At least 1,153 records · Page 64

Multinational underground nuclear parks

Newcomer countries expected to develop new nuclear power programs by 2030 are being encouraged by the International Atomic Energy Agency to explore the use of shared facilities for spent fuel storage and geologic disposal. Multinational underground nuclear parks (M-UNPs) are an option for sharing such facilities. Newcomer countries with suitable bedrock conditions could volunteer to host M-UNPs. M-UNPs would include back-end fuel cycle facilities, in open or closed fuel cycle configurations, with sufficient capacity to enable M-UNP host countries to provide for-fee waste management services to partner countries, and to manage waste from the M-UNP power reactors. M-UNP potential advantages include: the option for decades of spent fuel storage; fuel-cycle policy flexibility; increased proliferation resistance; high margin of physical security against attack; and high margin of containment capability in the event of beyond-design-basis accidents, thereby reducing the risk of Fukushima-like radiological contamination of surface lands. A hypothetical M-UNP in crystalline rock with facilities for small modular reactors, spent fuel storage, reprocessing, and geologic disposal is described using a room-and-pillar reference-design cavern. Underground construction cost is judged tractable through use of modern excavation technology and careful site selection. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Lessons Learned from the Application of Bulk Characterization to Individual Containers on the Brookhaven Graphite Research Reactor Decommissioning Project at Brookhaven National Laboratory - 12056

When conducting environmental cleanup or decommissioning projects, characterization of the material to be removed is often performed when the material is in-situ. The actual demolition or excavation and removal of the material can result in individual containers that vary significantly from the original bulk characterization profile. This variance, if not detected, can result in individual containers exceeding Department of Transportation regulations or waste disposal site acceptance criteria. Bulk waste characterization processes were performed to initially characterize the Brookhaven Graphite Research Reactor (BGRR) graphite pile and this information was utilized to characterize all of the containers of graphite. When the last waste container was generated containing graphite dust from the bottom of the pile, but no solid graphite blocks, the material contents were significantly different in composition from the bulk waste characterization. This error resulted in exceedance of the disposal site waste acceptance criteria. Brookhaven Science Associates initiated an in-depth investigation to identify the root causes of this failure and to develop appropriate corrective actions. The lessons learned at BNL have applicability to other cleanup and demolition projects which characterize their wastes in bulk or in-situ and then extend that characterization to individual containers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Groundwater Transport of Organic Compounds in Old Salvage Yard, Oak Ridge, TN - 12089

In 1950's and early 1960's during production of nuclear weapons at the US Department of Energy Y-12 National Security Complex in Oak Ridge TN, volatile organic compounds (VOCs) as well as heavy metals, nitrates, and radionuclides were released to the environment. Field investigations revealed that much of this contamination is still present in soil, bedrock, and groundwater. Operational buildings and old disposal facilities at the site have been identified as major sources of contamination. The Old Salvage Yard (OSY) on the western side of the site has long been characterized as the major source of VOC contamination in soil and groundwater. In order to analyze the fate and transport of VOC contamination- including tetrachloroethene (PCE), 1,2- dichloroethene (1,2-DCE), cis-1,2-dichloroethene (cis-1,2-DCE) and vinyl chloride (VC) - in groundwater and soil at the vicinity of OSY, an integrated surface and subsurface flow and transport model has been developed for the Y-12 NSC using the hydrodynamic and transport numerical package, MIKE-SHE. Hydrogeological characteristics of the site such as hydraulic conductivity, and transport parameters such as partitioning coefficients were varied in an effort to delineate subsurface flow and transport pathways, potential downstream impacts on Upper East Fork Poplar Creek, and the potential risk to industrial workers involved in related Decontamination and Decommissioning (D and D) activities. The simulation results were compared with the analytical modeling results previously performed by McLane Environmental Inc. using SESOIL-AT123D. Specific simulations have been performed to investigate the effect of possible remedial action (removing the contaminated surface soil layers) on the fate and transport of VOCs. The results of the MIKE-SHE reported here can be considered as an upper limit for the predicted concentrations. Based on MIKE-SHE results, PCE, 1,2 DCE, cis-1,2-DCE, and VC are sources in soil with potential to equal or exceed industrial groundwater hazard and risk levels at the vicinity of OSY. VOC contaminants in soil and groundwater will decay below industrial groundwater risk and hazard levels within approximately 20 years. Excavation of surface soil layers at the site will considerably reduce the concentration of VOCs in groundwater and the possibility of migration of VOCs to surface waters. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Construction, Startup and Operation of a New LLRW Disposal Facility in Andrews County, Texas - 12151

