Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Power System Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,153 records · Page 64

The NASA CSTI high capacity power project

The SP-100 Space Nuclear Power Program was established in 1983 by DOD, DOE, and NASA as a joint program to develop technology for military and civil applications. Starting in 1986, NASA has funded a technology program to maintain the momentum of promising aerospace technology advancement started during Phase 1 of SP-100 and to strengthen, in key areas, the chances for successful development and growth capability of space nuclear reactor power systems for a wide range of future space applications. The elements of the Civilian Space Technology Initiative (CSTI) High Capacity Power Project include Systems Analysis, Stirling Power Conversion, Thermoelectric Power Conversion, Thermal Management, Power Management, Systems Diagnostics, Environmental Interactions, and Material/Structural Development. Technology advancement in all elements is required to provide the growth capability, high reliability and 7 to 10 year lifetime demanded for future space nuclear power systems. The overall project will develop and demonstrate the technology base required to provide a wide range of modular power systems compatible with the SP-100 reactor which facilitates operation during lunar and planetary day/night cycles as well as allowing spacecraft operation at any attitude or distance from the sun. Significant accomplishments in all of the project elements will be presented, along with revised goals and project timelines recently developed.

Winter, J.↗

Project APEX: Advanced Phobos Exploration. Manned mission to the Martian moon Phobos

The manned exploration of Mars is a massive undertaking which requires careful consideration. A mission to the moon of Mars called Phobos as a prelude to manned landings on the Martian surface offers some advantages. One is that the energy requirements, in terms of delta 5, is only slightly higher than going to the Moon's surface. Another is that Phobos is a potential source of water and carbon which could be extracted and processed for life support and cryogenic propellants for use in future missions; thus, Phobos might serve as a base for extended Mars exploration or for exploration of the outer planets. The design of a vehicle for such a mission is the subject of our Aerospace System Design course this year. The materials and equipment needed for the processing plant would be delivered to Phobos in a prior unmanned mission. This study focuses on what it would take to send a crew to Phobos, set up the processing plant for extraction and storage of water and hydrocarbons, conduct scientific experiments, and return safely to Earth. The size, configuration, and subsystems of the vehicle are described in some detail. The spacecraft carries a crew of five and is launched from low Earth orbit in the year 2010. The outbound trajectory to Mars uses a gravitational assisted swing by of Venus and takes eight months to complete. The stay at Phobos is 60 days at which time the crew will be engaged in setting up the processing facility. The crew will then return to Earth orbit after a total mission duration of 656 days. Both stellar and solar observations will be conducted on both legs of the mission. The design of the spacecraft addresses human factors and life science; mission analysis and control; propulsion; power generation and distribution; thermal control; structural analysis; and planetary, solar, and stellar science. A 0.5 g artificial gravity is generated during transit by spinning about the lateral body axis. Nuclear thermal rockets using hydrogen as fuel are selected to reduce total launch mass and to shorten the duration of the mission. The nuclear systems also provide the primary electrical power via dual mode operation. The overall spacecraft length is 110 meters and the total mass departing from low Earth orbit is 900 metric tons.

Source record↗

Coherent Doppler lidar for automated space vehicle rendezvous, stationkeeping and capture

The inherent spatial resolution of laser radar makes ladar or lidar an attractive candidate for Automated Rendezvous and Capture application. Previous applications were based on incoherent lidar techniques, requiring retro-reflectors on the target vehicle. Technology improvements (reduced size, no cryogenic cooling requirement) have greatly enhanced the construction of coherent lidar systems. Coherent lidar permits the acquisition of non-cooperative targets at ranges that are limited by the detection capability rather than by the signal-to-noise ratio (SNR) requirements. The sensor can provide translational state information (range, velocity, and angle) by direct measurement and, when used with any array detector, also can provide attitude information by Doppler imaging techniques. Identification of the target is accomplished by scanning with a high pulse repetition frequency (dependent on the SNR). The system performance is independent of range and should not be constrained by sun angle. An initial effort to characterize a multi-element detection system has resulted in a system that is expected to work to a minimum range of 1 meter. The system size, weight and power requirements are dependent on the operating range; 10 km range requires a diameter of 3 centimeters with overall size at 3 x 3 x 15 to 30 cm, while 100 km range requires a 30 cm diameter.

