Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “data requests”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,135 records · Page 63

Industry Level Feasibility of LiDAR Data into Fire Modeling Using Fire Risk Investigation in 3D (FRI3D)

Many evaluation, assessment, and modeling tasks at nuclear power plants require spatial information this often requires physical visits to locations within the facility because the 2D or 3D schematics and current models do not contain enough detail or do not capture as-built and real-world conditions. These visits require extensive manual labor for not only the requesting party, but support groups such as security. LIDAR mapping is trying to solve that problem by providing very detailed 3D models for low costs. However, the use of these models can be very limited because either component reference information is missing and too costly to add, or there is no way to extract specific spatial data needed for other tools. This report presents Idaho National Lab's work with Environmental Intellect (Ei) covering two main efforts. First, to reduce the effort of "tagging" data in large 3D models. By using both existing plant database information, and artificial intelligence (AI) to find and read equipment labels. This research explores the ability of to provide a simple way for the user to tag items and verify plant data, capturing both the speed of AI and human verification. The second part of the work is the development of an interface for importing pieces needed for Modeling & Simulation. Analysis work such as that for fire, flood, or physical security all require spatial or 3D models in various levels of detail. This interface will allow for the retrieval of item location or boundaries, enabling the auto generation of models for varying tools. The application program interface (API) of the fire risk investigation in 3D (FRI3D) was used to test feasibility of exporting the LiDAR tagged spatial information. Outcomes from this work provide preliminary data to determine if the tools and methods could provide substantial industry benefit if fully matured.

97 MATHEMATICS AND COMPUTING↗

Reaching the Diffraction Limit - Differential Speckle and Wide-Field Imaging for the Gemini-N Telescope

Speckle imaging allows telescopes to achieve di raction limited imaging performance. The technique requires cameras capable of reading out frames at a very fast rate, e ectively `freezing out' atmospheric seeing. The resulting speckles can be correlated and images reconstructed that are at the di raction limit of the telescope. These new instruments are based on the successful performance and design of the Di erential Speckle Survey Instrument (DSSI) [2, 1]. The instruments are being built for the Gemini-N and WIYN telescopes and will be made available to the community via the peer review proposal process. We envision their primary use to be validation and characterization of exoplanet targets from the NASA K2 and TESS missions and RV discovered exoplanets. Such targets will provide excellent follow-up candidates for both the WIYN and Gemini telescopes [3]. Examples of DSSI data are shown in the gures below. We expect similar data quality in speckle imaging mode with the new instruments. Additionally, both cameras will have a wide- eld mode and standard SDSS lters. They will be highly versatile instruments and it is that likely many other science programs will request time on the cameras. The limiting magnitude for speckle observations, will remain around 13-14th at WIYN and 16-17th at Gemini, while wide- eld, normal CCD imaging operation should be able to go to much fainter, providing usual CCD imaging and photometric capabilities. The instruments will also have high utility as scoring cameras for telescope engineering purposes, or other applications where high time resolution is needed. Instrument support will be provided, including a software pipeline that takes raw speckle data to fully reconstructed images.

Gemini-N↗

Use of an Alternative Conceptual Model of Vadose Zone Heterogeneity to Evaluate Past Tank Leaks and Other Unplanned Releases within a Tank Farm at the Hanford Site - 20061

Washington State Department of Ecology (Ecology) requested that U.S. Department of Energy (DOE)-Office of River Protection (ORP) consider an evaluation of effects of fine-grained thin sediment layers on transport with a separate alternative conceptual model in its evaluation of the potential impact of tank leaks and other unplanned releases within the tank farm at the Hanford Site. For this alternative model, Ecology recommended that the model be developed based on the general framework of fine-grained units identified by a stakeholder group in their interpretations of variability in moisture content data collected in the vicinity of Waste Management Area (WMA) C. In discussions with DOE-ORP, Ecology acknowledged that the underlying data and interpretations of the occurrence and lateral continuity of the fine-grained thin layers identified by a stakeholder group are uncertain. However, DOE-ORP agreed to Ecology's recommendation and has provided support for the requested evaluation that involved development of an alternative model based on the general framework of the unpublished report by the stakeholder. DOE-ORP considered this evaluation to be a hypothetical evaluation of vadose zone heterogeneities at WMA C. General observations from the range of simulation cases examined in the evaluation of the effects of hypothetical vadose zone heterogeneities at WMA C are as follows. - The movement of the center of mass of the simulated plumes was generally vertically downward below the source for all simulations, including those that incorporated the hypothetical fine-grained units. - All simulations that incorporated hypothetical heterogeneity produced additional plume spreading over what was produced in simulations using Equivalent Homogeneous Media (EHM) model(s)a. The spreading resulted in a broadening of the fringes of the plume, resulting in a wider region of low concentration, but lower peak concentrations associated with the center of mass of the plume. - Simulations that used the silty-sand hydraulic properties, suggested by Ecology for the hypothetical fine-grained units, generally produced similar spreading and slightly lower peak mass flux at the water table when compared to the EHM modeling results. a The EHM-based models used at WMA C do not explicitly include small-scale fine-grained heterogeneities used in the model advocated by Ecology. - Simulations that used the silty-sand hydraulic properties, suggested by Ecology for the hypothetical fine-grained units, generally produced less spreading and an earlier arrival of mass flux at the water table when compared to the use of another set of hydraulic properties from a silty-sand sample collected at a nearby disposal facility. - The EHM representation of the vadose zone generally produced higher peak mass flux and an earlier occurrence of peak fluxes at the water table compared to all analyses incorporating additional hypothetical heterogeneity. Results of this alternative model evaluation of past leaks provided some insight into the transport effects of vadose zone heterogeneities at WMA C that helped resolve Ecology's comments and issues related to the effects of vadose zone heterogeneities on past leaks and losses from the WMA C tank farms area. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Thematic mapper flight model preshipment review data package. Volume 3, part A: System data