During this last year, Waste Control Specialists LLC (WCS) completed construction and achieved start of operations of a new low level radioactive waste (LLRW) disposal facility in Andrews County Texas. Disposal operations are underway for commercial LLRW, and start up evolutions are in progress for disposal of Department of Energy (DOE) LLRW. The overall approach to construction and start up are presented as well as some of the more significant challenges and how they were addressed to achieve initial operations of the first new commercial low level radioactive waste disposal facility in more than 30 years. The WCS disposal facility consists of two LLRW disposal cells, one for Texas Compact waste, and a separate disposal cell for DOE waste. Both disposal cells have very robust and unique designs. The cells themselves are constructed entirely in very low permeability red bed clay. The cell liners include a 0.91 meter thick clay liner meeting unprecedented permeability limits, 0.3 meter thick reinforced concrete barriers, as well as the standard geo-synthetic liners. Actions taken to meet performance criteria and install these liners will be discussed. Consistent with this highly protective landfill design, WCS chose to install a zero discharge site water management system. The considerations behind the design and construction of this system will be presented. Other activities essential to successful start of LLRW disposal operations included process and procedure development and refinement, staffing and staff development, and training. Mock ups were built and used for important evolutions and functions. Consistent with the extensive regulation of LLRW operations, engagement with the Texas Commission on Environmental Quality (TCEQ) was continuous and highly interactive. This included daily activity conference calls, weekly coordination calls and numerous topical conference calls and meetings. TCEQ staff and consultants frequently observed specific construction evolutions, such as geological feature mapping of designated excavation faces, disposal cell clay liner installation, disposal cell concrete barrier construction, etc. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Final Radiological Conditions at Areas of the Niagara Falls Storage Site Remediated under the Formerly Utilized Sites Remedial Action Program - 12184

The U.S. Department of Energy (DOE) methods and protocols allow evaluation of remediation and final site conditions to determine if remediated sites remain protective. Two case studies are presented that involve the Niagara Falls Storage Site (NFSS) and associated vicinity properties (VPs), which are being remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). These properties are a part of the former Lake Ontario Ordnance Works (LOOW). In response to stakeholders concerns about whether certain remediated NFSS VPs were putting them at risk, DOE met with stakeholders and agreed to evaluate protectiveness. Documentation in the DOE records collection adequately described assessed and final radiological conditions at the completed VPs. All FUSRAP wastes at the completed sites were cleaned up to meet DOE guidelines for unrestricted use. DOE compiled the results of the investigation in a report that was released for public comment. In conducting the review of site conditions, DOE found that stakeholders were also concerned about waste from the Separations Process Research Unit (SPRU) at the Knolls Atomic Power Laboratory (KAPL) that was handled at LOOW. DOE agreed to determine if SPRU waste remained at that needed to be remediated. DOE reviewed records of waste characterization, historical handling locations and methods, and assessment and remediation data. DOE concluded that the SPRU waste was remediated on the LOOW to levels that pose no unacceptable risk and allow unrestricted use and unlimited exposure. This work confirms the following points as tenets of an effective long-term surveillance and maintenance (LTS and M) program: - Stakeholder interaction must be open and transparent, and DOE must respond promptly to stakeholder concerns. - DOE, as the long-term custodian, must collect and preserve site records in order to demonstrate that remediated sites pose no unacceptable risk. - DOE must continue to maintain constructive relationships with the U.S. Army Corps of Engineers and state and federal regulators. After review of historical site documentation, DOE reports, and USACE radiological data, DOE concluded the following: - DOE had access to adequate documentation to evaluate site conditions at the former LOOW. This is important to confirm now, while institutional knowledge of early FUSRAP work remains available. - DOE remediated the completed VPs to conditions that are protective for unrestricted residential use. Sample and walkover gamma scan results indicate that no wastes remain that exceed cleanup criteria. - Process knowledge and field observations establish that Cs-137 is the predominant radionuclide in the KAPL waste stream. Cs-137, a strong gamma emitter, was used as an indicator for remediation of KAPL waste. Other radionuclides were present in much lower relative concentrations and were likely also removed during remediation of the VPs. - KAPL contaminants were removed during remedial activities at the former LOOW as either co-located or co-mingled with other radionuclides. - For the active VPs (VP-E, VP-E', and VP-G), results of DOE's cleanup of the accessible portions of these properties indicate that KAPL waste does not remain at concentrations greater than the DOE cleanup limit: - Inaccessible areas were not associated with historic KAPL waste handling. Therefore, it is unlikely that KAPL waste remains on the active VPs. - Because gamma activity was used by DOE during remediation/verification activities for excavation control, additional USACE cleanup of FUSRAP wastes on these properties will likely result in the remediation of any co-located residual KAPL wastes to acceptable levels or identification of KAPL waste that is not co-located. - Although USACE has not established a cleanup level for Cs-137 on the active NFSS VPs, DOE assessment and remediation data indicate that assessed Cs-137 was remediated and significant Cs-137 is unlikely to remain. Because of the low likelihood of encountering significant KAPL waste on the active NFSS VPs, additional remediation is not anticipated at these properties. - USACE assessment soil sampling results on the NFSS proper indicate that KAPL waste does not exceed the DOE cleanup level for Cs-137. USACE has not established a cleanup level for Cs-137 on NFSS proper. The USACE cleanup of FUSRAP wastes on the NFSS proper will likely result in the remediation of any co-located residual KAPL wastes or identification of KAPL waste that is not co-located. DOE is drafting a report of the investigation of KAPL waste at LOOW. The report will be released to the public for comment when the draft is complete. DOE responses to stakeholder inquiries resulted in a common understanding of site conditions and site risk. DOE expects additional interaction with stakeholders at the former LOOW as USACE completes remediation of the active VPs and the NFSS proper, and these relationships will hopefully have built trust between DOE and the stakeholders that DOE will perform its duties in an open and transparent manner that includes stakeholders as stewards for remediated FUSRAP sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Refinement of Modeling Techniques for the Structural Evaluation of Hanford Single-Shell Nuclear Waste Storage Tanks - 12288

