Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DIRECTORS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,153 records · Page 64

ORNLs Laboratory Directed Research and Development Program (FY 2011 Annual Report)

The Laboratory Directed Research and Development (LDRD) program at Oak Ridge National Laboratory (ORNL) reports its status to the U.S. Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries of all ORNL LDRD research activities supported during FY 2011. The associated FY 2011 ORNL LDRD Self-Assessment (ORNL/PPA-2012/2) provides financial data and an internal evaluation of the program’s management process.

09 BIOMASS FUELS↗

ORNLs Laboratory Directed Research and Development Program (FY 2012 Annual Report)

The Laboratory Directed Research and Development (LDRD) program at Oak Ridge National Laboratory (ORNL) reports its status to the US Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries of all ORNL LDRD research activities supported during FY 2012. The associated FY 2012 ORNL LDRD Self-Assessment (ORNL/PPA-2012/2) provides financial data and an internal evaluation of the program’s management process.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ORNLs Laboratory Directed Research and Development Program FY 2013 Annual Report

The Laboratory Directed Research and Development (LDRD) program at Oak Ridge National Laboratory (ORNL) reports its status to the US Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries of all ORNL LDRD research activities supported during FY 2013. The associated FY 2013 ORNL LDRD Self-Assessment (ORNL/PPA-2014/2) provides financial data and an internal evaluation of the program’s management process.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Regulations and Procedures Manual

The purpose of the Regulations and Procedures Manual (RPM) is to provide Laboratory personnel with a reference to University and Lawrence Berkeley National Laboratory policies and regulations by outlining the normal practices and answering most policy questions that arise in the day-to-day operations of Laboratory departments. Much of the information in this manual has been condensed from detail provided in Laboratory procedure manuals, Department of Energy (DOE) directives, and Contract DE-AC02-05CH11231. This manual is not intended, however, to replace any of those documents. The sections on personnel apply only to employees who are not represented by unions. Personnel policies pertaining to employees represented by unions may be found in their labor agreements. Questions concerning policy interpretation should be directed to the department responsible for the particular policy. A link to the Managers Responsible for RPM Sections is available on the RPM home page. If it is not clear which department should be called, please contact the Associate Laboratory Director of Operations.

99 GENERAL AND MISCELLANEOUS↗

BOCC Blueprint

The Pacific Northwest National Laboratory (PNNL) Facility and Operations (F&O) Division strives to manage performance, to assure long-term health and sustainability for the organization and our staff through innovation and learning. The F&O organization is committed to achieving five strategic outcomes over the next several years. The strategic outcomes are aligned with the Department of Energy (DOE) and PNNL mission and vision. One key outcome important to enabling our vision is to integrate the smartest facilities, connected to the smartest people, by the smartest systems. We call this our SMART3 Initiative. The F&O SMART3 Initiative will connect human capital with intelligent systems, resulting in a best-in-class, integrated facility-operations strategy that improves productivity and optimizes operational costs. The Building Operations Control Center (BOCC) Blueprint is a key deliverable in this effort and will define near-term and long-term objectives aligned with the SMART3 Initiative. The BOCC Blueprint provides a plan to successfully position the BOCC and assure full integration into the new Systems Engineering Laboratory (SEL). The BOCC Blueprint near-term objectives will satisfy each of the three elements of the SMART3 Initiative. 1. The facilities element will be achieved by defining the minimum set of smart sensors for deployment, establishing dashboards and metrics, and initiating a Real-Time Commissioning Program (RT-Cx). 2. The people element will be achieved as F&O and the Energy and Environment Directorate (EED) collaborate, mentor, and cross-train within F&O. The collaboration effort will provide proof of concept by testing, applying and sharing information on facility systems through smart grid, facility re-tuning & audits, and DSOM fault detection and diagnostics. The mentoring and cross-training will be realized by integrating air balance operators, power operators and FMCS specialists within the BOCC. 3. The systems element will be achieved by standardizing the Facility Management Control Systems (FMCS) and Decision Support for Operations and Maintenance (DSOM) development, specifically by implementing facility dashboards and tools. The long-term objectives are to enhance reliability, reduce cost, and demonstrate the “Living Laboratory,” as defined by the way facilities are used to advance research from theoretical to practical applications through scientific collaboration among PNNL’s research and development (R&D) staff. With the BOCC Blueprint defining the objectives to meet the SMART3 Initiative, the BOCC will become a valuable PNNL core competency, and allow for additional R&D opportunities.

