Evaluation of FTWC Vent System

A monitored exhaust system has been designed for use in venting the Flanged Tritium Waste Containers (FTWCs) at LANL. This system will provide controlled exhaust and emissions monitoring for the FTWCs, and also provide general area exhaust around the venting operations to measure any emissions which may bypass the primary vent system. A full description of the process and need for the system is described in the Pre-Construction Application for this project. This document describes the commissioning testing performed on the FTWC vent system to prepare it for use. The system has been tested and shown to meet ANSI standard requirements and is fully suitable for use.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Catalytic Bio-crude Production in a Novel, Short-Contact Time Reactor

RTI has developed a catalytic fast pyrolysis (CFP) process to produce biomass-based hydrocarbon replacement fuels. From a technology perspective, this advanced biofuels process produces liquid transportation fuels that can leverage capital expenditures in the existing petroleum distribution infrastructure. From a business perspective, this technology does not face potential market limitations caused by oxygenate blend limitations for light duty vehicle applications. A promising catalyst has been developed with excellent potential for deoxygenation to produce a hydrocarbon-rich biocrude that is more suitable for upgrading with traditional hydroprocessing technology. The role of the catalyst is to control the chemistry during biomass pyrolysis to produce a biocrude in a single step that has lower oxygen content and is more thermally stable than conventional biomass fast pyrolysis oil. Catalyst properties are optimized to minimize gas and coke production and improve catalytic deoxygenation and biocrude yields. Results from this project have demonstrated that biocrudes from catalytic fast pyrolysis contain <20 wt% oxygen, with the organic fraction as low as 12% oxygen. These oxygen numbers are > 50% lower compared to traditional fast pyrolysis oils. The biocrude produced from our CFP process can be upgraded to gasoline range hydrocarbons. A very conservative approach for upgrading included a preliminary stabilization step followed by a hydroprocessing step. The oxygen content in the upgraded product was decreased by 97% (to less than 3wt %) from the oxygen content of the biocrude sample. Additionally, the acid content was reduced by 99% from the acid content of the biocrude sample. In an optimized integrated process, the CFP step and the hydroprocessing (upgrading) step need to be carefully balanced to maximize the input biomass energy that is recovered in the finished biofuels. Hydrogen utilization and carbon recovery during both catalytic biomass pyrolysis and biocrude upgrading need to be optimized to maximize energy recovery in the finished biofuel. A nominal 1 ton per day (TPD) catalytic biomass pyrolysis system was designed based on the laboratory experimental data. The system was designed to achieve the short residence times (0.5–2 sec) and high heat transfer rates required for maximum liquid biocrude yields while optimizing process integration to maintain catalyst activity by continuous regeneration. The catalytic biomass pyrolysis reactor is a continuously circulating single-loop transport reactor design that is flexible enough to allow sensitivity studies around temperature, residence time, biomass feed rate, and catalyst-to-biomass ratio (i.e., catalyst circulation rate) for process optimization. For a nominal 100 lb/hr feed rate of dry biomass, the products include ~25 lb/hr char and coke, ~20 lb/hr permanent gases, and ~55 lb/hr condensable vapors. Pyrolysis temperatures are 350–600°C, and the system is operated close to ambient pressure. Production of the catalyst developed within the project was scaled up to provide enough material (200kg) for bench-scale testing. The 1TPD bench-scale unit was fabricated, installed and commissioned with this project. Biocrude samples from wood were produced in this unit with the CFP catalyst with material balance > 90%. The intermediate biocrude yields and chemical composition compare well with previous laboratory results and a hydroprocessing strategy for upgrading the resulting biocrude was developed. The experimental results obtained within this project were used to develop a process model for a 2000 TPD commercial facility. Detailed flow sheets were developed for all major unit operations in the process and provided a basis for an economic analysis to develop capital and operating costs. Estimates of the biofuel production costs were used to develop internal rates of return for the yields and compositions measured for the current state of technology at the end of this project and for the yields anticipated for an optimized (nth plant) scenario as additional process improvements are made.