The single-shell tanks at the Hanford Site (in Washington State, USA) were constructed between 1943 and 1964 and are well beyond their estimated 25 year design life. This article discusses the structural analysis approach and modeling challenges encountered during the ongoing analysis of record for evaluating the structural integrity of the single-shell tanks. There are several geometrical and material nonlinearities and uncertainties to be dealt with while performing the modern finite element analysis of these tanks. The analysis takes into account the temperature history of the tanks and allowable mechanical operating loads for proper estimation of creep strains and thermal degradation of material properties. The loads prescribed in the analysis of record models also include anticipated loads that may occur during waste retrieval and closure. Due to uncertainty in a number of modeling details, sensitivity studies were conducted to address questions related to boundary conditions that realistically or conservatively represent the influence of surrounding tanks in a tank farm, the influence of backfill excavation slope, the extent of backfill and the total extent of undisturbed soil surrounding the backfill. Because of the limited availability of data on the thermal and operating history for many of the individual tanks, some of the data was assumed or interpolated. However, the models developed for the analysis of record represent the bounding scenarios and include the loading conditions that the tanks were subjected to or anticipated. The modeling refinement techniques followed in the analysis of record resulted in conservative estimates for force and moment demands at various sections in the concrete tanks. This article discusses the modeling aspects related to Type-II and Type-III single-shell tanks. The modeling techniques, methodology and evaluation criteria developed for evaluating the structural integrity of single-shell tanks at Hanford are in general applicable to other similar tanks or underground concrete storage structures. This article presented the details of the finite element models and analysis approach followed during the ongoing effort to establish structural integrity of single shell tanks at the Hanford site. The details of the material constitutive models applicable to the underground Hanford concrete tanks that capture the thermal and creep induce degradation are also presented. The thermal profiles were developed based on the available tank temperature data for the Type II and Type III single-shell tanks, and they were chosen to yield conservative demands under the thermal and operating loads analysis of these tanks. Sensitivity studies were conducted to address two issues regarding the soils modeled around the single-shell tanks. The results indicate that excluding the boundary separating the backfill soil from the undisturbed soil will result in conservative demands (plots 14b and 14c green lines for circumferential Demand/Capacity ratios). The radial extent study indicated that the soil model extending to 240 ft gave more conservative results than the model with 62 ft of soil (plots 17a and 17c magenta lines for hoop Demand/Capacity ratios). Based on these results, a 240 ft far-field soil boundary with backfill throughout the lateral extent was recommended and used for the finite element models used in the Type-II and Type-III analyses of record. The modeling effort and sensitivity studies discussed in this article helped in developing bounding models for the structural integrity evaluation of single shell tanks at the Hanford site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuisance Odors: Is there a Concern - 12340

Nuisance odors are generally thought of as just being annoying or unpleasant and not causing any physiological harm to our internal organs or other biologic systems. Yet during an excavation of buried animal remains, field workers experienced a multitude of symptoms that are associated with exposures to toxic materials. An examination of the decomposition process revealed that there is a potential off-gassing of a number of common, yet harmful chemicals including ammonia, mercaptans, hydrogen sulfide, butyric acid and phenol. In addition, other compounds, that have limited information such as established health data and occupational exposure limits, were also potential contaminants-of-concern. While a variety of monitoring and sampling techniques were used to assess worker exposures, all results indicated non-detectable airborne concentrations. Nevertheless, workers were experiencing such symptoms as nausea and headaches. As such, protective measures were necessary for field personnel to continue work while having confidence that the project was instituting sincere steps to ensure their health and safety. Researching the possible reasons for the causes of workers exhibiting adverse health effects from nuisance odors revealed that such exposures initiate electrochemical pathways, starting from the olfactory bulb to the brain, followed by a transfer of information to such biologic systems as the hypothalamus and pituitary gland. These systems, in turn, secrete hormones that cause a number of involuntary reactions; many of which are observed as typical adverse health effects, when in fact, they are merely reactions caused by the brain's memory; most likely created from previous experiences to unpleasant odors. The concern then focuses of how the Occupational Safety and Health community shall respond to such workplace exposures. Future work in this area may need to focus on the viability of current occupational exposure limits and the possibility of revising these standards. Another area of consideration would be whether nuisance odors will need separate and distinct criteria with regards to hazard identification and control. While evidence suggests that odorants do not cause direct toxicological effects to the various biologic systems, they can be influential by initiating symptoms that are associated with known toxins. The difference between the classic toxic systemic reactions and those initiated by nuisance odors can be summarized as one causing a dysfunction of a target organ or system as opposed to triggering a message to the brain which causes a physical reaction. While strong odors may exist at HAZWOPER work sites, their particular risk of pathogenic disease has yet to be established. This leaves many unanswered questions; the most obvious being, 'can an odorous chemical that can result in headaches, nausea, changes in blood pressure, body temperature, etc., be considered a toxin even if biological systems remain unaffected and sampling/monitoring protocol negative stimuli, thereby causing symptomatic experiences; will such disciplines as psychology need to be considered as part of the expertise within the field a environmental and occupational health? In the classic text, 'The Fundamentals of Industrial Hygiene' industrial hygiene has been defined as 'that science and art devoted to the anticipation, recognition, evaluation, and control of those environmental factors or stressors arising in or from the workplace that may cause sickness, impaired health and well-being, or significant discomfort among workers or among the citizens of the community'. Based on this definition, it is indeed the responsibility of the occupational health professional to move forward and to provide an effective program to 'anticipate, recognize, evaluate, and control' such airborne contaminants that may not be adequately controlled based on current knowledge and technology. The question is, 'Is the industrial hygiene community equipped to carry out this responsibility?' 'Are new assessment methods and tools necessary? Are alternate exposure limits needed and can they be adequately implemented? As more of the non-traditional health hazards become recognized, it appears that it shall be essential for more sophisticated methods to be part of the standard practice used to assess human health. Whether that means more sensitive equipment that has greater detection capabilities, or the development of new technologies designed specifically for these hazards, at present can only be left to speculation. While the occupational health community may wrestle with these questions, the responsibility of the safety and health community must maintain its diligence. As such, persons within the discipline of environmental and occupational health must continue to communicate the hazards and controls to the work force. Through such efforts, the workforce shall become engaged in the process of hazard identification, assessment and control, which, in turn, will create a greater appreciation and acceptance for field assessment methods as well as the processes by which workplace controls are designed to protect them. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation Technologies Screening Report for the Deep Vadose Zone, Hanford's Central Plateau - 12414