99 GENERAL AND MISCELLANEOUS↗

Recovery Act. Sub-Soil Gas and Fluid Inclusion Exploration and Slim Well Drilling, Pumpernickel Valley, Nevada

Nevada Geothermal Power Company (NGP) was awarded DOE Award DE-EE0002834 in January 2010 to conduct sub-soil gas and fluid inclusion studies and slim well drilling at its Black Warrior Project (now known as North Valley) in Washoe and Churchill Counties, Nevada. The project was designed to apply highly detailed, precise, low-cost subsoil and down-hole gas geochemistry methods from the oil and gas industry to identify upflow zone drilling targets in an undeveloped geothermal prospect. NGP ran into multiple institutional barriers with the Black Warrior project relating to property access and extensive cultural survey requirement. NGP requested that the award be transferred to NGP’s Pumpernickel Valley project, due to the timing delay in obtaining permits, along with additional over-budget costs required. Project planning and permit applications were developed for both the original Black Warrior location and at Pumpernickel. This included obtaining proposals from contractors able to conduct required environmental and cultural surveying, designing the two-meter probe survey methodology and locations, and submitting Notices of Intent and liaising with the Bureau of Land Management to have the two-meter probe work approved. The award had an expiry date of April 30, 2013; however, due to the initial project delays at Black Warrior, and the move of the project from Black Warrior to Pumpernickel, NGP requested that the award deadline be extended. DOE was amenable to this, and worked with NGP to extend the deadline. However, following the loss of the Blue Mountain geothermal power plant in Nevada, NGP’s board of directors changed the company’s mandate to one of cash preservation. NGP was unable to move forward with field work on the Pumpernickel property, or any of its other properties, until additional funding was secured. NGP worked to bring in a project partner to form a joint venture on the property, or to buy the property. This was unsuccessful, and NGP notified the DOE on February 13, 2014 that it would not be able to complete the project objectives before the recovery act awards deadline and submitted a mutual termination request to the DOE which was accepted.

15 GEOTHERMAL ENERGY↗

COE Task Order 4. Final Report: Automated Threat Recognition

Lawrence Livermore National Laboratory (LLNL) was tasked by the Department of Homeland Security (DHS) Science and Technology Directorate (S&T) with developing an automated target recognition algorithm for finding objects of interest in checked baggage at airports. The project used x-ray computed tomography (CT) data collected on a medical scanner of various simulated checked bags. Target objects of interest include clay, rubber, and saline in various concentrations. The final results are 93.9% probability of detection (P D ) with 11.9% probability of false alarm (PFA) on all targets and 100% detection for pseudo target sheets. This result is achieved by using a three-stage algorithm made up of segmentation, post-processing, and feature extraction and object classification. The segmentation proved to be the most important stage and it involves merging two distinct segmentation results followed by a set of algorithms for cleaning up the merged segmentations. The first segmentation algorithm operates on planar 10x10 voxel slabs (two- dimensional segments) in the three spatial planes. The segmenter calculates a probability that each slab in the image is a part of a target, determines if the probability was above a threshold, and then merges all connected slabs together. The second segmentation algorithm is an ensemble segmenter, which generates a set of possible segmentations through random permutations and computes an average behavior. The distinct properties of these segmenters results in a merged segmentation with superior results than either segmenter alone. The merged segmentation is “cleaned up” using post processing techniques to achieve the final labeled images. The final classification stage made use of a random forest classifier algorithm to discriminate targets from non-targets based on a set of features of the segmented objects partially from the voxel slabs and partially from the individual voxels. Features include standard statistics such as mean, median, and standard deviations of the density, features capturing some aspects of texture, and some features about the surrounding bag structure. In addition to the detection and false alarm results above, we show how the algorithms can be trained to “overfit” to the limited data set provided and achieve near perfect results (P D =100% and P FA =0%). This over-training is not recommended for long-term operation, but instead is meant to demonstrate how test design is an important factor in aviation security. Possible improvements to the algorithm and the testing methodology (including blind testing) are also presented.

