Development of Advanced Waste Management Software to Enhance Operating Efficiency and Reduce Life-Cycle Cost at the Oak Ridge National Laboratory, Oak Ridge, Tennessee, USA
No abstract prepared.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
No abstract prepared.
Addressing critical improvements in biomass productivity and associated biochemical composition is a priority for the economic and sustainable commercial development of biofuels and bioproducts from algae. Capitalizing on pathways that integrate engineering approaches with fundamental biochemistry of photosynthetic organisms will lead to a better understanding of the complex nexus of algae growth rates, productivity and composition. This project focuses on identifying the critical factors for economic development of fuel and bioproduct technologies. Algal compositional characteristics form the foundation of robust economic and business models. This project supports that foundation by developing and validating accurate compositional methods and disseminating them to the greater community. Simultaneously, we build a deep understanding of the dynamic biochemical composition and carbon allocation for biomass value and conversion yields. A co-product portfolio developed under this project demonstrated a 30% increase in intrinsic value. Additionally, an integrated pipeline of molecular diversity mapping for product discovery with quantitative demonstration across species was deployed over the BETO algae program. The advances made here are highly relevant to BETO's multi-year program targets of reducing costs and integrating dynamic biomass composition with conversion processes to provide options for bioproducts, all leveraging the molecular diversity of algae.
Building decarbonization via electrification on a clean grid is the most promising climate solution proposed to date for the building sector. In cold climate zones, building electrification will be driven in large part by moving from natural gas space heating to cold climate heat pumps (CCHPs). CCHPs are commercially available today, including economical cold climate air source heat pumps (ccASHPs). But there's one big problem - wide-scale adoption of ccASHPs will dramatically increase winter peak electricity demand, even with the highest efficiency ccASHP products. Furthermore, cold climate space heating loads will drive unprecedented electric system peaks during the lowest periods of renewable generation and are likely to overwhelm existing distribution systems. This scenario is avoidable by coupling electrification with building envelope upgrades to reduce peak heating loads. This paper presents a model, built from home energy audit and research data sets, that quantifies the above challenges. Results demonstrate how weatherization efforts coupled with additional high-performance envelope upgrade measures can prepare the building stock for electrification and show the benefit these measures can bring to future utility operations. Much of this envelope upgrade work is cost-effective, according to conservative cost-benefit testing and program successes to date, and is coupled with substantial non-energy benefits. However, persistent market barriers have made scaling of envelope retrofit work challenging for decades, suggesting additional policy support is required. Lessons learned from previous policy experience, combined with new technology and administrative support, create exciting potential for this decarbonization climate solution.
The Inreach program combines the Deep River Science Academy (DRSA) 'learning through research' approach with state of the art communication technology to bring scientific research to high school classrooms. The Inreach program follows the DRSA teaching model where a university student tutor works on a research project with scientific staff at AECL's Chalk River Laboratories. Participating high school classes are located across Canada. The high school students learn about the ongoing research activities via weekly web conferences. In order to engage the students and encourage participation in the conferences, themed exercises linked to the research project are provided to the students. The DRSA's Inreach program uses a cost-effective internet technology to reach a wide audience, in an interactive setting, without anyone leaving their desks or offices. An example Inreach research project is presented here: an investigation of the potential of the Canadian supercritical water cooled reactor (SCWR) concept to burn transuranic elements (Np, Pu, Am, Cm) to reduce the impact of used nuclear fuel. During this project a university student worked with AECL (Atomic Energy of Canada Limited) researchers on technical aspects of the project, and high school students followed their progress and learned about the composition, hazards, and disposition options for used nuclear fuel. Previous projects included the effects of tritium on cellular viability and neutron diffraction measurement of residual stresses in automobile engines.
