IT) and have accelerated beam to above 17 MeV. PIP-II is the first U.S. accelerator project that will be constructed with significant contributions from international partners, including India, Italy, France, United Kingdom and Poland. The project was baselined in April 2022, and the construction phase is underway.

43 PARTICLE ACCELERATORS↗

Exploring the outer planets

Initial, current and planned United States projects for the spacecraft exploration of the outer planets of the solar system are presented. Initial plans were developed in the mid-1960's for the exploration of the outer planets by utilizing the gravity-assist technique during a fortuitous alignment of the outer planets in the Grand Tour Project, however although state-of-the-art space technology could have supported the project, it was considered too expensive, therefore politically infeasible. Subsequently, the Pioneer Project was undertaken to explore the asteroid belt and the environment around Jupiter and the Voyager Project was undertaken to send two spacecraft to fly by Jupiter and utilize its gravity assist to reach Saturn. The successful Pioneer 10 and 11 missions have provided important information on the effects of the asteroid belt and the severe radiation environment around Jupiter, and Voyager 1 has collected information about Jupiter, its magnetic fields and radiation zones, and its satellites. Project Galileo is intended to be launched in January 1982 to conduct an intensive investigation of Jupiter, its satellites and immediate environment and a Saturn Orbiter dual probe mission and a Uranus orbiter are also under consideration.

Parks, R. J.↗

Electrochemical oxygen pumps. Final CRADA report.

All tasks of the Work Plan of ISTC Project 2277p have been completed, thus: (1) techniques of chemical synthesis were developed for more than ten recipes of electrolyte based on cerium oxide doped with 20 mole% of gadolinium (CeGd)O{sub 2}, doped by more than 10 oxide systems including 6 recipes in addition to the Work Plan; (2) electric conductivity and mechanical strength of CeGd specimens with additions of oxide systems were performed, two candidate materials for the electrolyte of electrochemical oxygen pump (pure CeGd and CeGd doped by 0.2 wt% of a transition metal) were chosen; (3) extended studies of mechanical strength of candidate material specimens were performed at room temperature and at 400, 600, 800 C; (4) fixtures for determination of mechanical strength of tubes by external pressure above 40 atmospheres at temperature up to 700 C were developed and fabricated; and (5) technology of slip casting of tubes from pure (Ce,Gd)O{sub 2} and of (Ce,Gd)O{sub 2} doped by 0.2 wt% of a transition metal, withstanding external pressure of minimum 40 atmospheres at temperature up to 700 C was developed, a batch of tubes was sent for testing to Argonne National Laboratory; (6) technology of making nanopowder from pure (Ce,Gd)O{sub 2} was developed based on chemical synthesis and laser ablation techniques, a batch of nanopowder with the weight 1 kg was sent for testing to Argonne National Laboratory; (7) a business plan for establishing a company for making powders of materials for electrochemical oxygen pump was developed; and (8) major results obtained within the Project were reported at international conferences and published in the Russian journal Electrochemistry. In accordance with the Work Plan a business trip of the following project participants was scheduled for April 22-29, 2006, to Tonawanda, NY, USA: Manager Victor Borisov; Leader of technology development Gennady Studenikin; Leader of business planning Elena Zadorozhnaya; Leader of production Vasily Lepalovsky; and Translator Vladimir Litvinov. During this trip project participants were to discuss with the project Technical Monitor J.D. Carter and representative of Praxair Inc. J. Chen the results of project activities (prospects of transition metal-doped material application in oxygen pumps), as well as the prospects of cooperation with Praxair at the meeting with the company management in the following fields: (1) Deposition of thin films of oxide materials of complex composition on support by magnetron and ion sputtering, research of coatings properties; (2) Development of block-type structure technology (made of porous and dense ceramics) for oxygen pump. The block-type structure is promising because when the size of electrolyte block is 2 x 2 inches and assembly height is 10 inches (5 blocks connected together) the area of active surface is ca. 290 square inches (in case of 8 slots), that roughly corresponds to one tube with diameter 1 inch and height 100 inches. So performance of the system made of such blocks may be by a factor of two or three higher than that of tube-based system. However one month before the visit, J. Chen notified us of internal changes at Praxair and the cancellation of the visit to Tonawanda, NY. During consultations with the project Technical Monitor J.D. Carter and Senior Project Manager A. Taylor a decision was made to extend the project term by 2 quarters to prepare proposals for follow-on activities during this extension (development of block-type structures made of dense and porous oxide ceramics for electrochemical oxygen pumps) using the funds that were not used for the trip to the US.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

