Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Probabilistic Risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,153 records · Page 64

Development of cyber security test scenario for non-safety display system - 226

In order to test the cyber security of NPP related to safety, the results of probabilistic safety assessment were used. The fault tree (FT) is used to reflect the impact of the cyber-attack on the operator. The cyber security test should be performed focusing on the scenario derived from the FT. The concept of a security case has been introduced. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

TPSAS-NF1676L-17243-DND

This presentation captures ERA Project's effort in using integrated cost-schedule-risk analysis tool, identifying and capturing explicit relationships between program funds, schedule, and discrete risks. The project team merged a myriad of cost and schedule data for timely, objective, uncertainty analysis of the ITD's budget and schedule. The project team conducted detailed schedule uncertainty analysis showing schedule activities and how their interrelationships were impacted, representing an impressive advance beyond routine Gantt charts. Furthermore, the ERA Project collected discrete risk events including their impacts to costs and/or schedule and interwove these risks into cost and schedule logic networks, providing the foundation to conduct cost and schedule analyses. The team integrated this data into the analysis model, providing probabilistic results that were then used by the ERA Project's senior management for decision-making purposes. The ERA Project management team, through technical and pathfinder expertise in integrating cost, schedule, risk, and technical content, consistently provided risk-informed recommendations to Implementing Centers and ISRP senior management which ultimately ensured the successful ARMD Key Decision Point (KDP) review of the ERA Phase 2 ITD Portfolio and increased the likelihood of achieving technical objectives within cost and schedule constraints.

Gaudy M Bezos-O'Connor↗

The Integrated Medical Model - Optimizing In-flight Space Medical Systems to Reduce Crew Health Risk and Mission Impacts

The Integrated Medical Model (IMM) is a decision support tool used by medical system planners and designers as they prepare for exploration planning activities of the Constellation program (CxP). IMM provides an evidence-based approach to help optimize the allocation of in-flight medical resources for a specified level of risk within spacecraft operational constraints. Eighty medical conditions and associated resources are represented in IMM. Nine conditions are due to Space Adaptation Syndrome. The IMM helps answer fundamental medical mission planning questions such as What medical conditions can be expected? What type and quantity of medical resources are most likely to be used?", and "What is the probability of crew death or evacuation due to medical events?" For a specified mission and crew profile, the IMM effectively characterizes the sequence of events that could potentially occur should a medical condition happen. The mathematical relationships among mission and crew attributes, medical conditions and incidence data, in-flight medical resources, potential clinical and crew health end states are established to generate end state probabilities. A Monte Carlo computational method is used to determine the probable outcomes and requires up to 25,000 mission trials to reach convergence. For each mission trial, the pharmaceuticals and supplies required to diagnose and treat prevalent medical conditions are tracked and decremented. The uncertainty of patient response to treatment is bounded via a best-case, worst-case, untreated case algorithm. A Crew Health Index (CHI) metric, developed to account for functional impairment due to a medical condition, provides a quantified measure of risk and enables risk comparisons across mission scenarios. The use of historical in-flight medical data, terrestrial surrogate data as appropriate, and space medicine subject matter expertise has enabled the development of a probabilistic, stochastic decision support tool capable of optimizing in-flight medical systems based on crew and mission parameters. This presentation will illustrate how to apply quantitative risk assessment methods to optimize the mass and volume of space-based medical systems for a space flight mission given the level of crew health and mission risk.

Kerstman, Eric↗

Panel Session 132: Risk-Informed Approach for Decision Making in WM, D and D and SNF Management: Reasonable Assurance for Safety