42 ENGINEERING↗

Selected Examples of LDRD Projects Supporting Test Ban Treaty Verification and Nonproliferation

The Laboratory Directed Research and Development (LDRD) Program at the DOE National Laboratories was established to ensure the scientific and technical vitality of these institutions and to enhance the their ability to respond to evolving missions and anticipate national needs. LDRD allows the Laboratory directors to invest a percentage of their total annual budget in cutting-edge research and development projects within their mission areas. We highlight a selected set of LDRD-funded projects, in chronological order, that have helped provide capabilities, people and infrastructure that contributed greatly to our ability to respond to technical challenges in support of test ban treaty verification and nonproliferation.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Environmental Surveillance at Los Alamos during 2007

Environmental Surveillance at Los Alamos reports are prepared annually by the Los Alamos National Laboratory (the Laboratory) Environmental Directorate, as required by US Department of Energy Order 450.1, General Environmental Protection Program, and US Department of Energy Order 231.1A, Environment, Safety, and Health Reporting. These annual reports summarize environmental data that are used to determine compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and departmental policies. Additional data, beyond the minimum required, are also gathered and reported as part of the Laboratory’s efforts to ensure public safety and to monitor environmental quality at and near the Laboratory. Chapter 1 provides an overview of the Laboratory’s major environmental programs and explains the risks and the actions taken to reduce risks at the Laboratory from environmental legacies and waste management operations. Chapter 2 reports the Laboratory’s compliance status for 2007. Chapter 3 provides a summary of the maximum radiological dose the public and biota populations could have potentially received from Laboratory operations and discusses chemical exposures. The environmental surveillance and monitoring data are organized by environmental media (Chapter 4, air; Chapters 5 and 6, water and sediments; Chapter 7, soils; and Chapter 8, foodstuffs and biota) in a format to meet the needs of a general and scientific audience. Chapter 9 provides a summary of the status of environmental restoration work around LANL. A glossary and a list of acronyms and abbreviations are in the back of the report. Appendix A explains the standards for environmental contaminants, Appendix B explains the units of measurements used in this report, Appendix C describes the laboratory’s technical areas and their associated programs, and Appendix D provides web links to more information. In printed copies of this report or Executive Summary, we have also enclosed a compact disc with a copy of the full report in Adobe Acrobat (PDF) form and detailed supplemental tables of data from 2007 in Microsoft Excel format. These files are also available for download from the web (http://www.lanl.gov/community-environment/environmental- stewardship/environmental-report.php).

54 ENVIRONMENTAL SCIENCES↗

The Oak Ridge Reservation Annual Site Environmental Report: 2007

The Oak Ridge Reservation (ORR) consists of three major government-owned, contractor-operated facilities: the Y-12 National Security Complex, Oak Ridge National Laboratory, and East Tennessee Technology Park. The ORR was established in the early 1940s as part of the Manhattan Project, a secret undertaking that produced materials for the first atomic bombs. The reservation’s role has evolved over the years, and it continues to adapt to meet the changing defense, energy, and research needs of the United States. Both the work carried out for the war effort and subsequent research, development, and production activities have involved, and continue to involve, the use of radiological and hazardous materials. The Oak Ridge Reservation Annual Site Environmental Report and supporting data are available at Http://www.ornl.gov/sci/env_rpt or from the project director.