Deep Vadose Zone contamination is a significant issue because it represents a potential source for continued release of contamination to the groundwater and associated receptors. This contamination, which is the result of past waste disposal practices on the Hanford Site Central Plateau, occurs deep in the subsurface and is not easily remediated by typical surface remedies. The Deep Vadose Zone is defined as the sediment below the limit of typical surface-based remedies (such as, excavation or caps), but above the water table. The Central Plateau Deep Vadose Zone begins at a depth of approximately 15 m (50 ft) below ground surface and extends to a depth of approximately 76 m (250 ft) below ground surface. Cleanup of the Deep Vadose Zone is challenging because contamination is difficult to access and expensive to characterize; contaminants occur at different depths and soil types; conventional, surface-based remedies have limited effectiveness; and remedy performance is difficult to predict, test, and monitor. Typically, remedial technologies for Deep Vadose Zone contamination are less developed than for the shallow soil contamination or saturated groundwater contaminants. In addition, few remediation technologies have been tested in the field, and fewer still have been successfully implemented as full remedial actions. These challenges, along with the limited number of potentially applicable remediation technologies, complicate the decision-making process for evaluating and selecting Deep Vadose Zone remedial alternatives. The Deep Vadose Zone remediation technologies pre-screening involved a comprehensive review of potentially applicable technologies for remediating Deep Vadose Zone contamination in the Hanford Site's Central Plateau. The list of remediation technologies was developed from previous Hanford Site studies, science and technology databases, as well as other cleanup projects across the country that have similar conditions. The list of remediation technologies was shared with the public and stakeholders to provide an opportunity to identify additional technologies. From these efforts, 59 technologies that may support future remediation of the Deep Vadose Zone were identified. The initial list of 59 potential technologies were then screened in order to identify viable or potentially viable technologies whose implementation would benefit from further investigation and evaluation during the remedial investigation/feasibility study activities. This approach eliminated five technologies from further consideration because they either would not be ready to support remediation within the next 3 to 5 years or were not applicable for Deep Vadose Zone remediation. Eleven (11) technologies were identified as viable, requiring no further testing or investigation during the RCRA Facility Investigation/Remedial Investigation activities. The remaining 43 potentially applicable technologies were identified as requiring additional testing or investigation to determine whether they should be considered further in the selection of a remedial alternative for the 200-DV-1 Operable Unit. The results of this pre-screening effort will be used to plan and scope the appropriate field investigation, treatability study, and feasibility study tasks during development of the 200-DV-1 Operable Unit Work Plan. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning and Demolition of a Redundant UK Research Facility at AWE Aldermaston - 12453

The redundant two-storey brick built research facility on the AWE Site at Aldermaston, UK is in the closing stages of decommissioning and demolition. The facility was used for a variety of purposes up to 1995 predominately involving the use of alpha-emitting isotopes. The two main areas of alpha-based contamination have been decommissioned with the removal of hot -boxes and fume cupboards on the ground floor and HEPA filter units and ventilation equipment on the first floor. Many of these activities were undertaken using both airline fed suits, (supplied via a free standing mobile unit), and full face respirators. Asbestos materials were located and cleared from the first floor by specialist contractor. All sections of active drain running from the building to the site active effluent disposal system were removed early in the program using established techniques with specialist monitoring equipment used to provide confidence in the data required for disposal of the decommissioning debris. In particular a dedicated High Resolution Gamma Spectrometer (radioactive materials scanning unit) was utilized to categorise waste drums and wrapped packages. The building has been decommissioned and the monitoring and sampling of the structure was completed in November 2011 - the results demonstrating that the building was clear of contamination in accordance with UK clearance and exemption requirements. The demolition plan was developed and implemented in December with site excavation of foundations and site clearance currently ongoing in preparation for final site backfill activities and project close. A number of useful lessons have been learnt during the operations and are set out at the rear of the main text. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned: Tribal Community Engagement, Remediation and Restoration of a Uranium Mine Tailings Site, Navajo Nation - 12484