High-Burnup Spent Fuel Data Project: Sister Rod Final Phase II Test Plan

The Sibling Pin test campaign is a Department of Energy (DOE) research activity within the Spent Fuel and Waste Science and Technology (SFWST) program that is tasked with characterization of high burnup (HBU) fuel in support of the High Burnup Spent Fuel Data Project. Of the 25 fuel rods in the Sibling Pin inventory, approximately 9 rod lengths have been consumed during the first phase (Phase I) of the test campaign leaving approximately 16 rod lengths for the second phase (Phase II) of testing. This plan outlines the Phase II testing and the motivations for performing these tests. Priorities for Phase II testing are based on previously identified knowledge gaps, lessons-learned from Phase I work, the original objectives of the High Burnup Spent Fuel Data Project and the Sibling Pin test campaign, and input from external stakeholders. The priorities for Phase II testing are to obtain data to characterize the effects of annealing on cladding mechanical properties and fuel rod performance, to quantify the creep behavior of cladding materials and fuel rods and the effects of creep deformations on the performance of cladding and fuel rods, and to gather data to support the final closure of the hydride reorientation and radial hydride induced embrittlement gap for HBU fuel rods.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Final Scientific / Technical Report: Enabling Technologies for Heavy-Duty Vehicles – Cummins 55BTE

The Cummins 55% BTE (55BTE) program has completed the planned technical work on the project. This work includes the planned engine system demonstration in pursuit of the goal of demonstrating a peak system brake thermal efficiency (BTE) of 55%. The engine system included a high efficiency diesel engine integrated with a state-of-the-art waste heat recovery (WHR) system and an advanced aftertreatment system capable of meeting the current emissions standards. While the ultimate program goal of 55% BTE was not fully achieved due to hardware issues during the final testing phase, the program demonstrated a significant increase in reported engine system BTE for a heavy duty sized engine. The previous demonstrations in the Department of Energy funded SuperTruck 1 programs ranged between 50% - 51% BTE. The Cummins 55% BTE program demonstrated 54% BTE. Additionally, the program established a revised path-to-target showing how the system could be improved to reach the ultimate program goal of 55% BTE with some minor modification to the engine system. The changes in the revised path-to-target were unable to be completed during the course of this program due to time and money constraints placed on the program. The program’s goals were challenging in both scope and timing. Although the program’s goal can be simply stated in terms of demonstrating a system efficiency of 55%, the achievement of a heavy-duty diesel engine capable of full torque curve operation, adequate transient performance, low emissions and high brake thermal efficiency (>51% BTE) had not been previously demonstrated in a heavy-duty engine. The closest efforts to date included the SuperTruck 1 programs referenced earlier. The program made several advancements in all system areas. The combustion system was re-designed for a shorter combustion duration and lower in-cylinder heat loss. This was achieved through optimization of the fuel injection rate shape, number of spray holes, piston bowl shape, compression ratio, piston oil cooling, heat flow through the piston and in-cylinder charge motion. The air handling system was re-designed to provide cooled EGR at virtually no pumping penalty. This was achieved through implementation of a dual loop EGR system, reduction of EGR system pressure drop, and implementation of advanced turbocharger efficiency technologies. The engine friction and parasitic signature was dramatically reduced by the program through adoption of variable flow pumps, advanced rings and coatings, rollerized valvetrain, adoption of low viscosity lubricants and reduction in cylinder line bore distortion. The aftertreatment system was optimized through use of low dP substrates and an ammonia gas injection system. The WHR system development included the use of a dual-entry turbine and a mixed charger cooler. Finding and implementing these solutions in a short two-year program at the budgeted funding provided the greatest challenge for the program.

