Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Nuclear Waste Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,153 records · Page 64

System impacts of accelerated transfer of used nuclear fuel to dry storage - 15220

In the wake of the September 11, 2001 terror attacks, and again after the March 11, 2011, accident at the Fukushima Dai-Ichi station from the Great East Japan Earthquake/tsunami, concern was expressed regarding security of current spent fuel storage practices in the United States. An approach recurrently proposed to reduce the potential for fire and the release of radionuclides in an accident or sabotage scenario is to reduce the loading of the reactor fuel pools, which are frequently maintained near their full capacity at many reactor sites in the U.S. We assess the impact on the waste management system of different scenarios for accelerating the schedule of used nuclear fuel (UNF) transfer from reactor pools to dry storage casks. We consider scenarios where the spent fuel pools are drawn down to 50% or 25% of full capacity over 5- or 10-year schedules. The scenarios include status quo, where UNF continues to remain in dry storage at the reactor sites, as well as scenarios with UNF transfer to interim storage and eventually to a mined geologic repository. The primary purpose is to evaluate how the different scenarios for accelerating the transfer of UNF to at-reactor dry storage would affect the performance of the entire UNF management system. Areas that were considered include an estimate of the additional system costs that could be incurred and where the existing infrastructure at the reactor sites would come under stress from the transfer demands. This study considered only the fuel-handling logistics and rough-order-of-magnitude cost at reactor sites, interim storage facility, and operations to package UNF into disposal canisters. The effects of minimum fuel age that could be transferred and the accelerated transfer starting date are also examined, but found to have relatively little effect. Impacts on safety and worker dose are not evaluated quantitatively, although effects can be inferred from increases in handling operations, etc. from the scenarios considered. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spent Nuclear Fuel Management and Disposal in Finland - Status and Lessons Learned at the End of 2015 - 16507

In November 2015 the Finnish Government approved and the Parliament ratified Posiva's 2012 License Application for Construction of a mined, deep geological repository for the spent nuclear fuel (SNF) at the Olkiluoto site in the Eurajoki municipality based upon recommendations provided by the Finnish Radiation Safety Authority (STUK), international expert groups and long-standing local support. The preceding siting process began in 1983 and it included disposal-concept selection (KBS-3V), 'consent-based' site selection and large-scale in-situ tests conducted in an underground research laboratory, the ONKALO, situated ∼440 m below the mean Sea level immediately adjacent to the planned repository at the Olkiluoto site. At the end of 2015, the Finnish SNF repository is projected to open in 2024 as the first of its kind. Four related lessons learned in Finland during the past 30 years are: 1. The selection of potentially-suitable sites for geological disposal of SNF proved to be more difficult and more time consuming than initially envisioned. 2. The siting of nuclear facilities has evolved from being mainly a radionuclide containment and isolation challenge to becoming a critical moving-target, socio-political challenge governing progress with majority local acceptance being a fundamental imperative. 3. Public and political acceptance and support are strongly linked to the competency, credibility and transparency of the involved organisations and the maturity/pedigree of the proposed disposal concept. 4. Timely sharing lessons learned and conducting selective collaborations with other countries proved to be successful keys to timely and cost-effectively obtain and maintain public and political acceptance and support. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Study on the financing mechanism and management for decommissioning of nuclear installations in Malaysia

The whole cycle of the decommissioning process development of repository requires the relevant bodies to have a financial system to ensure that it has sufficient funds for its whole life cycle (over periods of many decades). Therefore, the financing mechanism and management system shall respect the following status: the national position, institutional and legislative environment, technical capabilities, the waste origin, ownership, characteristics and inventories. The main objective of the studies is to focus on the cost considerations, alternative funding managements and mechanisms, technical and non-technical factors that may affect the repository life-cycle costs. As a conclusion, the outcomes of this paper is to make a good recommendation and could be applied to the national planners, regulatory body, engineers, or the managers, to form a financial management plan for the decommissioning of the Nuclear Installation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deep Borehole Field Test Laboratory and Borehole Testing Strategy