In May, 2011 New World Environmental Inc. was awarded a contract by the Navajo Nation Environmental Protection Agency to remediate an illegal radioactive waste disposal site located in the Navajo Nation. The initial scope included the excavation and shipment of an estimated 3,000 cubic yards of Uranium mine tailings and associated industrial waste. In this instance Stakeholders were supportive of the project, remediation and restoration, yet the movement of residual radioactive materials through tribal communities was a controversial issue. Other Stakeholder issues included site security, water sources for remediation activities, local residents' temporary re-location and care of livestock, right of way permissions and local workforce development. This presentation recaps the technical and non-technical issues encountered in the remediation and restoration the seven acre site and the outreach to surrounding communities. Cultural and equity issues resulting from historical problems associated with this and other sites in the immediate area and education and training. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

River Corridor Closure at DOE's Hanford Site - 12503

The discussion of Hanford's River Corridor will cover work that has already been completed plus the work remaining to be done. This includes the buildings, waste sites, and groundwater plumes in the 300 Area; large-scale burial ground remediation in the 600 Area; plutonium production reactor dismantling and 'cocooning' along the river; preservation of the world's first full-scale plutonium production reactor; removal of more than 14 million tons of contaminated soil and debris along the Columbia River shoreline and throughout the River Corridor; and the excavation of buried waste sites in the river shore area. It also includes operating an EPA-permitted low-level waste disposal facility in the central portion of the site. At the completions of cleanup in 2015, Hanford's River Corridor will be the largest closure project ever completed by the Department of Energy. Cleanup of the River Corridor has been one of Hanford's top priorities since the early 1990's. This urgency has been due to the proximity of hundreds of waste sites to the Columbia River. In addition, removal of the sludge from K West Basin, near the river, remains a high priority. This 220-square-mile area of the Hanford Site sits on the edge of the last free-flowing stretch of the Columbia River. The River Corridor portion of the Hanford Site includes the 100 and 300 Areas along the south shore of the Columbia River. The 100 Areas contain nine retired plutonium production reactors. These areas are also the location of numerous support facilities and solid and liquid waste disposal sites that have contaminated groundwater and soil. The 300 Area, located just north of the city of Richland, contains fuel fabrication facilities, nuclear research and development facilities, and their associated solid and liquid waste disposal sites that have contaminated groundwater and soil. In order to ensure that cleanup actions address all threats to human health and the environment, the River Corridor includes the adjacent areas that extend from the 100 Area and 300 Area to the Central Plateau. For sites in the River Corridor, remedial actions are expected to restore groundwater to drinking water standards and ensure that aquatic life in the Columbia River is protected by achieving ambient water quality standards. It is intended that these objectives be achieved, unless technically impracticable, within a reasonable timeframe. In those instances where remedial action objectives are not achievable in a reasonable time frame, or are determined to be technically impracticable, programs are being implemented to contain the plume, prevent exposure to contaminated groundwater, and evaluate further risk reduction opportunities as new technologies become available. River Corridor cleanup work also removes potential sources of contamination, which are close to the Columbia River, and places them on the Central Plateau for final disposal. The intent is to shrink the footprint of active cleanup to within the 75-square- mile area of the Central Plateau by removing excess facilities and remediating waste sites. Cleanup actions are supporting anticipated future land uses consistent with the Hanford Reach National Monument, where applicable, and the Hanford Comprehensive Land- Use Plan (DOE 1999). The River Corridor has been divided into six geographic decision areas to achieve source and groundwater remedy decisions. These decisions will provide comprehensive coverage for all areas within the River Corridor and will incorporate ongoing interim action cleanup activities. Cleanup levels will be achieved in order to support anticipated future land uses of conservation and preservation for most of this area and industrial use for the 300 Area. At the conclusion of cleanup actions, the federal government will implement long-term stewardship activities to ensure protection of human health and the environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Remediation Activities in Japan Following the Fukushima Dai-ichi Reactor Incident - 12603

In March 2011, the Fukushima Dai-ichi reactor power plant was crippled by the Great Pacific earthquake and subsequent tsunami. Much of the focus in the news was on the reactor site itself as the utility company (TEPCO), the Japanese government, and experts from around the world worked to bring the damaged plants into a safe shutdown condition and stem the release of radioactivity to the environment. Most of the radioactivity released was carried out to sea with the prevailing winds. Still, as weather patterns changed and winds shifted, a significant plume of radioactive materials released from the plant deposited in the environment surrounding the plant, contaminating large land areas of the Fukushima Prefecture. The magnitude of the radiological impact to the surrounding environmental is so large that the Japanese government has had to reevaluate the meaning of 'acceptably clean'. In many respects, 'acceptably clean' cannot be a one-size-fits-all standard. The economics costs of such an approach would make impossible what is already an enormous and costly environmental response and remediation task. Thus, the Japanese government has embarked upon an approach that is both situation-specific and reasonably achievable. For example, the determination of acceptably clean for a nursery school or kindergarten play yard may be different from that for a parking lot. The acceptably clean level of residual radioactivity in the surface soil of a rice paddy is different from that in a forested area. The recognized exposure situation (scenario) thus plays a large role in the decision process. While sometimes complicated to grasp or implement, such an approach does prioritize national resources to address environment remediation based upon immediate and significant risks. In addition, the Japanese government is testing means and methods, including advanced or promising technologies, that could be proven to be effective in reducing the amount of radioactivity in the environment beyond a fixed, concentration based limit. Essentially, the definition of acceptably clean includes the concept of reasonably achievable, given the available technology, means and methods, and the cost to implement such. The Japanese government recently issued three technology demonstration contracts expressly designed to test and evaluate the available technologies, means, and methods, which, if implemented, might produce the greatest risk reduction from environmental contamination for the best value. One of the Japanese contract holders, Obayashi JV, has teamed with AMEC to demonstrate the applicability and capabilities of the Orion ScanPlot{sup SM} and ScanSort{sup SM} technologies in radiologically impacted towns both inside and immediately outside the 20 km restricted zone. This presentation provides some unique images and informative insight into the environmental radioactive impacts in and around the exclusion zone. It will provide a look at one element of the Japanese government?s efforts to achieve the greatest risk reduction that is reasonably achievable. The Orion ScanPlot{sup SM} and ScanSort{sup SM} are being used with success on the Japan Town Demonstration Project to assess pre-remedial action contamination levels, document the post-remedial action contamination levels and to precisely measure and segregate excavated soils based on their radioactive content and the prescribed segregation limits (DCS). Initial results suggest that these technologies could provide capabilities to the remedial action efforts that would result in considerable improvements in field data certainty and compliance with remedial objectives while reducing overall costs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Compressible Arch Segments for the Cigeo Access Ramps, Drifts and Vaults - A Field Test - 17011

