Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “performance management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,135 records · Page 63

Session 022 - Panel: Doing Business with the US Department of Energy (R1.8)

This panel session provided a fast-paced, high-energy and thought-provoking session on how to do business with the US DOE. Representatives from the Office of EM and the NNSA gave attendees insight on how to market and seek opportunities within their program offices, sites and laboratories, along with suggestions from a successful small business in the DOE market. Panelists with presentations: Department of Energy Office of Environmental Management (EM) (Norbert Doyle); Indian Eyes, LLC - What We Learned (video, Roxie Schescke)

99 GENERAL AND MISCELLANEOUS↗

Sandia National Laboratories, California Environmental Management System Program Manual

Sandia National Laboratories, California (SNL/CA) has maintained environmental functions to assist with regulatory compliance for more than 30 years. During 2005, these existing functions were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site first received ISO 14001 certification in September 2006 and recertification in 2009 and 2012. SNL/CA’s EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA’s EMS Program benefits from two corporate functional programs (Facilities Energy & Water Resource Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories, New Mexico (SNL/NM). Although these groups, from an organizational perspective, are part of Division 8000, they are managed locally and fall under the environmental requirements specific to their New Mexico location. The New Mexico groups in Division 8000 follow the corporate EMS Program for New Mexico operations.

Larsen, Barbara L.↗

Optimization of the Area 5 Radioactive Waste Management Site Closure Cover

The U.S. Department of Energy Manual DOE M 435.1-1, “Radioactive Waste Management Manual,” requires that performance assessments demonstrate that releases of radionuclides to the environment are as low as reasonably achievable (ALARA). Quantitative cost benefit analysis of radiation protection options is one component of the ALARA process. This report summarizes a quantitative cost benefit analysis of closure cover thickness for the Area 5 Radioactive Waste Management Site (RWMS) on the Nevada Test Site. The optimum cover thickness that maintains doses ALARA is shown to be the thickness with the minimum total closure cost. Total closure cost is the sum of cover construction cost and the health detriment cost. Cover construction cost is estimated based on detailed cost estimates for closure of the 92-acre Low-Level Waste Management Unit (LLWMU). The health detriment cost is calculated as the product of collective dose and a constant monetary value of health detriment in units of dollars per unit collective dose. Collective dose is the sum of all individual doses in an exposed population and has units of person-sievert (Sv). Five discrete cover thickness options ranging from 2.5 to 4.5 meters (m) (8.2 to 15 feet [ft]) are evaluated. The optimization was subject to the constraints that (1) options must meet all applicable regulatory requirements and that (2) individual doses be a small fraction of background radiation dose. Total closure cost is found to be a monotonically increasing function of cover thickness for the 92-ac LLWMU, the Northern Expansion Area, and the entire Area 5 RWMS. The cover construction cost is orders of magnitude greater than the health detriment cost. Two-thousand Latin hypercube sampling realizations of the relationship between total closure cost and cover thickness are generated. In every realization, the optimum cover thickness is 2.5 m (8.2 ft) for the 92-ac Low-Level Waste Management Unit, the Northern Expansion Area, and the entire Area 5 RWMS. The conclusions of the optimization are found to be insensitive to all input parameters, the monetary value of the health detriment over a range of values from $200,000 to $15,000,000 per person-Sv, and the period of integration of collective dose. A 2.5 m (8.2 ft) closure cover at the Area 5 RWMS can meet all applicable regulatory requirements and maintain radionuclide releases ALARA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CONE - An STS-based cryogenic fluid management experiment

An overview of the CONE program is presented which includes a definition of the technology addressed by CONE and a baseline experiment set, a description of the experimental and support subsystems, interface requirements between the STS and the experiment carrier (Hitchhiker M), and the reusability and expansion capacity for additional experiment flights. CONE evaluates three primary technologies: the active thermodynamic vent system, the passive thermodynamic vent system, and liquid acquisition device performance. The cryogenic fluid management technology database that the system offers will allow for efficient subcritical cryogenic system designs for operation in a low-gravity environment. This system maximizes the balance between existing component technology and the need for the development of a cryogenic-fluid-management (CFM) test bed to investigate and demonstrate methods of storage and handling arenas.