Deep Borehole Disposal (DBD) of high-level radioactive wastes has been considered an option for geological isolation for many years (Hess et al. 1957). Recent advances in drilling technology have decreased costs and increased reliability for large-diameter (i.e., ≥50 cm [19.7”]) boreholes to depths of several kilometers (Beswick 2008; Beswick et al. 2014). These advances have therefore also increased the feasibility of the DBD concept (Brady et al. 2009; Cornwall 2015), and the current field test design will demonstrate the DBD concept and these advances. The US Department of Energy (DOE) Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (DOE 2013) specifically recommended developing a research and development plan for DBD. DOE sought input or expression of interest from States, local communities, individuals, private groups, academia, or any other stakeholders willing to host a Deep Borehole Field Test (DBFT). The DBFT includes drilling two boreholes nominally 200m [656’] apart to approximately 5 km [16,400’] total depth, in a region where crystalline basement is expected to begin at less than 2 km depth [6,560’]. The characterization borehole (CB) is the smaller-diameter borehole (i.e., 21.6 cm [8.5”] diameter at total depth), and will be drilled first. The geologic, hydrogeologic, geochemical, geomechanical and thermal testing will take place in the CB. The field test borehole (FTB) is the larger-diameter borehole (i.e., 43.2 cm [17”] diameter at total depth). Surface handling and borehole emplacement of test package will be demonstrated using the FTB to evaluate engineering feasibility and safety of disposal operations (SNL 2016).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Salt Heater Test (FY19), Rev. 2

This report summarizes the 2019 fiscal year (FY19) status of the borehole heater test in salt funded by the US Department of Energy Office of Nuclear Energy (DOE-NE) Spent Fuel and Waste Science & Technology (SFWST) campaign. This report satisfies SFWST level-three milestone report M3SF-19SN010303033. This report is an update of the April 2019 level-two milestone report M2SF-19SNO10303031 to reflect the nearly complete as-built status of the borehole heater test. This report discusses the fiscal year 2019 (FY19) design, implementation, and preliminary data interpretation plan for a set of borehole heater tests call the brine availability tests in salt (BATS), which is funded by the DOE Office of Nuclear Energy (DOE-NE) at the Waste Isolation Pilot Plant (WIPP), a DOE Office of Environmental Management (DOE-EM) site. The organization of BATS is outlined in Project Plan: Salt In-Situ Heater Test (SNL, 2018). An early design of the field test is laid out in Kuhlman et al. (2017), including extensive references to previous field tests, which illustrates aspects of the present test. The previous test plan by Stauffer et al. (2015) places BATS in the context of a multi-year testing strategy, which involves tests of multiple scales and processes, eventually culminating in a drift-scale disposal demonstration. This level-3 milestone report is an update of a level-2 milestone report from April 2019 by the same name. The update adds as-built details of the heater test, which at the time of writing (August 2019) is near complete implementation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Transition From Operation to Decommissioning with a Sudden Decision to Permanent Shutdown and with Parallel Operation On-site - 18559

In a short time the Swedish nuclear operator OKG have to shift from a operator of three nuclear power plants at one site to a company where both decommissioning and operation will take place in parallel for numerous of years as a result of a decision to permanently shut down two of the three reactors. The paper will be focusing on the challenges to change organization and mind-set from operations to decommissioning within parts of a company while still maintaining and developing the highest standard for the plant still in operation, and this in the combination with a decision of permanent shutdown earlier than expected. The paper will also address how OKG managed to create and maintain momentum in essential processes like permits, defueling and project planning before, during and short after the organization was changed and some of the employees had to leave the company. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CLOSURE REPORT FOR CORRECTIVE ACTION UNIT 577 AREA 5 CHROMIUM CONTAINING WASTE DISPOSAL CELLS

