Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DOCUMENTATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,153 records · Page 64

A Prototype Thick-Target Bremsstrahlung Model with Angularly-Dependent Emission in the MCNP6 ® Code

This document summarizes the current thick-target bremsstrahlung (TTB) model in MCNP and provides test results for an alternative implementation to improve the accuracy with reduced cost compared to full electron transport. It has been observed that the current TTB model produces inaccurate results in problems where the medium is thick with respect to electrons, but the photon distribution in the problem has a strong directionality. An example of such a simulation is detectors surrounding a metal target irradiated with a radiographic beam of high energy photons. The primary cause of this discrepancy is the current TTB method emits all bremsstrahlung photons in the same direction as the primary electron produced from each (γ, e ± ) interaction, leading to artificially forward peaked photon distributions for intermediate to high-energy incident photons. To improve the TTB model, we have implemented an angularly-dependent TTB model in a developer version of the MCNP6 ® code; for developers, this was done on the branch prototype/angular_ttb in the mcnp6 repo on bitbucket. The angularly-dependent TTB model accounts for the energy and scattering of electrons as they slow down in the current material, but does not sample the computationally expensive energy straggling, secondary electron events, and tracking electrons; this approach is significantly less computationally expensive than full electron transport and can be comparable to the original TTB method for problems with sufficiently complex materials and geometry. To evaluate the method, we have modeled a simple problem of a beam of 5 MeV photons incident on a sphere of plutonium surrounded by detectors at different deflection angles. For this problem, the angularly-dependent TTB produces a photon flux within 8.0% for a 90 degree deflection angle and 0.8% along the beam axis, as compared to the electron transport solution. This is an improvement compared to a 43% and 81% discrepancy with the original TTB method, respectively. The rest of this work includes the following: the first section details the current TTB treatment in MCNP, which has not been well documented elsewhere. Then, the modified TTB algorithm is detailed and the approximations compared to the condensed history algorithm are compared. Results are given comparing the two TTB methods to the condensed history transport algorithm. The appendix includes details for code developers on relevant electron transport implementation details and potential code improvements for future work.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

United States Nuclear Data Program: Work Plan for Fiscal Year 2023

The work plan described in this document has been developed to cover work to be performed by the U. S. Nuclear Data Program (USNDP) during Fiscal Year (FY) 2023 that begins on October 1, 2022. Previously, 23 work plans have been prepared for the nuclear data program covering FYs 2021-2022. This plan has been prepared in consultation with the members of the Coordinating Committee who represent the organizations participating in the program. Each Coordinating Committee member prepared a draft plan for his/her organization. Each contribution was integrated into a unified work plan. The draft plan was then circulated to the Coordinating Committee for comments and corrections before the final document was submitted to the U.S. Department of Energy (DOE). As was done in previous years, the tasks proposed by the various organizations were reviewed internally according to the following criteria, which were developed considering the mission and goals outlined in past review panel reports and oversight committee discussions, and in consultation with the DOE program manager.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

The National Diagnostic Plan (NDP) for HED Science September 2022

This documents the National Diagnostic Plan as of September 2022. The major changes in this version compared to the NDP document issued in 2021 are the new schedules and the text for the national transformative diagnostics - section III. The many local diagnostics for our three Inertial Confinement Fusion (ICF) facilities; NIF, Z and OMEGA are updated and captured in section V.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The LANSCE experimental program: accelerator requirements

The LANSCE accelerator complex exploits a flexible, high power 800 MeV proton linear accelerator to enable a broad swath of experimental work supporting multiple scientific programs. The beam requirements for these programs are diverse and change over time. The purpose of this document is to record, at a high level, the experimental requirements driving the beam delivery requirements for each experimental facility at LANSCE. Revision 0 serves to baseline the current set of experiments, and we expect to revise the document on an as-needed basis when either the experimental requirements change or are found to require a more complete definition.