09 BIOMASS FUELS↗

Light Water Reactor Sustainability Program: September 2019 Physical Security Stakeholder Working Group Meeting

The LWRS Program Physical Security Pathway held the first meeting of the Physical Security Stakeholder working group on September 10-12, 2019 at Sandia National Laboratories. This working group is comprised of nuclear enterprise physical security stakeholders and the meeting included over 10 Utilities representing roughly 60 nuclear power plants, two staff from the Nuclear Regulatory Commission, physical security vendors, the Nuclear Energy Institute, the Electric Power Research Institute, and staff from Sandia National Laboratories and Idaho National Laboratory. The working group was established with the objectives of providing stakeholder feedback to the LWRS Program on their research and development needs and priorities, socializing the progress of Physical Security Pathway initiatives, and identifying opportunities for additional engagement and participation of stakeholders in the pathway research activities. The working group also provided a forum for physical security professionals to share common experiences and recommend prioritized activities based on their common needs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Tandem particle-slurry batch reactors for solar water splitting (Final Scientific/Technical Report)

Economically, particle slurry reactors are projected to be one of the most promising technologies for solar photoelectrochemical hydrogen production, according to a 2009 techno-economic analysis commissioned by the US DOE and performed by Directed Technologies, Inc. The Fuel Cell Technologies Office’s Multi-Year Research, Development and Demonstration (MYRD&D) goals and targets are to reduce the cost of H 2 produced from renewable sources at the plant gate (i.e. not including delivery, dispensing, or storage) to < $2.00/gge, equivalent to ~$2.00/kg H 2 . Research results from our techno-economic modeling research suggest that this target could be met using particle slurry reactors assuming STH efficiencies in the range of 5 – 10%, materials lifetimes of < 1 year, and nanoparticles that cost up to 20 times more than projected costs of TiO 2 -coated Fe 2 O 3 nanoparticles. Although most large worldwide research efforts directed at solar photoelectrochemical hydrogen production focus on wafer-based designs, the projected lower cost for a particle slurry reactor at these disparate projected STH efficiencies clearly suggests that particle slurry reactors could be a scalable and deployable technology, assuming several challenges are overcome. These major technological challenges include the demonstration of a vertically-stacked-vessel architecture that is capable of operating sustainably while mostly relying on diffusion and natural convection to mix the redox shuttles between the vessels, and the demonstration that photocatalyst particles can operate at an overall 1% STH efficiency or larger when incorporated into this two-vessel design. Our research adds to the understanding of photocatalytic reactors for solar water splitting through numerical modeling results and experimental results. Numerical models were developed to simulate relevant device physics including particle and reactor dimensions which affect optical, transport, and rheological properties, electrocatalytic and photovoltaic properties of particles at various temperatures, and properties of redox shuttles and separators. Moreover, theoretical maximum solar-to-hydrogen efficiencies for ensembles of particles like in photocatalyst reactors were modeled and simulated and shown to equal or exceed those of photoelectrochemical designs under most scenarios. These results help determine constraints on the reactor that will enable more optimal designs for future prototypes. In parallel, experiments were performed to identify the most effective redox shuttles and to empirically validate the numerical models and simulations. Toward the latter, state-of-the-art light-absorbing particles and electrocatalysts were synthesized and characterized physically and photoelectrochemically for water electrolysis and redox chemistry with redox shuttles in the form factor of mesoporous electrodes and free-floating particles. The most promising materials candidates were used in a suspension reactor to evaluate performance toward photocatalytic H 2 production and results from the two measurements were compared. Predominantly, state-of-the-art cocatalyst-modified Rh-doped SrTiO 3 and BiVO 4 particles were further characterized to assess for their ability to perform visible-light-driven H 2 and O 2 evolution, respectively, and results were similar to those reported for the state-of-the-art in the peer-reviewed literature. Outcomes from this work inform the public of the effectiveness and promise of solar photocatalytic water splitting for clean and renewable hydrogen production. This work may also help increase research interest and funding for photocatalysis projects, which will accelerate development of a technology that will benefit the public by generating fuel while emitting few greenhouse gases and pollutants.