Bell, R. S.↗

High fidelity simulation and analysis of liquid jet atomization in a gaseous crossflow at intermediate Weber numbers

Recent advances in numerical methods coupled with the substantial enhancements in computing power and the advent of high performance computing have presented first principle, high fidelity simulation as a viable tool in the prediction and analysis of spray atomization processes. The credibility and potential impact of such simulations, however, has been hampered by the relative absence of detailed validation against experimental evidence. The numerical stability and accuracy challenges arising from the need to simulate the high liquid-gas density ratio across the sharp interfaces encountered in these flows are key reasons for this. In this work we challenge this status quo by presenting a numerical model able to deal with these challenges, employing it in simulations of liquid jet in crossflow atomization and performing extensive validation of its results against a carefully executed experiment with detailed measurements in the atomization region. We then proceed to the detailed analysis of the flow physics. The computational model employs the coupled level set and volume of fluid approach to directly capture the spatiotemporal evolution of the liquid-gas interface and the sharp-interface ghost fluid method to stably handle high liquid-air density ratio. Adaptive mesh refinement and Lagrangian droplet models are shown to be viable options for computational cost reduction. Moreover, high performance computing is leveraged to manage the computational cost. The experiment selected for validation eliminates the impact of inlet liquid and gas turbulence and focuses on the impact of the crossflow aerodynamic forces on the atomization physics. Validation is demonstrated by comparing column surface wavelengths, deformation, breakup locations, column trajectories and droplet sizes, velocities, and mass rates for a range of intermediate Weber numbers. Analysis of the physics is performed in terms of the instability and breakup characteristics and the features of downstream flow recirculation, and vortex shedding. Formation of “Λ” shape windward column waves is observed and explained by the combined upward and lateral surface motion. The existence of Rayleigh-Taylor instability as the primary mechanism for the windward column waves is verified for this case by comparing wavelengths from the simulations to those predicted by linear stability analyses. Physical arguments are employed to postulate that the type of instability manifested may be related to conditions such as the gas Weber number and the inlet turbulence level. The decreased column wavelength with increasing Weber number is found to cause enhanced surface stripping and early depletion of liquid core at higher Weber number. A peculiar “three-streak-two-membrane” liquid structure is identified at the lowest Weber number and explained as the consequence of the symmetric recirculation zones behind the jet column. It is found that the vortical flow downstream of the liquid column resembles a von Karman vortex street and that the coupling between the gas flow and droplet transport is weak for the conditions explored.

42 ENGINEERING↗

Pilot workload, performance and aircraft control automation

Conceptual and practical issues associated with the design, operation, and performance of advanced systems and the impact of such systems on the human operators are reviewed. The development of highly automated systems is driven by the availability of new technology and the requirement that operators safely and economically perform more and more activities in increasingly difficult and hostile environments. It is noted that the operators workload may become a major area of concern in future design considerations. Little research was done to determine how automation and workload relate to each other, although it is assumed that the abstract, supervisory, or management roles that are performed by operators of highly automated systems will impose increased mental workload. The relationship between performance and workload is discussed in relation to highly complex and automated environments.

Hart, S. G.↗

Applications Of The Advanced Simulation Capability For Environmental Management (ASCEM) - 17253