Bilbro, James A.↗

The NASA CSTI High Capacity Power Project

The elements of the Civilian Space Technology Initiative (CSTI) High Capacity Power Project include Systems Analysis, Stirling Power Conversion, Thermoelectric Power Conversion, Thermal Management, Power Management, Systems Diagnostics, Environmental Interactions, and Material/Structural Development. The overall project will develop and demonstrate the technology base required to provide a wide range of modular power systems compatible with the SP-100 reactor which facilitates operation during lunar and planetary day/night cycles as well as allowing spacecraft operation at any attitude or distance from the sun. Significant accomplishments in all of the project elements are presented, along with revised goals and project timelines recently developed.

Winter, J.↗

Lidar Measurements Of Stratospheric Ozone

Report describes selected aspects of underlying theory, design, and operation of ground-based, high-power, pulsed lidar system measuring concentration of stratospheric ozone as function of altitude.

Mcdermid, I. Stuart↗

Manufacturing and testing of a magnetically suspended composite flywheel energy storage system

This paper presents the work performed to develop a multiring composite material flywheel and improvements of a magnetically suspended energy storage system. The flywheel is constructed of filament would graphite/epoxy and is interference assembled for better stress distribution to obtain higher speeds. The stationary stack in the center of the disk supports the flywheel with two magnetic bearings and provides power transfer to the flywheel with a motor/generator. The system operates under a 10(exp -4) torr environment and has been demonstrated to 20,000 rpm with a total stored energy of 15.9 Wh. When this flywheel cycles between its design speeds (45,000 to 90,000 rpm), it will deliver 242 Wh and have a usable specific energy density of 42.6 Wh/kg.

Wells, Stephen↗

The Implementation and Evaluation of the Emergency Response Dose Assessment System (ERDAS) at Cape Canaveral Air Station/Kennedy Space Center

The Emergency Response Dose Assessment System (ERDAS) is a system which combines the mesoscale meteorological prediction model RAMS with the diffusion models REEDM and HYPACT. Operators use a graphical user interface to run the models for emergency response and toxic hazard planning at CCAS/KCS. The Applied Meteorology Unit has been evaluating the ERDAS meteorological and diffusion models and obtained the following results: (1) RAMS adequately predicts the occurrence of the daily sea breeze during non-cloudy conditions for several cases. (2) RAMS shows a tendency to predict the sea breeze to occur slightly earlier and to move it further inland than observed. The sea breeze predictions could most likely be improved by better parameterizing the soil moisture and/or sea surface temperatures. (3) The HYPACT/REEDM/RAMS models accurately predict launch plume locations when RAMS winds are accurate and when the correct plume layer is modeled. (4) HYPACT does not adequately handle plume buoyancy for heated plumes since all plumes are presently treated as passive tracers. Enhancements should be incorporated into the ERDAS as it moves toward being a fully operational system and as computer workstations continue to increase in power and decrease in cost. These enhancements include the following: activate RAMS moisture physics; use finer RAMS grid resolution; add RAMS input parameters (e.g. soil moisture, radar, and/or satellite data); automate data quality control; implement four-dimensional data assimilation; modify HYPACT plume rise and deposition physics; and add cumulative dosage calculations in HYPACT.

Evans, Randolph J.↗

Development of Ultra Low Temperature, Impact Resistant Lithium Battery for the Mars Microprobe

The requirements of the power source for the Mars Microprobe, to be backpacked on the Mars 98 Spacecraft, are fairly demanding, with survivability to a shock of the order of 80,000 g combined with an operational requirement at -80 C. Development of a suitable power system, based on primary lithium-thionyl chloride is underway for the last eighteen months, together with Yardney Technical Products Inc., Pawcatuck, CT. The battery consists of 4 cells of 2 Ah capacity at 25 C, of which at least 25 % would be available at -80 C, at a moderate rate of C/20. Each probe contains two batteries and two such probes will be deployed. The selected cell is designed around an approximate 1/2 "D" cells, with flat plate electrodes. Significant improvements to the conventional Li-SOCl2 cell include: (a) use of tetrachlorogallate salt instead of aluminate for improved low temperature performance and reduced voltage delay, (b) optimization of the salt concentration, and (c) modification of the cell design to develop shock resistance to 80,000 g. We report here results from our several electrical performance tests, mission simulation tests, microcalorimetry and AC impedance studies, and Air gun tests. The cells have successfully gone through mission-enabling survivability and performance tests for the Mars Microprobe penetrator.

