SUPERCONDUCTING RING CYCLOTRON FOR RIKEN RI BEAM FACTORY IN JAPAN

Since 1997, RIKEN Nishina Center has been constructing the Radioactive Isotope Beam Factory (RIBF) and succeeded in beam commissioning of its accelerator complex at the end of 2006. The world's first superconducting ring cyclotron (SRC) is the final booster in the RIBF accelerator complex which is able to accelerate all-element heavy ions to a speed of about 70% of the velocity of light. The ring cyclotron consists of 6 major superconducting sector magnets with a maximum field of 3.8 T. The total stored energy is 235 MJ, and its overall sizes are 19 m diameter, 8 m height and 8,300 tons. The magnet system assembly was completed in August 2005, and successfully reached the maximum field in November 2005. The first beam was extracted at the end of 2006 and the first uranium beam was extracted in March 2007. However operation of the helium refrigerator was not satisfactory although the commissioning of SRC was successful. Operation was stopped every two month due to degradation of its cooling power. In February 2008 the reason of the degradation was revealed to be oil contamination. Operation of the cryogenic system was restarted from August 2008 after hard task to clean up the helium refrigerator and to add oil separators to the compressor. After restoration long-term steady operation to keep the magnet superconducting continued for about 8 months with no sign of degradation of cooling capacity.

43 PARTICLE ACCELERATORS↗

Successful Completion of the Top-off Upgrade of the Advanced Light Source

An upgrade of the Advanced Light Source (ALS) to enable top-off operation has been completed during the last four years. The final work centered around radiation safety aspects, culminating in a systematic proof that top-off operation is equally safe as decaying beam operation. Commissioning and transition to full user operations happened in late 2008 and early 2009. Top-off operation at the ALS provides a very large increase in time-averaged brightness (by about a factor of 10) as well as improvements in beam stability. The following sections provide an overview of the radiation safety rationale, commissioning results, as well as experience in user operations.

43 PARTICLE ACCELERATORS↗

Use of an autonomous sensor to evaluate the biological performance of the advanced turbine at Wanapum Dam

Hydropower is the largest renewable energy resource in the United States and the world. However, hydropower dams have adverse ecological impacts because migrating fish may be injured or killed when they pass through hydroturbines. In the Columbia and Snake River basins, dam operators and engineers are required to make those hydroelectric facilities more fish-friendly through changes in hydroturbine design and operation after fish population declines and the subsequent listing of several species of Pacific salmon under the Endangered Species Act of 1973 . Public Utility District No. 2 of Grant County, Washington, requested authorization from the Federal Energy Regulatory Commission to replace the ten turbines at Wanapum Dam with advanced hydropower turbines designed to improve survival for fish passing through the turbines while improving operation efficiency and increasing power generation. As an additional measure to the primary metric of direct injury and mortality rates of juvenile Chinook salmon using balloon tag-recapture methodology, this study used an autonomous sensor device - the Sensor Fish - to provide insight into the specific hydraulic conditions and physical stresses experienced by the fish as well as the specific causes of fish biological response. We found that the new hydroturbine blade shape and the corresponding reduction of turbulence in the advanced hydropower turbine were effective in meeting the objectives of improving fish survival while enhancing operational efficiency of the dam. The frequency of severe events based on Sensor Fish pressure and acceleration measurements showed trends similar to those of fish survival determined by the balloon tag-recapture methodology. In addition, the new turbine provided a better pressure and rate of pressure change environment for fish passage. Altogether, the Sensor Fish data indicated that the advanced hydroturbine design improved passage of juvenile salmon at Wanapum Dam.

13 HYDRO ENERGY↗

Radiotherapy and Nuclear Medicine Project for an Integral Oncology Center at the Oaxaca High Specialization Regional Hospital

A building project of Radiotherapy and Nuclear Medicine services (diagnostic and therapy), within an Integral Oncology Center (IOC), requires interdisciplinary participation of architects, biomedical engineers, radiation oncologists and medical physicists. This report focus on the medical physicist role in designing, building and commissioning stages, for the final clinical use of an IOC at the Oaxaca High Specialization Regional Hospital (HRAEO). As a first step, during design stage, the medical physicist participates in discussions about radiation safety and regulatory requirements for the National Regulatory Agency (called CNSNS in Mexico). Medical physicists propose solutions to clinical needs and take decisions about installing medical equipment, in order to fulfill technical and medical requirements. As a second step, during the construction stage, medical physicists keep an eye on building materials and structural specifications. Meanwhile, regulatory documentation must be sent to CNSNS. This documentation compiles information about medical equipment, radioactivity facility, radiation workers and nuclear material data, in order to obtain the license for the linear accelerator, brachytherapy and nuclear medicine facilities. As a final step, after equipment installation, the commissioning stage takes place. As the conclusion, we show that medical physicists are essentials in order to fulfill with Mexican regulatory requirements in medical facilities.