08 HYDROGEN↗

Economic Extraction and Recovery of REEs and Production of Clean Value-Added Products from Low-Rank Coal Fly Ash

The University of North Dakota (UND) Energy & Environmental Research Center (EERC) teamed with Pacific Northwest National Laboratory (PNNL) , the North Dakota Industrial Commission Lignite Research Program, and commercial partners Basin Electric Power Cooperative, Great River Energy, and Southern Company to execute a Cooperative Agreement funded by the U.S. Department of Energy’s (DOE’s) National Energy Technology Laboratory (NETL) focused on identifying unique pathways and pretreatments to extract rare-earth elements (REEs) from low-rank coal (LRC) ash in a more economical and environmentally benign manner than current methods. The EERC drew upon the unique and deep knowledge of the team regarding LRC geochemistry, ash transformation mechanisms during combustion, and fly ash chemistry in the approach to understand the portioning of REEs in LRC ash. A comprehensive characterization effort was undertaken to fully establish the form, associations, and partitioning of the REEs and other elements/minerals of interest in fly ash, as well as the ash chemistry, mineralogy, and morphology. Using this information, the team tested methods of REE extraction to take advantage of the unique and advantageous properties of LRC ash. Multiple complementary approaches were evaluated that combined both novel and proven methods to develop an extractive process for REEs and other high-value metals from LRC ash that provide technological and economic progress on the current state of the art. Methodologies were also evaluated for the potential to synergistically remove toxic metals while extracting other high-value metals from the ash, generating a clean, safe ash material as a value-added product. This would eliminate waste and offer significant additional revenue potential. Based on laboratory-scale testing, an initial high-level technical and economic analysis to estimate operating expenses and product revenues to guide future phases of technology development was implemented. By focusing on minimizing process steps and consumptive use of extraction solutions, a tunable, economically viable process for REE extraction from LRC ash was developed. The tunable process has the ability to be adjusted to adapt to the differing ash chemical and physical properties that are characteristic of LRC ash. This is key to deployment as a commercial process. In demonstrating the process, the EERC was able to illustrate mixed REE concentration greater than the goal of 2 wt%. High-level economic analysis of the process with LRC ash of moderate REE levels demonstrated the potential of the process, but recovery of just the REEs was insufficient to cover operational costs. With the additional extraction of other high-value metals found in LRC ash, the process economics approach would break even, and it is anticipated that with process optimization, the developed process could potentially be economically sound. The same economic analysis performed utilizing LRC ash with high levels of REEs showed the recovery of the REEs alone would make the process economically viable even without further optimization.

01 COAL, LIGNITE, AND PEAT↗

Mechanisms Engineering Test Loop - Flexicask Design and Testing Report

This report documents the design development and testing of the Flexicask system for the Mechanisms Engineering Test Loop (METL). Currently, METL has completed Phase I construction and has been operating for over a year. The Flexicask system (Figure 1) was designed to allow for the removal and insertion of test articles into a METL test vessel while maintaining an acceptable inert atmosphere to minimize contamination of the METL sodium. This report discusses the design development of the Flexicask system, the commissioning and testing of the system, and the initial use of the Flexicask system to remove the Gear Test Assembly (GTA) from the METL Test Vessel 1.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Project 57 Air Monitoring Report: (Jan 1 - Dec 31 2018)

During the late 1950s, the Atomic Energy Commission (AEC) (now the U.S. Department of Energy [DOE]) conducted a series of safety experiments to determine if a nuclear device subjected to a large conventional explosives detonation would result in a nuclear yield. The AEC obtained temporary use of a large portion of western Emigrant Valley from the U.S. Department of Defense (DOD) for one of these experiments: Project 57. Following the Project 57 safety experiment, the AEC fenced the contaminated area and returned control of the surrounding land to the DOD. Emigrant Valley is part of the Nevada Test and Training Range (NTTR). For safety and security reasons, access to the NTTR is controlled using both physical (i.e., fences) and administrative (e.g., signs and postings) controls. Therefore, the public cannot access the Project 57 site and there are no known human receptors that routinely access the site. Project 57 was detonated on April 24, 1957, in Emigrant Valley approximately 13 mi (21 km) northeast of the north end of Yucca Flat. This test was undertaken to develop: (1) a means of estimating immediate distribution and long-term redistribution of plutonium dispersed during a nonnuclear detonation; (2) biomedical evaluation techniques for use in likely plutonium-laden environments; (3) methods of decontaminating ground areas, pavements, and building materials; and (4) alpha survey instruments and field monitoring procedures to promptly estimate contaminant deposition. Although the test did not result in the fission of nuclear materials, it did disseminate plutonium across the ground surface. Various radiological surveys have been performed in the area since Project 57 was conducted. The AEC delineated the area containing radioactive material based on radioactivity surveys performed shortly after the test was conducted. A designated Contamination Area (CA), marked by a fence, was established later. The distribution of americium-241 (Am-241) in the area was determined again in a 1997 flyover, which showed Am-241 ranging from as much as 70,000 counts per second (cps) at ground zero to background (<70 cps). This survey also documented Am-241 radioactivity on the ground surface beyond the east side CA fence at levels of up to 150 cps. In 2007, the DOE expanded the CA by posting “Contamination Area” signs 200 ft to 400 ft (60 m to 120 m) beyond the original fence, which formed a new CA boundary.