Results of vibration, acoustical noise, and thermal vacuum are described as well as tests studies of EMI/EMC and mass properties conducted for thematic mapper systems integration. Liens are summarized and the engineering change proposal status is presented. Requests for deviation/waiver are included along with failure and nonforming material reports.

Source record↗

Designing and prototyping extensions to the Message Passing Interface in MPICH

As HPC system architectures and the applications running on them continue to evolve, the MPI standard itself must evolve. The trend in current and future HPC systems toward powerful nodes with multiple CPU cores and multiple GPU accelerators makes efficient support for hybrid programming critical for applications to achieve high performance. However, the support for hybrid programming in the MPI standard has not kept up with recent trends. The MPICH implementation of MPI provides a platform for implementing and experimenting with new proposals and extensions to fill this gap and to gain valuable experience and feedback before the MPI Forum can consider them for standardization. Here, in this work, we detail six extensions implemented in MPICH to increase MPI interoperability with other runtimes, with a specific focus on heterogeneous architectures. First, the extension to MPI generalized requests lets applications integrate asynchronous tasks into MPI’s progress engine. Second, the iovec extension to datatypes lets applications use MPI datatypes as a general-purpose data layout API beyond just MPI communications. Third, a new MPI object, MPIX_Stream, can be used by applications to identify execution contexts beyond MPI processes, including threads and GPU streams. MPIX stream communicators can be created to make existing MPI functions thread-aware and GPU-aware, thus providing applications with explicit ways to achieve higher performance. Fourth, MPIX Streams are extended to support the enqueue semantics for offloading MPI communications onto a GPU stream context. Fifth, thread communicators allow MPI communicators to be constructed with individual threads, thus providing a new level of interoperability between MPI and on-node runtimes such as OpenMP. Lastly, we present an extension to invoke MPI progress, which lets users spawn progress threads with fine-grained control to adapt the communication performance to their application designs. We describe the design and implementation of these extensions, provide usage examples, and highlight their expected benefits with performance results.

97 MATHEMATICS AND COMPUTING↗

Historical Review of Uncommanded Lateral-Directional Motions at Transonic Conditions

This paper presents the results of a survey of past experiences with uncommanded lateral-directional motions at transonic speeds during specific military aircraft programs. The effort was undertaken to provide qualitative and quantitative information on past airplane programs that might be of use to the participants in the joint NASA/Navy/Air Force Abrupt Wing Stall (AWS) Program. The AWS Program was initiated because of the experiences of the F/A-l8E/F development program, during which unexpected, severe wing-drop motions were encountered by preproduction aircraft at transonic conditions. These motions were judged to be significantly degrading to the primary mission requirements of the aircraft. Although the problem was subsequently solved for the production version of the F/A-l8E/F, a high-level review panel emphasized the poor understanding of such phenomena and issued a strong recommendation to: "Initiate a national research effort to thoroughly and systematically study the wing drop phenomena." A comprehensive, cooperative NASA/Navy/Air Force AWS Program was designed to respond to provide the required technology requirements. As part of the AWS Program, a work element was directed at a historical review of wing-drop experiences in past aircraft development programs at high subsonic and transonic speeds. In particular, information was requested regarding: specific aircraft configurations that exhibited uncommanded motions and the nature of the motions; geometric characteristics of the air- planes; flight conditions involved in occurrences; relevant data, including wind-tunnel, computational, and flight sources; figures of merit used for analyses; and approaches used to alleviate the problem. An attempt was also made to summarize some of the more important lessons learned from past experiences, and to recommend specific research efforts. In addition to providing technical information to assist the AWS research objectives, the study produced fundamental information regarding the historical challenge of uncommanded lateral-directional motions at transonic conditions and the associated aerodynamic phenomena.