43 PARTICLE ACCELERATORS↗

COMBLE Radar b1 Processing: Corrections, Calibrations, and Processing Report

The U.S. Department of Energy’s (DOE) Atmospheric Radiation Measurement (ARM) user facility recently concluded its Cold-Air Outbreaks in the Marine Boundary Layer Experiment (COMBLE), with its campaign emphasis on marine boundary-layer clouds and mixed-phase clouds during cold-air outbreaks. The COMBLE campaign featured the deployment of the first ARM Mobile Facility (AMF1) to northern Scandinavia (Andenes, Norway), including its standard complement of ARM cloud radars. In keeping with user demands stemming from the previous AMF Cloud, Aerosol, and Complex Terrain Interactions (CACTI) field campaign in Argentina, a post-campaign radar mentor effort was initiated for COMBLE. This activity was intended to improve the usability of the ARM cloud radar data sets in response to overall demands for calibrated, corrected data sets for downstream studies and retrieval applications. In addition to the terrain complexities previously important to CACTI data sets (e.g., clutter designation and/or removal), COMBLE presented new challenges to existing ARM radar mentor capabilities. These included the extension of existing methodologies (e.g., relative calibration adjustment [RCA] target techniques) to frozen environments and the potential issues with their applicability when considering mixed-phase precipitation conditions. As in the previous CACTI documentation (Hardin et al. 2020), the overall calibration and conditioning process in ARM nomenclature is referred to as generating a “b1” datastream. For the radars, these “b1” standards refer to a datastream that has been calibrated (and cross-calibrated), with effort to deliver the highest-quality (well-characterized) data possible. The “b1” radar mentor reporting (this current document) is intended to detail (i) the status/quality of the original “a1” (raw) data sets during the COMBLE AMF campaign, (ii) the corrections and calibrations that are applied to generate the b1 datastreams available on ARM’s Data Discovery, and (iii) the details of the applied methods, e.g., how radar offset/calibration numbers were determined.

54 ENVIRONMENTAL SCIENCES↗

Centrifugal Pump Model for System Codes for Advanced NPP Designs

In this document, a homologous model and one-dimensional line model for centrifugal pump are described to provide the theoretical background of a pump model to be developed in system-level codes. Input and output parameters are proposed, along with a summary of the governing equations for each model. Furthermore, hydraulic performance degradation of centrifugal pump is also modeled in the homologous pump model. This document suggests that system codes provide a homologous and one-dimensional line model for centrifugal pumps, allowing the users to choose the model that best fits their purposes.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Preliminary IHLW Formulation Algorithm Description