33 ADVANCED PROPULSION SYSTEMS↗

Development and Demonstration of Advanced Engine and Vehicle Technologies For Class 8 Heavy Duty Vehicle (Supertruck II)

The PACCAR SuperTruck II program has completed the planned technical work on the project. This work includes the planned vehicle demonstrator showing a greater than 100% improvement in vehicle freight efficiency (on a ton-mile-per-gallon basis) relative to a 2009 baseline, and an engine system demonstration achieving a greater than 55% engine brake thermal efficiency at a 65-mph cruise point on a dynamometer. Both program targets were exceeded by PACCAR with robust margins. Finally, PACCAR used technologies that have a possible route to production, with no specialty or unrealistic solutions proposed.

33 ADVANCED PROPULSION SYSTEMS↗

Data management for support of the Oregon Transect Ecosystem Research (OTTER) project

Management of data collected during projects that involve large numbers of scientists is an often overlooked aspect of the experimental plan. Ecosystem science projects like the Oregon Transect Ecosystem Research (OTTER) Project that involve many investigators from many institutions and that run for multiple years, collect and archive large amounts of data. These data range in size from a few kilobytes of information for such measurements as canopy chemistry and meteorological variables, to hundreds of megabytes of information for such items as views from multi-band spectrometers flown on aircraft and scenes from imaging radiometers aboard satellites. Organizing and storing data from the OTTER Project, certifying those data, correcting errors in data sets, validating the data, and distributing those data to other OTTER investigators is a major undertaking. Using the National Aeronautics and Space Administration's (NASA) Pilot Land Data System (PLDS), a Support mechanism was established for the OTTER Project which accomplished all of the above. At the onset of the interaction between PLDS and OTTER, it was not certain that PLDS could accomplish these tasks in a manner that would aid researchers in the OTTER Project. This paper documents the data types that were collected under the auspices of the OTTER Project and the procedures implemented to store, catalog, validate, and certify those data. The issues of the compliance of investigators with data-management requirements, data use and certification, and the ease of retrieving data are discussed. We advance the hypothesis that formal data management is necessary in ecological investigations involving multiple investigators using many data gathering instruments and experimental procedures. The issues and experience gained in this exercise give an indication of the needs for data management systems that must be addressed in the coming decades when other large data-gathering endeavors are undertaken by the ecological science community.

Skiles, J. W.↗

"Intelligent Ensemble" Projections of Precipitation and Surface Radiation in Support of Agricultural Climate Change Adaptation

Earth's climate is changing and will continue to change into the foreseeable future. Expected changes in the climatological distribution of precipitation, surface temperature, and surface solar radiation will significantly impact agriculture. Adaptation strategies are, therefore, required to reduce the agricultural impacts of climate change. Climate change projections of precipitation, surface temperature, and surface solar radiation distributions are necessary input for adaption planning studies. These projections are conventionally constructed from an ensemble of climate model simulations (e.g., the Coupled Model Intercomparison Project 5 (CMIP5)) as an equal weighted average, one model one vote. Each climate model, however, represents the array of climate-relevant physical processes with varying degrees of fidelity influencing the projection of individual climate variables differently. Presented here is a new approach, termed the "Intelligent Ensemble, that constructs climate variable projections by weighting each model according to its ability to represent key physical processes, e.g., precipitation probability distribution. This approach provides added value over the equal weighted average method. Physical process metrics applied in the "Intelligent Ensemble" method are created using a combination of NASA and NOAA satellite and surface-based cloud, radiation, temperature, and precipitation data sets. The "Intelligent Ensemble" method is applied to the RCP4.5 and RCP8.5 anthropogenic climate forcing simulations within the CMIP5 archive to develop a set of climate change scenarios for precipitation, temperature, and surface solar radiation in each USDA Farm Resource Region for use in climate change adaptation studies.

Taylor, Patrick C.↗

Proceedings of the First Biennial Space Biomedical Investigators' Workshop

The First Biennial Space Biomedical Investigators' Workshop, held January 11-13, 1999, was unique in that it assembled, for the first time, a broad cross section of NASA-funded biomedical researchers to present the current status of their projects and their plans for future investigations. All principal investigators with active, or recently-completed ground-based projects in NASA's Biomedical Research and Countermeasures Program that were funded through NASA's Office of Life and Microgravity Sciences and Applications were invited. Included were individual investigators funded through NASA Research Announcements, investigators with NASA Specialized Centers of Research and Training, investigators with the recently established National Space Biomedical Research Institute (NSBRI), and NASA civil servant investigators. Seventy-seven percent of all eligible projects were presented at the workshop. Thus, these Proceedings should provide a useful snapshot of the status of NASA-funded space biomedical research as of January 1999. An important workshop objective was to achieve free and open communication among the presenting investigators. Therefore, presentation of new and incomplete results, as well as hypotheses and ideas for future research, was encouraged. Comments and constructive criticisms from the presenters' colleagues were also encouraged. These ground rules resulted in many lively and useful discussions, during both the presentation sessions and informal evening gatherings and breaks.