Mr. Larry Camper organized a panel of experts to discuss approaches to better make risk-informed decisions in waste management, decommissioning, and the management of Spent Nuclear Fuel (SNF). The audience heard the perspectives from four panelists that addressed issues ranging from the technical basis used to make risk-informed decisions to for developing cleanup criteria and promulgating regulations and safety standards both domestically and abroad. A summary of each of the presentations given by the panelists is provided herein. This WMS BOD featured panel focused on the Risk-Informed Approach for Decision Making in WM, D and D and SNF Management and the Reasonable Assurance for Safety. The panelists addressed and discussed with the audience different approaches used for decision-making, summarizing ongoing probabilistic vs. deterministic approaches, including IAEA graded approach, and discussed policies/approaches to achieve reasonable assurance for safety rather than using absolute assurance. Panelists with presentations: Risk-Informed Decision Making - More than a Motto? (Paul Black); NRC Staff Perspective on Risk-Informed Approach and Reasonable Safety Assurance in D and D and LLW (Rateb (Boby) Abu Eid); Risk-Informed Decision-Making and Illustrative National Academies Studies (Charles Ferguson); IAEA's Revised Safety Guidance on Remediation (Michelle Roberts); NDA Radioactive Waste Strategy - A Risk Informed Approach (James McKinney)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hurricane-induced power outage risk under climate change is primarily driven by the uncertainty in projections of future hurricane frequency

Nine in ten major outages in the US have been caused by hurricanes. Long-term outage risk is a function of climate change-triggered shifts in hurricane frequency and intensity; yet projections of both remain highly uncertain. However, outage risk models do not account for the epistemic uncertainties in physics-based hurricane projections under climate change, largely due to the extreme computational complexity. Instead they use simple probabilistic assumptions to model such uncertainties. Here, we propose a transparent and efficient framework to, for the first time, bridge the physics-based hurricane projections and intricate outage risk models. We find that uncertainty in projections of the frequency of weaker storms explains over 95% of the uncertainty in outage projections; thus, reducing this uncertainty will greatly improve outage risk management. We also show that the expected annual fraction of affected customers exhibits large variances, warranting the adoption of robust resilience investment strategies and climate-informed regulatory frameworks.

54 ENVIRONMENTAL SCIENCES↗

Monte Carlo Simulation of Influence of Input Parameters Uncertainty on Output Data

Input parameters of a complex system in the probabilistic simulation are treated by means of probability density function (PDF). The result of the simulation have also probabilistic character. Monte Carlo simulation is widely used to obtain predictions concerning the probability of the risk. The Monte Carlo method was performed to calculate histograms of PDF for release rate given by uncertainty in distribution coefficient of radionuclides {sup 135}Cs and {sup 235}U.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Probabilistic Economic Valuation of Safety Margin Management

The goal of this project was to explore a new methodology for evaluation of potential safety margin upgrades to add a new instrument to the Risk Informed Safety Margin Characterization (RISMC) toolkit. To this end, the RAVEN code developed by the Idaho National Laboratory was used to perform a cost-benefit analysis of several potential power plant safety upgrades to compare the material cost of the upgrades with the probabilistic benefit of avoiding accident scenario consequences to find the most cost-effective safety upgrades. By coupling RAVEN to MELCOR to drive Monte-Carlo method stochastic parameter analysis and using data from existing nuclear codes, as well as MELCOR’s radionuclide relocation tracking capabilities, the radionuclide release source term activity in a severe accident scenario can be estimated. Severe Accident Mitigation upgrades were benchmarked against the Hardened Containment Ventilation upgrade mandated by the USNRC for Mk1 BWRs using dollars spent per Curie of release prevented as a metric by which to evaluate the economic efficacy of the upgrades. Additionally, Fault Tree/Event Tree-based analyses were performed to compare older methods of evaluation to the methodology pioneered in this work, and Monthly Operating Report (MORP) outage data was analyzed for insights into power plant outage optimization and reduction.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Updates to a Preliminary Probabilistic Performance Assessment Model for Radiological and Chemical Contamination at the West Valley Site, New York - 20420