This report documents the initial algorithm that could be used by the Waste Treatment and Immobilization Plant (WTP) in batching high-level waste (HLW) and glass-forming chemicals (GFCs) in the HLW melter feed preparation vessel (MFPV) (HFP-VSL-00001 and -00005). Not all Hanford tank waste can be accommodated by the models developed for this report and significant expansion of the model boundaries could be achievable to reduce the WTP mission life and total canister production count. The immobilized HLW (IHLW) must meet a series of constraints to be acceptable for disposal in the Monitored Geologic Repository, which are contained in the Specification 1 of the Contract (DOE 2000), the Waste Acceptance Product Specifications (WAPS, DOE 1996), and the Waste Acceptance System Requirements Document (WASRD, DOE 2007). The IHLW Waste Form Compliance Plan (WCP, 24590-HLW-PL-RT-07-0001, Rev 3) specifies that the formulation algorithm will be developed and used to comply with the constraints associated with glass composition and properties. This report is not an engineering calculation, does not provide design input, and is not an engineering study. Algorithm inputs include the chemical analyses of the blended HLW in the HLW blend vessel (HBV) (HLP-VSL-00028, the volume and composition of the MFPV heel, the volume and composition of the MFPV after waste addition, the volume and composition of MFPV batch after GFC addition, the compositions of individual GFCs, and the mass of glass in each canister. In addition to these inputs, uncertainties in the HLW composition and processing parameters are included in the algorithm. Using the above inputs, the algorithm calculates the following outputs: 1) the volume of HLW to be transferred from the HBV to the MFPV, 2) the mass of each GFC for addition to the MFPV, 3) the composition of the glass that will be produced along with uncertainties, and 4) the predicted properties, with associated uncertainties, of the resulting IHLW. The algorithm uses the property-composition models to calculate properties with associated uncertainties and compares them with various constraints to ensure that a processable feed is formulated and a compliant IHLW is produced. The GFC additions are determined using an optimization approach to provide high confidence that the HLW glass will meet all product quality requirements and key processing constraints. For most HLW batches there are many possible glass compositions that meet all constraints. In these cases, the glass composition is optimized for a series of target component concentrations and target property values. The algorithm also incorporates process measurement and product quality uncertainties, based on the work of Piepel et al. (2005). Estimates of the various process and measurement uncertainties that affect glass compositions and predicted glass properties have been previously reported (Piepel et al. 2005, 2006) and the impacts of these estimated uncertainties on the IHLW composition envelope that meets product quality and processing-related properties with sufficient confidence were evaluated. The details of work performed to date to develop this initial GFC addition and batching algorithm are summarized in Sections 4 and 5. An example data set is used to illustrate the calculations of the algorithm summarized in Section 6. Finally, in Section 7, there is a statement of the required work to achieve a final operational IHLW formulation control algorithm. This report is not an engineering calculation, does not provide design input, and is not an engineering study.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Inspection and Monitoring Report for Surface Corrective Action Unit 417 at the Central Nevada Test Area, Nevada, Site

This report documents the biennial postclosure site inspections conducted in June 2018 at the surface Corrective Action Unit (CA U) 417 at the Central Nevada Test Area, Nevada, Site. The UC-I, UC-3, and UC-4 sites are inspected every 2 years, in accordance with the Post-Closure Monitoring Plan provided in the CAU 417 Closure Report published in 2001. The requirements for postclosure monitoring have been modified over the years through negotiations with the Nevada Division of Environmental Protection (NDEP). Modifications were documented through three separate Records of Technical Change to the Closure Report, which were approved by NDEP in 2003, 2011, and 2015. The UC-1, UC-3, and UC-4 sites were all observed as being in good condition during the 2018 inspections. A few minor cracks on the UC-1 Central Mud Pit cover were repaired during the UC- I inspection. A concrete monument at the northeast corner of Mud Pit U3E at the UC-3 site had some damage near the top of the monument, but the damage has not impacted the functionality of the monument or survey pin on top of the monument. No issues were identified at the UC-4 site. No maintenance or additional repair activities are recommended at the UC-1, UC-3, and UC-4 sites.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Observations and Lessons Learned From Installing Residential Roofing-Integrated Photovoltaics