Source record↗

Liquid Rocket Booster (LRB) for the Space Transportation System (STS) systems study. Study plan

The two major objectives are: to present the study approach, and to provide the standard for guiding the Liquid Rocket Booster (LRB) project. The task plans provide a comprehensive description of the work to be performed. Each plan is presented on a foldout sheet that shows the task description, approach, timeframe, inputs/outputs, manloading, and management lead responsibility. A logic network depicting tasks/subtasks, interrelationships, and time-phasing is described. The milestones and timelines are defined for all tasks and subtasks.

Source record↗

Land of Opportunity: Potential for Renewable Energy on Federal Lands

Renewable energy (RE) in the United States has historically been deployed primarily on private lands, but the growing interest in RE development, generally across the country and specifically on federal lands, raises questions about the potential for RE on public lands. This study seeks to estimate RE technical potential on federal lands and project the amount of RE to be developed on federal lands under decarbonization scenarios for the contiguous United States. The study applied a combination of high-resolution geospatial analysis and power sector modeling and relied on multiple partner federal agencies and land administrators from the Bureau of Land Management, the U.S. Fish and Wildlife Service, the U.S. Forest Service, the U.S. Department of Defense, and the U.S. Department of Energy. In our reference siting access case, we estimate 44 million acres of federal land across the contiguous United States is potentially suitable for UPV development, which corresponds to a capacity technical potential of 5,750 gigawatts (GW) (Figure ES-1). Federal land area available for wind development is similar to UPV but wind’s generating capacity technical potential is lower (875 GW). The technical potential is estimated for two geothermal technologies, hydrothermal and enhanced geothermal systems (EGS), both of which have a smaller amount of federal land available for development (12 and 27 million acres, respectively). However, in terms of capacity, the technical potential for EGS (975 GW) is approximately equal to wind’s technical potential and there is an estimated 130 GW of hydrothermal potential. We also developed cases with more-limited land available for UPV and wind (for federal and non-federal lands) resulting in 96% reduction of wind capacity potential and 70% reduction for UPV. In a case with additional constraints applied to non-federal lands only (Limited Private), the overall (federal and non-federal) technical potential declines but the share of that technical potential on federal lands is higher than in the other siting cases. The technical potential is the maximum amount that could be developed, but only a small fraction would be developed or needed in the future. Across seven scenarios that achieve 100% carbon-free electricity by 2035, we estimate 26 GW to 270 GW of RE capacity could be deployed on federal lands by 2035. The three central scenarios have 51–84 GW of RE deployed by 2035 and requiring about 500,000 to 1,000,000 acres of total land area. Direct land consumption is less than total land use required, thus enabling co-use opportunities. The large technical potential estimates and the increasing deployment projections from the collection of scenarios show the opportunities for RE development on federal lands. Capturing these opportunities-while minimizing conflicts with other land uses, federal department or agency missions, and public interest, and simultaneously maximizing the economic, grid, and social value of the projects-would require collaborative planning among federal land administrators, grid planners, project developers, the public, and other stakeholders.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

CleanStart DERMS: Modeling Effort Update

This document describes the model conversion approach taken to transform the Synergee distribution feeder models received from Riverside Public Utility (RPU) to GridLAB-D models. The document briefly introduces the tools and software applications used in this process. Then, the model validation results acquired from GridLAB-D simulations are shown. Finally, several test-cases are presented that the research teams are planning to implement with the GridLAB-D models. The document presents the current state of the project and the planned next steps.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Autonomous Science Restart for the Planned Europa Mission with Lightweight Planning and Execution