Three applications were completed using the Advanced Simulation Capability for Environmental Management (ASCEM), supported by the U.S. Department of Energy's Office of Environmental Management. These analyses were performed for the Savannah River Site (SRS) F-Area, the Los Alamos National Laboratory (LANL) Site, and the Nevada National Security Site (NNSS). At the SRS F-Area, ASCEM simulations were used to help develop cost-effective, long-term monitoring approaches for science-based site closure and management. The simulation results were used to develop a mechanistic understanding of correlations between contaminant concentrations and master variables that can be used for monitoring. At LANL, the ASCEM simulator Amanzi was integrated with a LANL-based decision support tool for the LANL onsite program. A saturated-zone site model focused on a key area of interest was developed and calibrated to measured data. This model was applied to quantify uncertainty and provide decision support to inform chromium remediation efforts. To support assessment of groundwater contamination at NNSS, ASCEM was used to calibrate hydrologic properties and flow directions using water levels observed under steady-state conditions and during four different pump tests on Pahute Mesa. The flow fields generated from these pump tests will be used to simulate transport pathways from underground nuclear tests to compare with field observations and to test alternative conceptual models of transport, which will ultimately facilitate better placement of monitoring wells. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning of a facility in a historical reactor at SRS: achieving both historical significance preservation and effective in-situ decommissioning - 15275

The Savannah River Site (SRS) is an 802 square-kilometer United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina, where Management and Operations are performed by Savannah River Nuclear Solutions, LLC (SRNS). In 2004, US DOE recognized SRS as a structure within the Cold War Historic District of national, state and local significance because it is composed of the first generation of facilities constructed and operated from 1950 through 1989 to produce plutonium and tritium for our nation's defense. US DOE agreed to manage the SRS 105-C Reactor Facility as a potentially historic property due to its significance in supporting the U.S. Cold War Mission and for potential for future interpretation. The Disassembly Basin (DB) in C Reactor was evaluated for action under CERCLA. Data indicated there were over 830 curies of radioactivity associated with the basin sediments and approximately 9.1 million (M) liters (L) of contaminated water, not including a large quantity of activated reactor equipment, scrap metal, and debris on the basin floor. The release of DB water could potentially migrate to the aquifer and contaminate groundwater. The need for an action was identified to reduce risks to personnel in the facility and to eliminate the possible release of contaminants into the environment. In-situ decommissioning was selected as the remedy. The remedial action proceeded in stages: -Above-grade modifications to the interior of DB building -Relocation of irradiated scrap and reactor components to the deepest segments of the DB - Construction of a metal building to house evaporators - Forced evaporation of the DB's radiologically contaminated water - Grouting with special hybrid grouts - Removal of the evaporators and temporary building. Since the building itself was not demolished and will remain unchanged in appearance with the exception of filling the DB with grout, this ISD removal action/methodology did not adversely impact the historical significance of the 105-C Reactor Building, in accordance with the National Historic Preservation Act, nor did it adversely affect the ability to determine the full extent and details of preservation at some later date. Both special hybrid grout materials met all requirements. Overall average 7-day compressive strength for the dry area mix was 1.54 MPa (223 psi) and for the underwater mix 2.94 MPa (427 psi).Overall 28-day compressive strength for the dry area mix was 2.88 MPa (417 psi) and for the underwater mix 4.99 MPa (724 psi). A limited amount of testing was also performed at 91 days, where the overall compressive strength for the dry area mix was found to be 9.40 MPa (1363 psi) and for the underwater mix 13.98 MPa (2028 psi). All compressive strength values far exceeded the 0.34 MPa (50 psi) minimum requirements. The special, flowable-fill grouts designed and used for P- and R-Reactor ISD and used again for this 105-C ISD removal action resulted in considerable labor, cost, and schedule savings versus conventional materials. As an added bonus/benefit, the CO{sub 2} footprint of the SRS C-Reactor DB ISD was minimized by using a small amount of cement and byproduct material to produce the structural fill materials. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

Determining spatially varying profit‐maximizing management practices for miscanthus and switchgrass production in the rainfed United States