Report will be submitted to the state of Nevada Corrective Action Unit (CAU) 577, “Area 5 Chromium Containing Waste Disposal Cells,” includes five low-level waste cells at the Nevada National Security Site (NNSS) Area 5 Radioactive Waste Management Site (RWMS) where buried waste received from Nuclear Fuel Services, Inc. (NFS), was subsequently determined to contain chromium that exceeded the Toxicity Characteristic Leaching Procedure regulatory limit, which would require the waste to carry hazardous waste code D007. CAU 577 was created to satisfy the requirements of the Settlement Agreement (SA) executed between the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office on April 25, 2019. The SA required that the chromium-containing waste received from NFS would be addressed following the closure process laid out in the Federal Facility Agreement and Consent Order (FFACO). The FFACO process ensures proper closure of the chromium-containing waste cells and documentation of that closure through FFACO-type documents (NDEP 2019). As stipulated in Paragraph 5C of the SA, a Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) was prepared that identified and evaluated risks and corrective action alternatives (CAAs) for CAU 577, provided the plan for implementing the recommended CAA, and presented the post-closure plan (U.S. Department of Energy [DOE] Environmental Management [EM] Nevada Program 2021).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

International Governmental Collaboration on Best Practice in Aging Infrastructure Management - 18027

Legacy nuclear sites in the US, UK and Canada are all facing a similar challenge of completing their operational and cleanup missions in parallel in a safe, efficient and cost-effective manner. Compounding the challenge is the fact that many important facilities are old with a significant level of deferred maintenance/capital needs, resulting in the need for a strategic approach to infrastructure management to ensure that maintenance and capital funding is directed at the highest priority items and that neither operations nor ongoing Decontamination and Decommissioning (D and D) activities are compromised. To help address this challenge, a Technical Information Exchange meeting was held in Ottawa, Canada in early June 2017 which brought together responsible parties from; - Government agencies including the UK Nuclear Decommissioning Authority (NDA), US Department of Energy Environmental Management (DOE EM), US National Nuclear Security Administration (NNSA), Atomic Energy of Canada Ltd (AECL) and Canadian Department of Defense - Implementers and other Government entities including Savannah River National Laboratory, Idaho National Laboratory and Canadian Nuclear Laboratories (CNL) - Associations including representation on behalf of the Institute of Asset Management and; - Contractors including Mission Support Alliance, Mott McDonald, and Longenecker and Associates The objective of this meeting was to share information about respective 'best practices' and to begin to develop common approaches to the prioritization and management of aging infrastructure investment across the organizations. The exchange focused on identifying common critical issues which were discussed through a series of presentations and small group discussions. The outcome from the meeting was an improved understanding by all participants of the latest approaches being applied to Infrastructure Asset Management and the formation of four International Working Groups which now meet on a regular (4-6 week) basis to share lessons learned and to develop international best practice in their area of interest. This paper details; - the issues and challenges that were identified during the meeting - how these were assimilated and distilled into discrete areas to enable formation of specific Working Groups - progress made by the Working Groups to date. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comparison of microprecipitation methods for polonium source preparation for alpha spectrometry

Detection of radioactive isotopes of polonium is important for understanding natural processes, management and assessment of radioactive waste, and nuclear forensics applications. Further, the most common methods for preparation of polonium samples for alpha spectrometry are electrodeposition and spontaneous deposition which are time consuming. Here, we compare three approaches utilizing rapid microprecipitation from bismuth phosphate, copper sulfide, or tellurium alongside traditional spontaneous deposition methods. From these experiments, results show that copper sulfide microprecipitation recoveries are similar to spontaneous deposition on silver and less time consuming with an approximate five-fold decrease in preparation time, including in the presence of complex matrices like seawater.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Fiscal Year 2010 Program of the U.S. DOE Office of Groundwater and Soil Remediation

The mission of the Office of Groundwater and Soil Remediation (EM-32) is to perform assessments, establish technical criteria and promote cross-site integration. The Office provides guidance for the development and implementation of plans for remediation of groundwater and is responsible for development of technologies needed to reduce risk from groundwater contamination. It is also responsible for providing technical direction and/or assistance to sites in resolving difficult technical groundwater and soil remediation problems. This paper discusses the activities funded by EM-32 for FY-2010.

