Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operational reliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,135 records · Page 63

DropBot: An open-source digital microfluidic control system with precise control of electrostatic driving force and instantaneous drop velocity measurement

We introduce DropBot: an open-source instrument for digital microfluidics (http://microfluidics.utoronto.ca/dropbot). DropBot features two key functionalities for digital microfluidics: (1) real-time monitoring of instantaneous drop velocity (which we propose is a proxy for resistive forces), and (2) application of constant electrostatic driving forces through compensation for amplifier-loading and device capacitance. We anticipate that this system will enhance insight into failure modes and lead to new strategies for improved device reliability, and will be useful for the growing number of users who are adopting digital microfluidics for automated, miniaturized laboratory operation.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Magnetic Launch Assist

The objectives of this program are to: (1) To develop a safe, reliable, inexpensive, and minimum operation launch assist system for sending payloads into orbit using ground powered, magnetic suspension and propulsion technologies; (2) Improve safety, reliability, operability for third generation Reusable Launch Vehicles (RLV); (3) Reduce vehicle weight and increase payload capacity; and (4) Support operational testing of Rocket Based Combine Cycle (RBCC) engines.

Perez, Jose↗

Multi-level optimization with the koopman operator for data-driven, domain-aware, and dynamic system security

Cyber-Physical Systems (CPSs) like the power grid are critically important but also increasingly vulnerable; ensuring reliable system operation in the face of disruptions is becoming more and more challenging. Multi-Level Optimization (MLO) is a powerful way to model adversarial interactions, which naturally makes it applicable to studying CPS security. However, MLO typically does not address underlying system dynamics, and incorporating nonlinear dynamics is generally infeasible. In this paper, we show how to combine MLO with the Koopman Operator (KO) to remedy this. The KO maps nonlinear dynamics to a lifted space in which those dynamics are linear, thus making it ideal for use with MLO. Moreover, the structure of the KO also provides convenient ways to incorporate domain knowledge into the data-driven process of learning the KO representation of a given system. Here we then demonstrate the use of MLO-KO on a small example problem taken from the power grid domain, discuss the scalability and computational cost of MLO-KO, and identify future research directions for this work.

42 ENGINEERING↗

Optimal Operation for Resilient and Economic Modes in an Islanded Alaskan Grid

Legacy energy management systems for distribution system or microgrids are typically driven by economics. During extreme events, resiliency can be defined as ability of the system to keep supplying critical loads. Resilient operation during extreme events (e.g. avalanche in Alaska) may require decision variables to be different and conflicting with economic operation. Operational objectives are driven by a complex consideration of the economic, reliable and resilient operation of the system: economic and reliable in normal operating state and resilient during extreme events. Challenge is to move between economic and resilient operation in optimal manner and setting up problem formulation and constraints specially with Distributed Energy Resources (DERs). In this paper, we focus on striking a balance between optimal economic and resilient operation using novel formulation and developed tool called Resiliency Enabled Energy System Operation Toolbox (RE-ESOT). Simulation results are provided for a real islanded grid in Alaska with battery energy systems.

