Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “tasking”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,135 records · Page 63

Biowaste resistojet propellant system, biological and functional analysis, task 1 and 2

The influence of chemical contaminants in potential biowaste sources upon the design and interface requirements of a biowaste resistojet propulsion system for a space station and/or base are evaluated. Chemical contaminants are defined as all compounds present in biowaste other than carbon dioxide, water, and methane. The latter are the nominal effluent candidates for the biowaste resistojet.

Source record↗

Remote detection of trailing vortices, task 3, modification 3

The operation of a frequency tracker for use with the laser Doppler velocimeter (LDV) is reported. Topics discussed include: laser beam profile, lens matching, and LDV resolution data. It is concluded that the LDV provides good ground wind signals. The loss in sensitivity of the cavity system at high frequencies is partly compensated by an increase in the scattering cross section of the atmosphere due to dust.

Fridman, J.↗

Experiment module concepts study. Volume 5 book 1, appendix A: Shuttle only task

Results of a preliminary investigation of the effect on the candidate experiment program implementation of experiment module operations in the absence of an orbiting space station and with the availability of the space shuttle orbiter vehicle only are presented. The fundamental hardware elements for shuttle-only operation of the program are: (1) integrated common experiment modules CM-1, CM-3, and CM-4, together with the propulsion slice; (2) support modules capable of supplying on-orbit crew life support, power, data management, and other services normally provided by a space station; (3) dormancy kits to enable normally attached modules to remain in orbit while shuttle returns to earth; and (4) shuttle orbiter. Preliminary cost estimates for 30 day on-orbit and 5 day on-orbit capabilities for a four year implementation period are $4.2 billion and $2.1 billion, respectively.

Source record↗