The well-known 80 - 20 principle, also known as the Pareto principle, describes the fact that usually 80 % of the result is achieved by 20 % of the effort, because many probability distributions are caused by a power-law. This principle is valued in the realm of project management and management in general because of the fast progress which generally takes place in the first fifth of the process. If the final result is not exactly specified or resources are spent wisely, 100 % of the planned result will be reached easily. However, in nuclear business safety is a principal parameter. Therefore precision is inevitable. In long-lasting projects the bad end of the Pareto-distribution is dominant: The very shallowly-inclined gradient at the end of the graph means that results at that point come at a very high effort and cost. The graph reaches the 100% only asymptomatically, meaning the initially projected results are never met. Especially if in earlier project phases the Pareto principle is applied very successfully, a lot of work is transferred to the future. For example, in decommissioning projects the waste often is badly characterized causing an enormous effort in the process of characterization and qualification. Especially if funding or time are limited, it is important to be aware of the asymmetric distribution of applied work and result. The 80 - 20 principle is a great advantage, if you start a project and respect the asymmetric distribution of applied resources and results in your project plan. Especially in long-lasting projects with changing perspectives, this asymmetric distribution may cause massive delays and expansion of costs, because small changes near the end cause large/big effort due to consequences on the existing data. If the proper goal of a project is not entirely known in the beginning, it is very probable that the last 5 - 10 % of the result will cause major financial threat and extensions of the estimated time frame. If funding or time are limited, it is almost impossible to readjust a project in the estimated frame of resources. In this case a complete restart of the project may be more reasonable than a long-lasting change management with uncertain results. (authors)
The Environmental Management Waste Management Facility (EMWMF) is an above-grade waste disposal facility that is owned by DOE and operated by URS | CH2M Oak Ridge LLC (UCOR), a contractor to DOE's Oak Ridge Office of Environmental Management. The EMWMF landfill is located on the Oak Ridge Reservation (ORR) and has a 2.18 M cubic yard capacity. EMWMF is a key component of the cost-effective ORR cleanup program and accepts remediation waste from across the ORR. Multiple low-level and low-level mixed CERCLA waste streams are disposed at EMWMF, mostly as direct-dumped demolition and remediation debris. EMWMF receives and disposes of a myriad of contaminated waste streams and waste types, including massive structural steel from some of the largest buildings ever constructed, contaminated soils from legacy disposal areas, containers that must be grouted under negative pressure, and special waste that must be tightly controlled. Support activities include managing several million gallons of landfill wastewater per year and driving around 20,000 miles per year to transport leachate to a treatment facility. Even with the wide range of waste accepted and the diversity of support activities, EMWMF Operations has maintained an impressive safety record of no lost workday cases in nearly 16 years of continuous operation and was recently awarded the National Safety Council's Superior Safety Performance Award. This safety record is a testament to the commitment to safety by both workers and management. Several factors are key to the EMWMF Operations safety record. UCOR senior management established safety as a priority and allocates proper funding and resources. EMWMF Operations management embraces safety as an integral part of the work and also 'walks the talk'-emphasizing safety over productivity and showing personal commitment to safety. A stable workforce promotes a culture where safety is valued and helps train new personnel in this culture. The UCOR integrated safety management approach to work control is fully embraced, where worker feedback is highly valued and used to better identify and control job hazards. Finally, job supervisors actively encourage input. Worker concerns, suggestions, and observations are encouraged and positively addressed. As a result, the entire Operations Team is committed to identifying and mitigating hazards. This team commitment to safety results in a culture where safety is not only valued, but is expected. Safety concerns are identified and addressed proactively, and communication is encouraged. This strong safety culture and outstanding safety record have also proven to be good business, with the facility available to receive waste 99.6% of available work hours and outstanding turnaround times on waste shipments. The EMWMF Operations team commitment to safety can be used in other environments to develop an engaged, safety-conscious workforce. (authors)
At the U. S. Department of Energy's Hanford Site in southeastern Washington State, 216 million liters (57 million gallons) of nuclear waste is currently stored in aging underground tanks, threatening the Columbia River. The River Protection Project (RPP), a fully integrated system of waste storage, retrieval, treatment, and disposal facilities, is in varying stages of design, construction, operation, and future planning. These facilities face many overlapping technical, regulatory, and financial hurdles to achieve site cleanup and closure. Program execution is ongoing, but completion is currently expected to take approximately 40 more years. Strategic planning for the treatment of Hanford tank waste is by nature a multi-faceted, complex and iterative process. To help manage the planning, a report referred to as the RPP System Plan is prepared to provide a basis for aligning the program scope with the cost and schedule, from upper-tier contracts to individual facility operating plans. The Hanford Tank Waste Operations Simulator (HTWOS), a dynamic flowsheet simulation and mass balance computer model, is used to simulate the current planned RPP mission, evaluate the impacts of changes to the mission, and assist in planning near-term facility operations. Development of additional modeling tools, including an operations research model and a cost model, will further improve long-term planning confidence. The most recent RPP System Plan, Revision 4, was published in September 2009.