50 EE - Wind and Water Power Program - Water (EE-4↗

Space Launch System Accelerated Booster Development Cycle

With the retirement of the Space Shuttle, NASA is seeking to reinvigorate the national space program and recapture the public s interest in human space exploration by developing missions to the Moon, near-earth asteroids, Lagrange points, Mars, and beyond. The would-be successor to the Space Shuttle, NASA s Constellation Program, planned to take humans back to the Moon by 2020, but due to budgetary constraints was cancelled in 2010 in search of a more "affordable, sustainable, and realistic" concept2. Following a number of studies, the much anticipated Space Launch System (SLS) was unveiled in September of 2011. The SLS core architecture consists of a cryogenic first stage with five Space Shuttle Main Engines (SSMEs), and a cryogenic second stage using a new J-2X engine3. The baseline configuration employs two 5-segment solid rocket boosters to achieve a 70 metric ton payload capability, but a new, more capable booster system will be required to attain the goal of 130 metric tons to orbit. To this end, NASA s Marshall Space Flight Center recently released a NASA Research Announcement (NRA) entitled "Space Launch System (SLS) Advanced Booster Engineering Demonstration and/or Risk Reduction." The increased emphasis on affordability is evident in the language used in the NRA, which is focused on risk reduction "leading to an affordable Advanced Booster that meets the evolved capabilities of SLS" and "enabling competition" to "enhance SLS affordability. The purpose of the work presented in this paper is to perform an independent assessment of the elements that make up an affordable and realistic path forward for the SLS booster system, utilizing advanced design methods and technology evaluation techniques. The goal is to identify elements that will enable a more sustainable development program by exploring the trade space of heavy lift booster systems and focusing on affordability, operability, and reliability at the system and subsystem levels5. For this study, affordability is defined as lifecycle cost, which includes design, development, test, and engineering (DDT&E), production and operational costs (P&O). For this study, the system objectives include reducing DDT&E schedule by a factor of three, showing 99.9% reliability, flying up to four times per year, serving both crew and cargo missions, and evolving to a lift capability of 130 metric tons.3 After identifying gaps in the current system s capabilities, this study seeks to identify non-traditional and innovative technologies and processes that may improve performance in these areas and assess their impacts on booster system development. The DDT&E phase may be improved by incorporating incremental development testing and integrated demonstrations to mitigate risk. To further reduce DDT&E, this study will also consider how aspects of the booster system may have commonality with other users, such as the Department of Defense, commercial applications, or international partners; by sharing some of the risk and investment, the overall development cost may be reduced. Consideration is not limited to solid and liquid rocket boosters. A set of functional performance characteristics, such as engine thrust, specific impulse (Isp), mixture ratio, and throttle range are identified and their impacts on the system are evaluated. This study also identifies how such characteristics affect overall life cycle cost, including DDT&E and fixed and variable P&O.

Arockiam, Nicole↗

Hydrogen Fuel Cell Performance as Telecommunications Backup Power in the United States

Working in collaboration with the U.S. Department of Energy (DOE) and industry project partners, the National Renewable Energy Laboratory (NREL) acts as the central data repository for the data collected from real-world operation of fuel cell backup power systems. With American Recovery and Reinvestment Act of 2009 (ARRA) co-funding awarded through DOE's Fuel Cell Technologies Office, more than 1,300 fuel cell units were deployed over a three-plus-year period in stationary, material handling equipment, auxiliary power, and backup power applications. This surpassed a Fuel Cell Technologies Office ARRA objective to spur commercialization of an early market technology by installing 1,000 fuel cell units across several different applications, including backup power. By December 2013, 852 backup power units out of 1,330 fuel cell units deployed were providing backup service, mainly for telecommunications towers. For 136 of the fuel cell backup units, project participants provided detailed operational data to the National Fuel Cell Technology Evaluation Center for analysis by NREL's technology validation team. NREL analyzed operational data collected from these government co-funded demonstration projects to characterize key fuel cell backup power performance metrics, including reliability and operation trends, and to highlight the business case for using fuel cells in these early market applications. NREL's analyses include these critical metrics, along with deployment, U.S. grid outage statistics, and infrastructure operation.

30 DIRECT ENERGY CONVERSION↗

Safety-Related Instrumentation and Control Pilot Upgrade (Initial Scoping Phase Implementation Report)

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP), NISP-EN-04, Standard Digital Engineering Process (SDEP), and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrade.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Method of Testing and Predicting Failures of Electronic Mechanical Systems

A method employing a knowledge base of human expertise comprising a reliability model analysis implemented for diagnostic routines is disclosed. The reliability analysis comprises digraph models that determine target events created by hardware failures human actions, and other factors affecting the system operation. The reliability analysis contains a wealth of human expertise information that is used to build automatic diagnostic routines and which provides a knowledge base that can be used to solve other artificial intelligence problems.

Iverson, David L.↗

Safety-Related Instrumentation & Control Pilot Upgrade Initiation Phase Implementation Report

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP) [Reference 2], NISP-EN-04, Standard Digital Engineering Process (SDEP) [Reference 3], and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrades.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A new bipolar Qtrim power supply system

This year marks the 15th run of RHIC (Relativistic Heavy Ion Collider) operations. The reliability of superconducting magnet power supplies is one of the essential factors in the entire accelerator complex. Besides maintaining existing power supplies and their associated equipment, newly designed systems are also required based on the physicist’s latest requirements. A bipolar power supply was required for this year’s main quadruple trim power supply. This paper will explain the design, prototype, testing, installation and operation of this recently installed power supply system.