Frank, H.↗

Dust Mitigation for Mars Solar Arrays

Settling of atmospheric dust onto the surface of the solar array is potentially a lifetime-limiting factor for a power system on any Mars mission. For long-term operation of arrays on Mars, it will be necessary to develop techniques to remove deposited dust. Dust is expected to adhere to the array by Van der Waals adhesive forces. These forces are quite strong at the dust particle sizes expected. Dust removal methods must overcome this force. Removal methods can be categorized briefly into four categories: natural, mechanical, electromechanical, and electrostatic. The environment of Mars is expected to be an ideal one for use of electrostatic dust-removal techniques.

Landis, Geoffrey A.↗

Investigation of Desiccants and CO2 Sorbents for Advanced Exploration Systems 2015-2016

Advanced Exploration Systems are integral to crewed missions beyond low earth orbit and beyond the moon. The long-term goal is to reach Mars and return to Earth, but current air revitalization systems are not capable of extended operation within the mass, power, and volume requirements of such a mission. Two primary points are the mechanical stability of sorbent pellets and recovery of sorbent productivity after moisture exposure in the event of a leak. In this paper, we discuss the present efforts towards screening and characterizing commercially-available sorbents for extended operation in desiccant and CO2 removal beds.

Knox, James C.↗

Development of a Multi-Phase Mission Planning Tool for NASA X-57 Maxwell

The physical design and operation of electric aircraft like NASA Maxwell X-57 are significantly different than conventionally fueled aircraft. Operational optimization will require close coupling of aerodynamics, propulsion, and power. To address the uncertainty of electric aircraft operation, a system level Mission Planning Tool is developed to simulate all aircraft trajectory phases: taxi, motor run-up, takeoff, climb, cruise, and descent. The Mission Planning Tool captures performance parameters at each point of the trajectory including battery state of charge, the temperatures of components in the electrical system, and propulsion system thrust. This work describes the modeling of each mission phase, and compares the results of simulating a user-specified trajectory, and using a collocated optimal control approach to determine an optimal trajectory. The results show that optimization of the mission show a significant increase in the final battery state of charge over the user- specified simulation strategy. These results will inform the operation of the NASA Maxwell X-57 test flights that will take place this year.

Schnulo, Sydney L.↗

Polar Volatiles Exploration in Peary Crater Enabled by NASA's Kilopower Project

For more than 50 years, scientists have discussed the possibility of the existence of water ice and other frozen volatiles at the lunar poles [1]. However, it was not until the 1990s when the polar orbiting spacecraft Clementine and Lunar Prospector collected data supporting these hypotheses [2]. Subsequent missions, including the Lunar Reconnaissance Orbiter (LRO) mission [3], and the Lunar Crater Observation and Sensing Satellite (LCROSS) mission [4], provided further evidence that supports the existence of water ice deposits at the lunar poles. During NASA's Constellation Program, several areas at both lunar poles polar were included in 50 Regions of Interest (ROI) for intensive study by the Lunar Reconnaissance Orbiter Camera (LROC) [5]. These polar ROI focused on peaks and craters rims that received high amounts of solar illumination, assuming initial missions back to the lunar surface would utilize solar arrays to generate electricity. Recently, the successful demonstration of NASA's Kilopower Project at the National Nuclear Security Administration (NNSA) Nevada National Security Site makes it possible to consider lunar polar missions at locations other than highly illuminated regions. The Kilopower Project was initiated in 2015 to demonstrate subsystem-level technology readiness of a small space fission power system [6]. This abstract describes the science objectives and operations for a mission concept developed at NASA Glenn Research Center's COMPASS Concurrent Engineering Team for a 1-year exploration of Peary Crater focused on prospecting for lunar polar volatiles.