A versatile computer program analyzes the link-design control table necessary for designing the telecommunication subsystem of a spacecraft in orbit around the Earth or on a deep-space mission. The program helps to calculate all the important parameter values for spacecraft-to-ground telemetry links and ground-to-spacecraft command links. The program also enables the design of turn-around ranging and one-way ranging links, which are very useful for determining the positions of spacecraft and for satisfying various other operational needs. The user can specify several aspects of spacecraft telecommunication-subsystem design, including the nature of the antenna (paraboloidal reflector, patch, dipole, etc.), the power-amplifier rating, and the link data rate. The program enables the use of comparative design procedures and includes an extensive database on the capabilities, attributes, and costs of commercially available telecommunications equipment. Hence, the program can also perform cost analyses. The software includes an extensive ground-station database, so that link design can be carried out using different ground stations in a comparative process in an effort to select the best design. The output of the program is in the form of graphs as well as numbers.
This paper examines the question of cost, from the birth of a program to its conclusion, particularly from the point of view of large multi-center programs, and suggests how to avoid some of the traps and pitfalls. Emphasis is given to cost in the systems engineering process, but there is an inevitable overlap with program management. (These terms, systems engineering and program management, have never been clearly defined.) In these days of vast Federal budget deficits and increasing overseas competition, it is imperative that we get more for each research and development dollar. This is the only way we will retain our leadership in high technology and, in the long run, our way of life.
The purpose of this work is to present a new methodology, and associated computational tools, developed within the U.S. Department of Energy (U.S. DOE) Fuel Cycle Option Campaign to quantify the economic performance of complex nuclear fuel cycles. The levelized electricity cost at the busbar is generally chosen to quantify and compare the economic performance of different baseload generating technologies, including of nuclear: it is the cost of electricity which renders the risk-adjusted discounted net present value of the investment cash flow equal to zero. The work presented here is focused on the calculation of the levelized cost of electricity of fuel cycles at mass balance equilibrium, which is termed LCAE (Levelized Cost of Electricity at Equilibrium). To alleviate the computational issues associated with the calculation of the LCAE for complex fuel cycles, a novel approach has been developed, which has been called the “island approach” because of its logical structure: a generic complex fuel cycle is subdivided into subsets of fuel cycle facilities, called islands, each containing one and only one type of reactor or blanket and an arbitrary number of fuel cycle facilities. A nuclear economic software tool, NE-COST, written in the commercial programming software MATLAB®, has been developed to calculate the LCAE of complex fuel cycles with the “island” computational approach. NE-COST has also been developed with the capability to handle uncertainty: the input parameters (both unit costs and fuel cycle characteristics) can have uncertainty distributions associated with them, and the output can be computed in terms of probability density functions of the LCAE. In this paper NE-COST will be used to quantify, as examples, the economic performance of (1) current Light Water Reactors (LWR) once-through systems; (2) continuous plutonium recycling in Fast Reactors (FR) with driver and blanket; (3) Recycling of plutonium bred in FR into LWR. For each fuel cycle, the contributions to the total LCAE of the main cost components will be identified.