Abstract Determining optimal management practices for the profitable production of perennial energy crops is critical for scaling up production beyond experimental levels. Although many experimental field studies have examined the effects of management practices on the performance of miscanthus and switchgrass, there are no recommendations for economically optimal nitrogen (N) application rates and how they should vary spatially and with the age of the energy crop as well as on optimal rotation age of the energy crop to maximize profits. We develop a modeling framework to determine economically optimal crop management decisions and simulate the variability under various scenarios for miscanthus and switchgrass production across 2287 counties in the rainfed United States. We find that profit‐maximizing N recommendations for these crops vary across maturity stages and regions and can increase the landowner's profits compared with a uniform N rate across ages and regions. We also find that the optimal rotation for these crops is shorter than the productive physical lifespan (15–20 and 10 years for miscanthus and switchgrass, respectively). Specifically, the N rate that maximizes the economic returns is negligible for miscanthus and 111 kg ha −1 for switchgrass production at age 2. The mean profit‐maximizing N rate increases with age for miscanthus, peaking at 151 kg ha −1 at age 11 before declining to 114 kg ha −1 at the optimal rotation age of 13 years while that for switchgrass is 150 kg ha −1 for middle‐aged stands and declines to 114 kg ha −1 at the optimal rotation of 8–9 years. We find that miscanthus is the most profitable energy crop in the northern region of the rainfed United States while switchgrass is most profitable in the south of the rainfed United States. Our findings are useful for improving assessments of the profitability of energy crops and guiding future management decisions by landowners.

54 ENVIRONMENTAL SCIENCES↗

Optimizing spacecraft design - optimization engine development : progress and plans

At JPL and NASA, a process has been developed to perform life cycle risk management. This process requires users to identify: goals and objectives to be achieved (and their relative priorities), the various risks to achieving those goals and objectives, and options for risk mitigation (prevention, detection ahead of time, and alleviation). Risks are broadly defined to include the risk of failing to design a system with adequate performance, compatibility and robustness in addition to more traditional implementation and operational risks. The options for mitigating these different kinds of risks can include architectural and design choices, technology plans and technology back-up options, test-bed and simulation options, engineering models and hardware/software development techniques and other more traditional risk reduction techniques.

risk↗

2011 Annual Criticality Safety Program Performance Summary

The 2011 review of the INL Criticality Safety Program has determined that the program is robust and effective. The review was prepared for, and fulfills Contract Data Requirements List (CDRL) item H.20, 'Annual Criticality Safety Program performance summary that includes the status of assessments, issues, corrective actions, infractions, requirements management, training, and programmatic support.' This performance summary addresses the status of these important elements of the INL Criticality Safety Program.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Pacific Northwest National Laboratory National Environmental Policy Act Compliance Program -- FY 2010 Annual Report

During fiscal year (FY) 2010, Pacific Northwest National Laboratory (PNNL) Environmental Protection and Regulatory Programs Division (before March 1, 2011 known as the Environmental Management Services Department) staff performed a number of activities as part of PNNL’s National Environmental Policy Act (NEPA) compliance program. These activities helped to verify U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) and Richland Operations Office (RL) compliance with NEPA requirements and streamline the NEPA process for federal activities conducted at PNNL. Self-assessments were performed to address NEPA compliance and cultural and biological resource protection. The NEPA self-assessments focused on implementation within the PNNL Energy and Environment Directorate and routine maintenance activities conducted during the previous calendar year. The cultural and biological resource self-assessments were conducted in accordance with the PNSO Cultural and Biological Resources Management Plan, which specifies annual monitoring of important resources to assess and document the status of the resources and the associated protective mechanisms in place to protect sensitive resources.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Automatic Beam Path Analysis of Laser Wakefield Particle Acceleration Data

Numerical simulations of laser wakefield particle accelerators play a key role in the understanding of the complex acceleration process and in the design of expensive experimental facilities. As the size and complexity of simulation output grows, an increasingly acute challenge is the practical need for computational techniques that aid in scientific knowledge discovery. To that end, we present a set of data-understanding algorithms that work in concert in a pipeline fashion to automatically locate and analyze high energy particle bunches undergoing acceleration in very large simulation datasets. These techniques work cooperatively by first identifying features of interest in individual timesteps, then integrating features across timesteps, and based on the information derived perform analysis of temporally dynamic features. This combination of techniques supports accurate detection of particle beams enabling a deeper level of scientific understanding of physical phenomena than hasbeen possible before. By combining efficient data analysis algorithms and state-of-the-art data management we enable high-performance analysis of extremely large particle datasets in 3D. We demonstrate the usefulness of our methods for a variety of 2D and 3D datasets and discuss the performance of our analysis pipeline.