Chambers, Joseph R.↗

Historical Review of Uncommanded Lateral-Directional Motions At Transonic Conditions (Invited)

This paper presents the results of a survey of past experiences with uncommanded lateral-directional motions at transonic speeds during specific military aircraft programs. The effort was undertaken to provide qualitative and quantitative information on past airplane programs that might be of use to the participants in the joint NASA/Navy/Air Force Abrupt Wing Stall (AWS) Program. The AWS Program was initiated because of the experiences of the F/A-18E/F development program, during which unexpected, severe wing-drop motions were encountered by preproduction aircraft at transonic conditions. These motions were judged to be significantly degrading to the primary mission requirements of the aircraft. Although the problem was subsequently solved for the production version of the F/A-l8E/F, a high-level review panel emphasized the poor understanding of such phenomena and issued a strong recommendation to: Initiate a national research effort to thoroughly and systematically study the wing drop phenomena. A comprehensive, cooperative NASA/Navy/Air Force AWS Program was designed to respond to provide the required technology requirements. As part of the AWS Program, a work element was directed at a historical review of wing-drop experiences in past aircraft development programs at high subsonic and transonic speeds. In particular, information was requested regarding: specific aircraft configurations that exhibited uncommanded motions and the nature of the motions; geometric characteristics of the air- planes; flight conditions involved in occurrences; relevant data, including wind-tunnel, computational, and flight sources; figures of merit used for analyses; and approaches used to alleviate the problem. An attempt was also made to summarize some of the more important lessons learned from past experiences, and to recommend specific research efforts. In addition to providing technical information to assist the AWS research objectives, the study produced fundamental information regarding the historical challenge of uncommanded lateral-directional motions at transonic conditions and the associated aerodynamic phenomena.

Chambers, Joseph R.↗

SOHO Ultraviolet Coronagraph Spectrometer (UVCS) Mission Operations and Data Analysis

The scientific goal of UVCS is to obtain detailed empirical descriptions of the extended solar corona as it evolves over the solar cycle and to use these descriptions to identify and understand the physical processes responsible for coronal heating, solar wind acceleration, coronal mass ejections (CMEs), and the phenomena that establish the plasma properties of the solar wind as measured by 'in situ' solar wind instruments. This report covers the period from 01 February 2002 to 15 February 2003. During that time, UVCS observations have consisted of three types: 1) standard synoptic observations comprising, primarily, the H I Ly alpha line profile and the O VI 103.2 and 103.7 nm intensity over a range of heights from 1.5 to about 3.0 solar radii and covering 360 degrees about the sun, 2) sit and stare watches for CMEs, and 3) special observations designed by the UVCS Lead Observer of the Week for a specific scientific purpose. The special observations are often coordinated with those of other space-based and ground-based instruments and they often are part of SOHO joint observation programs and campaigns. Lead observers have included UVCS Co-Investigators, scientists from the solar physics community and several graduate and undergraduate level students. UVCS has continued to achieve its purpose of using powerful spectroscopic diagnostic techniques to obtain a much more detailed description of coronal structures and dynamic phenomena than existed before the SOHO mission. The new descriptions of coronal mass ejections (CMEs) and coronal structures from UVCS have inspired a large number of theoretical studies aimed at identifying the physical processes responsible for CMEs and solar wind acceleration in coronal holes and streamers. UVCS has proven to be a very stable instrument. Stellar observations have demonstrated its stability. UVCS has required no flight software modifications and all mechanisms are operational. The UVCS O VI Channel with its redundant optical path for wavelengths near H I Ly alpha is capable of observing the entire UVCS wavelength range. Since December 1998, the O VI Channel has been used for all UVCS observations. Although the H I Ly alpha Channel and detector are still operational, increases in the dark count up to about 5 x 10(exp -4) counts/sec/pixel and an increase in high voltage current to within a factor of two of the maximum used in the laboratory before flight led to the decision to not use that detector at the present time. There is no significant decrease in the scientific capability of UVCS owing to the O VI channel redundant optical path. UVCS data, data analysis software, calibration files and the mission log are available from the SOHO archive and SAO. All UVCS data is now available to scientists and the general public via the SOHO Data Archive and SAO within three months of the observations. UVCS has resulted in 46 scientific papers in 2002. There were numerous presentations at scientific meetings. All requests for observation time by qualified outside users have been granted.

Kohl, John L.↗

The Potosi Reservoir Model 2014

As a part of a larger project co-funded by the United States Department of Energy (US DOE) to evaluate the potential of formations within the Cambro-Ordovician strata above the Mt. Simon Sandstone as potential targets for carbon sequestration in the Illinois and Michigan Basins, the Illinois State Geological Survey (ISGS) requested Schlumberger to evaluate the potential injectivity and carbon dioxide (CO2) plume size of the Cambrian Potosi Formation. The evaluation of this formation was accomplished using wireline data, core data, pressure data, and seismic data from this project as well as two other separately funded projects: the United States Department of Energy-funded Illinois Basin – Decatur Project (IBDP) being conducted by the Midwest Geological Sequestration Consortium (MGSC) in Macon County, Illinois, and the Illinois Industrial Carbon Capture and Sequestration (IL-ICCS) project funded through the American Recovery and Reinvestment Act.

