Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “launch control system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,135 records · Page 63

The Role of NASA Engineering & Safety Center (NESC) in Advancing NASA's Earth Science Missions (Past, Present, and Future)

The NASA Engineering & Safety Center (NESC) was established in 2003 to provide an independent technical resource for the resolution of challenging technical problems (through the use of studies, analysis, tests, etc.). Since its inception, NESC has completed nearly 1000 technical assessments for NASA’s Human Exploration and Operation Mission Directorate (HEOMD), Science Mission Directorate (SMD), Space Technology Mission Directorate (STMD), and Aeronautics Research Mission Directorate (ARMD). Of the SMD related assessments, several were for the resolution of technical problems, analysis, or studies related to NASA’s Earth science missions in various phases of the project from design to operation. Some of the recent examples of NESC technical support for NASA (or NOAA) Earth science missions have been for: Soil Moisture Active Passive (SMAP), Deep Space Climate Observatory (DSCOVR), Cyclone Global Navigation Satellite System (CYGNSS), Ice, Cloud, and Land Elevation Satellite (ICESat-II), Joint Polar Satellite System (JPSS), and the soon to be launched collaboration mission with India, NASA-ISRO Synthetic Aperture Radar (NISAR). In this paper, we outline some of the technical challenges faced by these Earth science missions and describe how NESC contributed to their resolution. The case studies cover a wide range of disciplines involving space lidars, radars, electronics, attitude control systems, as well as Micrometeoroid Orbital Debris (MMOD) risk assessment impact to NASA missions. The efforts include strategies for risk mitigation, technical resolution of challenging problems, and failure root cause investigations combined with lessons learned reports to advance discipline knowledge, enhance NASA capabilities, and avoid future problems.

NASA↗

High resolution solar X-ray studies

Two high resolution solar X-ray payloads and their launches on Aerobee rockets with pointing system are described. The payloads included 5 to 25A X-ray spectrometers, multiaperture X-ray cameras, and command box attitude control inflight by means of a television image radioed to ground. Spatial resolution ranged from five arc minutes to ten arc seconds and spectral resolution ranged from 500 to 3000. Several laboratory tasks were completed in order to achieve the desired resolution. These included (1) development of techniques to align grid collimators, (2) studies of the spectrometric properties of crystals, (3) measurements of the absorption coefficients of various materials used in X-ray spectrometers, (4) evaluation of the performance of multiaperture cameras, and (5) development of facilities.

Blake, R. L.↗

BRAVO economic study of LANDSAT follow-on

The LANDSAT Follow-On satellite consists of two major systems: the instrument module and the Multi-Mission Modular Spacecraft (MMS). The instrument module contains the thematic mapper and the five-band multispectral scanner instruments. The instrument module also includes the solar array, the tracking and data relay satellite (TDRS) antenna, and the wideband data module. The MMS contains the modularized and standardized power, propulsion, attitude control, and command and data handling subsystems. The Shuttle will be supporting the LANDSAT Follow-On system. The LANDSAT Follow-On Project plans two Delta 3910 launches. The first is scheduled for 1981; the second Delta launch will occur as needed to keep one satellite operational on orbit. The second satellite will be ready six months after the first. It could be launched any time after that. Shuttle support of the system could begin in early 1983 but would be scheduled to start after the second Delta launch.

Pritchard, E. I.↗

Real-time dynamic spacecraft simulation

This paper presents experience in designing and implementing a fully interactive real-time dynamic spacecraft simulation software system for the International Ultraviolet Explorer (IUE) satellite to be launched by NASA. The primary objective for this simulator, called SIMIUE, is to help train the IUE Operations Control Center personnel in the dynamic commanding and operations of the IUE spacecraft. It is felt that the approach taken in developing SIMIUE will prove to be largely valid for spacecraft training simulators to be developed for future satellites. For this reason discussion of those aspects of SIMIUE which relate specifically to the IUE satellite has been kept to a minimum.

Macker, A. J.↗

Experimental Investigation of Launch Vehicle Transient Input Simulation in Payload Tests

The technique of electronically simulating the structural dynamics of a launch vehicle in transient tests of payloads using multiple vibration excitation systems was investigated. The development of computer programs to determine transfer functions, synthesize shaker forcing functions, and control vibration exciters is described. A demonstration test using the techniques was described and results are presented. The evaluation of the potential for applying this technique to large Shuttle payloads is discussed.