Gruener, J. E.↗

Airborne Trajectory Management for Urban Air Mobility

Urban Air Mobility (UAM) has captured the imagination of the public and the aviation industry for someday soon moving people and goods through and around metropolitan areas using Unmanned Aircraft Systems (UAS) that are electrically powered, environmentally friendly, and autonomously operated. Significant investment and rapid development of vehicles for this activity is taking place, with package delivery services already beginning in some areas. However, the ability to manage thousands of these vehicles safely in a congested urban area presents a challenge unprecedented in air traffic management. Initial studies of this problem led by NASA under the UAS Traffic Management (UTM) initiative have primarily focused on geo-fencing and centralized reservation of airspace for individual flights. This paper proposes an extension of UTM using a de-centralized approach employing airborne surveillance, self-separation, and a minimized “design separation” approach to permit the optimization and safety of each flight in very high traffic densities and close proximities. The concept employs Airborne Trajectory Management (ABTM) principles and a novel new concept for variable separation criteria to manage the angular velocity of a passing vehicle, thus eliminating the "startle factor" and perceived hazard of very close operations. ABTM also accomplishes most of the services required for safe planning and execution of normal flights and recovery from abnormal or emergency operations while accommodating conventional piloted flights using the current air traffic control paradigm. The environment for UAM operations is described along with the proposed means for autonomous, tactical separation of the vehicles. Sample geometries of traffic conflicts and resolutions are shown and the airspace definitions, rules for flight within them, and additions and exemptions to the rules for these flights are listed and explained.

Cotton, William↗

Overview of NASA's Solar Electric Propulsion Project

NASA is continuing to develop and qualify a state of the art 13 kW-class Advanced Electric Propulsion System (AEPS) for NASA exploration missions through a contract with Aerojet Rocketdyne (AR). An objective of the AEPS project is accelerate the adoption of high power electric propulsion technologies by reducing the risk and uncertainty of integrating Solar Electric Propulsion (SEP) technologies into space flight systems. NASA and AR have recently initiated testing of engineering hardware including the Hall Current Thruster (HCT), Power Processing Unit (PPU), and Xenon Flow Controller (XFC) at both the component and system levels. The successful completion of these tests will provide the required information to advance the AEPS system towards Critical Design Review. In support of the AEPS contract, NASA and JPL have been performing risk reduction activities to address specific concerns of this higher power Hall thruster propulsion system. These risk reduction activities have included long duration wear testing of the Technology Demonstration Unit (TDU) Hall thruster and cathode hardware, thermal cycling of TDU cathode heaters and coils, plasma plume measurements, and performed early circuit testing of the AEPS PPU design. In addition to the propulsion system development, the SEP project is developing the Plasma Diagnostic Package (PDP) and the SEP Testbed. The PDP is designed for use in conjunction with a high-powered electric propulsion (EP) system to characterize in-space operation. The SEP Testbed system is being developed to demonstrate integrated SEP system performance. The paper presents an overview of the NASA and the AEPS contract activities and a summary of the associated NASA in-house activities.

Plasma diagnostics package↗

Application of Analytical Hierarchy Process for Narrowing Down Nep Candidate Reactor Designs

NASA is currently studying the possibility of human exploration of Mars in the late 2030s timeframe using a hybrid nuclear electric propulsion (NEP)/chemical propulsion system. Present analyses indicate such a mission could require a reactor power system in the range of 2 to 6 MWe operating for approximately 3 years. At present, the Technology Readiness Levels (TRL) of key NEP technologies are still low, implying that significant technology development activities must be undertaken prior to making informed design selections for an integrated propulsion system. NASA’s Space Nuclear Propulsion (SNP) project has recently undertaken an in-depth effort to identify NEP candidate technologies and determine the required developmental work to mature these technologies to the point where they could realistically support the design and assembly of a full NEP system. A version of the Analytical Hierarchy Process is being employed to narrow the technology candidates for SNP investment planning. This multi-attribute decision-making process relies on quantified technical inputs and the judgement of Subject Matter Experts (SMEs) to evaluate technology options against key technical and programmatic Figures-of-Merit (FOM) at the subsystem and optimized system level. The process and an example evaluation of nuclear fuel/moderator combinations in a sodium heat pipe honeycomb-geometry reactor concept are described. The evaluation and analysis methodology described in this paper can be employed for pairwise comparisons between reactor concepts and technology choices as new data become available.