Building-sited solar photovoltaics (PV) could play a key role in decarbonizing the building sector either through racked and mounted PV or through Building-integrated PV (BIPV). BIPV is installed into the building envelope itself, with solar cells and/or modules forming the outer layer of a building structure, thus transforming a single-purpose structure into one that serves the dual purposes of the building envelope and electricity. BIPV can be applied to building roofs, facades, awnings, pergolas, windows, skylights, balustrades, and other external surfaces. Given BIPV products vary widely, the focus of this research is residential roofing integrated PV (RIPV), where solar is incorporated into or otherwise replaces the roofing material. Previous research suggests that residential RIPV could reduce customer acquisition, labor, supply chain, and equipment costs. These products have yet to realize these cost savings and deployment remains significantly less than conventional rooftop PV as a relative share of the addressable market in the US. One potential barrier to broader residential roofing integrated PV deployment may be higher costs relative to conventional rooftop PV, primarily because the design and installation of these products is still evolving. Here, we explore residential RIPV cost-reduction opportunities by analyzing installation processes. Our study documents residential RIPV installations at 2 reroofing sites and the equivalent of 9 new construction sites in California through a methodology known as time and motion study. We also conducted interviews with subject-matter experts to identify barriers and solutions to maximize these products' market penetration. Our time and motion study breaks the RIPV installation process into four steps: 1) staging, unloading, and roof preparation; 2) fire resistant underlayment(s) (synthetic material laid between roof shingles and roof deck); 3) flashings and PV installation; and 4) wiring and monitoring. We measure the time required for each step in terms of worker-hours, representing an hour of labor from a single worker. We further normalize process time by dividing worker-hours by kilowatt (kW) of system capacity. The most time-intensive step was flashings and PV installation, taking around 2.4 worker-hours per kW on average and accounting for around 60% of the process time for an average installation. The total installation process took on average about 6.4 and 3.5 worker-hours per kW at the reroofing sites and new construction sites, respectively. For comparison, a previous time and motion study documented a time of 6.9 worker-hours per kW for conventional rooftop PV. The shorter RIPV installation times are consistent with previous studies suggesting that RIPV could be installed faster than conventional rooftop PV. The time and motion results and feedback from interviewees provide insights into potential residential RIPV cost reduction opportunities. Several interviewees suggested that these products would be more efficient if PV installation was more fully integrated into the roofing/construction industries, which currently use separate supply chains and skillsets. Further integration could reduce supply chain delays and labor force redundancies. Future research could explore specific ways to integrate these industries to help realize the cost savings potential of RIPV.

14 SOLAR ENERGY↗

SAS4A/SASSYS-1 Verification Testing for Sodium Fast Reactor Applications: Acceptance Testing Report

SAS4A/SASSYS-1 (SAS) is a simulation tool used to perform deterministic analyses of anticipated events as well as design basis and beyond design basis accidents for advanced liquid-metal-cooled nuclear reactors. With its origin as SAS1A in the late 1960s, the SAS series of codes has been under continuous use and development for over forty-five years and represents a critical investment in safety analysis capabilities for the U.S. Department of Energy. To support demonstration of software pedigree and confirm key functional requirements, this report has been generated to provide detailed verification of the software. Although SAS was developed to support the analysis of any liquid-metal-cooled nuclear reactor, the acceptance testing described in this document focuses on the verification of SAS capabilities as they relate to pool-type Sodium Fast Reactors (SFRs). This report includes documentation of the test problem definition, analytical solution(s), computational solution(s), acceptance criteria, comparisons of analytical/computational solutions, and determination of acceptance of the computational solution(s). Deviations from acceptance criteria are noted.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 572: Test Cell C Ancillary Building and Structures - Nevada National Security Site, Nevada with ROTC 1

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 572, Test Cell C Ancillary Building and Structures, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 572 comprises the following corrective action sites (CASs) located in Area 25 of the Nevada National Security Site: CAS 25-33-01, Building 3220, Equipment Building; CAS 25-33-02, Building 3230, Motor Drive Building; CAS 25-33-03, Building 3231, Pump House; CAS 25-33-04, Building 3232, Cryogenic Evaluation Lab; CAS 25-99-22, Ancillary Facilities. This plan provides the methodology for field activities needed to gather the necessary information for closing CAU 572. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 572 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action. It is anticipated that the results of the field investigation and implementation of corrective actions will support a defensible recommendation that no further corrective action is necessary. The purpose of the corrective action investigation (CAI) will be to document and verify the adequacy of existing information; to affirm the decision for either clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. If it is determined that complete clean closure cannot be accomplished during the CAI, then a hold point will have been reached and the Nevada Division of Environmental Protection (NDEP) will be consulted to determine whether the remaining contamination will be closed under the alternative corrective action of closure in place. This will be presented in a closure report that will be prepared and submitted to NDEP for review and approval.