43 PARTICLE ACCELERATORS↗

RES-E-NEXT: Next Generation of RES-E Policy Instruments

The rapid deployment of renewable sources of electricity (RES-E) is transforming power systems globally. This trend is likely to continue with large increases in investment and deployment of RES-E capacity over the coming decades. Several countries now have penetration levels of variable RES-E generation (i.e., wind and solar) in excess of 15% of their annual electricity generation; and many jurisdictions (e.g., Spain, Portugal, Ireland, Germany, and Denmark; and, in the United States, Colorado) have experienced instantaneous penetration levels of more than 50% variable generation.1 These penetration levels of variable RES-E have prompted many jurisdictions to begin modifying practices that evolved in an era of readily dispatchable, centralised power systems. Providing insights for the transition to high levels of variable RES-E generation is the focus of this document, which is the final report of the RES-E-NEXT project commissioned by the International Energy Agency’s implementing agreement on Renewable Energy Technology Deployment (IEA-RETD). It presents a comprehensive assessment of issues that will shape power system evolution during the transition to high levels of variable RES-E generation. While policy will be a central tool to sustain the growth of RES-E capacity and to enable power system transitions, the scope of the report extends beyond policy considerations to include the related domains of regulation, power market design, and system operation protocols. This broad scope is in recognition that a changing resource mix with greater penetration levels of variable RES-E has broad implications for grid operations, wholesale and retail power markets, and infrastructure needs. The next decade will be a critical transition period for power system stakeholders, as global deployment of RES-E capacity (and especially variable RES-E capacity) continues to scale-up in many regions of the world. To address increased penetration levels of RES-E in power systems and the new challenges that could emerge, coordinated portfolios of policies, market designs, regulations, and operational protocols are essential. The goal for policymakers is to facilitate investment in RES-E technologies and to enable efficient and reliable system operation, costeffective service delivery, and continued public acceptance. Although the factors that impact the speed and scale of RES-E deployment manifest uniquely in each power system, in the transition to high shares of variable RES-E this report identifies four critical domains and the changing drivers that will shape next-generation policy for each. These domains are introduced in Table I, and comprise the major sections of this report.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Clocks and timing in the NASA Deep Space Network

A new timing system has been developed for the NASA Deep Space Network (DSN) and is currently in the final stages of integration, testing and implementation in all three DSN sites. The DSN is a distributed antenna network for deep space communication, whose facilities are continuously engaged in spacecraft tracking, Very Long Baseline Interferometry (VLBI) or Radio Astronomy activities. Its primary components consist of three Deep Space Communication Centers (DSCC) separated nearly equidistant around the Earth in California, USA; Spain; and Australia. Within each DSCC, synchronized, low jitter timing signals must be distributed to many users over distances of up to 30 kilometers. The design criteria for the timing system required state of the art stability and jitter performance, but also extremely high operability and reliability. This paper describes some of the key features and recent system performance data as measured both in the laboratory and the operational DSN.

clocks↗

Remote Diagnosis and Operational Response to an In-Flight Failure of the Drill Feed Mechanism Onboard the Mars Science Laboratory Rover

On November 30th, 2016 (Sol 1536 of the mission), the Mars Science Laboratory (MSL) flight operations team commanded the Curiosity rover to drill into a Martian rock to acquire the mission’s 16th rock powder sample. The drilling operation was halted when the drill feed mechanism unexpectedly stalled shortly after disengaging its magnetically-actuated friction brake at the start of a long move to extend the drill bit into contact with the target rock. The drilling campaign was put on hold and later abandoned as diagnostic experimentation revealed a tendency for the actuator to transition in and out of a high-drag state in which the mechanism could not actuate. In the subsequent months, the team conducted a variety of in-flight and ground-based investigations to determine root cause and identify mitigation strategies for continued operation. Mechanism reliability continued to degrade and by June 2017, it became clear that the mechanism could not be relied upon to support drilling operations. The team succeeded in fully extending the feed, enabling the development of new sampling techniques that would not rely on the feed mechanism. The first feed-extended drilling sample was successfully collected on Sol 2057, 521 sols after the initial feed stall. This paper discusses the anomaly investigation process, failure analysis, and feed mechanism operation mitigation strategies. It concludes with key lessons learned about mechanism design, mission architecture, and operational best practices.

