Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Distribution System Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,153 records · Page 64

A Risk-Driven Probabilistic Approach to Quantify Resilience in Power Distribution Systems

It is of growing concern to ensure resilience in power distribution systems to extreme weather events. However, there are no clear methodologies or metrics available for resilience assessment that allows system planners to assess the impact of appropriate planning measures and new operational procedures for resilience enhancement. In this paper, we propose a resilience metric using parameters that define system attributes and performance. To represent extreme events (tail probability), the conditional value-at-risk of each of the parameters are combined using Choquet Integral to evaluate the overall resilience. The effectiveness of the proposed resilience metric is studied within the simulation-based framework under extreme weather scenarios with the help of a modified IEEE 123-bus system. With the proposed framework, system operators will have additional flexibility to prioritize one investment over the others to enhance the resilience of the grid.

Poudyal, Abodh↗

Microgrid Design Toolkit [Slides]

This presentation provides an Introduction to the Microgrid Design Toolkit and how users can employ it.

24 POWER TRANSMISSION AND DISTRIBUTION↗

REopt: Energy Decision Support [Slides]

The REopt presentation, developed for the Energy Technology Innovation Partnership Project, provides an overview of the REopt tool. It covers tool's capabilities, how to use the tool, resources, and applications.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Technology development for future very large observatories

The future very large observatories planned as part of the Astronomical Search for Origins will require significant advances in focal planes, large apertures, active and adaptive wavefront control and distributed thermal management systems. The Vision Missions and the needed technologies will be briefly described.

LAOUT↗

Engage: Accelerating the Transformation of the Global Energy Economy; JISEA 2021 Annual Report

In 2020, the Joint Institute for Strategic Energy Analysis (JISEA) completed several ongoing studies, published many reports and journal articles, and continued remote dialogue and analysis with research partners. The 2021 annual report captures the work completed the past year, highlights key findings across diverse studies, and shows the people behind the research, offering a great window into JISEA for anyone wanting to know more about the institute.

annual report↗

Case Studies and Model Guidance for Establishing Solar Cybersecurity Working Groups

This tool outlines actions that states can take to establish state-level working groups, which can be a critical first step to establishing state cybersecurity programs and efforts to support cybersecurity in distributed energy resources. Specifically, these working groups can lead the development of cybersecurity task forces focused around distributed energy resources, formal recommendations for policy makers and regulators, and the creation of a response strategies and plans for cybersecurity impacts or incidents in solar photovoltaic systems.

14 SOLAR ENERGY↗

A Grid Intensity Map-Based Source Model for Monte Carlo Modeling of IMRT Field Irradiation - Paper 5

An accurate source model is important for TPS (Treatment Planning System) dose calculation and verification, especially for IMRT (Intensity Modulated Radiotherapy) irregular and inhomogeneous fields. Monte Carlo simulation is the most accurate way to calculate dose distributions in the heterogeneous media like human bodies. A full radiotherapy modeling generally includes Linac modeling and phantom dose calculation. Full Linac modeling is very time-consuming and requires highly detailed knowledge of the accelerator composition and structure, however, which is very difficult to obtain for commercial interests. Often all relevant parameters are not known with sufficient accuracy, and thus a time-consuming tuning of e.g. the electron beam spot size and energy must be performed. A multiple source model (MSM) regards particles coming from different parts of an accelerator as if they are coming from different virtual sources. MSM uses a set of virtual sources representing the treatment beam (e.g. primary photons, head scatter, electron contamination) by a set of analytic functions or histograms with parameters derived from dosimetric measurements or a full MC simulation. Tillikainen et al built a three sub-source model by matching with measurement data using an automatic process to optimize the free model parameters for a Varian 2100 C/D accelerator. Lin et al have built a convenient five-photon-sub-source model for Varian 2300C 6 MV-X beam based on Monte Carlo simulated Linac for ARTS (Accurate Radiotherapy System). The particle generation of MSM is very fast compared to full Linac simulation, and its sampling efficiency is not limited by the size of the phase space file (PSF). However, generally MSM is generated based on regular field PSF and needs an irregular component to form the beam shape meanwhile apt to bringing error Linac modeling and MSM producing from PSF analysis actually both are multi-freedom optimization process by adjusting several parameters (e.g. electron energy and angular divergence). Linac modeling adjusts its parameters from the beginning of electron hitting target through all components to fit the simulation to the measurement. MSM tunes its PSF-derived parameters by optimizing to minimize the deviations between the simulation and the measurement. Since the full Linac modeling and the MSM model both need to fine tune their parameters to match the simulation to the measurement, and sometimes maybe offsets the real accelerator for its multi-parameter optimization process. So, why not fine tune directly all source model parameters just behind all Linac components to fit the simulation to the measurement? A grid intensity-based surface source model was suggested here, which assumed the particle emitting from the bottom surface of Linac last beam trimmer MLC (Multi Leaf Collimator). The particle emitting position is sampled on the grid intensity map optimized by TPS, and the particle weight is adjusted by its original grid intensity. This source model not only takes advantage of the Monte Carlo method in the heterogeneous media, but also avoids effectively the transportation speed shortcoming of Monte Carlo simulation through Linac components. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

