Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Ground System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,153 records · Page 64

Implementing Distributed Operations: A Comparison of Two Deep Space Missions

Two very different deep space exploration missions--Mars Exploration Rover and Cassini--have made use of distributed operations for their science teams. In the case of MER, the distributed operations capability was implemented only after the prime mission was completed, as the rovers continued to operate well in excess of their expected mission lifetimes; Cassini, designed for a mission of more than ten years, had planned for distributed operations from its inception. The rapid command turnaround timeline of MER, as well as many of the operations features implemented to support it, have proven to be conducive to distributed operations. These features include: a single science team leader during the tactical operations timeline, highly integrated science and engineering teams, processes and file structures designed to permit multiple team members to work in parallel to deliver sequencing products, web-based spacecraft status and planning reports for team-wide access, and near-elimination of paper products from the operations process. Additionally, MER has benefited from the initial co-location of its entire operations team, and from having a single Principal Investigator, while Cassini operations have had to reconcile multiple science teams distributed from before launch. Cassini has faced greater challenges in implementing effective distributed operations. Because extensive early planning is required to capture science opportunities on its tour and because sequence development takes significantly longer than sequence execution, multiple teams are contributing to multiple sequences concurrently. The complexity of integrating inputs from multiple teams is exacerbated by spacecraft operability issues and resource contention among the teams, each of which has their own Principal Investigator. Finally, much of the technology that MER has exploited to facilitate distributed operations was not available when the Cassini ground system was designed, although later adoption of web-based and telecommunication tools has been critical to the success of Cassini operations.

Cassini Mission↗

Mercury Sample Return using Solar Sails

A conventional Mercury sample return mission requires significant launch mass due to the large deltav required for the outbound and return trips, and the large mass of a planetary lander and ascent vehicle. Solar sailing can be used to reduce lander mass allocation by delivering the lander to a low, thermally safe orbit close to the terminator. Propellant mass is not an issue for solar sails so a sample can be returned relatively easily, without resorting to lengthy, multiple gravity assists. The initial Mercury sample return studies reported here were conducted under ESA contract ESTEC/16534/02/NL/NR, PI Colin McInnes, Technical Officer Peter Falkner. Updated solar sail capabilities were developed under the Ground System Demonstration program, funded by the NASA's In-Space Propulsion Technology (ISPT) Program.

Montgomery, Edward E.↗

The Glory Program: Global Science from a Unique Spacecraft Integration

The Glory program is an Earth and Solar science mission designed to broaden science community knowledge of the environment. The causes and effects of global warming have become a concern in recent years and Glory aims to contribute to the knowledge base of the science community. Glory is designed for two functions: one is solar viewing to monitor the total solar irradiance and the other is observing the Earth s atmosphere for aerosol composition. The former is done with an active cavity radiometer, while the latter is accomplished with an aerosol polarimeter sensor to discern atmospheric particles. The Glory program is managed by NASA Goddard Space Flight Center (GSFC) with Orbital Sciences in Dulles, VA as the prime contractor for the spacecraft bus, mission operations, and ground system. This paper will describe some of the more unique features of the Glory program including the integration and testing of the satellite and instruments as well as the science data processing. The spacecraft integration and test approach requires extensive analysis and additional planning to ensure existing components are successfully functioning with the new Glory components. The science mission data analysis requires development of mission unique processing systems and algorithms. Science data analysis and distribution will utilize our national assets at the Goddard Institute for Space Studies (GISS) and the University of Colorado's Laboratory for Atmospheric and Space Physics (LASP). The Satellite was originally designed and built for the Vegetation Canopy Lidar (VCL) mission, which was terminated in the middle of integration and testing due to payload development issues. The bus was then placed in secure storage in 2001 and removed from an environmentally controlled container in late 2003 to be refurbished to meet the Glory program requirements. Functional testing of all the components was done as a system at the start of the program, very different from a traditional program. The plan for Glory is to minimize any changes to the spacecraft in order to meet the Glory requirements. This means that the instrument designs must adhere to the existing interfaces and capabilities as much as possible. Given Glory's unique history and the potential science return, the program is one of significant value to both the science community and the world. The findings Glory promises will improve our understanding of the drivers for global climate change for a minimal investment. The program hopes to show that reuse of existing government assets can result in a lower cost, and fully successful mission.

Bajpayee Jaya↗

Novel Thin Film Sensor Technology for Turbine Engine Hot Section Components

Degradation and damage that develops over time in hot section components can lead to catastrophic failure of the turbine section of aircraft engines. A range of thin film sensor technology has been demonstrated enabling on-component measurement of multiple parameters either individually or in sensor arrays including temperature, strain, heat flux, and flow. Conductive ceramics are beginning to be investigated as new materials for use as thin film sensors in the hot section, leveraging expertise in thin films and high temperature materials. The current challenges are to develop new sensor and insulation materials capable of withstanding the extreme hot section environment, and to develop techniques for applying sensors onto complex high temperature structures for aging studies of hot propulsion materials. The technology research and development ongoing at NASA Glenn Research Center for applications to future aircraft, launch vehicles, space vehicles, and ground systems is outlined.