54 ENVIRONMENTAL SCIENCES↗

North Dakota Integrated Carbon Storage Complex Feasibility Study. Final report

In spring 2017, the Energy & Environmental Research Center (EERC) initiated an effort to determine the feasibility of developing a commercial-scale CO 2 geologic storage complex able to store 50+ million tonnes (Mt) of CO 2 in central North Dakota safely, permanently, and economically. The objective was to fulfill the goals of the U.S. Department of Energy (DOE) Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative and address technical and nontechnical challenges specific to commercial-scale deployment of a CO2 storage project. The findings clearly show that the concept of capturing CO 2 from a lignite-fired electrical generation facility in central North Dakota and safely and permanently storing the CO 2 in the deep subsurface is indeed technically, economically, and socially feasible. This project evaluated two study areas and their respective geologic storage complexes located adjacent to separate coal-fired facilities in North Dakota: the Basin Electric Power Cooperative (BEPC)-owned Great Plains Synfuels Plant (GPSP) and the Minnkota Power Cooperative (Minnkota)-owned Milton R. Young Station (MRYS). These locations, one with CO 2 capture in place and an existing CO 2 pipeline, are bolstered by progressive North Dakota pore space ownership and long-term liability laws. These elements and a motivated team created an ideal synergistic scenario for ensuring success of the CarbonSAFE Initiative and promoting North Dakota’s statewide vision for carbon management. The project included drilling two new geologic characterization wells, integrating an existing 3-D seismic survey, creating a geologic model subsequently used for injection simulation, a risk assessment, public outreach, and generating a site development plan based on results. In addition, the performance of select National Risk Assessment Partnership tools was evaluated. The geologic characterization wells were drilled ~5600 feet deep to the Broom Creek Formation; ~350 feet of core was retrieved from each well. The core included the Broom Creek (targeted injection zone) and a portion of the overlying Opeche Shale (seal). The Flemmer-1 well, west of Beulah, North Dakota, yielded 169 feet of sandstone. The BNI-1 well located south of Center, North Dakota, yielded 124 feet of sandstone. In each case, laboratory analysis of the sandstone showed permeability in the 300–1000-mD range, with porosity of 20%–30%. The Flemmer-1 well was sited within the boundaries of an existing 3-D seismic survey. Colocating the well with the seismic survey maximized the relationship between new and legacy data and developed a first-of-its-kind interpretation of the geologic fabric of the Broom Creek. Geologic characterization data were integrated into a 5544-mi 2 geocellular model that encompassed both new wells and stratigraphy from the surface to the Amsden Formation (underlying the Broom Creek). The model was later expanded vertically to include the deeper Black Island–Deadwood interval to examine its potential viability as a storage target. The geocellular model provided the foundation for dynamic simulation of CO 2 into the Broom Creek. Results of the simulation suggest that the Broom Creek could accept the DOE target rate of 2 Mt/yr of CO 2 into as few as two wells. To bracket the expected capture from MRYS, simulations were also investigated for a 4-Mt/yr rate near MRYS. Although more wells are needed (two additional), the Broom Creek still has the storage resource to accept the CO 2 at the increased rate. A risk assessment exercise was conducted to identify and assess technical and nontechnical risks that could prevent potential candidate storage complexes within the study area from serving as commercial storage sites. The assessment identified and evaluated six technical risk categories: 1) CO 2 injectivity, 2) storage capacity, 3) lateral migration of CO 2 , 4) lateral pressure propagation, 5) vertical migration of CO 2 or formation brine, and 6) induced seismicity. Following two rounds of analysis and scoring, no risks were determined to preclude continued efforts to develop carbon capture, utilization, and storage (CCUS) in central North Dakota. The risk assessment results will be used to guide future site characterization, modeling and simulation, and monitoring activities. A