54 ENVIRONMENTAL SCIENCES↗

Extending PETSc's Composable Hierarchical Solvers (Final Technical Report)

This report documents research activities conducted at CU Boulder as part of Extending PETSc’s Composable Hierarchical Solvers, which has been part of a collaboration with Argonne National Laboratory (separate award). Our work has focused on performance-portable end-to-end GPU solvers demonstrated via exemplary applications in nonlinear fluid and structural mechanics. We describe advances in algorithmic composition and analysis in the context of these applications, but the implementations are fully documented and decoupled, and in use by other projects. We believe the vertical integration achieved through collaboration with ECP’s CEED and the PSAAP center at CU was necessary to take risks with data structures and algorithms.

42 ENGINEERING↗

Initial Delayed Critical Configuration of SHEBA I and Subcritical Measurements by Californium Source-Driven Noise Analysis

In September 1980, the initial delayed critical configuration of the Solution High-Energy Burst Assembly (SHEBA I) was assembled, and the US Department of Energy’s Oak Ridge National Laboratory (ORNL) staff performed near critical and subcritical measurements using the californium source-driven noise analysis (CSDNA) method at the Los Alamos National Laboratory (LANL) Critical Experiments Facility. An unreflected 56 cm outside diameter stainless-steel cylindrical tank was partially filled with uranyl fluoride solution (235U enrichment was 4.95 wt %) until delayed criticality was achieved. Then, measurements were performed for various fuel solution heights from delayed critical to 60% of the height required for delayed criticality. The stainless-steel tank had an inside diameter of 54.6 cm and a height of 105 cm and was partially (20–36.5 cm) filled with an aqueous solution of uranyl fluoride (with a density of 2.162 g/cm 3 ). The density of the uranium in solution was 1.042 g/cm 3 , and the solution had a H/U atomic ratio of 20.43. The tank had a 6.35 mm wall thickness and an axial reentrant tube with an inside diameter of 6.02 cm and wall thickness of 0.165 cm. The tank was essentially unreflected on the top and sides because it was in a thin metal shed. The reactivity of the near–delayed critical configuration was −10.4 cents, which corresponds to a k eff value of 0.99922. In addition to the CSDNA measurements, the prompt neutron decay constants were determined from break frequency noise analysis (BNFA) measurements. The subcritical neutron multiplication factors from CSDNA and BFNA compared extremely well. These data can be used as the basis of International Nuclear Criticality Safety Evaluation benchmark for the near-critical configuration, and the k eff values at various subcritical configurations can be used as subcritical benchmarks. Furthermore, the measured prompt neutron decay constants can be used as reactor physics benchmarks. This report documents the experimental information for the measurements performed so that, at a later date, researchers could perform the required uncertainty and calculational analyses and documentation to use these data for an International Criticality Safety Benchmark Evaluation Program (ICSBEP) or Nuclear Energy Agency benchmarks. The measured prompt neutron decay constants can be used as the basis of a benchmark for the International Reactor Physics Evaluation Program (IRPhEP). The data from these measurements are available from the ORNL Records Management Services Department, and the logbook is available from ICSBEP at Idaho National Laboratory.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

National Institute of Standards and Technology Requirements (Analysis Report)

EPOC uses the Deep Dive process to discuss and analyze current and planned science, research, or education activities and the anticipated data output of a particular use case, site, or project to help inform the strategic planning of a campus or regional networking environment. This includes understanding future needs related to network operations, network capacity upgrades, and other technological service investments. A Deep Dive comprehensively surveys major research stakeholders’ plans and processes in order to investigate data management requirements over the next 5–10 years. In October of 2022, staff members from the Engagement and Performance Operations Center (EPOC) met with researchers and staff from the National Institute of Standards and Technology (NIST) for the purpose of a Deep Dive into scientific and research drivers. The goal of this activity was to help characterize the requirements for a number of campus use cases, and to enable cyberinfrastructure support staff to better understand the needs of the researchers within the community. Material for this event included the written documentation from each of the profiled research areas, documentation about the current state of technology support, and a write-up of the discussion that took place via e-mail and video conferencing. The case studies highlighted the ongoing challenges and opportunities that NIST has in supporting a cross-section of established and emerging research use cases. Each case study mentioned unique challenges which were summarized into common needs.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

