Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “downlink”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,126 records · Page 63

Selection of Ka-Band Transponder Turnaround Frequency Ratio

The Consultative Committee for Space Data Systems has issued recommendations specifying Transponder Turn-around Frequency Ratios for S-band and X-band coherent earth-to-space and space-to earth links.

downlink and/or uplink Ka-band links transponder m↗

Microtechnology in Telecommunications for Spacecraft Cost and Mass Reduction

This paper examines the incorporation of both microelectronics and micromachining (termed microtechnologies) as applied to deep space telecommunication subsystems. Using the Pluto Fast Flyby Pre-Project as a main case study we have reduced the subsystem mass by 50%.

MCM amplifiers filters switches Goldstone Deep Spa↗

The Near Solar Conjuction Experiment

The Near Earth Asteroid Rendezvous (NEAR) spacecraft was occulted by the solar disk on February 19, 1997. During the period between February 7 and March 3, 1997, the Near X-band telecommunications system was used to carry out a combination of engineering and radio science measurements through the solar corona.

Near Earth Asteroid Rendezvous NEAR solar corona X↗

A Whale of a Tale: Creating Spacecraft Telemetry Data Analysis Products for the Deep Impact Mission

A description of the Whale product generation utility and its means of analyzing project data for Deep Impact Missions is presented. The topics include: 1) Whale Definition; 2) Whale Overview; 3) Whale Challenges; 4) Network Configuration; 5) Network Diagram; 6) Whale Data Flow: Design Decisions; 7) Whale Data Flow Diagram; 8) Whale Data Flow; 9) Whale Team and Users; 10) Creeping Requirements; 11) Whale Competition; 12) Statistics: Processing Time; 13) CPU and Disk Usage; 14) The Ripple Effect of More Data; and 15) Data Validation and the Automation Challenge.

ground data systems↗

A Whale of a Tale: Creating Spacecraft Telemetry Data Analysis Products for the Deep Impact Mission

This paper describes some of the challenges and lessons learned from the Deep Impact (DI) Mission Ground Data System's (GDS) telemetry data processing and product generation tool, nicknamed 'Whale.' One of the challenges of any mission is to analyze testbed and operational telemetry data. Methods to retrieve this data to date have required spacecraft subsystem members to become experts in the use of a myriad of query and plot tools. As budgets shrink, and the GDS teams grow smaller, more of the burden to understand these tools falls on the users. The user base also varies from novice to expert, and requiring them to become GDS tool experts in addition to spacecraft domain experts is an undue burden. The "Whale" approach is to process all of the data for a given spacecraft test, and provide each subsystem with plots and data products 'automagically.'.

Deep Impact↗

Redefining Tactical Operations for MER Using Cloud Computing

The Mars Exploration Rover Mission (MER) includes the twin rovers, Spirit and Opportunity, which have been performing geological research and surface exploration since early 2004. The rovers' durability well beyond their original prime mission (90 sols or Martian days) has allowed them to be a valuable platform for scientific research for well over 2000 sols, but as a by-product it has produced new challenges in providing efficient and cost-effective tactical operational planning. An early stage process adaptation was the move to distributed operations as mission scientists returned to their places of work in the summer of 2004, but they would still came together via teleconference and connected software to plan rover activities a few times a week. This distributed model has worked well since, but it requires the purchase, operation, and maintenance of a dedicated infrastructure at the Jet Propulsion Laboratory. This server infrastructure is costly to operate and the periodic nature of its usage (typically heavy usage for 8 hours every 2 days) has made moving to a cloud based tactical infrastructure an extremely tempting proposition. In this paper we will review both past and current implementations of the tactical planning application focusing on remote plan saving and discuss the unique challenges present with long-latency, distributed operations. We then detail the motivations behind our move to cloud based computing services and as well as our system design and implementation. We will discuss security and reliability concerns and how they were addressed

Mars↗

Overview of the Ground-to-Orbit Lasercom Demonstration

The Ground-to-Orbit Lasercom Demonstration conducted between the ETS-VI spacecraft and the ground station at JPL's Table Mountain Facility, Wrightwood, California was the first gound-to-space two-way optical communications experiment.

measure↗