Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “system planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,135 records · Page 63

Evolutionary growth for Space Station Freedom electrical power system

Over an operational lifetime of at least 30 yr, Space Station Freedom will encounter increased Space Station user requirements and advancing technologies. The Space Station electrical power system is designed with the flexibility to accommodate these emerging technologies and expert systems and is being designed with the necessary software hooks and hardware scars to accommodate increased growth demand. The electrical power system is planned to grow from the initial 75 kW up to 300 kW. The Phase 1 station will utilize photovoltaic arrays to produce the electrical power; however, for growth to 300 kW, solar dynamic power modules will be utilized. Pairs of 25 kW solar dynamic power modules will be added to the station to reach the power growth level. The addition of solar dynamic power in the growth phase places constraints in the initial Space Station systems such as guidance, navigation, and control, external thermal, truss structural stiffness, computational capabilities and storage, which must be planned-in, in order to facilitate the addition of the solar dynamic modules.

Marshall, Matthew Fisk↗

Study and Demonstration of Planning and Scheduling Concepts for the Earth Observing System Data and Information System

The University of Colorado's Laboratory for Atmospheric and Space Physics (CU/LASP) along with the Goddard Space Flight Center (GSFC) and the Jet Propulsion Laboratory (JPL) designed, implemented, tested, and demonstrated a prototype of the distributed, hierarchical planning and scheduling system comtemplated for the Earth Observing System (EOS) project. The planning and scheduling prototype made use of existing systems: CU/LASP's Operations and Science Instrument Support Planning and Scheduling (OASIS-PS) software package; GSFC's Request Oriented Scheduling Engine (ROSE); and JPL's Plan Integrated Timeliner 2 (Plan-It-2). Using these tools, four scheduling nodes were implemented and tied together using a new communications protocol for scheduling applications called the Scheduling Applications Interface Language (SAIL). An extensive and realistic scenario of EOS satellite operations was then developed and the prototype scheduling system was tested and demonstrated using the scenario. Two demonstrations of the system were given to NASA personnel and EOS core system (ECS) contractor personnel. A comprehensive volume of lessons learned was generated and a meeting was held with NASA and ECS representatives to review these lessons learned. A paper and presentation on the project's final results was given at the American Institute of Aeronautics and Astronautics Computing in Aerospace 9 conference.

Davis, Randal↗

LLNL ES&H Analytical Services and Instrumentation Analytical Laboratory (ALAB) (CY2022 Management Review Report)

"An annual review shall be conducted of the analytical activities to ensure continuing suitability, adequacy, and effectiveness." (ALAB-01 Rev 6 ALQAP section 6.11.2) "The laboratory management shall review its management system at planned intervals, in order to ensure its continuing suitability, adequacy and effectiveness..."(ISO/IEC 17025:2017 Section 8.9.1) "In accordance with a predetermined schedule and procedure, the laboratory's top management shall periodically conduct a review of the laboratory's management system and testing and/or calibration activities to ensure their continuing suitability and effectiveness, and to introduce necessary changes or improvements. "(TNI Standard EL-V1M2-2016-Rev2.1:Quality Systems General Requirements)

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

NASA's UAS Integration into the NAS: A Report on the Human Systems Integration Phase 1 Simulation Activities

In 2011 the National Aeronautics and Space Administration (NASA) began a five-year Project to address the technical barriers related to routine access of Unmanned Aerial Systems (UAS) in the National Airspace System (NAS). Planned in two phases, the goal of the first phase was to lay the foundations for the Project by identifying those barriers and key issues to be addressed to achieve integration. Phase 1 activities were completed two years into the five-year Project. The purpose of this paper is to review activities within the Human Systems Integration (HSI) subproject in Phase 1 toward its two objectives: 1) develop GCS guidelines for routine UAS access to the NAS, and 2) develop a prototype display suite within an existing Ground Control Station (GCS). The first objective directly addresses a critical barrier for UAS integration into the NAS - a lack of GCS design standards or requirements. First, the paper describes the initial development of a prototype GCS display suite and supporting simulation software capabilities. Then, three simulation experiments utilizing this simulation architecture are summarized. The first experiment sought to determine a baseline performance of UAS pilots operating in civil airspace under current instrument flight rules for manned aircraft. The second experiment examined the effect of currently employed UAS contingency procedures on Air Traffic Control (ATC) participants. The third experiment compared three GCS command and control interfaces on UAS pilot response times in compliance with ATC clearances. The authors discuss how the results of these and future simulation and flight-testing activities contribute to the development of GCS guidelines to support the safe integration of UAS into the NAS. Finally, the planned activities for Phase 2, including an integrated human-in-the-loop simulation and two flight tests are briefly described.