Smith, Valerie↗

The Potosi Reservoir Model 2013

As a part of a larger project co-funded by the United States Department of Energy (US DOE) to evaluate the potential of formations within the Cambro-Ordovician strata above the Mt. Simon as potential targets for carbon sequestration in the Illinois and Michigan Basins, the Illinois Clean Coal Institute (ICCI) requested Schlumberger to evaluate the potential injectivity and carbon dioxide (CO2) plume size of the Cambrian Potosi Formation. The evaluation of this formation was accomplished using wireline data, core data, pressure data, and seismic data from the US DOE-funded Illinois Basin–Decatur Project (IBDP) being conducted by the Midwest Geological Sequestration Consortium in Macon County, Illinois. In 2010, technical performance evaluations on the Cambrian Potosi Formation were performed through reservoir modeling. The data included formation tops from mud logs, well logs from the VW1 and the CCS1 wells, structural and stratigraphic formation from three dimensional (3D) seismic data, and field data from several waste water injection wells for Potosi Formation. Intention was for two million tons per annum (MTPA) of CO2 to be injected for 20 years. In the preceding, the 2010 Potosi heterogeneous model (referred to as the "Potosi Dynamic Model 2010" in this topical report) was re-run using a new injection scenario; 3.2 MTPA for 30 years. The extent of the Potosi Dynamic Model 2010, however, appeared too small for the new injection target. It was not sufficiently large enough to accommodate the evolution of the plume. The new model, Potosi Dynamic Model 2013a, was built by extending the Potosi Dynamic Model 2010 grid to 30 miles x 30 miles (48.3km x48.3km), while preserving all property modeling workflows and layering. This model was retained as the base case of Potosi Dynamic Model 2013a. The Potosi reservoir model was updated to take into account the new data from the verification well VW2 which was drilled in 2012. The new porosity and permeability modeling was performed to take into account the log data from the new well. Revisions of the 2010 modeling assumptions were also done on relative permeability, capillary pressures, formation water salinity, and the maximum allowable well bottomhole pressure. Dynamic simulations were run using the injection target of 3.2 MTPA for 30 years. This new dynamic model was named Potosi Dynamic Model 2013b. Due to the major uncertainties on the vugs permeability, two models were built; the Pessimistic and Optimistic Cases. The Optimistic Case assumes vugs permeability of 9,000 mD, which is analog to the vugs permeability identified in the pressure fall off test of a waste water injector in the Tuscola site, approx. 40 miles (64.4km) away from the IBDP area. The Pessimistic Case assumes that the vugs permeability is equal to the log data, which does not take into account the permeability from secondary porosity. The probability of such case is deemed low and could be treated as the worst case scenario, since the contribution of secondary porosity to the permeability is neglected and the loss circulation events might correspond to a much higher permeability. It is considered important, however, to identify the range of possible reservoir performance since there are no rigorous data available for the vugs permeability. The Optimistic Case gives an average CO2 injection rate of 0.8 MTPA and cumulative injection of 26 MT in 30 years, which corresponds to 27% of the injection target. The injection rate is approx. 3.2 MTPA in the first year as the well is injecting into the surrounding vugs, and declines rapidly to 0.8 MTPA in year 4 once the surrounding vugs are full and the CO2 start to reach the matrix. This implies that according to this preliminary model, a minimum of four (4) wells could be required to achieve the injection target. This result is lower than the injectivity estimated in the Potosi Dynamic Model 2013a (43 MT in 30 years), since the permeability model applied in the Potosi Dynamic Model 2013b is more conservative. This revision was deemed necessary to treat the uncertainty in a more appropriate manner. As the CO2 follows the paths where vugs interconnection exists, a reasonably large and irregular plume extent was created. For the Optimistic Case, the plume extends 17 miles (27.4km) in E-W and 14 miles (22.5km) in N-S directions after 30 years. After injection is completed, the plume continues to migrate laterally, mainly driven by the remaining pressure gradient. After 100 years post injection, the plume extends 20 miles (32.2km) in E-W and 15.5 miles (24.9km) in N-S directions. Should the targeted cumulative injection of 96 MT be achieved; a much larger plume extent could be expected. For the Optimistic Case, the increase of reservoir pressure at the end of injection is approximately 1200 psia (8,274 kPa) around the injector and gradually decreases away from the well. The reservoir pressure increase is less than 30 psia (206.8 kPa) beyond 14 miles (22.5km) away from injector. Should the targeted cumulative injection of 96 MT be achieved; a much larger areal pressure increase could be expected. The initial reservoir pressure is nearly restored after approximately 100 years post injection. The presence of matrix slows down the pressure dissipations. The Pessimistic Case gives an average CO2 injection rate of 0.2 MTPA and cumulative injection of 7 MT in 30 years, which corresponds to 7% of the injection target. This implies that in the worst case scenario, a minimum of sixteen (16) wells could be required to achieve the injection target. The present evaluation is mainly associated with uncertainty on the vugs permeability, distribution, and interconnectivity. The different results indicated by the Optimistic and Pessimistic Cases signify the importance of vugs permeability characterization. Therefore, injection test and pressure interference test among the wells could be considered to evaluate the local vugs permeability, extent, and interconnectivity. Porosity mapping derived from the seismic inversion could also be used in the succeeding task to characterize the lateral porosity distribution within the reservoir. With or without seismic inversion porosity mapping, it is worth exploring whether increased lateral heterogeneity plays a significant role in Potosi injectivity. Investigations on vugular, dolomitic outcrops suggest that there may be significantly greater lateral heterogeneity than what has been modeled here. Facies modeling within the Potosi has yet to be thoroughly addressed. The carbonates during the time of deposition are believed to be regionally extensive. However, it may be worth delineating the reservoir with other regional wells or modern day analogues to understand the extent of the Potosi. More specifically, the model could incorporate lateral changes or trends if deemed necessary to represent facies transition. Data acquisitions to characterize the fracture pressure gradient, the formation water properties, the relative permeability, and the capillary pressure could also be considered in order to allow a more rigorous evaluation of the Potosi storage performance. A simulation using several injectors could also be considered to determine the required number of wells to achieve the injection target while taking into account the pressure interference.