Joint Confidence Level (JCL) analysis focuses on the integration of traditionally stove-piped programmatic components (schedule, cost and risk) to establish projected resource and schedule requirements at various confidence levels and to identify programmatic cost and schedule risk drivers. SLS Program consists of multiple Prime Contractors managed by independent SLS Elements which are integrated using SE&I and Program Management. SLS further integrates with GSDO and MPCV through ESD integrated working groups.
Space conditioning end-uses, which include heating, cooling, and ventilation, represent a significant fraction of commercial building energy use, with a wide variety of heating and cooling technology options available in the market. In the interest of improving the overall efficiency of heating, ventilation and air-conditioning (HVAC) technologies, governments, utilities and private sector entities have implemented a variety of market transformation policies that aim to influence consumer purchase decisions. To evaluate the costs and benefits of such programs, analysts typically postulate a hypothetical default equipment choice, and compare it to one that provides comparable service with lower energy and/or power use. The corresponding reduced operating cost provides a benefit that offsets the potential higher cost of improved efficiency. Typically, life-cycle cost or cash-flow analyses are used to quantify the net economic benefit. These analyses require the capability to assess how a given equipment design would perform across a broad range of characteristics, both of the building and of the local weather. While these assessments can be performed using customized building simulations, it is generally not practical to develop and validate detailed building simulation code to cover all the potential variations of equipment design and installation. An alternative, and somewhat simpler, approach is to solely use detailed building simulations to generate time series of heating and cooling loads in commercial buildings. These loads can then be used as input to more detailed, stand-alone engineering models that simulate HVAC system performance under different equipment designs. This approach was used to evaluate a range of high-efficiency commercial packaged air conditioner design options for the Department of Energy’s Appliance and Equipment Standards Program (DOE-EERE 2015). While there may be some loss of precision relative to full simulation, the accuracy of this approach is sufficient for practical applications of cost-benefit analysis. This report describes the development of a database of commercial building heating and cooling loads, generated using the EnergyPlus software package, a whole building energy use model supported by the Department of Energy (DOE-EERE 2020a). EnergyPlus takes as input a set of configuration files that describe the building itself (size, zoning, envelope characteristics, etc.) and the various systems within it (HVAC, lighting, water heating, etc.). This analysis uses a publicly available collection of commercial reference buildings (CRB), comprised of sixteen building types and three vintages (DOE-EERE 2020b; Deru et al 2011). Each building is simulated in eighteen different locations, covering a wide range of climatic conditions. The prototype building description files assign the type of HVAC equipment used, and capacities across climate zones.
JLAB has long been a hub of SRF technology with the CEBAF accelerator as one of its first large scale adopters. As SRF technology has advanced, the C50 and C100 programs have allowed for the extension of CEBAF's total energy to 6 GeV and nearly 12 GeV respectively. Along with the increase in energy reach, rates of accelerating gradient degradation have been extracted for these cryomodule designs. A plan to mitigate these losses & maintain robust gradient headroom to deliver the 12 GeV program - the CEBAF Performance Plan - established a multi-year effort of cryomodule refurbishments and replacements. Part of this plan included a cost optimization of the C50 program with more modern processing techniques and the replacement of existing cavities with larger grain boundary cavities produced from ingot Niobium (dubbed C75 for 75 MeV gain). Reports have been made on the prototype pair of C75 cavities installed in a C50 cryomodule and the first full C75 cryomodule installed in 2017 and 2021. This paper reports on the results from the qualification of the cavities for the second C75 module in both a vertical cryostat and the commissioning results of the cryomodule in the CEBAF tunnel. This material is based upon work supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics under contract DE-AC05-06OR23177.