Andra is currently implementing the detailed engineering phase of the step-wise design development of Cigeo (the French HLW and IL-LLW Deep Geological Repository). Various technical issues are at stake, including the requirements linked to 'Reversibility / Retrievability', at different stages of the repository life cycle (from its construction start-up to its final closure and monitoring). These reversibility requirements have a significant impact on the way Cigeo is designed, will be progressively developed, operated, later closed and monitored. On a shorter term, one must demonstrate that the waste container retrieval operations are technically safe and feasible. In that sense, the structural dimensioning of the ramps and mains, as well as that of the IL-LLW disposal vaults, is critical, since the concrete liner supporting the rock walls must last over a period of some 100 to 150 years (lapse of time during which retrieval operations are likely to take place). The present paper starts with a description of the geomechanical conditions prevailing in the Callovo-Oxfordian (COX) clay-stone formation (aka the argillite). The structural dimensioning of the IL-LLW disposal vault liner, as calculated at the end of the basic engineering phase is indicated. The thickness values obtained so far have led to considering an alternative design in which a compressible material is positioned between the concrete liner intrados and the rock walls: in such situation, the 'creeping effect' of the rock is mitigated, for a time, by the compressible material (nearly a perfect elastoplastic material), hence reducing the stress level exerted inside the concrete liner. This situation enables to significantly reduce the liner thickness and provides potentially significant saving in the construction of the works concerned (preliminary sensitivity results are given). The following part of the paper is then focused on a practical case story: a technological demonstration (still ongoing) of a tunnel boring experiment, implemented underground (in a dedicated drift of the Meuse Haute Marne URL infrastructures, at scale 1:2 of the Cigeo drifts/vaults). In this excavation and construction experiment, the tunnel boring machine (TBM) lays (via an erector) 'classical' concrete arch segments (forming a ring) in a first portion of the drift and 'compressible' ones (the compressible material is positioned on their extrados) in a second portion of the drift. The technical demonstration objective is two-fold: the capacity to lay compressible arch segments with a TBM is checked, their structural behavior (with time) is compared with that of 'classical' ones. The way the compressible material is produced and then fixed on the arch concrete segment is also documented, c/w a description of the complementary testing campaign to be carried out on a test bench (on surface) of a concrete ring (at a scale 1:2 of Cigeo) formed of compressible arch segments. This paper concludes with a timeline of the experiment. Should the results obtained provide some perspectives of technical and economic improvement (i.e. saving vis-a-vis the 'classical' solution) a decision could be taken by Andra to incorporate this alternative solution in the 'design freeze' of Cigeo underground infrastructures. The positive outcomes of this technical test campaign would also pave the way for specifying the Cigeo TBM characteristics (dimensions and handling equipment), scheduled for manufacturing order around 2020. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization and Remediation of the Hanford 618-10 Burial Ground Vertical Pipe Units - 17121