54 ENVIRONMENTAL SCIENCES↗

Journal of Undergraduate Research, Volume IX, 2009

Each year more than 600 undergraduate students are awarded paid internships at the Department of Energy’s (DOE) National Laboratories. Th ese interns are paired with research scientists who serve as mentors in authentic research projects. All participants write a research abstract and present at a poster session and/or complete a fulllength research paper. Abstracts and selected papers from our 2007–2008 interns that represent the breadth and depth of undergraduate research performed each year at our National Laboratories are published here in the Journal of Undergraduate Research. The fields in which these students worked included: Biology; Chemistry; Computer Science; Engineering; Environmental Science; General Science; Materials Science; Medical and Health Sciences; Nuclear Science; Physics; Science Policy; and Waste Management.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

ATMOSPHERIC MODELING IN SUPPORT OF A ROADWAY ACCIDENT

The United States Forest Service-Savannah River (USFS) routinely performs prescribed fires at the Savannah River Site (SRS), a Department of Energy (DOE) facility located in southwest South Carolina. This facility covers {approx}800 square kilometers and is mainly wooded except for scattered industrial areas containing facilities used in managing nuclear materials for national defense and waste processing. Prescribed fires of forest undergrowth are necessary to reduce the risk of inadvertent wild fires which have the potential to destroy large areas and threaten nuclear facility operations. This paper discusses meteorological observations and numerical model simulations from a period in early 2002 of an incident involving an early-morning multicar accident caused by poor visibility along a major roadway on the northern border of the SRS. At the time of the accident, it was not clear if the limited visibility was due solely to fog or whether smoke from a prescribed burn conducted the previous day just to the northwest of the crash site had contributed to the visibility. Through use of available meteorological information and detailed modeling, it was determined that the primary reason for the low visibility on this night was fog induced by meteorological conditions.

54 ENVIRONMENTAL SCIENCES↗

Regulatory Consideration on Decommissioning Facilitation of Nuclear Power Plants In Korea

As the number of decommissioning NPPs worldwide increases, the necessity of decommissioning feasibility design at the initial design/construction stage of NPP is emphasized. Also as demand for NPP decommissioning increase, the generation of large amount of radioactive waste and environment contamination are expected. Based on the decommissioning experiences of nuclear facilities, it is recognized that the specific design and operational procedure are essentially required to minimize the radioactive waste generation and radiation exposure during decommissioning. Recently the legal framework of decommissioning in Korea was enhanced through the revision of Nuclear Safety Act (NSA) and its subordinate status in 2015. On the other hand, the Korean first NPP, Kori unit 1, will be scheduled permanently shut-down in mid-2017. The Korean regulatory body have experience for decommissioning of small-sized nuclear facilities like research reactors and nuclear fuel cycle facility. However we have no experience on decommissioning of NPP in Korea. Therefore the comprehensive and systematic technical standards and guidelines on safety review and inspection should be required for the Korean first case on decommissioning of NPP. According to the revised NSA, NPP operators in Korea should submit the decommissioning plan (DP) for the permanent shut-down NPP as well as the existing operating NPPs. The operator shall prepare and submit the design features and measures for decommissioning facilitation as one of DP items and regulatory body shall review the feasibility of decommissioning. Therefore the safety review guideline for those decommissioning facilitation should be required. In this paper, we studied the overseas safety requirements, design features and operational procedures for decommissioning facilitation. Through the overseas survey results, the regulatory position and major management plan were proposed for development of detailed implementation guideline on decommissioning facilitation of NPPs in Korea.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transitioning From Operations to Decommissioning - 16049

With the recent unplanned shutdown of a number of U.S. Nuclear Power Plants, a benchmarking effort was conducted in late 2104 to capture the lessons learned from these recently shutdown sites. The specific plants benchmarked for this effort included San Onofre Nuclear Generating Station (SONGS), Kewaunee, Zion, and Crystal River Nuclear Power Stations. The benchmark results found for the most part, site personnel had little or no decommissioning experience and in fact, were not aware of the challenges facing a plant in transitioning from operations to decommissioning. This lack of experience and knowledge resulted in a steep learning curve, a loss of productivity, and significant challenges by plant personnel prepared the site for decommissioning. The results of the benchmark identified a number of areas and challenges facing an operating plant during this period. All sites visited identified four key areas where significant cost savings and planning effectiveness could have been realized if they had been better prepared. The areas included transition planning, staffing, stakeholder involvement, and cost estimating. It was recognized if these areas are aggressively managed early in the process, it will have a significant positive impact on the effectiveness and cost of decommissioning and can better set the stage for a successful project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The User Guide for the ComPro Database