07 ISOTOPE AND RADIATION SOURCES↗

Performance of the Argonne National Laboratory electron cyclotron resonance charge breeder

An electron cyclotron resonance charge breeder for the Californium rare ion breeder upgrade (CARIBU), a new radioactive beam facility for the Argonne Tandem Linac Accelerator System (ATLAS), has been constructed and commissioned. Charge breeding efficiencies up to 15.6% have been realized for stable beams with a typical breeding time of 10 ms/charge state. The CARIBU system has been undergoing commissioning tests utilizing a 100 mCi {sup 252}Cf fission source. A charge breeding efficiency of 14.8 {+-} 5% has been achieved for the first radioactive beam of {sup 143}Cs{sup 27+}.

43 PARTICLE ACCELERATORS↗

An instrument for the investigation of actinides with spin resolved photoelectron spectroscopy and bremsstrahlung isochromat spectroscopy

A new system for spin resolved photoelectron spectroscopy and bremsstrahlung isochromat spectroscopy has been built and commissioned at Lawrence Livermore National Laboratory for the investigation of the electronic structure of the actinides. Actinide materials are very toxic and radioactive and therefore cannot be brought to most general user facilities for spectroscopic studies. The technical details of the new system and preliminary data obtained therein will be presented and discussed.

36 MATERIALS SCIENCE↗

Magnifying lens for 800 MeV proton radiography

This article describes the design and performance of a magnifying magnetic-lens system designed, built, and commissioned at the Los Alamos National Laboratory (LANL) for 800 MeV flash proton radiography. The technique of flash proton radiography has been developed at LANL to study material properties under dynamic loading conditions through the analysis of time sequences of proton radiographs. The requirements of this growing experimental program have resulted in the need for improvements in spatial radiographic resolution. To meet these needs, a new magnetic lens system, consisting of four permanent magnet quadrupoles, has been developed. This new lens system was designed to reduce the second order chromatic aberrations, the dominant source of image blur in 800 MeV proton radiography, as well as magnifying the image to reduce the blur contribution from the detector and camera systems. The recently commissioned lens system performed as designed, providing nearly a factor of three improvement in radiographic resolution.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Development of electron beam ion source charge breeder for rare isotopes at Californium Rare Isotope Breeder Upgrade

Recently, the Californium Rare Isotope Breeder Upgrade (CARIBU) to the Argonne Tandem Linac Accelerator System (ATLAS) was commissioned and became available for production of rare isotopes. Currently, an electron cyclotron resonance ion source is used as a charge breeder for CARIBU beams. To further increase the intensity and improve the purity of neutron-rich ion beams accelerated by ATLAS, we are developing a high-efficiency charge breeder for CARIBU based on an electron beam ion source (EBIS). The CARIBU EBIS charge breeder will utilize the state-of-the-art EBIS technology recently developed at Brookhaven National Laboratory (BNL). The electron beam current density in the CARIBU EBIS trap will be significantly higher than that in existing operational charge-state breeders based on the EBIS concept. The design of the CARIBU EBIS charge breeder is nearly complete. Long-lead components of the EBIS such as a 6-T superconducting solenoid and an electron gun have been ordered with the delivery schedule in the fall of 2011. Measurements of expected breeding efficiency using the BNL Test EBIS have been performed using a Cs{sup +} surface ionization ion source for external injection in pulsed mode. In these experiments we have achieved {approx}70% injection/extraction efficiency and breeding efficiency into the most abundant charge state of {approx}17%.

43 PARTICLE ACCELERATORS↗

A new extraction system for the Linac4 H{sup -}ion source

As part of the CERN accelerator complex upgrade, a new linear accelerator for H{sup -} (Linac4) is under construction. The ion source design is based on the non-caesiated DESY RF-driven ion source, with the goal of producing an H{sup -} beam of 80 mA beam current, 45 keV beam energy, 0.4 ms pulse length, and 2 Hz repetition rate. The source has been successfully commissioned for an extraction voltage of 35 kV, corresponding to the one used at DESY. Increasing the extraction voltage to 45 kV has resulted in frequent high voltage breakdowns in the extraction region caused by evaporating material from the electron dump, triggering a new design of the extraction and electron dumping system. Results of the ion source commissioning at 35 kV are presented as well as simulations of a new pulsed extraction system for beam extraction at 45 kV.