The 618-10 Burial Ground is approximately 148 m by 143 m (485 feet by 470 feet) and consists of 12 trenches and 94 Vertical Pipe Units (VPU's). It is located approximately 8.1 km (5 miles) north of Richland, Washington in the 600 Area of the Hanford Site. The 618-10 Burial Ground received low- to high-activity waste (e.g., fission products and some plutonium-contaminated waste). Most of the waste originated at the 300 Area laboratory facilities. Lower activity radioactive material and shielded drums were disposed in trenches, while laboratory wastes with higher levels of radiation were disposed in Vertical Pipe Units (VPUs). There are different variants of VPUs. Some VPUs are simply corrugated culverts or standard pipes, 36 cm (14 in.) diameter and 3.1 m to 4.6 m (10- to 15-ft) long, buried vertically. Some VPUs are carbon steel pipes 25 to 61 cm (10 to 24 in.) in diameter and up to 4.6 m (15 ft) in length. The final design of the VPUs is 56 cm (22-in) diameter, 4.4 m (14.4 ft) long waste receptacles constructed by welding five 208 L (55-gallon) bottomless drums together end-to-end and burying them vertically, separated by approximately 3.1 m (10 feet) on center in rows approximately 7.6 m (25 feet) apart. The 618-10 Burial Ground contains approximately 94 VPUs. Historical documents indicate that shielding materials (e.g., concrete or soil) may have been added to the VPUs to reduce dose rates over the openings, and that each VPU was backfilled with sand and capped with concrete at the end of its service life. Historical documents also indicate that the VPUs were covered with approximately 0.6 m (2-ft) of soil when they were closed, and an additional 0.6 m (2-ft) of topsoil was later added for surface stabilization. In general, the process for VPU remediation was as follows: - Installed four cone penetrometers (CPTs) around the exterior of each individual VPU and sent radiation detection probes down the interior of the CPTs to get initial radiation data in order to calculate the overall curie content and create maps showing the dose rate distribution throughout the VPU. - Removed the CPTs and installed a 122 cm (48-in) diameter, 1.3 cm (0.5-in) thick steel over-casing using a vibrating hammer suspended from a crane that encompassed the VPU with some surrounding soil. - Using a Bauer BG-30 drill rig with a specifically designed augur bit and a specially designed confinement system the auger process was used to stabilize and size reduce the contents. - Once the auger reached a depth of 8.5 m (28 feet) the BG-30 drill stem was separated and additional characterization was completed by sending a radiation probe down the center of the drill stem to gather radiological data. - Once auguring and characterization was completed the waste was removed using a specially designed extended clamshell retrieval bucket and placed into individual 2.7 m x 1.5 m x 1.2 m (9-ft x 5-ft x 4-ft) metal boxes. - After the waste was placed into the metal waste boxes a low strength grout was added and the grout and waste material was mixed using a large rake device attached to an excavator. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Groundwater Flow, Solute Transport, and Geochemical Modeling To Evaluate Long-Term Nitrate Plume Concentrations Following Phreatophyte Source Control - 17262

The Monument Valley, Arizona, Processing Site is a former uranium mill site within the Navajo Nation in northeastern Arizona. Milling activities between 1955 and 1968 resulted in contamination of groundwater in the shallow alluvium at the site. Remedial action was completed under Title I of the Uranium Mill Tailings Radiation Control Act of 1978. Site remediation activities between 1992 and 1994 removed surficial source material and other site-related contamination, but contamination of deeper soil, primarily by nitrate, remained between the excavation depth and the water table. Residual nitrate in these soils, from uranium ore processing at the mill, has continued to be a source of groundwater contamination. To evaluate the potential for native phreatophytes to control remaining source material, four-wing salt-bush and black grease-wood were planted in 2000 and 2005 within the footprints of the former tailings piles. The objectives of the plantings were to increase nitrate removal from soil water through root uptake and, because phreatophyte water usage is expected to equal or exceed annual precipitation, to halt nitrate loading to groundwater. Recent evaluation showed more than an 80% decrease in soil nitrate concentrations and no effective groundwater recharge in the planting area. Numerical groundwater flow, solute transport, and geochemical modeling were performed to evaluate the long-term response of the existing nitrate plume to the phreatophyte source control measures. This modeling will help determine if 100-year natural flushing is a viable compliance strategy for the nitrate plume. Results showed that nitrate concentrations in the alluvial aquifer are expected to drop below the standard of 10 mg/L as N in approximately 70 years as a result of the phreatophyte planting. Companion sensitivity analysis was also performed to better understand how uncertainty in groundwater flow model and solute transport model inputs would impact cleanup times. Even considering input uncertainty, nitrate concentrations are expected to reach the standard in the alluvial aquifer within 100 years. Recognizing that model predictions are not absolute, but represent the general potential for an event to occur, the model was used to identify key sampling locations to verify that the nitrate plume will attenuate as predicted. This evaluation identified locations that can be used to assess the viability of the modeling predictions within the next 50 years. If the source diminishes or no longer exists, modeling predicts that concentrations of nitrate and ammonium in these wells should show significant declines over the next 10-55 years. If downward concentration trends do not occur as predicted, other remedial strategies may need to be evaluated to meet groundwater standards within the specified 100-year duration. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Emerging Contaminants: Investigation and Remediation of Poly- and Perfluoroalkyl Substances in the Environment - 17339

The group of chemicals known as PFAS (poly- and perfluoroalkyl substances) has come under increasing scientific and regulatory scrutiny in recent years as more is understood about their toxicity, their environmental persistence and their potential to bio-accumulate. PFAS are used in a wide range of industrial applications and commercial products due to their unique surface tension and levelling properties. They include stain repellents for textiles and carpeting, grease-proof paper, water- and oil-resistant coatings, and mist suppressants. PFAS are also major components of the class B fire fighting foams known as aqueous film forming foam (AFFF), Fluoro-protein Foams (FP) and Film Forming Fluoro-protein Foams (FFFP) commonly used at Federal and Commercial facilities throughout the world. Long chain PFASs (>5 or 6perfluroalkyl-carbons) such perfluorooctanoic acid (PFOA) and perfluorooctane sulfonate (PFOS), bio-accumulate. Currently, PFOS, PFOA, and a few other PFASs are increasingly regulated outside of the U.S., and at varying levels in drinking water or groundwater in select U.S. states. The U.S. EPA recently established a long-term exposure criteria of 70 ng/L for combined PFOS and PFOA in drinking water. While PFOS and PFOA have the most regulatory attention, there are thousands of chemicals in the PFAS class; some PFASs are precursor compounds capable of transforming to PFOS and PFOA or analogs. The remedial options available to address PFAS contamination are limited by the unique physico-chemical properties of these compounds. Technologies currently used for the remediation of PFAS contaminated sites include soil incineration or excavation to landfill, and groundwater extraction with PFAS adsorption onto activated carbon or resins. Emerging technologies for PFAS, include stabilization in soil, photolysis/ photo-catalysis, reductive decomposition, advanced oxidation, reduction and sonolysis for groundwater. However, the evidence that these technologies effectively break the fully fluorinated backbone of PFAS, or can treat or sequester all carbon chain lengths is limited. To date these technologies are unproven or considered infeasible for high flowrate, low concentration applications. New in-situ techniques, including an oxidation / reduction method known as ScisoR{sup R} (Smart combined in situ oxidation and Reduction), are currently being tested in the lab and some are being applied in field demonstrations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Phyto-screening for Volatile Organic Compounds in a Clay-based Glacial Till at the Niagara Falls Storage Site, New York - 17372