Lin, Megan Richardson↗

Electromechanical actuation for thrust vector control applications

At present, actuation systems for the Thrust Vector Control (TVC) for launch vehicles are hydraulic systems. The Advanced Launch System (ALS), a joint initiative between NASA and the Air Force, is a launch vehicle that is designed to be cost effective, highly reliable and operationally efficient with a goal of reducing the cost per pound to orbit. As part of this initiative, an electromechanical actuation system is being developed as an attractive alternative to the hydraulic systems used today. NASA-Lewis is developing and demonstrating an Induction Motor Controller Actuation System with a 40 hp peak rating. The controller will integrate 20 kHz resonant link Power Management and Distribution (PMAD) technology and Pulse Population Modulation (PPM) techniques to implement Field Oriented Vector Control (FOVC) of a new advanced induction motor. Through PPM, multiphase variable frequency, variable voltage waveforms can be synthesized from the 20 kHz source. FOVC shows that varying both the voltage and frequency and their ratio (V/F), permits independent control of both torque and speed while operating at maximum efficiency at any point on the torque-speed curve. The driver and the FOVC will be microprocessor controlled. For increased system reliability, a Built-in Test (BITE) capability will be included. This involves introducing testability into the design of a system such that testing is calibrated and exercised during the design, manufacturing, maintenance and prelaunch activities. An actuator will be integrated with the motor controller for performance testing of the EMA TVC system. The design and fabrication of the motor controller is being done by General Dynamics Space Systems Division. The University of Wisconsin-Madison will assist in the design of the advanced induction motor and in the implementation of the FOVC theory. A 75 hp electronically controlled dynamometer will be used to test the motor controller in all four quadrants of operation using flight type control algorithms. Integrated testing of the controller and actuator will be conducted at a facility yet to be named. The EMA system described above is discussed in detail.

Roth, Mary Ellen↗

Operationally Efficient Propulsion System Study (OEPPS)

A description is presented, through view graphs, of the problems encountered in today's launch vehicles and how these problems have adversely affected the ability to achieve serviceability, reliability, and operability. The need is emphasized to recognize and understand the operations problems and the effort that must be made to avoid them in future designs. Technology areas that will enhance operations requirements are also presented.

Wong, G. S.↗

Foundations for the Future Power System: Inverter-Based Resource Interconnection Standards

As power systems evolve to become reliant on solar, wind, batteries, and other inverter-based resources (IBRs), it is essential that those resources meet certain minimum performance and capability criteria designed to ensure the power system operates stably and reliably. Because those criteria, as enshrined in interconnection standards, take years to develop and are very long lived, they need to account for not only the present state of the power system but also its expected future state over the lifetime of the power plants to which they will apply. In addition, they need to be specific enough to ensure reliability without over specifying and, thereby, impeding innovation. Because power systems are shifting rapidly from a state where IBRs make up a small to medium portion of generation to one where the generation will, at times, come predominantly from IBRs, interconnection standards are especially challenging to develop today. Good interconnection standards can make the power system more reliable and less costly to operate, whereas poorly designed standards can lead to major problems, like the famous German 50.2-Hz problem, which introduced a risk of losing many gigawatts of solar on a frequency excursion and resulted in many IBRs being retrofitted at great cost to mitigate a major system reliability risk. Readying the power system by specifying forward-looking technical minimum functional capabilities for IBRs can be an effective approach to avoid future retrofits.

data models↗

Tribological Studies of Microelectromechanical Systems

Understanding and controlling friction in micromachine interfaces is critical to the reliability and operational efficiency of microelectromechanical systems (MEMS). The relatively high adhesion forces and friction forces encountered in these devices often present major obstacles to the design of reliable MEMS devices. Using surface micromachining, arrays of microstructures are being designed and tested to examine the adhesion characteristics, static friction behavior, and dynamic friction response. Emphasis is also being given to the control and actuation of the test structures and the modeling of the dynamic response and contact mechanics at the interface. Specifically, the purpose of the research is to fabricate and test MEMS devices in order to obtain insight into the effect of surface topography, material properties, surface chemical state, environmental conditions, and contact load on the static and dynamic characteristics of the contact interface.

77 NANOSCIENCE AND NANOTECHNOLOGY↗

Laser data links for communication satellites

Laser data relays potentially offer continuous 1 Gb/sec bandwidths, drastically increasing low-altitude satellite data collection capacity over present store-and-dump techniques. Availability of the laser link as a reliable alternative, operating within conventional low-altitude communication subsystem weight and power allocations, will create customer pressure for adoption. Major communication relay system impacts are discussed including reliability, mechanical design, attitude control, on-board data handling, contamination control, and traffic-net management. Interface parameters which drive the fundamental relay satellite design concepts are discussed, and conditions requiring early quantitative analysis are identified.

Ohern, W. L.↗