43 PARTICLE ACCELERATORS↗

Demonstration of a real-time interferometer as a bunch-length monitor in a high-current electron beam accelerator

A real-time interferometer (RTI) has been developed to monitor the bunch length of an electron beam in an accelerator. The RTI employs spatial autocorrelation, reflective optics, and a fast response pyro-detector array to obtain a real-time autocorrelation trace of the coherent radiation from an electron beam thus providing the possibility of online bunch-length diagnostics. A complete RTI system has been commissioned at the A0 photoinjector facility to measure sub-mm bunches at 13 MeV. Bunch length variation (FWHM) between 0.8 ps ({approx}0.24 mm) and 1.5 ps ({approx}0.45 mm) has been measured and compared with a Martin-Puplett interferometer and a streak camera. The comparisons show that RTI is a viable, complementary bunch length diagnostic for sub-mm electron bunches.

43 PARTICLE ACCELERATORS↗

Automated markerless full field hard x-ray microscopic tomography at sub-50nm 3-dimension spatial resolution

A full field transmission x-ray microscope (TXM) has been developed and commissioned at the National Synchrotron Light Source at Brookhaven National Laboratory. The capabilities we developed in auto-tomography, local tomography, and spectroscopic imaging that overcome many of the limitations and difficulties in existing transmission x-ray microscopes are described and experimentally demonstrated. Sub-50 nm resolution in 3-dimension (3D) with markerless automated tomography has been achieved. These capabilities open up scientific opportunities in many research fields.

36 MATERIALS SCIENCE↗

A shallow underground laboratory for low-background radiation measurements and materials development

Pacific Northwest National Laboratory recently commissioned a new shallow underground laboratory, located at a depth of approximately 30 meters-water-equivalent. This new addition to the small class of radiation measurement laboratories located at modest underground depths houses the latest generation of custom-made, high-efficiency, low-background gamma-ray spectrometers and gas proportional counters. This paper describes the unique capabilities present in the shallow underground laboratory; these include large-scale ultra-pure materials production and a suite of radiation detection systems. Reported data characterize the degree of background reduction achieved through a combination of underground location, graded shielding, and rejection of cosmic-ray events. We conclude by presenting measurement targets and future opportunities.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Dose received by occupationally exposed workers at a nuclear medicine department

Personal Dose Equivalent (PDE) values were determined for occupational exposed workers (OEW) at the Nuclear Medicine Department (NMD) of 'Instituto Nacional de Cancerologia' (INCan), Mexico, using TLD-100 thermoluminescent dosemeters. OEW at NMD, INCan make use of radiopharmaceuticals for diagnosis and treatment of diseases. Radionuclides associated to a pharmaceutical compound used at this Department are {sup 131}I, {sup 18}F, {sup 68}Ga, {sup 99m}Tc, {sup 111}In and {sup 11}C with main gamma emission energies between 140 and 511 keV. Dosemeter calibration was performed at the metrology department of 'Instituto Nacional de Investigaciones Nucleares' (ININ), Mexico. Every occupational worker used dark containers with three dosimeters which were replaced monthly for a total of 5 periods. Additionally, control dosemeters were also placed at a site free of radioactive sources in order to determine the background radiation. Results were adjusted to find PDE/day and estimating annual PDE values in the range between 2 mSv (background) and 9 mSv. The mean annual value is 3.51 mSv and the standard deviation SD is 0.78 mSv. Four of the 16 OEW received annual doses higher than the average +1 SD (4.29 mSv). Results depend on OEW daily activities and were consistent for each OEW for the 5 studied periods as well as with PDE values reported by the firm that performs the monthly service. All obtained values are well within the established annual OEW dose limit stated in the {sup R}eglamento General de Seguridad Radiologica{sup ,} Mexico (50 mSv), as well as within the lower limit recommended by the 'International Commission on Radiation Protection' (ICRP), report no.60 (20 mSv). These results verify the adequate compliance of the NMD at INCan, Mexico with the norms given by the national regulatory commission.