The Niagara Falls Storage Site (NFSS) and associated vicinity properties (VPs) occupy approximately 607 hectares (1,500 acres) of the original 3,035-hectare (7,500-acre) Lake Ontario Ordnance Works (LOOW). The NFSS was used to store radioactive materials, residues and waste from uranium ore processing between 1944 and 1952. The waste-handling practices produced an array of groundwater impacts throughout the site. Although the groundwater at the NFSS is naturally high in total dissolved solids that preclude untreated consumption, the groundwater contaminant levels in some areas of the site are very high and may pose risk to a Construction Worker receptor, as well as limit the options for future site re-use. Volatile organic compound (VOC) impacted soil in the northern portion of the site has produced a groundwater plume with significant concentrations of tetrachloroethene (PCE) and associated daughter compounds. Active groundwater remediation is impractical due to the clayey soils, as evident from adjacent property owners who have unsuccessfully attempted active remediation of their VOC plumes. Consequently, the Buffalo District may evaluate excavation options, with secondary phyto-remediative approaches as passive alternatives to lessen the groundwater impacts during the project's life cycle. A preliminary field-study in the VOC plume area sampled the interior of a Black Locust (Robinia pseudoacacia) tree using a Haglof tree corer. Detectable levels of tetrachloroethene (PCE), trichloroethene (TCE), and cis-1,2,-dichloroethene (cis-DCE) were found in the woody interior of the tree. Subsequent sampling and analyses were performed on proximal trees of varying species in and around the currently delineated VOC plume. The results indicate that poplar and native cottonwood variants preferentially contain the VOCs, whereas collocated hardwood trees produced non-detectable results. Additional sampling of Cottonwoods in the VOC-impacted area promoted further delineations of the impacts. The tree-sampling data can be considered a broad surrogate for soil sampling to optimally delineate the VOC plume without performing additional invasive sampling of the subsurface (e.g., drilling). The results also will be used to determine which native tree species preferentially uptake the VOCs from soil and groundwater. These species, and possibly other hybrid species known for VOC uptake and transpiration, would be propagated to promote interim phyto-extraction of the VOCs during the maintenance period between decision-document completion and likely remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges and Lessons Learned Performing Subsurface Investigations at a Radiologically Contaminated Site in an Urban Area - 17391

At the Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) the U.S. Army Corps of Engineers (USACE) has performed minimally intrusive (i.e. non-excavation) sub-surface investigations in soils, underneath roadways, and within buildings to generate information needed to determine whether contaminated material was present and to delineate the nature and extent. Given that thorium-232 (Th-232) contaminated material is present below various surfaces and that the current iteration of the Multi-Agency Radiation survey and Site Investigation Manual (MARSSIM) has only marginal guidance on evaluating and releasing subsurface data, survey design and implementation required detailed up front planning and post investigation analysis and reporting. This paper will discuss the approaches USACE utilized during a recent roadway investigation, some of the challenges encountered, a discussion of techniques used and results obtained, and an overall summary of pitfalls identified and lessons learned for future efforts. In order to evaluate selected areas, direct push technology was utilized in conjunction with plastic tubing to facilitate core capture and sample collection. PVC piping was inserted in each bore hole to prevent borehole collapse and facilitate downhole gamma logging. Soil samples were collected from the surface, from native material or the bottom of the boring, and from the interval or intervals which exhibited elevated downhole gamma readings, and from areas with an identifiable marker of contamination (i.e. soil discoloration) at the judgement of the field staff. Data was collected and evaluated using the approaches laid out in MARSSIM as best possible. As MARSSIM was developed to only address surface contamination, USACE, in agreement with regulators and stakeholders, utilized a 'varying plane' approach, where samples are evaluated as if on a single plane, and only the highest concentration encountered at any point is considered. Because the areas investigated were not easily cast into simple geometric shapes adhering to MARSSIM design criteria, it was important to ensure that Survey Unit design for Class 1 Survey Units were reasonable. All Class 1 SUs were contiguous survey units. Class 2 survey units were allowed to be non-contiguous provided that they are situated in close proximity to one another and share the same geology, conceptual site model, history, and radionuclide concentrations. The information contained in this paper will benefit Projects working with subsurface contamination which may require subsurface investigation and an understanding of the logistical, technological, and regulatory challenges. The ultimate outcome of this effort was the successful delineation of areas of contamination which will facilitate current utility work and guide future remediation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