In this paper we present MEXEC - a lightweight on-board planning and execution system that monitors spacecraft state to robustly respond to current conditions. In addition it projects the remaining plan forward in time to detect conflicts and revise the plan. Most current planetary missions use sequence based commanding from the ground,which limits the ability to respond to on-board state varying from planned for state. This results in planning for worst-case execution time, power utilization, data volume and other resources and leads to under utilization of the spacecraft capability. It also limits the ability to respond to faults. Due to the high radiation environment at Jupiter the probability of flight software resets is high. Therefore, of particular interest to the planned Europa Mission is the capability to restart the science plan after flight software resets. In this paper we present results from running Europa flyby scenarios with flight software resets in the Europa flight software test environment. Preliminary results with the prototype scenario show MEXEC takes less than a tenth of a second to respond to resets. The development was done as part of Europa-focused flight software, but MEXEC was designed to be applicable to landers and rovers as well.

Joshi, Rajeev↗

Stormwater Pollution Prevention Plan (SWPPP) for Coal Storage Area Stabilization Project

The scope of this project is to stabilize the abandoned coal storage area and redirect the storm water runoff from sanitary sewer system to the storm drain system. Currently, the existing storm water runoff is directed to a perimeter concrete drainage swale and collected in a containment basin. The collected water is then pumped to a treatment facility and after treatment, is discharged to the Y-12 sanitary sewer system. The existing drainage swale and collection basin along with silt fencing will be used during aggregate placement and grading to provide erosion and sediment control. Inlet protection will also be installed around existing structures during the storm water diversion construction. This project scope will include the installation of a non-woven geotextile fabric and compacted mineral aggregate base (paving optional) to stabilize the site. The geotextile specifications are provided on the vendor cut sheets in Appendix B. The installation of a storm water collection/retention area will also be installed on the southern side of the site in accordance with EPA Technical Guidance on Implementing the Stormwater Runoff Requirements for federal Projects under Section 438 of the Energy Independence and Security Act. The total area to be disturbed is approximately 2.5 acres. The order of activities for this Stormwater Pollution Prevention Plan (SWPPP) will be: (1) post notice of coverage (NOC) in a prominent display near entrance of the site; (2) install rain gauge on site or contact Y-12 Plant Shift Superintendent daily for Met tower rain gauge readings; (3) install stabilized construction exit on site; (4) install silt fencing along perimeter as indicated on the attached site plan; (5) regrade site; (6) install geotextile fabric and compacted mineral aggregate base; (7) install catch basin inlet protection where required; (8) excavate and lower existing catch basin tops, re-grade and asphalt to drain; and (9) when all disturbed areas are re-stabilized, remove silt fencing and any other temporary erosion control.

01 COAL, LIGNITE, AND PEAT↗

ESM data downscaling: a comparison of super-resolution deep learning models

Abstract Climate projections at fine spatial resolutions are required to conduct accurate risk assessment for critical infrastructure and design adaptation planning. Generating these projections using advanced Earth system models (ESM) requires significant computational resources. To address this issue, various statistical downscaling techniques have been introduced to generate fine-resolution data from coarse-resolution simulations. In this study, we evaluate and compare five deep learning-based downscaling techniques, namely, super-resolution convolutional neural networks, fast super-resolution convolutional neural network ESM, efficient sub-pixel convolutional neural network, enhanced deep residual network (EDRN), and super-resolution generative adversarial network (SRGAN). These techniques are applied to a dataset generated by the Energy Exascale Earth System Model (E3SM), focusing on key surface variables such as surface temperature, shortwave heat flux, and longwave heat flux. Models are trained and validated using paired fine-resolution (0.25 $$^{\circ }$$ ∘ ) and coarse-resolution (1 $$^{\circ }$$ ∘ ) monthly data obtained from a 9-year simulation. Next, blind testing is performed using monthly data obtained from two different years outside of the training and validation set. To evaluate the efficiency of each technique, different statistical metrics are used, including mean squared error (MSE), peak signal-to-noise ratio (PSNR), structural similarity index measure (SSIM), and learned perceptual image patch similarity (LPIPS). The results show that EDRN outperforms other algorithms in terms of PSNR, SSIM, and MSE, but struggles to capture fine-scale features in the data. In contrast, SRGAN, a generative model that uses perceptual loss, excels in capturing fine details at boundaries and internal structures, resulting in lower LPIPS than other methods.

Pawar, Nikhil M. (ORCID:0000000211613289)↗