Adushita, Yasmin↗

Potosi Reservoir Modeling; History and Recommendations

As a part of a larger project co-funded by the United States Department of Energy (US DOE) to evaluate the potential of formations within the Cambro-Ordovician strata above the Mt. Simon as potential targets for carbon sequestration in the Illinois and Michigan Basins, the Illinois Clean Coal Institute (ICCI) requested Schlumberger to evaluate the potential injectivity and carbon dioxide (CO₂) plume size of the Cambrian Potosi Formation. The evaluation of this formation was accomplished using wireline data, core data, pressure data, and seismic data from two projects: the US DOE-funded Illinois Basin–Decatur Project being conducted by the Midwest Geological Sequestration Consortium in Macon County, Illinois, as well as data from the Illinois – Industrial Carbon Capture and Sequestration (IL-ICCS) project funded through the American Recovery and Reinvestment Act. In 2010, technical performance evaluations on the Cambrian Potosi Formation were performed through reservoir modeling. The data included formation tops from mud logs, well logs from the Verification Well 1 (VW1) and the Injection Well (CCS1), structural and stratigraphic formation from three dimensional (3D) seismic data, and field data from several waste water injection wells for the Potosi Formation. The intention was for two million tonnes per annum (MTPA) of CO₂ to be injected for 20 years into the Potosi Formation. In 2013, updated reservoir models for the Cambrian Potosi Formation were evaluated. The data included formation tops from mud logs, well logs from the CCS1, VW1, and Verification Well 2 (VW2) wells, structural and stratigraphic formation from a larger 3D seismic survey, and field data from several waste water injection wells for Potosi Formation. The objective is to simulate the injection of CO₂ at a rate 3.5 million tons per annum (3.2 million tonnes per annum [MTPA]) for 30 years 106 million tons (96 MT total) into the Potosi Formation. The Potosi geomodeling efforts have evolved from using data from a single well in 2010 to the inclusion of data from three wells in 2013 which largely leverage the porosity and permeability logs plus knowledge of lost circulation zones. The first Potosi model (Potosi Geobody Model 2010) attempted to use the available seismic inversion data to inform the geomodel and predict vugular zones in advance of drilling VW1. Lost circulation zones in VW1 came in as the geologists predicted. The model was not implemented in subsequent simulation work. To date, reservoir models used for flow simulation work have relied predominately on Gaussian distributed properties (porosity and permeability) and have employed a single injection well. Potosi Model 2013b incorporated the new VW2 logs, and exhibited an extra level of sophistication by delineating the vugular intervals. This method added further realism that likely represents the best reservoir approximation to date. Where the 2010 reservoir models were 10 by 10 mi (16 by 16 km) in area, the 2013 models were expanded in size to 30 by 30 mi (48 by 48 km). The latest reservoir simulations show that a minimum of four injectors might be required to meet target injection rates. Still, there is data that requires further scrutiny and modeling methodologies that require testing for the Potosi Formation. This work is currently ongoing, and the next phase of the reservoir modeling intends to implement valuable data like porosity derived from seismic inversion, seismically derived geobodies, or a combination of both to further define vugular zones and the porosity distribution within the Potosi Formation. Understanding the dual porosity, dual permeability character of the Potosi remains the greatest challenge in representing this formation. Further analysis of the FMI* fullbore formation microimager data may aid in assessing this uncertainty. The Potosi Formation is indeed an interesting formation, and recommendations to further characterize it are included in the following list: - Data acquisition to identify the vugs permeability, distribution, and interconnectivity could be considered to perform a more rigorous evaluation of the Potosi Formation injectivity and capacity. This could be achieved by performing an injection test on a vugular interval to determine the vugs permeability, and an interference test between wells to evaluate the local vugs extent and interconnectivity. - A thorough study of the available FMI data may reveal specifics on estimating the vug to matrix ratio. This estimate could be used to further condition the porosity distribution. Porosity logs alone might underestimate the formation’s porosity associated with vugs. Porosity mapping derived from the seismic inversion could also be used in the succeeding task to characterize the lateral porosity distribution within the reservoir. This could involve the geobody methodology previously attempted in 2010. With or without seismic inversion porosity mapping, it is worth exploring whether increased lateral heterogeneity plays a significant role in Potosi injectivity. Investigations on vugular, dolomitic outcrops suggest that there may be significantly greater lateral heterogeneity than what has been modeled here. - The FMI data also reveals the presence of and helps describe open fractures. The presence of fractures will further enhance the formation’s permeability. The task of leveraging this data in the geomodeling effort still remains. Under the best of circumstances, this data describing open fractures may be combined with seismic attributes to delineate fracture corridors. Fracture modeling would certainly add another layer of sophistication to the model. Its contribution and applicability remain to be explored. - Facies modeling within the Potosi has yet to be thoroughly addressed. The carbonates during the time of deposition are believed to be regionally extensive. However, it may be worth delineating the reservoir with other regional wells or modern day analogues to understand the extent of the Potosi. More specifically, the model could incorporate lateral changes or trends if deemed necessary to represent facies transition. - Currently there is no fracture gradient data available for the Potosi in the Decatur project area. The acquisition of the fracture pressure data could be considered to determine an appropriate maximum allowable bottomhole injection pressure. This would allow the evaluation of injectivity and the required number of wells in a more precise manner. - Special core analysis (SCAL) to determine the relative permeability and capillary pressure of the vugs and matrix could be considered to have a better estimation of the reservoir injectivity and plume extent. - Formation water sampling and analysis could be considered for the Potosi to estimate the water salinity and properties. A vertical flow performance evaluation could be considered for the succeeding task to determine the appropriate tubing size, the required injection tubing head pressure, and to investigate whether the corresponding well injection rate falls within the tubing erosional velocity limit. - A simulation using several injectors could also be considered to determine the required number of wells to achieve the injection target while taking into account the pressure interference.