National Airspace System↗

Development of the XV-15 tiltrotor research aircraft - Lessons learned

The initial ground rules that guided the decision process during the initial stages of the XV-15 tiltrotor aircraft development are reviewed and reevaluated. A full flight-envelope nonlinear simulation mathematical model is outlined, along with the advantages of a multiaircraft program. Direct involvement of government engineers in all aspects of the program is considered to be beneficial, while the ejection-seat test requirement is not. Utilization of existing components - a rotor, transmissions, and engines - is analyzed, and emphasis is placed on integrated system test plans responsible for producing two reliable aircraft through a complete checkout of the aircraft subsystems before the start of the fligth program. Wind-tunnel and fatigue test requirements are presented, and the decision to go with an all mechanical control system design is addressed.

Schroers, Laurel G.↗

Navigation, guidance, and control systems for V/STOL aircraft.

The development of digital autopilots and integrated avionics systems, applicable to many classes of vehicles and missions, was undertaken by Sperry Flight Systems in the mid-sixties. The first application of the system was planned for automatic flight control in the U.S. supersonic transport; the termination of that program, however, thwarted any flight experience. The second application, which has additional navigation and energy management functions, is an airborne simulator of the space shuttle vehicle. The latter system underwent a series of successful flight tests in a CV-990 aircraft under contract with NASA. The third application, which has new electronic displays, air data computation, and time-constrained guidance (i.e., specified position and altitude at a specified time), is in the DOT/NASA STOLAND test program. The STOLAND system is described specifically in this paper.

Osder, S. S.↗

NASA Pilot Land Data System

Project development and planning for a Pilot Land Data System (PLDS) are discussed. The PLDS supplies basic information, data management, and data processing capabilities to the land research community. Topics on design and implementation, user requirements, and project management are examined. The scenarios developed thusfar are also included.

Estes, J. E.↗

Backward Assembly Planning With DFA Analysis

System of algorithms developed to automate planning of sequences of manufacturing or field operations in which components are put together into assemblies. Results of DFA analysis also used to modify designs to optimize them with respect to assembly considerations.

Lee, Sukhan↗

Ground Risk Informed Operational Planning for Small Unmanned Aerial Systems

Increasing quantities of small Unmanned Aerial Systems (sUAS) operations present many challenges in terms of safe adoption and integration into existing airspace. The ability to study and quantify the risk to third parties on the ground prior to flight is an important step toward enabling Beyond Visual Line of Sight (BVLOS) operations. The Ground Risk Assessment Service Provider (GRASP) software is a capability developed by NASA to assist with third-party risk quantification and risk-informed flight planning. In this paper, two nominal flight paths intended to represent an infrastructure inspection mission are evaluated using the software to demonstrate its utility. A method is also introduced for adding other NASA-developed capabilities into a single architecture to assess a broader set of operational risks associated with BVLOS operations. These capabilities include a navigation system performance prediction tool, a high fidelity vehicle dynamics model, high resolution wind field data, and other information pertinent to operators. Data produced by these capabilities are combined to enable use of the Performance Based Navigation (PBN) concept borrowed from conventional aviation, providing quantified flight path uncertainty for where the sUAS is likely to be relative to its nominal flight plan. Ground risk is assessed within this region of uncertainty, giving a higher level of confidence in the solution compared to an analysis of only the nominal flight path.

Ground Risk↗

Supporting Arctic Research, Engagement, and Policy With GMAO’s Next Generation Reanalysis & Prediction Systems

Modeling efforts at NASA aim to advance scientific understanding of the Earth system and its response to natural and human-induced changes and to improve our ability to predict climate, weather, and natural hazards. These efforts are particularly relevant for communities, scientists and stakeholders working and living in the Arctic. Here, we highlight current and planned Earth system prediction and data assimilation products from the Global Modeling and Assimilation Office (GMAO). We invite feedback and discussion on GMAO’s model and reanalysis development in support of Arctic research, engagement, and policy.

Lauren C Andrews↗

Heat transfer in space power and propulsion systems

NASA's planned Space Station has projected power requirements in the 75-300 kW range; attention is presently given to the range of power system configurations thus far proposed. These are a silicon solar cell system incorporating regenerative fuel cell or battery storage, with a 10-year lifetime, a solar-dynamic power system with phase-change or regenerative fuel cell energy storage, and a combination of these two alternatives. A development status evaluation is also given for the propulsion systems that may be used by next-generation boosters. These include such novel airbreathing systems as turboramjets, air liquefaction cycle rockets, airturboramjet/rockets, and supersonic combustion ramjets.