Wrbanek, John D.↗

Progress by the JWST Science Working Group

The JWST Science Working Group recently published a comprehensive, top-level review of JWST science in the journal Space Science Reviews (Gardner et al. 2006, SSR, 123, 485). That review paper gives details of the 4 JWST science themes, and describes the design of the observatory and ground system. Since publication, the SWG, working with members of the astronomical community, has continued to develop the science case for JWST, giving more details in a series of white papers. The white paper topics include first light, galaxy surveys, AGN, supernovae, stellar populations, and exoplanets. The white papers are in various stages of completion. In this poster, I will review recent progress.

Gardner, Jonathan P.↗

Measuring Image Navigation and Registration Performance at the 3-Sigma Level Using Platinum Quality Landmarks

Geostationary Operational Environmental Satellite (GOES) Image Navigation and Registration (INR) performance is specified at the 3- level, meaning that 99.7% of a collection of individual measurements must comply with specification thresholds. Landmarks are measured by the Replacement Product Monitor (RPM), part of the operational GOES ground system, to assess INR performance and to close the INR loop. The RPM automatically discriminates between valid and invalid measurements enabling it to run without human supervision. In general, this screening is reliable, but a small population of invalid measurements will be falsely identified as valid. Even a small population of invalid measurements can create problems when assessing performance at the 3-sigma level. This paper describes an additional layer of quality control whereby landmarks of the highest quality ("platinum") are identified by their self-consistency. The platinum screening criteria are not simple statistical outlier tests against sigma values in populations of INR errors. In-orbit INR performance metrics for GOES-12 and GOES-13 are presented using the platinum landmark methodology.

Carr, James L.↗

Observing Gamma-ray Bursts with GLAST

The Gamma-ray Large Area Telescope (GLAST) is a satellite-based observatory to study the high-energy gamma-ray sky. The Large Area Telescope, the main instrument, is a pair-conversion telescope which will survey the sky in the energy range 20 MeV to greater than 300 GeV. The LAT's wide field of view (greater than 2 sr), large effective area and low deadtime combine to provide excellent high-energy gamma-ray observations of GRB. To tie these frontier high-energy observations to the better-known properties at lower energies, a second instrument, the GLAST Burst Monitor (GBM) will provide important spectra and timing in the 8 keV to 30 MeV range. Upon detection of a GRB by the LAT or the GBM, the spacecraft can autonomously repoint to keep the GRB location within the LAT field of view, allowing high-energy afterglow observations. We describe how the instruments, spacecraft, and ground system work together to provide observations of gamma-ray bursts from 8 keV to over 300 GeV and provide rapid notification of these observations to the wider gamma-ray burst community. Analysis and simulation tools dedicated to the GRB science have been developed. In this contribution we show the expected LAT sensitivity obtained with such simulations, and illustrate the results we expect from GLAST observations with spectral and temporal analysis of simulated GRB.

McEnery, Julie↗

Schema for Spacecraft-Command Dictionary

An Extensible Markup Language (XML) schema was developed as a means of defining and describing a structure for capturing spacecraft command- definition and tracking information in a single location in a form readable by both engineers and software used to generate software for flight and ground systems. A structure defined within this schema is then used as the basis for creating an XML file that contains command definitions.

Laubach, Sharon↗

Flight Test Performance of a High Precision Navigation Doppler Lidar

A navigation Doppler Lidar (DL) was developed at NASA Langley Research Center (LaRC) for high precision velocity measurements from a lunar or planetary landing vehicle in support of the Autonomous Landing and Hazard Avoidance Technology (ALHAT) project. A unique feature of this DL is that it has the capability to provide a precision velocity vector which can be easily separated into horizontal and vertical velocity components and high accuracy line of sight (LOS) range measurements. This dual mode of operation can provide useful information, such as vehicle orientation relative to the direction of travel, and vehicle attitude relative to the sensor footprint on the ground. System performance was evaluated in a series of helicopter flight tests over the California desert. This paper provides a description of the DL system and presents results obtained from these flight tests.

Pierrottet, Diego↗

NASA Flight Operations of Ikhana and Global Hawk

This viewgraph presentation reviews the flight operations of Ikhana and Global Hawk Fire missions. The Ikhana fire missions modifications, ground systems, flight operations, range safety zones, primary and secondary emergency landing sites, and the Ikhana western states fire missions of 2007 are described, along with The Global Hawk specs, a description of the Global Hawk Pacific Science Campaign (GloPac '09) and GloPac payloads.