An extensive database of glass composition and durability data has been compiled at Savannah River National Laboratory to support the development of nuclear waste glasses. This database is referred to as the Glass Composition-Properties Database (ComPro). The ComPro Database, Revision 3, contains 14,134 total rows of data and 125 columns of composition, durability, as defined by the Product Consistency Test, and other fabrication and characterization information, if available, for each glass. Of the 14,134 total rows, 8,484 rows have been classified as “Model” data and 5,650 rows have been classified as “Non-Model” data. An integral supplement to the ComPro database is the User Guide. The User Guide was developed as a tool to aid the End User in a more effective use of the ComPro database. The User Guide provides a road-map of the specific datasets that comprise the ComPro database (both “Model” and “Non-Model” data) as well as a technical basis for the terminology and definitions the End User will encounter. In this report, a general description of the format and information contained in the User Guide is provided. In addition, specific terminology used in the User Guide is also discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Knowledge Management in the Field of Nuclear Energy - How to Bridge the Gap between Retiring Workforce and Next Generations - 17101

The current phase-out decision of the German Federal Government and the 'Energiewende' - resulting from the Fukushima Daiichi Accident in 2011 - changed the nuclear market significantly. Together with the change in political and social attitude towards nuclear energy since 2002 it has contributed to a decline in technical expertise. This as well as the generation change in the nuclear technology lead to the risk of losing accumulated knowledge and experience which still are essential for the future - not only in Germany but in other countries - even though the focus in Germany will shift from operating to decommissioning, dismantling and radioactive waste management. A long-term strategy in order to preserve technical expertise to solve the forthcoming tasks in Germany was required. This strategy should include e.g. the implementation of technical programs not only for internal training of the staff but also for authorities. Together with authorities TUV NORD developed individual training concepts for a broad range of customers to preserve a transfer of know-how with the state-of-the-art in science and technology and even support international projects, especially in countries with less experience in the nuclear fields. Additionally, special data bases were developed in order to ensure the accessibility of long-term nuclear data storage. Furthermore technical conferences in different fields like decommissioning and radioactive waste disposal were established as an opportunity for knowledge exchange. Based on given examples it is being demonstrated how technical expertise can be preserved even though the field of nuclear energy in Germany has changed. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Accelerating the disposition of transuranic waste from LANL - 9495

Los Alamos National Laboratory (LANL) was established during World War II with a single mission -- to design and build an atomic bomb. In the 65 years since, nuclear weapons physics, design and engineering have been the Laboratory's primary and sustaining mission. Experimental and process operations -- and associated cleanout and upgrade activities -- have generated a significant inventory of transuranic (TRU) waste that is stored at LANL's Technical Area 54, Material Disposal Area G (MDA G). When the Waste Isolation Pilot Plant (WIPP) opened its doors in 1999, LANL's TRU inventory totaled about 10,200 m{sup 3}, with a plutonium 239-equivalent curie (PE Ci) content of approximately 250,000 curies. By December 2008, a total of about 2,300 m3 (61,000 PE Ci) had been shipped to WIPP from LANL. This has resulted in a net reduction of about 1,000 m{sup 3} of TRU inventory over that time frame. This paper presents progress in dispositioning legacy and newly-generated transuranic waste (TRU) from ongoing missions at the LANL. The plans for, and lessons learned, in dispositioning several hundred high-activity TRU waste drums are reviewed. This waste population was one of the highest risks at LANL. Technical challenges in disposition of the high-activity drums are presented. These provide a preview of challenges to be addressed in dispositioning the remaining 6,800 m{sup 3} of TRU stored above ground and 2,400 m{sup 3} of TRU waste that is 'retrievably' stored below-grade. LANL is using subcontractors for much of this work and has formed a strong partnership with WIPP and its contractor to address this cleanup challenge.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