Synergies and trade-offs between storage, transmission, and sector coupling in high renewable energy systems

Energy storage, transmission, and sector coupling are some prominent flexibility solutions to support variable renewable energy (VRE) integration. However, investment cost uncertainties and public acceptance could hamper the deployment of these flexibility solutions. This raises questions about the development and cost-effectiveness of future energy systems, especially on how the dependence on local and cross-border solutions of flexibility would evolve if the uptake of these solutions is restricted. In this context, this paper identifies the synergies among flexibility options under restrictions on transmission expansion or increased costs of energy storage. It contributes to determining whether investments in energy storage and/or transmission expansion offer the least-cost transition and investigates the impact of sector coupling on these solutions. A long-term energy system planning and optimisation model towards 2050 is developed using the open-source energy system optimisation tool Balmorel, and a case study of the countries surrounding the Baltic Sea and the North Sea is established. Five cases with restrictions imposed on transmission expansion and higher energy storage technology costs are analysed at different levels of sector coupling. The results highlight the importance of transmission expansion at all levels of sector coupling. As the level of sector coupling increases, uncertainties around the cost of energy storage drive the least-cost pathways. Optimal investment solutions are found to have a mix of transmission and energy storage in capacity expansion at all levels of sector coupling.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dynamic MLC leaf sequencing for integrated linear accelerator control systems

Purpose: Leaf positions for dynamic multileaf collimator (DMLC) intensity modulated radiation therapy must be closely synchronized with MU delivery. For the Varian C3 series MLC controller, if the planned trajectory (leaf position vs. MU) requires velocities exceeding the capability of the MLC, the leaves fall behind the planned positions, causing the controller to momentarily hold the beam and thereby introduce dosimetric errors. We investigated the merits of a new commercial linear accelerator, TrueBeam, that integrates MLC control with prospective dose rate modulation. If treatment is delivered at dose rates so high that leaves would fall behind, the controller reduces the dose rate such that harmony between MU and leaf position is preserved. Methods: For three sets of DMLC leaf trajectories, point doses and two-dimensional dose distributions were measured in phantom using an ionization chamber and film, respectively. The first set, delivered using both a TrueBeam and a conventional C3 controller, comprised a single leaf bank closing at planned velocities of 2.4, 7.1, and 14 cm/s. The maximum achievable leaf velocity for both systems was 3 cm/s. The remaining two sets were derived from clinical fluence maps using a commercial treatment planning system for a range of planned dose rates and were delivered using TrueBeam set to the maximum dose rate, 600 MU/min. Generating trajectories using a planned dose rate that is lower than the delivery dose rate effectively increased the leaf velocity constraint used by the planning system for trajectory calculation. The second set of leaf trajectories was derived from two fluence maps containing regions of zero fluence obtained from representative beams of two different patient treatment plans. The third set was obtained from all nine fields of a head and neck treatment plan. For the head and neck plan, dose-volume histograms of the spinal cord and target for each planned dose rate were obtained. Results: For the single closing leaf bank trajectories, the TrueBeam control system reduced the dose rate such that the leaf velocity was less than the maximum. Dose deviations relative to the 2.4 cm/s trajectory were less than 3%. For the conventional controller, the leaves repeatedly fell behind the planned positions until the beam hold threshold was reached, resulting in deviations of up to 19% relative to the 2.4 cm/s trajectory. For the two clinical fluence maps, reducing the planned dose rate reduced the dose in the zero fluence regions by 15% and 24% and increased the delivery time by 5 s and 14 s. No significant differences were noted in the high and intermediate dose regions measured using film. The DVHs for the head and neck plan showed a 10% reduction in cord dose for 20 MU/min relative to 600 MU/min sequencing dose rate, which was confirmed by measurement. No difference in target DVHs were observed. The reduction in cord dose increased total treatment time by 1.8 min. Conclusions: Leaf sequencing algorithms for integrated control systems should be modified to reflect the reduced importance of maximum leaf velocity for accurate dose delivery.