54 ENVIRONMENTAL SCIENCES↗

Environmental Surveillance at Los Alamos during 2008

Environmental Surveillance at Los Alamos reports are prepared annually by the Los Alamos National Laboratory (the Laboratory) Environmental Programs Directorate, as required by US Department of Energy Order 450.1, General Environmental Protection Program, and US Department of Energy Order 231.1A, Environment, Safety, and Health Reporting. These annual reports summarize environmental data that are used to determine compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and departmental policies. Additional data, beyond the minimum required, are also gathered and reported as part of the Laboratory’s efforts to ensure public safety and to monitor environmental quality at and near the Laboratory. Chapter 1 provides an overview of the Laboratory’s major environmental programs and explains the risks and the actions taken to reduce risks at the Laboratory from environmental legacies and waste management operations. Chapter 2 reports the Laboratory’s compliance status for 2007. Chapter 3 provides a summary of the maximum radiological dose the public and biota populations could have potentially received from Laboratory operations and discusses chemical exposures. The environmental surveillance and monitoring data are organized by environmental media (Chapter 4, air; Chapters 5 and 6, water and sediments; Chapter 7, soils; and Chapter 8, foodstuffs and biota) in a format to meet the needs of a general and scientific audience. Chapter 9 provides a summary of the status of environmental restoration work around LANL. A glossary and a list of acronyms and abbreviations are in the back of the report. Appendix A explains the standards for environmental contaminants, Appendix B explains the units of measurements used in this report, Appendix C describes the Laboratory’s technical areas and their associated programs, and Appendix D provides web links to more information.

54 ENVIRONMENTAL SCIENCES↗

Perfect Power Prototype for Illinois Institute of Technology

Starting in October 2008, Illinois Institute of Technology (IIT), in collaboration with over 20 participating members, led an extensive effort to develop, demonstrate, promote, and commercialize a microgrid system and offer supporting technologies that will achieve Perfect Power at the main campus of IIT. A Perfect Power system, as defined by the Galvin Electricity Initiative (GEI), is a system that cannot fail to meet the electric needs of the individual end-user. The Principle Investigator of this Perfect Power project was Dr. Mohammad Shahidehpour, Director of the Robert W. Galvin Center for Electricity Innovation at IIT. There were six overall objectives of the Perfect Power project: (1) Demonstrate the higher reliability introduced by the microgrid system at IIT; (2) Demonstrate the economics of microgrid operations; (3) Allow for a decrease of fifty percent (50%) of grid electricity load; (4) Create a permanent twenty percent (20%) decrease in peak load from 2007 level; (5) Defer planned substation through load reduction; (6) Offer a distribution system design that can be replicated in urban communities.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Project Trinity: The Myth, The Legend, The Legacy [Slides]

The Manhattan Project was established in June 1942. Its mission: beat the Nazis to the atomic bomb. Los Alamos was selected as the site for the weapons design laboratory. J. Robert Oppenheimer served as the Laboratory’s director. In the spring of 1944, Los Alamos scientists discovered plutonium would not work in a gun assembly. That summer, the Laboratory was reorganized to build an implosion bomb. Scientists were confident Little Boy, the uranium gun weapon, would perform in combat. Initially, however, scientists were skeptical its imploding plutonium counterpart would function. Eventually, due to improvements in the high explosives (HE), most scientists were confident the implosion bomb would work …but not confident enough to use it in combat without testing it first! Oppenheimer persuaded General Leslie Groves, Commander of the Manhattan Engineer District, to test.

Military Technology, Weaponry, & National Defense(↗

2013 Los Alamos National Laboratory Hazardous Waste Minimization Report

Waste minimization and pollution prevention are inherent goals within the operating procedures of Los Alamos National Security, LLC (LANS). The US Department of Energy (DOE) and LANS are required to submit an annual hazardous waste minimization report to the New Mexico Environment Department (NMED) in accordance with the Los Alamos National Laboratory (LANL or the Laboratory) Hazardous Waste Facility Permit. The report was prepared pursuant to the requirements of Section 2.9 of the LANL Hazardous Waste Facility Permit. This report describes the hazardous waste minimization program (a component of the overall Waste Minimization/Pollution Prevention [WMin/PP] Program) administered by the Environmental Stewardship Group (ENV-ES). This report also supports the waste minimization and pollution prevention goals of the Environmental Programs Directorate (EP) organizations that are responsible for implementing remediation activities and describes its programs to incorporate waste reduction practices into remediation activities and procedures. LANS was very successful in fiscal year (FY) 2013 (October 1-September 30) in WMin/PP efforts. Staff funded four projects specifically related to reduction of waste with hazardous constituents, and LANS won four national awards for pollution prevention efforts from the National Nuclear Security Administration (NNSA). In FY13, there was no hazardous, mixedtransuranic (MTRU), or mixed low-level (MLLW) remediation waste generated at the Laboratory. More hazardous waste, MTRU waste, and MLLW was generated in FY13 than in FY12, and the majority of the increase was related to MTRU processing or lab cleanouts. These accomplishments and analysis of the waste streams are discussed in much more detail within this report.