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351-ha site located approximately 48 km south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States at the WNYNSC. NFS built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg (640 metric tons) of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations halted in 1972 and never restarted, leaving behind radioactive and chemical wastes. The U.S. Department of Energy (DOE) was required to complete certain waste management activities under the West Valley Demonstration Project (WVDP) Act of 1980 including decommissioning of WVDP facilities. As collaborating agencies, NYSERDA and the DOE are tasked with making decisions about decommissioning and risk reduction for the West Valley Site. Neptune and Company, Inc. (Neptune) was contracted to develop a probabilistic performance assessment (PPA) model to assist the agencies in their decision making process for decommissioning the WVDP and WNYNSC. One important tool that is needed in order to inform the decision-making process is a science-based model of the West Valley Site that evaluates potential future consequences for human health and the environment. This forms the core of the spatial domain of the West Valley PPA Model. The PPA Model, developed using the GoldSim system modeling software, is a tool intended to provide support for decision making that evaluates uncertainty, in a manner that is transparent, defensible, and robust. The PPA Model includes contaminant transport and health effects components, and is organized around geographically-grouped contaminated facilities. These include the waste disposal areas licensed by the U.S. Nuclear Regulatory Commission and the State of New York, a waste tank farm for storage of high level radioactive waste resulting from reprocessing operations, and several areas contaminated with radioactive and chemical constituents. The PPA Model evaluates contaminant transport from these sources to points of exposure across the site and into receiving surface waters and sediments. Hypothetical people and wildlife could be exposed to contamination at these locations, and the effects of these exposures are evaluated. Contaminant transport processes to be evaluated in the PPA Model include groundwater and surface water transport, contaminant translocation by plants and animals, diffusion, and erosion. The evaluation of exposures to people in this preliminary model is limited to a resident farmer scenario, and ecological assessment is performed at the level of a screening analysis. The results of these preliminary evaluations inform future model developments. PPA Model results are subjected to sensitivity analysis in order to determine those pathways and parameters that are most significant in influencing the results. This information allows analysts and decision makers to focus on those aspects of Site behavior and processes. With this information, the decision makers can drive informed, defensible decisions regarding decommissioning of the Site. This paper includes an update of the information presented at WM2019 [1]. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Recent developments of the NESSUS probabilistic structural analysis computer program

The NESSUS probabilistic structural analysis computer program combines state-of-the-art probabilistic algorithms with general purpose structural analysis methods to compute the probabilistic response and the reliability of engineering structures. Uncertainty in loading, material properties, geometry, boundary conditions and initial conditions can be simulated. The structural analysis methods include nonlinear finite element and boundary element methods. Several probabilistic algorithms are available such as the advanced mean value method and the adaptive importance sampling method. The scope of the code has recently been expanded to include probabilistic life and fatigue prediction of structures in terms of component and system reliability and risk analysis of structures considering cost of failure. The code is currently being extended to structural reliability considering progressive crack propagation. Several examples are presented to demonstrate the new capabilities.

Millwater, H.↗

Design of Critical Components

Critical component design is based on minimizing product failures that results in loss of life. Potential catastrophic failures are reduced to secondary failures where components removed for cause or operating time in the system. Issues of liability and cost of component removal become of paramount importance. Deterministic design with factors of safety and probabilistic design address but lack the essential characteristics for the design of critical components. In deterministic design and fabrication there are heuristic rules and safety factors developed over time for large sets of structural/material components. These factors did not come without cost. Many designs failed and many rules (codes) have standing committees to oversee their proper usage and enforcement. In probabilistic design, not only are failures a given, the failures are calculated; an element of risk is assumed based on empirical failure data for large classes of component operations. Failure of a class of components can be predicted, yet one can not predict when a specific component will fail. The analogy is to the life insurance industry where very careful statistics are book-kept on classes of individuals. For a specific class, life span can be predicted within statistical limits, yet life-span of a specific element of that class can not be predicted.