Rader, P.↗

Satellite power system: Concept development and evaluation program, reference system report

The Satellite Power System (SPS) Reference System is discussed and the technical and operational information required in support of environmental, socioeconomic, and comparative assessment studies are emphasized. The reference System concept features a gallium-aluminum-arsenide, and silicon solar cell options. Other aspects of an SPS are the construction of bases in space, launch and mission control bases on earth, and fleets of various transportation vehicles to support the construction and maintenance operations of the satellites.

Source record↗

STACBEAM 2

An investigation being conducted by Astro Aerospace Corporation (Astro) for Jet Propulsion Laboratory in which efficient structures for geosynchronous spacecraft solar arrays are being developed is discussed. Recent developments in solar blanket technology, including the introduction of ultrathin (50 micrometer) silicon solar cells with conversion efficiencies approaching 15 percent, have resulted in a significant increase in blanket specific power. System specific power depends not only on blanket mass but also on the masses of the support structure and deployment mechanism. These masses must clearly be reduced, not only to minimize launch weight, but also to increase array natural frequency. The solar array system natural frequency should be kept high in order to reduce the demands on the attitude control system. This goal is approached by decreasing system mass, by increasing structural stiffness, and by partitioning the blanket. As a result of this work, a highly efficient structure for deploying a solar array was developed.

Adams, L. R.↗

Three degree-of-freedom force feedback control for robotic mating of umbilical lines

The use of robotic manipulators for the mating and demating of umbilical fuel lines to the Space Shuttle Vehicle prior to launch is investigated. Force feedback control is necessary to minimize the contact forces which develop during mating. The objective is to develop and demonstrate a working robotic force control system. Initial experimental force control tests with an ASEA IRB-90 industrial robot using the system's Adaptive Control capabilities indicated that control stability would by a primary problem. An investigation of the ASEA system showed a 0.280 second software delay between force input commands and the output of command voltages to the servo system. This computational delay was identified as the primary cause of the instability. Tests on a second path into the ASEA's control computer using the MicroVax II supervisory computer show that time delay would be comparable, offering no stability improvement. An alternative approach was developed where the digital control system of the robot was disconnected and an analog electronic force controller was used to control the robot's servosystem directly, allowing the robot to use force feedback control while in rigid contact with a moving three-degree-of-freedom target. An alternative approach was developed where the digital control system of the robot was disconnected and an analog electronic force controller was used to control the robot's servo system directly. This method allowed the robot to use force feedback control while in rigid contact with moving three degree-of-freedom target. Tests on this approach indicated adequate force feedback control even under worst case conditions. A strategy to digitally-controlled vision system was developed. This requires switching between the digital controller when using vision control and the analog controller when using force control, depending on whether or not the mating plates are in contact.

Fullmer, R. Rees↗

Flywheel energy storage for electromechanical actuation systems

The authors describe a flywheel energy storage system designed specifically to provide load-leveling for a thrust vector control (TVC) system using electromechanical actuators (EMAs). One of the major advantages of an EMA system over a hydraulic system is the significant reduction in total energy consumed during the launch profile. Realization of this energy reduction will, however, require localized energy storage capable of delivering the peak power required by the EMAs. A combined flywheel-motor/generator unit which interfaces directly to the 20-kHz power bus represents an ideal candidate for this load leveling. The overall objective is the definition of a flywheel energy storage system for this application. The authors discuss progress on four technical objectives: (1) definition of the specifications for the flywheel-motor/generator system, including system-level trade-off analysis; (2) design of the flywheel rotor; (3) design of the motor/generator; and (4) determination of the configuration for the power management system.