54 ENVIRONMENTAL SCIENCES↗

Laboratory for Nuclear Science. High Energy Physics Program

High energy and nuclear physics research at MIT is conducted within the Laboratory for Nuclear Science (LNS). Almost half of the faculty in the MIT Physics Department carry out research in LNS at the theoretical and experimental frontiers of subatomic physics. Since 2004, the U.S. Department of Energy has funded the high energy physics research program through grant DE-FG02-05ER41360 (other grants and cooperative agreements provided decades of support prior to 2004). The Director of LNS serves as PI. The grant supports the research of four groups within LNS as “tasks” within the umbrella grant. Brief descriptions of each group are given here. A more detailed report from each task follows in later sections. Although grant DE-FG02-05ER41360 has ended, DOE continues to fund LNS high energy physics research through five separate grants (a research grant for each of the four groups, as well as a grant for AMS Operations). We are pleased to continue this longstanding partnership.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Section 2.0: Responsibilities

Describes responsibilities of program managers, office directors, and the peer review leader, as well as corporate responsibilities, for conducting peer reviews.

99 GENERAL AND MISCELLANEOUS↗

New Platform Provides Innovation

Sky Bridge is the primary unclassified scientific computing platform at Sandia, serving all Mission Areas within the Laboratories. At the formal ribbon cutting in December 2014, Laboratories Director Paul Hommert emphasized the importance of the Institutional Computing Program in providing a critical core Laboratories capability. The deployment of Sky Bridge more than doubled the computing cycles available in Sandia’s restricted computing environment, while incorporating the same underlying architecture as the existing ASC/TLCC2 compute clusters, thus allowing many existing computer codes to run on the system without any major modifications. Sky Bridge immediately addressed the shortfall in projected computing cycles for Sandia’s programs of energy and environment, nuclear weapons life expectancy program (NW LEP), and Applied Laboratory Technology (ALT). From a technological perspective, Sky Bridge is contributing to the readiness of the data center facility and operations personnel for a transition to liquid cooling in future HPC systems and other high-density systems. By comparing the performance and energy costs of Sky Bridge to similar systems (e.g., Dark Bridge) that are air-cooled rather than liquid-cooled, it will also provide valuable data for making return on investment decisions for future purchases. Installation of Sky Bridge enables decommissioning of the Red Sky supercomputer, reduce energy and support costs, and make room for future HPC systems already planned through the ASC and Institutional Computing programs. Sky Bridge’s use of liquid cooling (cold plate to the systems processors) and more efficient power distribution (480 V direct to the rack) saved over $\$$700, 000 in construction costs while reducing annual operating costs by $\$$120,000.

97 MATHEMATICS AND COMPUTING↗

DOE Advanced Scientific Computing Advisory Subcommittee (ASCAC) Report: Top Ten Exascale Research Challenges

Exascale computing systems are essential for the scientific fields that will transform the 21st century global economy, including energy, biotechnology, nanotechnology, and materials science. Progress in these fields is predicated on the ability to perform advanced scientific and engineering simulations, and analyze the deluge of data. On July 29, 2013, ASCAC was charged by Patricia Dehmer, the Acting Director of the Office of Science, to assemble a subcommittee to provide advice on exascale computing. This subcommittee was directed to return a list of no more than ten technical approaches (hardware and software) that will enable the development of a system that achieves the Department's goals for exascale computing. Numerous reports over the past few years have documented the technical challenges and the non¬-viability of simply scaling existing computer designs to reach exascale. The technical challenges revolve around energy consumption, memory performance, resilience, extreme concurrency, and big data. Drawing from these reports and more recent experience, this ASCAC subcommittee has identified the top ten computing technology advancements that are critical to making a capable, economically viable, exascale system.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