Hendricks, R. C.↗

A Comparison of Flow-Through Versus Non-Flow-Through Proton Exchange Membrane Fuel Cell Systems for NASA's Exploration Missions

As part of the Exploration Technology Development Program (ETDP) under the auspices of the Exploration Systems Mission Directorate (ESMD), NASA is developing both primary fuel cell power systems and regenerative fuel cell (RFC) energy storage systems within the fuel cell portion of the Energy Storage Project. This effort is being led by the NASA Glenn Research Center (GRC) in partnership with the NASA Johnson Space Center (JSC), Jet Propulsion Laboratory (JPL), NASA Kennedy Space Center (KSC), and industrial partners. The development goals are to improve fuel cell and electrolysis stack electrical performance, reduce system mass, volume, and parasitic power requirements, and increase system life and reliability. A major focus of this effort has been the parallel development of both flow-through and non-flow-through proton exchange membrane (PEM) primary fuel cell power systems. The plan has been, at the appropriate time, to select a single primary fuel cell technology for eventual flight hardware development. Ideally, that appropriate time would occur after both technologies have achieved a technology readiness level (TRL) of six, which represents an engineering model fidelity PEM fuel cell system being successfully tested in a relevant environment. Budget constraints in fiscal year 2009 and beyond have prevented NASA from continuing to pursue the parallel development of both primary fuel cell options. Because very limited data exists for either system, a toplevel, qualitative assessment based on engineering judgement was performed expeditiously to provide guidance for a selection. At that time, the non-flow-through technology was selected for continued development because of potentially major advantages in terms of weight, volume, parasitic power, reliability, and life. This author believes that the advantages are significant enough, and the potential benefits great enough, to offset the higher state of technology readiness of flow-through technology. This paper summarizes the technical considerations which helped form the engineering judgement that led to the final decision.

Hoberecht, Mark A.↗

Consideration of environmental noise effects in transportation planning by governmental entities

Environmental concerns are reviewed with respect to major transportation systems: the interstate highway system and commercial air transportation. The type of planning that was done for interstate highway systems is described, and the shift in social value emphasis that has become apparent since the interstate system was authorized is considered. Other topics discussed include the constitutional framework for the allocation of governmental power with respect to transportation systems planning, governmental assessment of the aircraft noise problem, and evaluating the social benefit of noise abatement.

Mayo, L. H.↗

Seventh International Workshop on Microgravity Combustion and Chemically Reacting Systems

The Seventh International Workshop on Microgravity Combustion and Chemically Reacting Systems was planned for June 3-6, 2003, in Cleveland, Ohio, near the NASA John H. Glenn Research Center at Lewis Field. The new name for the workshop is based on the decision to broaden our scope to encompass support for future space exploration through basic and applied research in reacting systems that in some cases may not look like combustion. The workshop has been lengthened to 4 days with focus sessions on spacecraft fire safety and exploration-related research. We believe that the microgravity combustion science community is almost uniquely positioned to make substantial contributions to this new effort.

Sacksteder, Kurt↗

The Mars Microprobe Mission: A Unique Solution for Network Science

The second deep-space advanced technology validation mission in NASA's New Millenium Program will demonstrate planetary microprobe technologies. Two microporobes, each consisting of a very low-mass aeroshell and penetrator system, are planned to be launched in January 1999 and arrive at at Mars in December 1999... This paper will summarize the engineering techniques that will be implemented to provide safe landing and operation of the Mars microprobe in its unique environment. This paper will also summarize some key mission and system design trades, as well as discuss some of the technologies being developed.

microprobes↗

Current Practices in Distribution Utility Resilience Planning for Wildfires

This report is part of a series of hazard-focused case studies examining common practices in electric utility resilience planning. We use standard terminology defining resilience as the ability to anticipate, withstand, absorb, and recover from hazards that cause long duration outages. We distinguish between reliability and resilience using IEEE 1366-2022, which defines major events as "an event that exceeds reasonable design and/or operational limits of the electric power system." Resilience planning is focused on major event days, and reliability planning is focused on non-major event days. Utility resilience plans are assessed according to common resilience components identified in existing resilience frameworks. The focus of this report is on wildfires. Standalone reports focusing on severe storms (including hurricanes and non-winter storms) and winter storms have been published in parallel with this report. This report can be used as a starting point for understanding potential investment prioritization processes and investment options. This report is intended to improve utility resilience planning by supporting constructive dialogue among utilities, regulators, and other stakeholders.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