Smith, Valerie↗

The Potosi Reservoir Model 2013c, Property Modeling Update

As part of a larger project co-funded by the United States Department of Energy (US DOE) to evaluate the potential of formations within the Cambro-Ordovician strata above the Mt. Simon as potential targets for carbon sequestration in the Illinois and Michigan Basins, the Illinois Clean Coal Institute (ICCI) requested Schlumberger to evaluate the potential injectivity and carbon dioxide (CO2) plume size of the Cambrian Potosi Formation. The evaluation of this formation was accomplished using wireline data, core data, pressure data, and seismic data from this project as well as two other separately funded projects: the US DOE-funded Illinois Basin–Decatur Project (IBDP) being conducted by the Midwest Geological Sequestration Consortium (MGSC) in Macon County, Illinois, and the Illinois Industrial Carbon Capture and Sequestration (ICCS) project funded through the American Recovery and Reinvestment Act. In 2010, technical performance evaluations on the Cambrian Potosi Formation were performed through reservoir modeling. The data included formation tops from mud logs, well logs from the Verification Well #1 (VW1) and the Injection Well (CCS1), structural and stratigraphic formation from three dimensional (3D) seismic data, and field data from several waste water injection wells for Potosi Formation. The intention was for 2.2 million tons per annum (2 million tonnes per annum [MTPA]) of CO2 to be injected for 20 years. In the Task Error! Reference source not found., the 2010 Potosi heterogeneous model (referred to as the "Potosi Dynamic Model 2010") was re-run using a new injection scenario of 3.5 million tons per annum (3.2 MTPA) for 30 years. The extent of the Potosi Dynamic Model 2010, however, appeared too small for the new injection target. The models size was insufficient to accommodate the evolution of the plume. The new model, Potosi Dynamic Model 2013a, was built by extending the Potosi Dynamic Model 2010 grid to 30 by 30 mi (48 by 48 km), while preserving all property modeling workflows and layering. This model was retained as the base case. In the preceding Task [1], the Potosi reservoir model was updated to take into account the new data from the Verification Well #2 (VW2) which was drilled in 2012. The porosity and permeability modeling was revised to take into account the log data from the new well. Revisions of the 2010 modeling assumptions were also done on relative permeability, capillary pressures, formation water salinity, and the maximum allowable well bottomhole pressure. Dynamic simulations were run using the injection target of 3.5 million tons per annum (3.2 MTPA) for 30 years. This dynamic model was named Potosi Dynamic Model 2013b. In this Task, a new property modeling workflow was applied, where seismic inversion data guided the porosity mapping and geobody extraction. The static reservoir model was fully guided by PorosityCube interpretations and derivations coupled with petrophysical logs from three wells. The two main assumptions are: porosity features in the PorosityCube that correlate with lost circulation zones represent vugular zones, and that these vugular zones are laterally continuous. Extrapolation was done carefully to populate the vugular facies and their corresponding properties outside the seismic footprint up to the boundary of the 30 by 30 mi (48 by 48 km) model. Dynamic simulations were also run using the injection target of 3.5 million tons per annum (3.2 MTPA) for 30 years. This new dynamic model was named Potosi Dynamic Model 2013c. Reservoir simulation with the latest model gives a cumulative injection of 43 million tons (39 MT) in 30 years with a single well, which corresponds to 40% of the injection target. The injection rate is approx. 3.2 MTPA in the first six months as the well is injecting into the surrounding vugs, and declines rapidly to 1.8 million tons per annum (1.6 MTPA) in year 3 once the surrounding vugs are full and the CO2 start to reach the matrix. After, the injection rate declines gradually to 1.2 million tons per annum (1.1 MTPA) in year 18 and stays constant. This implies that a minimum of three (3) wells could be required in the Potosi to reach the injection target. The injectivity evaluated in this Task was higher compared to the preceding Task, since the current facies modeling (guided by the porosity map from the seismic inversion) indicated a higher density of vugs within the vugular zones. 5 As the CO2 follows the paths where vugs interconnection exists, a reasonably large and irregular plume extent was created. After 30 years of injection, the plume extends 13.7 mi (22 km) in E-W and 9.7 mi (16 km) in N-S directions. After injection finishes, the plume continues to migrate laterally, mainly driven by the remaining pressure gradient. After 60 years post-injection, the plume extends 14.2 mi (22.8 km) in E-W and 10 mi (16 km) in N-S directions, and remains constant as the remaining pressure gradient has become very low. Should the targeted cumulative injection of 106 million tons (96 MT) be achieved; a much larger plume extent could be expected. The increase of reservoir pressure at the end of injection is approximately 1,200 psia (8,274 kPa) around the injector and gradually decreases away from the well. The reservoir pressure increase is less than 10 psia (69 kPa) beyond 14 mi (23 km) away from injector. Should the targeted cumulative injection of 106 million tons (96 MT) be achieved; a much larger areal pressure increase could be expected. The reservoir pressure declines rapidly during the first 30 years post injection and the initial reservoir pressure is nearly restored after 100 years post-injection. The present evaluation is mainly associated with uncertainty on the vugs permeability and interconnectivity. The use of porosity mapping from seismic inversion might have reduced the uncertainty on the lateral vugs body distributions. However, major uncertainties on the Potosi vugs permeability remains. Therefore, injection test and pressure interference test among the wells could be considered to evaluate the local vugs permeability, extent, and interconnectivity. Facies modeling within the Potosi has yet to be thoroughly addressed. The carbonates during the time of deposition are believed to be regionally extensive. However, it may be worth delineating the reservoir with other regional wells or modern day analogues to understand the extent of the Potosi. More specifically, the model could incorporate lateral changes or trends if deemed necessary to represent facies transition. Data acquisitions to characterize the fracture pressure gradient, the formation water properties, the relative permeability, and the capillary pressure could also be considered in order to allow a more rigorous evaluation of the Potosi storage performance. A simulation using several injectors could also be considered to determine the required number of wells and appropriate spacing to achieve the injection target while taking into account the pressure interference.