43 PARTICLE ACCELERATORS↗

Transactive Control and Coordination of Distributed Assets for Ancillary Services

The need to diversify energy supplies, the need to mitigate energy-related environmental impact, and the entry of electric vehicles in large numbers present challenges and opportunities to power system professionals. Wind and solar power provide many benefits, and to reap the benefits the resulting increased variability—forecasted as well as unforecasted—should be addressed. A majority of states and the District of Columbia, representing over half of the total load, have passed renewable portfolio standards. California’s plans call for 33% renewable energy by 2020. For grid balancing and for meeting reliability standards, ancillary services are needed. The needs for these services are poised to increase significantly. Demand resources are receiving increasing attention as one means of providing the ancillary services. Control and coordination of a large number (~millions) of distributed smart grid assets requires innovative approaches. One such approach is transactive control and coordination (TC2)—a distributed, hierarchical, agent-based incentive and control system. The TC2 paradigm is to create a market-like control system in which participation is voluntary and the participant sets the price for participation. For transactions that are frequent, automation of bids and responses is necessary. Such an approach has been developed and demonstrated at the Pacific Northwest National Laboratory. The devices, typically thermostatically controlled heating, ventilating, and air conditioning (HVAC) loads, send their bids—the quantity of energy they need and, based on the consumer preferences encoded in a simple user interface, the price they are willing to pay. The typical bid period is 5 minutes. By aggregating all the bids, a demand curve is generated by the aggregating entity, and matched with a supply curve or supply constraint. The aggregator transmits the clearing price to the devices. The winning devices proceed to consume the energy they bid for and won. It is the purpose of this project to develop a similar approach for ancillary services. In this report, the following ancillary services are considered: spinning reserve, ramping, and regulation. These services are to be provided by the following devices: refrigerators, water heaters, clothes dryers, variable speed drives. We will assume that the variable speed drives operate an air handling fan in a commercial building.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Spatially resolved land and grid model of carbon neutrality in China

China has committed to achieve net carbon neutrality by 2060 to combat global climate change, which will require unprecedented deployment of negative emissions technologies, renewable energies (RE), and complementary infrastructure. At terawatt-scale deployment, land use limitations interact with operational and economic features of power systems. To address this, we developed a spatially resolved resource assessment and power systems planning optimization that models a full year of power system operations, sub-provincial RE siting criteria, and transmission connections. Our modeling results show that wind and solar must be expanded to 2,000 to 3,900 GW each, with one plausible pathway leading to 300 GW/yr combined annual additions in 2046 to 2060, a three-fold increase from today. Over 80% of solar and 55% of wind is constructed within 100 km of major load centers when accounting for current policies regarding land use. Large-scale low-carbon systems must balance key trade-offs in land use, RE resource quality, grid integration, and costs. Under more restrictive RE siting policies, at least 740 GW of distributed solar would become economically feasible in regions with high demand, where utility-scale deployment is limited by competition with agricultural land. Effective planning and policy formulation are necessary to achieve China’s climate goals.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Performance Comparison of Pulsed Plasma Thruster Electrode Configurations

Pulsed plasma thrusters are currently planned on two small satellite missions and proposed for a third. In these missions, the pulsed plasma thruster's unique characteristics will be used variously to provide propulsive attitude control, orbit raising, translation, and precision positioning. Pulsed plasma thrusters are attractive for small satellite applications because they are essentially stand alone devices which eliminate the need for toxic and/or distributed propellant systems. Pulsed plasma thrusters also operate at low power and over a wide power range without loss of performance. As part of the technical development required for the noted missions, an experimental program to optimize performance with respect to electrode configuration was undertaken. One of the planned missions will use pulsed plasma thrusters for orbit raising requiring relatively high thrust and previously tested configurations did not provide this. Also, higher capacitor energies were tested than previously tried for this mission. Multiple configurations were tested and a final configuration was selected for flight hardware development. This paper describes the results of the electrode optimization in detail.

Arrington, Lynn A.↗

Control room consolidation at Hanford tank farms for improved conduct of operation - 15345