43 PARTICLE ACCELERATORS↗

Battery Thermal Characterization

A well-designed thermal management system is critical to the life and performance of electric-drive vehicles (EDVs) hybrids (HEVs), plug-in hybrids (PHEVs), and all-electric vehicles (EVs). Temperature and temperature uniformity both significantly affect the performance, lifespan, and safety of vehicle energy storage devices. NREL conducts thermal management research and development (R&D) to optimize battery performance and extend useful life. A recognized leader in battery thermal analysis and characterization, NREL evaluates electrical and thermal performance of battery cells, modules, and packs, full energy storage systems, and the interaction of these systems with other vehicle components. The lab's performance assessments factor in the design of the thermal management system, the thermal behavior of the cell, battery lifespan, and safety of the energy storage system, as well as full integration into a vehicle. The lithium-ion (Li-ion) batteries found in most of today's electric-drive vehicles are smaller and more lightweight than previous nickel-metal hydride (NiMH) technology, but they are also more sensitive to overheating, overcharging, and extreme spikes in temperature known as thermal runaway. High temperatures diminish battery life and increase battery replacement costs, while low temperatures decrease battery power and capacity, all of which impact vehicle range, performance, and affordability. NREL's breakthrough research is focused on reducing thermal barriers to achieve more uniform temperatures. NREL uses its R&D 100 Award-winning Isothermal Battery Calorimeters, the only instruments in the world capable of such precise thermal measurements, for much of this research. Calorimeter readings are paired with thermal imaging of batteries using infrared cameras to evaluate battery temperature distribution. In addition, NREL is working with industry to develop computer-aided engineering software tools to optimize thermal management of batteries. NREL's analysis for the U.S. Advanced Battery Consortium (USABC) show that optimized thermal management can increase battery power by more than 10%. Without proper thermal management, an EDV battery can last more than 10 years in a temperate climate, like in Minnesota, but only 7 years in a hot climate, such as in Arizona. In extreme instances, battery overheating can pose safety hazards, including fires. Performance: Maintaining desired temperature ranges is critical in optimizing EDV battery storage capacity, lifespan, and performance, and eventually impacts cost and consumer acceptance. NREL's breakthrough research focuses on achieving more uniform temperatures while a vehicle is in motion and actively generating heat, as well as when it is parked and exposed to ambient temperatures over prolonged periods of time. Safety: Most energy storage systems deliver maximum performance at higher temperatures. However, this extreme heat can overload systems and create dangerous conditions. NREL evaluation helps to more effectively regulate thermal characteristics, providing greater safeguards and stronger performance. NREL has invented a device that emulates internal short circuits in batteries to better understand how to prevent future failures and related hazards.

25 ENERGY STORAGE↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

DataFed: Towards Reproducible Research via Federated Data Management

The increasingly collaborative, globalized nature of scientific research combined with the need to share data and the explosion in data volumes present an urgent need for a scientific data management system (SDMS). An SDMS presents a logical and holistic view of data that greatly simplifies and empowers data organization, curation, searching, sharing, dissemination, etc. We present DataFed - a lightweight, distributed SDMS that spans a federation of storage systems within a loosely-coupled network of scientific facilities. Unlike existing SDMS offerings, DataFed uses high-performance and scalable user management and data transfer technologies that simplify deployment, maintenance, and expansion of DataFed. DataFed provides web-based and command-line interfaces to manage data and integrate with complex scientific workflows. DataFed represents a step towards reproducible scientific research by enabling reliable staging of the correct data at the desired environment.

Stansberry, Dale↗