Dasari V Rao↗

Phase-Free Orbital Element Model Designed to Enable Rapid Assessment of Eclipse and Radiation Profiles for Low-Thrust Spiral Transfers Around the Earth

The Gateway Power and Propulsion Element (PPE) will be the first low-thrust solar electric ion propulsion mission to transfer from a highly elliptical Earth-bound orbit to a southern near-rectilinear halo orbit (NRHO) at the Earth-Moon L2 point. Due to the low thrust nature of the transfer orbit, it is desirable to locate viable trajectories that minimize the time spent in the Van Allen radiation belts to reduce solar array degradation and keep radiation dosages below design limits. In addition to radiation, low thrust trajectories which spiral around the Earth will pass through at least one or more seasons of Earth eclipses. The solar electric propulsion system relies on sunlight to generate the power necessary to operate the ion thrusters. Therefore, it is advantageous to find trajectories which also minimize the amount of time spent in eclipse and avoid excessive battery draw-down periods. We present an analytical method which rapidly approximates low-thrust spiral trajectories, fit to high-fidelity simulated data and parameterized to allow for changes in vehicle thrust characteristics, that is post-processed to determine eclipse profiles and time spent in the belts using a novel approach that estimates the geometry of the belts using a first-order dipole approximation of the Earth’s magnetic field. This method can be used to find satisfactory launch dates and orbit orientations that can serve as initial guesses when optimizing such missions in high-fidelity software.

low thrust trajectory design↗

Phase-Free Orbital Element Model Designed to Enable Rapid Assessment of Eclipse and Radiation Profiles for Low-Thrust Spiral Transfers Around the Earth

The Gateway Power and Propulsion Element (PPE) will be the first low-thrust solar electric ion propulsion mission to transfer from a highly elliptical Earth-bound orbit to a southern near-rectilinear halo orbit (NRHO) at the Earth-Moon L2 point. Due to the low thrust nature of the transfer orbit, it is desirable to locate viable trajectories that minimize the time spent in the Van Allen radiation belts to reduce solar array degradation and keep radiation dosages below design limits. In addition to radiation, low thrust trajectories which spiral around the Earth will pass through at least one or more seasons of Earth eclipses. The solar electric propulsion system relies on sunlight to generate the power necessary to operate the ion thrusters. Therefore, it is advantageous to find trajectories which also minimize the amount of time spent in eclipse and avoid excessive battery draw-down periods. We present an analytical method which rapidly approximates low-thrust spiral trajectories, fit to high-fidelity simulated data and parameterized to allow for changes in vehicle thrust characteristics, that is post-processed to determine eclipse profiles and time spent in the belts using a novel approach that estimates the geometry of the belts using a first-order dipole approximation of the Earth’s magnetic field. This method can be used to find satisfactory launch dates and orbit orientations that can serve as initial guesses when optimizing such missions in high-fidelity software.

low thrust trajectory design↗

Arcjet system integration development

Compatibility between an arcjet propulsion system and a communications satellite was verified by testing a Government-furnished, 1.4 kW hydrazine arcjet system with the FLTSATCOM qualification model satellite in a 9.1-meter (30-foot) diameter thermal-vacuum test chamber. Background pressure was maintained at 10(exp -5) torr during arcjet operation by cryopumping the thruster exhaust with an array of 5 K liquid helium cooled panels. Power for the arcjet system was obtained from the FLTSATCOM battery simulator. Spacecraft telemetry was monitored during each thruster firing period. No changes in telemetry data attributable to arcjet operation were detected in any of the tests. Electromagnetic compatibility data obtained included radiated emission measurements, conducted emission measurements, and cable coupling measurements. Significant noise was observed at lower frequencies. Above 500 MHz, radiated emissions were generally within limits, indicating that communication links at S-band and higher frequencies will not be affected. Other test data taken with a diagnostic array of calorimeters, radiometers, witness plates, and a residual gas analyzer evidenced compatible operation, and added to the data base for arcjet system integration. Two test series were conducted. The first series only included the arcjet and diagnostic array operating at approximately 0.1 torr background pressure. The second series added the qualification model spacecraft, a solar panel, and the helium cryopanels. Tests were conducted at 0.1 torr and 10(exp-5) torr. The arcjet thruster was canted 20 degrees relative to the solar panel axis, typical of the configuration used for stationkeeping thrusters on geosynchronous communications satellites.

Zafran, Sidney↗