Hockney, Richard L.↗

Flight Performance of Skylab Attitude and Pointing Control System

In 1967 a paper at the AIAA Guidance, Control and Flight Dynamics Conference in Huntsville, Ala. presented for the first time the prot)osed SKYLAB Attitude and Pointing Control System (APCS) The system requirements, Apollo Telescope Mount (ATM) configuration, control philosophy, and operational modes were presented and the APCS described. The Initial mission and system design requirements changed during the period of time before the SKYLAB was launched. This paper will review the Initial and final APCS requirements and goals and their relationship. The actual flight mission (and Its alterations during the flight) and known achieved APCS performance will then be presented. SKYLAB was a tremendous success in furthering man's scientific knowledge; but perhaps SKYLAB will be remembered more for the anomalies and the efforts undertaken to solve them. On May 14, 1973, the unmanned SKYLAB Orbital Workshop (OWS) was launched from Cape Kennedy. Serious hardware failures began to occur during ascent through the atmosphere and their spectre continued to haunt both the astronauts and their ground based support team. Nor were these the only surprises affecting the design and operation of the APCS. Mission requirements for pointing to various stellar targets and to nadir for earth resources experiments were added after the hardware was designed. The chance appearance of comet Kohoutek during the SKYLAB operational life-time caused NASA to add comet observation to the mission requirements and to adjust the time when the third crew would man the SKYLAB. The development of new procedures and software for the opportunity to observe this visitor to our solar system is described.

Chubb, W. B.↗

Living and Working in Space

This document is a presentation about some of the challenges of living and working in space. The presentation shows slides of the Apollo 11 liftoff, Skylab in orbit, a Space Shuttle launch, and a slide of the International Space Station. It reviews the needs and effluents of the astronauts per day, and the Environmental Control and Life Support (ECLS) systems. It shows a flow diagram of the Space Station Regenerative ECLS, which shows the various systems, and how they interact to control the environment and recycle the air, and water. There are other slides some of which show astronauts eating, brushing teeth, shaving, and sipping from a sip bottle while exercising.

Monsi Roman↗

The Fast Alternative Cryogenic Experiment Testbed

One of the challenges in the area of cryogenics for space exploration in the next millennium is providing the capability for inexpensive, frequent, access to space. Faced with this challenge during the International Space Station (ISS) build era, when other Space Shuttle manifesting opportunities are unavailable, a "proof of concept" cryostat has been developed to demonstrate the ability to accommodate low temperature science investigations within the constraints of the Hitchhiker siderail carrier. The Hitchhiker siderail carrier is available on a "mass available" basis during the ISS build era. In fact, several hitchhiker payloads flew with the deployment of the Unity module. Hitchhiker siderail carrier payloads have historically flown an average of about four times a year. A hybrid Solid Neon - Superfluid Helium cryostat has been developed with Janis Research Company to accommodate instruments of 16.5 cm diameter and 30 cm. length. This hybrid approach was taken in part to provide adequate on-orbit lifetime for instruments with high (conducted) heat loads from the instrumentation wiring. Mass, volume, lifetime and the launch hold scenario were all design drivers. In addition, with Ball Aerospace and Technologies Corporation, a multichannel VME architecture Germanium Resistance Thermometer (GRT) readout and heater control servo system has been developed. In a flight system, the cryostat and electronics payloads would be umbilically attached in a paired Hitchhiker siderail mount, and permit on-orbit command and telemetry capability. The results of performance tests of both the cryostat, and a helium sample instrument will be presented. The instrument features a self contained, miniaturized, nano-Kelvin resolution High Resolution Thermometer (HRT). This high level of thermal resolution is achieved through the utilization of a dc Superconducting Quantum Interference Device (SQUID). Although developed for the Low Temperature Microgravity Fundamental Physics investigator community, many design features are applicable in fields such as infrared and x-ray astronomy.

Nash, Alfred↗

Operations and Range Technology Development

The Operations and Range Technology Project is responsible for the development of key technologies as part of the KSC Spaceport Technology Center Initiative to substantially reduce vehicle launch and processing operations costs and improve the systems safety and reliability. The topics include: 1) Spaceport Technology Areas; 2) Umbilical Systems Development; 3) Automated Payload Handling Systems; 4) Command, Control and Monitor Systems; 5) Intelligent Synthesis Environment; 6) Low TRL Development; 7) Second Generation Project Organization; and 8) ASTP (3rd Generation) Project Organization. This paper is presented in viewgraph form.