61 RADIATION PROTECTION AND DOSIMETRY↗

Qualification Requirements of Guided Ultrasonic Waves for Inspection of Piping in Light Water Reactors

Guided ultrasonic waves (GUW) are being increasingly used for both NDT and monitoring of piping. GUW offers advantages over many conventional NDE technologies due to the ability to inspect large volumes of piping components without significant removal of thermal insulation or protective layers. In addition, regions rendered inaccessible to more conventional NDE technologies may be more accessible using GUW techniques. For these reasons, utilities are increasingly considering the use of GUWs for performing the inspection of piping components in nuclear power plants. GUW is a rapidly evolving technology and its usage for inspection of nuclear power plant components requires refinement and qualification to ensure it is able to achieve consistent and acceptable levels of performance. This paper will discuss potential requirements for qualification of GUW techniques for the inspection of piping components in light water reactors (LWRs). The Nuclear Regulatory Commission has adopted ASME Boiler and Pressure Vessel Code requirements in Sections V, III, and XI for nondestructive examination methods, fabrication inspections, and pre-service and in-service inspections. A Section V working group has been formed to place the methodology of GUW into the ASME Boiler and Pressure Vessel Code but no requirements for technique, equipment, or personnel exist in the Code at this time.

Guided Ultrasonic Waves↗

Radio frequency cavity analysis, measurement, and calibration of absolute Dee voltage for K-500 superconducting cyclotron at VECC, Kolkata

Variable Energy Cyclotron Centre has commissioned a K-500 superconducting cyclotron for various types of nuclear physics experiments. The 3-phase radio-frequency system of superconducting cyclotron has been developed in the frequency range 9-27 MHz with amplitude and phase stability of 100 ppm and {+-}0.2{sup 0}, respectively. The analysis of the RF cavity has been carried out using 3D Computer Simulation Technology (CST) Microwave Studio code and various RF parameters and accelerating voltages ('Dee' voltage) are calculated from simulation. During the RF system commissioning, measurement of different RF parameters has been done and absolute Dee voltage has been calibrated using a CdTe X-ray detector along with its accessories and known X-ray source. The present paper discusses about the measured data and the simulation result.

43 PARTICLE ACCELERATORS↗

The magnetic recoil spectrometer for measurements of the absolute neutron spectrum at OMEGA and the NIF

The neutron spectrum produced by deuterium-tritium (DT) inertial confinement fusion implosions contains a wealth of information about implosion performance including the DT yield, iontemperature, and areal-density. The Magnetic Recoil Spectrometer (MRS) has been used at both the OMEGA laser facility and the National Ignition Facility (NIF) to measure the absolute neutron spectrum from 3 to 30 MeV at OMEGA and 3 to 36 MeV at the NIF. These measurements have been used to diagnose the performance of cryogenic target implosions to unprecedented accuracy. Interpretation of MRS data requires a detailed understanding of the MRS response and background. This paper describes ab initio characterization of the system involving Monte Carlo simulations of the MRS response in addition to the commission experiments for in situ calibration of the systems on OMEGA and the NIF.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Precision phase control for the radio frequency system of K500 superconducting cyclotron at Variable Energy Cyclotron Centre, Kolkata

Variable Energy Cyclotron Centre (VECC) has commissioned K500 Superconducting cyclotron (SCC) based on MSU and Texas A and M university cyclotrons. The radio frequency (RF) system of SCC has been commissioned with the stringent requirement of various RF parameters. The three-phase RF system of Superconducting cyclotron has been developed in the frequency range 9–27 MHz with amplitude and phase stability of 100 ppm and ±0.1°, respectively. The phase control system has the option to change the relative phase difference between any two RF cavities and maintain the phase stability within ±0.1° during round-the-clock cyclotron operation. The said precision phase loop consists of both analogue In-phase/Quadrature modulator to achieve faster response and also Direct Digital Synthesis based phase shifter to achieve wide dynamic range as well. This paper discusses detail insights into the various issues of phase control for the K500 SCC at VECC, Kolkata.

43 PARTICLE ACCELERATORS↗

Application of JLab 12GeV helium refrigeration system for the FRIB accelerator at MSU

The planned approach to have a turnkey helium refrigeration system for the MSU-FRIB accelerator system, encompassing the design, fabrication, installation and commissioning of the 4.5-K refrigerator cold box(es), cold compression system, warm compression system, gas management, oil removal and utility/ancillary systems, was found to be cost prohibitive. Following JLab’s suggestion, MSU-FRIB accelerator management made a formal request to evaluate the applicability of the recently designed 12GeV JLab cryogenic system for this application. The following paper will outline the findings and the planned approach for the FRIB helium refrigeration system.

43 PARTICLE ACCELERATORS↗