Washington River Protection Solutions (WRPS) manages the underground waste storage tanks at the Hanford site in Washington State on behalf of the DOE Office of River Protection. There are 177 tanks distributed among 18 tank farms spread across an area of desert scrub covering about 20 square miles. A single evaporator facility supports the tanks to provide waste reduction activities. Farms and associated equipment, including exhausters, have been operated locally since installation. Upgrades over time introduced limited automation, but using inconsistent platforms, and providing isolated control locations around the farms. However, as the Tank Farms move from maintenance operations to production operations, with increased numbers of waste transfers and evaporator campaigns, and also prepare for integration with the adjacent Hanford Waste Treatment Plant, then operational improvements were planned and are being implemented. Infrastructure improvement projects included upgrades of control systems to a common platform, and installation of a fiber optic based local area network to the majority of farms, which together provided a distributed control system supporting tank farms. This new infrastructure provided the basis to propose consolidation of control and monitoring operations to a single location. More than a single location, the new Central Control Room was to increase effectiveness of operations by providing full status of all activities being performed across the Tank Farms and the Evaporator. The recent addition of productivity e-tools also would provide capability for management, supervisors and operators to make informed decisions regarding facility operations, through custom online applications designed to provide real time information derived from operational data. For example, tracking turnover activities between shifts, and maintaining compliance with limited conditions for operations. The Central Control Room would also have a single supervisor able to effectively manage the status of all assets and processes. The expected benefits of this arrangement include increased operator utility, increased situational awareness, improved response time for upset conditions, improvement in operator environment, and reductions in operating costs. The projected ROI for the Central Control Room when fully operational was projected to be about two years based on reduced costs from freeing up operations staff to perform other work plus the time and material savings realized by operations being performed with increased situational awareness. So the Central Control Room would become a hub for monitoring and controlling facility operations while responding to real time information affecting productivity and performance, from a centralized location customized to a fresh working environment. Over a 14-month period, WRPS developed the concept and engineering, procured over 500 items, modified and installed in renovated building, and completed transition and testing of this new Central Control Room, turning over the initial phase to Operations for 24/7 use in April 2014. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Catalina Repower Feasibility Study: NREL Phases I & II Summary Report

Engineers at the National Renewable Energy Laboratory (NREL) supported Southern California Edison (SCE) and the United States Environmental Protection Agency (EPA) by conducting technical and economic analyses for energy systems at Santa Catalina (Catalina) Island, which is located 22 miles off the coast of Long Beach, California. This effort was part of a broader Repower Catalina Feasibility Study that was also supported by NV5, an engineering consulting firm and project partner to NREL for this analysis. This document describes NREL’s techno-economic modeling and optimization analysis for the first two phases of this project which focus on supply-side generation and energy storage options for Catalina. SCE’s goal for this analysis is to determine a strategy for electricity generation on Catalina Island that results in lower energy costs, improved energy resiliency, and reduced air emissions. EPA goals for this effort are to reduce emissions of air pollution and encourage renewable energy development on contaminated and formerly contaminated lands when such development is aligned with the community’s vision for the site. Currently, an on-island SCE power plant serves the Catalina Island electrical load with 6 reciprocating diesel generators totaling 9.4 MW; 23 propane-fueled microturbines totaling 1.5 MW; and a 1-MW, 7.2-MWh sodium sulfur battery energy storage system (BESS). In 2017, the electricity consumption on the island was 29.1 GWh, with an average load of 3.3 MW and peak load of approximately 5.5 MW. Considering new environmental standards on diesel generator emissions from California’s South Coast Air Quality Management District, a 60% renewable energy target for 2030 laid out in California’s Senate Bill 100, SCE’s Clean Power Electrification Pathway, and the characteristics of the island’s existing diesel generators, SCE is seeking to evaluate the technical and economic implications of different energy technology options to determine a path forward. Phases I and II of the Repower Catalina Feasibility Study, summarized in this document, evaluated the following: Interconnection with the mainland via an undersea cable; On-island fossil fuel generation, including diesel, propane, and/or liquified natural gas (LNG); On-island renewable energy (RE) technologies, including solar photovoltaics (PV), wind turbines, and wave energy devices; BESS to support the above generation technologies; Initial analysis of the potential impacts of implementing energy efficiency measures. Results indicate strong techno-economic potential for a mix of on-island diesel and/or propane generators, solar PV, BESS, and energy efficiency measures to help SCE and Catalina achieve their goals compliant with California’s emissions and clean energy standards while minimizing electricity life cycle costs (LCC) over the 30-year analysis period. This document summarizes the considerations and findings of Phases I and II, focusing on high-level takeaways from Phase I and more detailed results from Phase II, and discusses a potential path forward for Phase III.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integrated planning and scheduling for Earth science data processing

Several current NASA programs such as the EOSDIS Core System (ECS) have data processing and data management requirements that call for an integrated planning and scheduling capability. In this paper, we describe the experience of applying advanced scheduling technology operationally, in terms of what was accomplished, lessons learned, and what remains to be done in order to achieve similar successes in ECS and other programs. We discuss the importance and benefits of advanced scheduling tools, and our progress toward realizing them, through examples and illustrations based on ECS requirements. The first part of the paper focuses on the Data Archive and Distribution (DADS) V0 Scheduler. We then discuss system integration issues ranging from communication with the scheduler to the monitoring of system events and re-scheduling in response to them. The challenge of adapting the scheduler to domain-specific features and scheduling policies is also considered. Extrapolation to the ECS domain raises issues of integrating scheduling with a product-generation planner (such as PlaSTiC), and implementing conditional planning in an operational system. We conclude by briefly noting ongoing technology development and deployment projects being undertaken by HTC and the ISTB.

Boddy, Mark↗