Adushita, Yasmin↗

Vulcan Test Platform: Demonstrating the Data Center as a Flexible Grid Asset

Explosive data center demand is outpacing grid infrastructure development. AI workloads and hyperscale cloud growth are creating unprecedented power requirements, while traditional grid expansion faces multi-year development timelines, regulatory hurdles, and decarbonization challenges. Sidewalk Infrastructure Partners recognized this impending crisis years ago and founded Verrus to develop an innovative solution: data centers that function as grid assets rather than passive loads. The Verrus approach integrates proprietary grid-aware controls with battery energy storage systems (BESS) in a medium-voltage architecture that delivers three critical capabilities: Fast-responding demand flexibility that can service requests from the utility within 10 seconds, Uninterrupted transition to islanded operation during grid disturbances, Continuous uptime assurance while maintaining all customer service level commitments Through Verrus' strategic partnership with the National Renewable Energy Laboratory (NREL), we validated these capabilities on Vulcan, a 70 MW utility-scale test platform powered by NREL's ARIES Virtual Emulation Environment. This deployment-ready technology has successfully demonstrated that Verrus data centers can deliver meaningful grid services while maintaining mission-critical reliability. This technical report outlines the design, methodology, and results of this emulated deployment, demonstrating that data centers can play a pivotal role in enhancing grid flexibility and reliability, without sacrificing service level guarantees.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Reaching the Diffraction Limit - Differential Speckle and Wide-Field Imaging for the WIYN Telescope

Speckle imaging allows telescopes to achieve diffraction limited imaging performance. The technique requires cameras capable of reading out frames at a very fast rate, effectively 'freezing out' atmospheric seeing. The resulting speckles can be correlated and images reconstructed that are at the diffraction limit of the telescope. These new instruments are based on the successful performance and design of the Differential Speckle Survey Instrument (DSSI).The instruments are being built for the Gemini-N and WIYN telescopes and will be made available to the community via the peer review proposal process. We envision their primary use to be validation and characterization of exoplanet targets from the NASA, K2 and TESS missions and RV discovered exoplanets. Such targets will provide excellent follow-up candidates for both the WIYN and Gemini telescopes. We expect similar data quality in speckle imaging mode with the new instruments. Additionally, both cameras will have a wide-field mode and standard SDSS filters. They will be highly versatile instruments and it is that likely many other science programs will request time on the cameras. The limiting magnitude for speckle observations will remain around 13-14th at WIYN and 16-17th at Gemini, while wide-field, normal CCD imaging operation should be able to go to much fainter, providing usual CCD imaging and photometric capabilities. The instruments will also have high utility as scoring cameras for telescope engineering purposes, or other applications where high time resolution is needed. Instrument support will be provided, including a software pipeline that takes raw speckle data to fully reconstructed images.