129 I, 99 Tc, And U Distribution Coefficients of Subsurface Sediments Collected from the Proposed Site of the Environmental Management Disposal Facility

Performance Assessment calculations were completed in 2020 to evaluate the Environmental Management Disposal Facility (EMDF), a proposed new low-level radioactive waste (LLW) disposal facility on the U.S. Department of Energy’s Oak Ridge Reservation (ORR). Among the large number of input parameters needed for such calculations, are distribution coefficients (K d values; radionuclide concentration solid:liquid ratio) that provide a measure of the tendency of radionuclides to bind to sediments. The objective of this study was to measure K d values of three radionuclides that may pose a disproportionately large amount of risk, U, 129 I and 99 Tc. The average I K d value for the 14 geological materials recovered from the proposed EMDF site was 37.8 mL/g and ranged from -1.8 to 140.9 mL/g. These values were consistent, but somewhat larger than previous measurements made with ORR sediments and were about an order of magnitude greater than those used in previous EMDF PA calculations. The median Tc K d value was 365.7 mL/g, much greater than previously reported using ORR geological materials. Five of the 14 tested geological materials sorbed large quantities of Tc, suggesting that the weakly sorbing Tc(VII) species had been reduced to the sparingly soluble Tc(IV) species. The five strongly sorbing sediments had apparent Tc solubility values of approximately <10 -8 mol/L. The median U K d value was 5,726 mL/g. All of the tested geological materials had large K d values, ranging from 625 to >10,208 mL/g. Among the sediment samples that exhibited strong U binding, the apparent solubility value was approximately <10 -9 mol/L. Based on sediment properties and general ORR geological considerations, it was proposed that much of the I and Tc retention could be attributed to the site materials exhibiting low pH (average pH = 4.94), low redox status, and/or the elevated levels of iron oxides, manganese oxides, and natural organic matter. Similarly, the extremely high U binding measured in these sediments may also be attributed to the low conditions of carbonates, which can complex and therefore solubilize uranyl in these tests due to the low pH, and also the relatively high concentrations of iron and organic coatings on these samples. An implication of this study is that the areas of the EMDF subsurface environment may have natural properties for attenuating I, Tc, and U movement, and potentially other radionuclides, thereby possibly reducing risk posed by burial of LLW at this site. This document is a revision of SRNL-STI-2021-00404, Revision 0 that includes new data describing U K d values and new I and Tc K d values for four Nolichucky sediments. These new results were integrated into the data presented in the original document.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Specification of EBR-II Laser Profilometry Data

All laser profilometry data stored in FIPD were originally measured using the element laser profilometer system in HFEF/N. The irradiated fuel elements or pins were scanned by a laser beam to measure the outer diameter with position mapping of the spacer wire. The normal operation and data collection were performed automatically with HFEF/N Data Acquisition and Process Control System (DAPCS). With the digital control system, measured laser profilometry data were recorded in digital form on magnetic tapes, different from the analog contact profilometry data recorded by strip-chart record sheets. Two documents contained most of the important details about laser profilometry measurements. The first one is the operational manual of the laser profilometer (title: Element laser profilometer (ELP) operation and maintenance manual, HFEF/N OMM 4329, DOC. NO. W0171-0149-ES-01). This manual provides: (1) description of laser profilometer including the functions of each component (transceiver, retroreflector, clamping guide, shielding enclosure, electronic controller, etc.); (2) step-by-step guidance for calibrations, operations and measurements; and (3) maintenance procedures and other details of the element laser profilometer. Since first issued on 12/1/1986, several revisions/changes of the manual were developed to update the measurement accuracies and other factors for the laser profilometer system. The second document is a publicly accessible conference article titled “the element laser profilometer system in HFEF/N.” This article summarizes important functions and parameters of the laser profilometer. The range of measurements and the uncertainties reported in the article were consistent with the values reported in the operational manual.