An economic analysis was performed to determine the cost of the design and fabrication of a low Earth orbit, 2 kW photovoltaic/battery, space qualified power system. A commercially available computer program called PRICE (programmed review of information for costing and evaluation) was used to conduct the analysis. The sensitivity of the various cost factors to the assumptions used is discussed. Total cost of the power system was found to be $2.46 million with the solar array accounting for 70.5%. Using the assumption that the prototype becomes the flight system, 77.3% of the total cost is associated with manufacturing. Results will be used to establish whether the cost of space qualified hardware can be reduced by the incorporation of commercial design, fabrication, and quality assurance methods.
A profile of altitude, airspeed, and flight path angle as a function of range between a given set of origin and destination points for particular models of transport aircraft provided by NASA is generated. Inputs to the program include the vertical wind profile, the aircraft takeoff weight, the costs of time and fuel, certain constraint parameters and control flags. The profile can be near optimum in the sense of minimizing: (1) fuel, (2) time, or (3) a combination of fuel and time (direct operating cost (DOC)). The user can also, as an option, specify the length of time the flight is to span. The theory behind the technical details of this program is also presented.
The study to develop a system model and computer program representative of broadcasting satellite systems employing community-type receiving terminals is reported. The program provides a user-oriented tool for evaluating performance/cost tradeoffs, synthesizing minimum cost systems for a given set of system requirements, and performing sensitivity analyses to identify critical parameters and technology. The performance/ costing philosophy and what is meant by a minimum cost system is shown graphically. Topics discussed include: main line control program, ground segment model, space segment model, cost models and launch vehicle selection. Several examples of minimum cost systems resulting from the computer program are presented. A listing of the computer program is also included.
To meet cost and safety objectives, space missions that involve proximity operations between two vehicles require a high level of autonomy to successfully complete their missions. The need for autonomy is primarily driven by the need to conduct complex operations outside of communication windows, and the communication time delays inherent in space missions. Autonomy also supports the goals of both NASA and the DOD to make space operations more routine, and lower operational costs by reducing the requirement for ground personnel. NASA and the DoD have several programs underway that require a much higher level of autonomy for space vehicles. NASA's Space Launch Initiative (SLI) program has ambitious goals of reducing costs by a factor or 10 and improving safety by a factor of 100. DARPA has recently begun its Orbital Express to demonstrate key technologies to make satellite servicing routine. The Air Force's XSS-ll program is developing a protoflight demonstration of an autonomous satellite inspector. A common element in space operations for many NASA and DOD missions is the ability to rendezvous, inspect anclJor dock with another spacecraft. For DARPA, this is required to service or refuel military satellites. For the Air Force, this is required to inspect un-cooperative resident space objects. For NASA, this is needed to meet the primary SLI design reference mission of International Space Station re-supply. A common aspect for each of these programs is an Autonomous Mission Manager that provides highly autonomous planning, execution and monitoring of the rendezvous, inspection and docking operations. This paper provides an overview of the Autonomous Mission Manager (AMM) design being incorporated into many of these technology programs. This AMM provides a highly scalable level of autonomous operations, ranging from automatic execution of ground-derived plans to highly autonomous onboard planning to meet ground developed mission goals. The AMM provides the capability to automatically execute the plans and monitor the system performance. In the event of system dispersions or failures the AMM can modify plans or abort to assure overall system safety. This paper describes the design and functionality of Draper's AMM framework, presents concept of operations associated with the use of the AMM, and outlines the relevant features of the flight demonstrations.
The configuration of the propulsion system engine externals must meet many airplane requirements such as cost, thrust, weight, range and systems power extraction. On the 737-700 several program requirements also played a major role in the development of the engine externals. These program goals were increased range, same cost as a 1994 737-300, 15% reduction in maintenance costs from the 737-300, and a propulsion package that appeared as if it was designed by one company. This presentation will show how these requirements shaped the design of the engine externals for the 737-700/CFM56-7B.