Posada, Herman D.↗

A Summary of NASA and USAF Hypergolic Propellant Related Spills and Fires

Several unintentional hypergolic fluid related spills, fires, and explosions from the Apollo Program, the Space Shuttle Program, the Titan Program, and a few others have occurred over the past several decades. Spill sites include the following government facilities: Kennedy Space Center (KSC), Johnson Space Center (JSC), White Sands Test Facility (WSTF), Vandenberg Air Force Base (VAFB), Cape Canaveral Air Force Station (CCAFS), Edwards Air Force Base (EAFB), Little Rock AFB, and McConnell AFB. Until now, the only method of capturing the lessons learned from these incidents has been "word of mouth" or by studying each individual incident report. The root causes and consequences of the incidents vary drastically; however, certain "themes" can be deduced and utilized for future hypergolic propellant handling. Some of those common "themes" are summarized below: (1) Improper configuration control and internal or external human performance shaping factors can lead to being falsely comfortable with a system (2) Communication breakdown can escalate an incident to a level where injuries occur and/or hardware is damaged (3) Improper propulsion system and ground support system designs can destine a system for failure (4) Improper training of technicians, engineers, and safety personnel can put lives in danger (5) Improper PPE, spill protection, and staging of fire extinguishing equipment can result in unnecessary injuries or hardware damage if an incident occurs (6) Improper procedural oversight, development, and adherence to the procedure can be detrimental and quickly lead to an undesirable incident (7) Improper materials cleanliness or compatibility and chemical reactivity can result in fires or explosions (8) Improper established "back-out" and/or emergency safing procedures can escalate an event The items listed above are only a short list of the issues that should be recognized prior to handling hypergolic fluids or processing vehicles containing hypergolic propellants. The summary of incidents in this report is intended to cover many more issues than those listed above.

Nufer, Brian M.↗

Ares I-X 30 Day Report

This slide presentation represents the 30 day report on the Ares I-X test flight. Included in the review is information on the following areas: (1) Ground Systems, (2) Guidance, Navigation and Control, (3) Roll Response, (4) Vehicle Response, (5) Control System Performance, (6) Structural Damping, (7) Thrust Oscillation, (8) Stage Separation, (9) Connector Assessment, (10) USS Splashdown, (11) Data Recorder and (12) FS Hardware Assessment.

Ess, Bob↗

Life Cycle Cost Growth Study for the Discovery and New Frontiers Program Office

The D&NF Program Office LCC Management Study provides a detailed look at the drivers underlying cost overruns and schedule delays for five D&NF missions. While none of the findings are new, the study underlines the importance of continued emphasis on sound project management techniques: a clean project management structure with a clear definition of roles and responsibilities across the various partners in a project, an understanding of institutional standards and procedures and any differences among the partners, and the critical need for a comprehensive IMS that can be used easily and routinely to identify potential threats to the critical path. The study also highlights the continuing need for realistic estimates of the total LCC. Sufficient time and resources must be allocated early in a project to ensure that the appropriate trade studies and analyses are performed across all aspects of a mission: spacecraft, ground system, operations concept, and fault management, to ensure that proposed and confirmed costs truly reflect the resource requirements over the entire mission life cycle. These studies need to include a realistic review of the assumptions underlying the use of new technologies, the integration of heritage and new hardware and software into the total mission environment, and any development and test savings based on heritage technology and lessons learned. Finally, the LCC Management Study stresses the need to listen to, carefully consider, and take positive action regarding the issues raised during reviews by the expert review teams.

Barley, Bryan↗

Conflict-Aware Scheduling Algorithm

conflict-aware scheduling algorithm is being developed to help automate the allocation of NASA s Deep Space Network (DSN) antennas and equipment that are used to communicate with interplanetary scientific spacecraft. The current approach for scheduling DSN ground resources seeks to provide an equitable distribution of tracking services among the multiple scientific missions and is very labor intensive. Due to the large (and increasing) number of mission requests for DSN services, combined with technical and geometric constraints, the DSN is highly oversubscribed. To help automate the process, and reduce the DSN and spaceflight project labor effort required for initiating, maintaining, and negotiating schedules, a new scheduling algorithm is being developed. The scheduling algorithm generates a "conflict-aware" schedule, where all requests are scheduled based on a dynamic priority scheme. The conflict-aware scheduling algorithm allocates all requests for DSN tracking services while identifying and maintaining the conflicts to facilitate collaboration and negotiation between spaceflight missions. These contrast with traditional "conflict-free" scheduling algorithms that assign tracks that are not in conflict and mark the remainder as unscheduled. In the case where full schedule automation is desired (based on mission/event priorities, fairness, allocation rules, geometric constraints, and ground system capabilities/ constraints), a conflict-free schedule can easily be created from the conflict-aware schedule by removing lower priority items that are in conflict.