Hendricks, Robert C.↗

A Preliminary Probabilistic Performance Assessment Model for Radiological and Chemical Contamination at the West Valley Site, New York - 19295

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351-ha site located approximately 48 km south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States at the WNYNSC. NFS built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg (640 metric tons) of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations halted in 1972 and never restarted, leaving behind radioactive and chemical wastes. The reprocessing wastes include high-level waste (HLW), so U.S. Department of Energy (DOE) was compelled to complete certain waste management activities under the West Valley Demonstration Project (WVDP) Act of 1980, including decommissioning of WVDP facilities. As collaborating agencies, NYSERDA and the DOE are tasked with making decisions about decommissioning and risk reduction for the West Valley Site. Neptune and Company, Inc. (Neptune) was contracted to develop a probabilistic performance assessment (PPA) model to assist the agencies in their decision making process for decommissioning the WVDP and WNYNSC. One important tool that is needed in order to inform the decision-making process is a science-based model of the contamination at the West Valley Site and its potential implications for human health and the environment. The West Valley PPA Model (the Model), developed using the GoldSim modeling software, is a tool intended to provide support for decision making with uncertainty, in a manner that is transparent, defensible, and robust. The PPA Model includes contaminant transport and health effects components, and is organized around geographically-organized contaminated facilities. These include the waste disposal areas licensed by the U.S. Nuclear Regulatory Commission and the State of New York, a waste tank farm for storage of HLW resulting from reprocessing operations, and several areas contaminated with radioactive and chemical constituents. The Model evaluates contaminant transport from these sources to points of exposure across the site and into receiving surface waters and sediments. Hypothetical people and wildlife are exposed to contamination at these locations, and the effects of these exposures are evaluated. Contaminant transport processes to be evaluated in the Model include groundwater and surface water transport, contaminant translocation by plants and animals, diffusion in subsurface air and water, and erosion of the Site. The evaluation of exposures to people in this preliminary model is limited to a resident farmer scenario, and ecological assessment is performed at the level of a screening analysis. The results of these preliminary evaluations inform future model developments. Model results are subjected to sensitivity analysis in order to determine those pathways and parameters that are most significant in influencing the results. This information allows analysts and decision makers to focus on those aspects of Site behavior and processes that contribute most to overall uncertainty. With this information, the Supplemental Environmental Impact Statement (SEIS) can inform defensible decisions regarding remediation of the Site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Probabilistic Assessment of High-Renewables Power Systems: Current Work and Future Directions

In a future with higher penetrations of variable and energy-limited resources, the dominant sources of resource adequacy risk begin to shift from (assumed) independent thermal unit outages to spatially- and temporally-correlated weather-driven phenomena. Traditional resource adequacy assessment and planning methods can be ill-suited to such scenarios. This presentation will highlight aspects of NREL's work in adapting and developing new probabilistic methods and tools in anticipation of the needs of the power system planning exercises of tomorrow.

17 WIND ENERGY↗

Flows of engineered nanomaterials through the recycling process in Switzerland

Highlights: • Recycling is one of the likely end-of-life fates of nanoproducts. • We assessed the material flows of four nanomaterials in the Swiss recycling system. • After recycling, most nanomaterials will flow to landfills or incineration plants. • Recycled construction waste, plastics and textiles may contain nanomaterials. - Abstract: The use of engineered nanomaterials (ENMs) in diverse applications has increased during the last years and this will likely continue in the near future. As the number of applications increase, more and more waste with nanomaterials will be generated. A portion of this waste will enter the recycling system, for example, in electronic products, textiles and construction materials. The fate of these materials during and after the waste management and recycling operations is poorly understood. The aim of this work is to model the flows of nano-TiO{sub 2}, nano-ZnO, nano-Ag and CNT in the recycling system in Switzerland. The basis for this study is published information on the ENMs flows on the Swiss system. We developed a method to assess their flow after recycling. To incorporate the uncertainties inherent to the limited information available, we applied a probabilistic material flow analysis approach. The results show that the recycling processes does not result in significant further propagation of nanomaterials into new products. Instead, the largest proportion will flow as waste that can subsequently be properly handled in incineration plants or landfills. Smaller fractions of ENMs will be eliminated or end up in materials that are sent abroad to undergo further recovery processes. Only a reduced amount of ENMs will flow back to the productive process of the economy in a limited number of sectors. Overall, the results suggest that risk assessment during recycling should focus on occupational exposure, release of ENMs in landfills and incineration plants, and toxicity assessment in a small number of recycled inputs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Rule-Based Expert System Applied to Moisture Durability of Building Envelopes