Taylor, Dave↗

Geoscience Laser Altimeter System (GLAS) Loop Heat Pipes: An Eventual First Year On-Orbit

Goddard Space Flight Center's Geoscience Laser Altimeter System (GLAS) is the sole scientific instrument on the Ice, Cloud and land Elevation Satellite (ICESat) that was launched on January 12, 2003 from Vandenberg AFB. A thermal control architecture based on propylene Loop Heat Pipe technology was developed to provide selectable/stable temperature control for the lasers and other electronics over the widely varying mission environment. Following a nominal LHP and instrument start-up, the mission was interrupted with the failure of the first laser after only 36 days of operation. During the 5-month failure investigation, the two GLAS LHPs and the electronics operated nominally, using heaters as a substitute for the laser heat load. Just prior to resuming the mission, following a seasonal spacecraft yaw maneuver, one of the LHPs deprimed and created a thermal runaway condition that resulted in an emergency shutdown of the GLAS instrument. This paper presents details of the LHP anomaly, the resulting investigation and recovery, along with on-orbit flight data during these critical events.

Grob, E.↗

NASA Dryden Status

This slide presentation reviews several projects that NASA Dryden personnel are involved with: Integrated Resilient Aircraft Controls Project (IRAC), NASA G-III Research Aircraft, X-48B Blended Wing Body aircraft, Stratospheric Observatory for Infrared Astronomy (SOFIA), and the Orion CEV Launch Abort Systems Tests.

Jacobson, Steve R.↗

Commercial Orbital Transportation Cargo Services Environmental Control and Life Support Integration

The International Space Station s (ISS) largest crew and cargo resupply vehicle, the Space Shuttle, will retire in 2011. To help augment ISS resupply and return capability, NASA announced a project to promote the development of Commercial Orbital Transportation Services (COTS) for the ISS in January of 2006. By December of 2008, NASA entered into space act agreements with SpaceX and Orbital Sciences Corporation for COTS development and ISS Commercial Resupply Services (CRS). The intent of CRS is to fly multiple resupply missions each year to ISS with SpaceX s Dragon vehicle providing resupply and return capabilities and Orbital Science Corporation s Cygnus vehicle providing resupply capability to ISS. The ISS program launched an integration effort to ensure that these new commercial vehicles met the requirements of the ISS vehicle and ISS program needs. The Environmental Control and Life Support System (ECLSS) requirements cover basic cargo vehicle needs including maintaining atmosphere, providing atmosphere circulation, and fire detection and suppression. The ISS-COTS integration effort brought unique challenges combining NASA s established processes and design knowledge with the commercial companies new initiatives and limited experience with human space flight. This paper will discuss the ISS ECLS COTS integration effort including challenges, successes, and lessons learned.

Duchesne, Stephanie↗

International Space Station Passive Thermal Control System Analysis, Top Ten Lessons-Learned

The International Space Station (ISS) has been on-orbit for over 10 years, and there have been numerous technical challenges along the way from design to assembly to on-orbit anomalies and repairs. The Passive Thermal Control System (PTCS) management team has been a key player in successfully dealing with these challenges. The PTCS team performs thermal analysis in support of design and verification, launch and assembly constraints, integration, sustaining engineering, failure response, and model validation. This analysis is a significant body of work and provides a unique opportunity to compile a wealth of real world engineering and analysis knowledge and the corresponding lessons-learned. The analysis lessons encompass the full life cycle of flight hardware from design to on-orbit performance and sustaining engineering. These lessons can provide significant insight for new projects and programs. Key areas to be presented include thermal model fidelity, verification methods, analysis uncertainty, and operations support.

Iovine, John↗

Integrated Ground Operations Demonstration Units Testing Plans and Status

Cryogenic propellant loading operations with their associated flight and ground systems are some of the most complex, critical activities in launch operations. Consequently, these systems and operations account for a sizeable portion of the life cycle costs of any launch program. NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite advances in cryogenics, system health management and command and control technologies. This project was developed to mature, integrate and demonstrate advancement in the current state of the art in these areas using two distinct integrated ground operations demonstration units (GODU): GODU Integrated Refrigeration and Storage (IRAS) and GODU Autonomous Control

Johnson, Robert G.↗