42 ENGINEERING↗

Demand Response in Industrial Facilities: Peak Electric Demand

The US Department of Energy’s (DOE’s) Better Buildings, Better Plants Program (Better Plants) is a voluntary energy efficiency leadership initiative for US manufacturers and water/wastewater entities. The program encourages organizations to commit to reducing the energy intensity of their US operations over a 10-year period, typically by 25%. Companies joining Better Plants are recognized by DOE for their leadership in implementing energy efficiency practices and for reducing their energy intensity. Better Plants Partners are assigned to a Technical Account Manager, who can help companies establish energy intensity baselines, develop energy management plans, and identify key resources and incentives from DOE, other federal agencies, states, utilities, and other organizations that can enable them to reach their goals. Better Plants Partners are expected to report their progress to DOE once a year. This involves establishing an energy intensity baseline upon joining the program and then tracking their progress over time. Demand Response in Industrial Facilities: Peak Electrical Demand is intended to help companies understand peak demand response programs offering by their local utility. Manufacturing industries can learn about time-varying rates and smart technologies they can use to help them reduce their energy bills. This guidance document is applicable to companies participating at either the program or challenge level. Although this guide is intended primarily to assist companies participating in Better Plants, the methodologies and guidance within the document are applicable to any organization interested in understanding peak demand response programs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Performance Assessment for the Disposal of Low-Level Waste in the 200 West Area Burial Grounds (Annual Status Report FY 2022)

This annual review provides the projected dose estimates of radionuclide inventories disposed in the active 200 West Area Low-Level Waste Burial Grounds (LLBGs) since September 26, 1988. These estimates are calculated using the original dose methodology developed in the performance assessment (PA) analysis (WHC-EP-0645). The estimates are compared with the performance objectives defined in U.S. Department of Energy requirements (DOE O 435.1 and its companion documents DOE M 435.1-1 and DOE-STD-5002-2017). All performance objectives are currently satisfied, and operational waste acceptance criteria (HNF-EP-0063) and waste acceptance practices continue to be sufficient to maintain compliance with performance objectives. Inventory estimates and associated dose estimates from future waste disposal actions are unchanged from previous years’ evaluations that indicate potential impacts well below performance objectives; therefore, future compliance with DOE O 435.1 is expected. Within the active burial grounds, low-level and mixed low-level waste currently may be disposed only in two lined trenches in the 218-W-5 Burial Ground (Trenches 31 and 34) until they are either filled or a decision is made to close these trenches. Some mixed low-level waste is also disposed at the Environmental Restoration Disposal Facility in the 200 West Area (which is covered under a separate PA). During this (fiscal year 2022) reporting period (October 1, 2021, through September 30, 2022), waste was disposed to the 200 West Area LLBGs. Continued groundwater monitoring of the 200 West Area LLBGs indicates no groundwater contamination due to LLBG waste. Current assumptions about future land use at the Hanford Site are consistent with PA analysis assumptions of a postclosure facility that will not be degraded by human activity. The LLBGs are in an area identified for waste management and containment of residual contamination (DOE/EIS-0391). The current closure plan for the LLBGs (DOE/RL-2000-70) estimates that the 200 West LLBGs will be closed in the 2050 timeframe. The Disposal Authorization Statement, other technical basis documents, and the radioactive waste management basis are of continued adequacy to meet the performance objectives of DOE O 435.1. Overall, there are no substantive changes to primary PA assumptions and no changes to the PA analysis conclusion; therefore, compliance with DOE O 435.1 and the Disposal Authorization Statement is maintained. A new PA to evaluate the long-term impacts of three disposal trenches that are currently active within the 200 East and 200 West Areas (Trench 94 in the 200 East Area and Trenches 31 and 34 in the 200 West Area) was initiated in fiscal year 2019 and completed in fiscal year 2022. Corrective actions addressing 3 key issues and 31 secondary issues identified during the review process were developed and submitted to the Low-Level Waste Disposal Facility Federal Review Group Co-Chairs for review and approval. This PA provides additional technical basis for the continued adequacy of the existing Operating Disposal Authorization Statement.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