The moisture durability of an envelope component such as a wall or roof is difficult to predict. Moisture durability depends on all the construction materials used, as well as the climate, orientation, air tightness, and indoor conditions. Modern building codes require more insulation and tighter construction but provide little guidance about how to ensure these energy-efficient assemblies remain moisture durable. Furthermore, as new products and materials are introduced, builders are increasingly uncertain about the long-term durability of their building envelope designs. Oak Ridge National Laboratory and the US Department of Energy's Building America Program are applying a rule-based expert system methodology in a web tool to help designers determine whether a given wall design is likely to be moisture durable and provide expert guidance on moisture risk management specific to a wall design and climate. The expert system is populated with knowledge from both expert judgment and probabilistic hygrothermal simulation results.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

RAVEN Quality Assurance Activities

This report discusses the quality assurance activities needed to raise the Quality Level of Risk Analysis in a Virtual Environment (RAVEN) from Quality Level 3 to Quality Level 2. This report also describes the general RAVEN quality assurance activities. For improving the quality, reviews of code changes have been instituted, more parts of testing have been automated, and improved packaging has been created. For upgrading the quality level, requirements have been created and the workflow has been improved.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Level-3 Probabilistic Safety Analysis VAB-3 as an NPP Safety Enhancement Stage

Questions pertaining to the development of reactors from the standpoint of the evolution of protection and emergency response systems for large radiation accidents, and development of probabilistic safety analysis at different levels are examined. Examples are presented of the calculation of quantitative characteristics of risk in an accident at a model NPP that show the possibility of using VAB-3 to evaluate the scale of countermeasures as a function of the level of intervention, their effectiveness as a function of the time of application and validation of countermeasures for an individual populated point. It is shown that the VAB-3 methodology must be developed in order to increase NPP safety.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Sensitivity Analysis of Successful Evacuee Proportion in Hypothetical Seismic Nuclear Emergency Situation

A magnitude 5.8 earthquake, which is the strongest earthquake ever detected in Korea, occurred in Gyeongju on 12 September, 2016. People were worried about not only the impact to their safety and quality of life as directly affected from the earthquake, but also the secondary impact from such a nuclear power plant (NPP) accident incurred by the earthquake. Public awareness is changing such that the risk of earthquakes is no longer a story of other countries. Even if the current situation in Korea is not regarded, it is important to assess the seismic hazard to an NPP and prepare for preventing the effects related with the earthquake impact. Developing a seismic evacuation model is necessary in a part of a level 3 probabilistic safety assessment (PSA) because it is one of the most affecting factors of public radiation exposure and health effects in an emergency phase. In a previous study, a sensitivity analysis of the evacuation speed in a hypothetical NPP accident by an earthquake has been carried out, and population doses resulting from various seismic evacuation scenarios associated with evacuation speed have been compared. In addition to the previous study, the proportion of evacuees who evacuate successfully with adequate speed has been considered and a sensitivity analysis has been performed in this study.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

External Events Analysis for LWRS/RISMC Project: Methodology Development and Early Demonstration

The ultimate scope of Industrial Application no.2 (IA) of the LWRS/RISMC project is a realistic simulation of natural external hazards that impose threat to a NPP. This scope requires the development of a methodology and of a qualified set of tools able to perform advanced risk-informed safety analysis. In particular the methodology should be able to combine results from seismic, flooding and thermal-hydraulic (TH) deterministic calculations with dynamic PRA. A so-called Risk Informed Margin Management (RIMM) approach is being used to represent meaningful (i.e., realistic facility representation and simulation) event scenarios and consequences by linking probabilistic simulations to external events physics. Calculations performed so far demonstrated the capabilities of the proposed methodology in analyzing multi-hazards generated by External Events. The sample application described in this paper allowed identifying the main issues (code interfaces, computational and human resources needed, simplifications) connected to such kind of advanced analysis. The next steps will be the risk-informed earthquakes and flooding analysis of a system of a generic PWR.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