Wang, Yeou-Fang↗

Message Bus Architectures - Simplicity in the Right Places

There will always be a new latest and greatest architecture for satellite ground systems. This paper discusses the use of a proven message-oriented middleware (MOM) architecture using publish/subscribe functions and the strengths it brings to these mission critical systems. An even newer approach gaining popularity is Service Oriented Architectures (SOAs). SOAs are generally considered more powerful than the MOM approach and address many mission-critical system challenges. A MOM vs SOA discussion can highlight capabilities supported or enabled by the underlying architecture and can identify benefits of MOMs and SOAs when applied to differing sets of mission requirements or evaluation criteria.

Smith, Dan↗

Operating and Managing a Backup Control Center

Due to the criticality of continuous mission operations, some control centers must plan for alternate locations in the event an emergency shuts down the primary control center. Johnson Space Center (JSC) in Houston, Texas is the Mission Control Center (MCC) for the International Space Station (ISS). Due to Houston s proximity to the Gulf of Mexico, JSC is prone to threats from hurricanes which could cause flooding, wind damage, and electrical outages to the buildings supporting the MCC. Marshall Space Flight Center (MSFC) has the capability to be the Backup Control Center for the ISS if the situation is needed. While the MSFC Huntsville Operations Support Center (HOSC) does house the BCC, the prime customer and operator of the ISS is still the JSC flight operations team. To satisfy the customer and maintain continuous mission operations, the BCC has critical infrastructure that hosts ISS ground systems and flight operations equipment that mirrors the prime mission control facility. However, a complete duplicate of Mission Control Center in another remote location is very expensive to recreate. The HOSC has infrastructure and services that MCC utilized for its backup control center to reduce the costs of a somewhat redundant service. While labor talents are equivalent, experiences are not. Certain operations are maintained in a redundant mode, while others are simply maintained as single string with adequate sparing levels of equipment. Personnel at the BCC facility must be trained and certified to an adequate level on primary MCC systems. Negotiations with the customer were done to match requirements with existing capabilities, and to prioritize resources for appropriate level of service. Because some of these systems are shared, an activation of the backup control center will cause a suspension of scheduled HOSC activities that may share resources needed by the BCC. For example, the MCC is monitoring a hurricane in the Gulf of Mexico. As the threat to MCC increases, HOSC must begin a phased activation of the BCC, while working resource conflicts with normal HOSC activities. In a long duration outage to the MCC, this could cause serious impacts to the BCC host facility s primary mission support activities. This management of a BCC is worked based on customer expectations and negotiations done before emergencies occur. I.

Marsh, Angela L.↗

Computational Model of the Chilldown and Propellant Loading of the Space Shuttle External Tank

This paper describes a computational model of the chilldown and propellant loading of the Space Shuttle External Tank liquid oxygen and hydrogen tanks at Launch Complex 39B at Kennedy Space Center. The purpose of the computational model is to predict the time required to chilldown the entire assembly consisting of the ground system transfer line and propellant tanks in order to compare with observed loading times, to evaluate the feasibility of similar models developed for the Ares I Upper Stage. The model also predicts the history of inflow and outflow from the tank, pressure and temperature inside the tank, and heat leak through the walls. The Generalized Fluid System Simulation Program (GFSSP), a general purpose network flow analysis code, has been used to develop this computational model. The paper describes the simulation of the loading process for both tanks and compares the resulting predictions to measurements

LeClair, Andre C.↗

The Operational Land Imager (OLI) and the Thermal Infrared Sensor (TIRS) on the Landsat Data Continuity Mission (LDCM)

The Landsat Data Continuity Mission (LDCM), a joint NASA and United States Geological Survey (USGS) mission, is scheduled for launch in December, 2012. The LDCM instrument payload will consist of the Operational Land Imager (OLI), provided by Ball Aerospace and Technology Corporation (BATC) under contract to NASA and the Thermal Infrared Sensor (TIRS), provided by NASA's Goddard Space Flight Center (GSFC). This paper will describe the design, capabilities and status of the OLI and TIRS instruments. The OLI will provide 8 channel multispectral images at a spatial resolution of 30 meters and panchromatic images at 15 meter spatial resolution. The TIRS is a 100 meter spatial resolution push-broom imager whose two spectral channels, centered at 10.8 and 12 microns, split the ETM+ thermal bands. The two channels allow the use of the "split-window" technique to aid in atmospheric correction. The TIRS focal plane consists of three Quantum Well Infrared Photodetector (QWIP) arrays to span the 185 km swath width. The OLI and TIRS instruments will be operated independently but in concert with each other. Data from both instruments will be merged into a single data stream at the (USGS)/Earth Resources Observation and Science (EROS) facility. The ground system, being developed by USGS, includes an Image Assessment System (lAS), similar to Landsat-7's, to operationally monitor, characterize and update the calibrations of the two sensors.

Reuter, Dennis↗