detector↗

STS-56, RSRM-031, 360L031 KSC processing configuration and data report

KSC Processing Configuration and Data Report is being provided as a historical document and as an enhancement to future RSRM manufacturing and processing operations. The following sections provide information on segment receipt, aft booster build-up, booster assembly, and closeout for STS-56, RSRM flight set 36OL031. Section 2.0 contains a summary of RSRM-031 processing. Section 3.0 discusses any significant problems or special issues that require special attention. Sections 4.0 through 6.0 contain narrative descriptions of all key events, including any related processing problems. Appendix A provides engineering specifications and changes. A list and matrix of all problem reports (PR's) pertinent to this flight set is provided in Appendix B. The matrix was provided by the Thiokol LSS Quality Engineering office. Copies of the PR's generated during the processing of RSRM-031 will be provided upon request. Appendix C contains the motor set status matrix, which provides milestone dates for the RSRM-031 flow. Section 7.0 provides recommendations, if any, for the improvement of flight hardware processing. Section 8.0 contains data sheets that provide flight hardware parts and consumables information installed during the booster build-up and stacking operations by location, lot/serial number, expiration and cure dates/times, and installation dates.

Source record↗

Activities ONDRAF/NIRAS related to the decommissioning of nuclear facilities

Since 1980, the Agency is responsible by law for the safe management of all radioactive waste produced in Belgium, including decommissioning wastes. By the law of 11 January 1991 and the implementing Royal Decree of 16/10/1991, ONDRAF/NIRAS has been entrusted with a mission concerning the decommissioning of nuclear facilities. This mission involves the collection and assessment of data concerning decommissioning forecasts for nuclear facilities, the approval of facilities' decommissioning programmes, the establishment - in consultation with operators - of financing conditions for decommissioning, as well as the implementation of these programmes on request by the operator, or in the case of its failure to do so. This is the case for the company Best Medical Belgium SA located at Fleurus (MDS Nordion SA, till April 2011), which produced radioisotopes for medical applications and went bankrupt in 2012. These installations have been entrusted to ONDRAF/NIRAS. A plan of action was developed for taking over the operations in the framework of remediation and decommissioning. Steps have been taken to integrate his new role as a nuclear operator. The installations of Best Medical Belgium SA are now referred to as the 'O/N - Site Fleurus.' Nuclear facility operators, or any person requesting to operate a nuclear facility, are obliged to provide ONDRAF/NIRAS, under their responsibility and in due time, with all the necessary information concerning these facilities' decommissioning forecasts, the nature, quantities and dates of transfer of the resulting waste, and the financing conditions for these facilities' decommissioning. In order to make the necessary funds available for decommissioning a nuclear facility when it will be shut down, operators are obliged to establish provisions during the facility's active life. These provisions are calculated in such a way that the total amount established at the time of the final shutdown covers all costs resulting from the facility's final phase, namely the preparation of decommissioning, decontamination, more or less long-term maintenance, dismantling, treatment, conditioning and disposal of waste produced during this phase. In order to face to multiple and repeated evaluation processes, the Agency, already in the early 90's, started with the implementation of its own integrated data processing system, recording the physical and radiological inventories of nuclear facilities, and allowing the evaluation of the quantities of decommissioning materials and wastes as well as of the decommissioning costs of these facilities. The cost evaluations cover all decommissioning activities from final shutdown of the facility until final release from nuclear control, as well as conventional demolition and site restoration if required. Beside the information related to the inventories, the database involves so called auxiliary tables integrating unit prices of the various decontamination and dismantling techniques, unit rates for radioactive waste processing, interim storage and final disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Chemical release and radiation effects (CRRES) data directory

The following tasks were completed under this contract: a revision and update of the Chemical Release and Radiation Effects (CRRES) data directory was performed taking into account the corrections and suggests for improvements obtained from the participants at the final CRRES IWG meeting held at SAIC on 14-16 Dec. 1992. A draft copy of the report was then circulated to as many as possible of the relevant CRRES Principal Investigators, co-Investigators, and technicians with a request for a final check on accuracy and completion. A copy of the mailing list is given in Appendix A. All corrections and updates received were implemented. A hard copy together with a floppy disk version was forwarded to Richard Howard, NASA Headquarters, who is arranging for the archiving of the CRRES Data Summary at NSSDC. Final copies were sent where possible.

Miller, George P.↗

Reaching bandwidth saturation using transparent injection parallelization

Although logically available, applications may not exploit enough instantaneous communication concurrency to maximize network utilization on HPC systems. This is exacerbated in hybrid programming models that combine single program multiple data with OpenMP or CUDA. We present the design of a “multi-threaded” runtime able to transparently increase the instantaneous network concurrency and to provide near saturation bandwidth, independent of the application configuration and dynamic behavior. The runtime offloads communication requests from application level tasks to multiple communication servers. The servers use system specific performance models to attain network saturation. Our techniques alleviate the need for spatial and temporal application level message concurrency optimizations. Experimental results show improved message throughput and bandwidth by as much as 150% for 4 KB messages on InfiniBand and by as much as 120% for 4 KB messages on Cray Aries. For more complex operations such as all-to-all collectives, we observe as much as 30% speedup. This translates into 23% speedup on 12,288 cores for a NAS FT implemented using FFTW. We observe as much as 76% speedup on 1500 cores for an already optimized UPC+OpenMP geometric multigrid application using hybrid parallelism. For the geometric multigrid GPU implementation, we observe as much as 44% speedup on 512 GPUs.

Chaimov, Nicholas↗