specific nontechnical strategic risk based on challenges that may be realized in amalgamation of pore space resulted in vertically expanding the geologic model to incorporate the potential for stacked storage in multiple saline reservoirs. By including the Black Island–Deadwood interval (the basal sedimentary reservoir in this region), the amalgamated areal extent could be reduced by as much as 45%. Working with a smaller geographic area reduces risks and costs associated with monitoring and pore space leasing. An economic evaluation incorporating capture; transport (<5 mi); Class VI wells; permitting; and monitoring, verification, and accounting suggests implementing commercial-scale CCUS is economically attractive if the federal tax benefits of 45Q are included. This is validated by Minnkota’s continued pursuit of CO 2 capture and geologic storage at MRYS through its Project Tundra initiative, indicating that there is a business case for CCUS in central North Dakota. Currently, North Dakota is the only state with underground injection control (UIC) Class VI primacy. Built into the North Dakota Century Code is a series of regulatory requirements that guide the process to obtain a Class VI CO 2 storage facility permit. As part of this project, a site development plan was compiled to assure compliance with North Dakota’s requirements to permit a commercial-scale CO 2 storage operation and includes a prospective time line encompassing a general breakdown of activities. In total, an estimated 30 months would be needed to execute the necessary steps to attain a North Dakota CO 2 storage facility permit. Outreach was an integral part of the project and encompassed any project-related activity that had contact or exposure beyond the project team. The goals of outreach were to foster an environment from which stakeholders could make informed decisions about the project and gauge community receptiveness to a CCUS project. A consistent set of messages and outreach products were developed in conjunction with an outreach advisory board that integrated project partners and team members. To gauge public acceptability of geologically storing CO 2 , 5611 households in the project area were invited to participate in an online survey. The survey results indicate that the public attitude regarding CCUS is neutral to positive, with strong sentiment that CO 2 capture and storage may be an approach to maintain the economic vitality of the region. To achieve project objectives, critical support in the form of financial backing, engineering evaluations, site access, outreach collaboration, operations data, risk assessment/evaluation, and software access was provided by BEPC, the North Dakota Industrial Commission Lignite Research Council, ALLETE Clean Energy, BNI Energy, North American Coal Corporation, Minnkota, Prairie Public Broadcasting, Computer Modelling Group Ltd., and Schlumberger.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Model MC&A for Pebble Bed Reactors (Technical Direction No. 5 Task 2.6 Letter Report)

In preparation for non-light water reactor (non-LWR) activities, US Nuclear Regulatory Commission (NRC) staff are advancing risk-informed and performance-based licensing approaches and addressing key policy issues. One non-LWR reactor concept is a pebble bed reactor (PBR). This reactor design uses spherical fuel elements (pebbles) that are continually added to and removed from the reactor core. The free movement of the fuel in this design presents new challenges for material control and accounting (MC&A) programs. Therefore, an assessment of MC&A program features and measures for a PBR was performed to help NRC staff develop associated MC&A regulations or regulatory guides. The current regulatory framework for non-LWR fuel cycles excludes support for licensing reviews for MC&A programs for PBRs. Licensing reviews of an MC&A program for PBRs can be facilitated by (1) a model MC&A program for a PBR based on identification and assessment of MC&A program features and recommended measures for a reference PBR and (2) a methodology for assessing MC&A performance that can help assess different MC&A program features and measures. This report supports the NRC’s non-LWR Vision and Strategy Near-Term Implementation Action Plans.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Pitka's Point/St. Mary's Wind Energy Construction Project. Final report

This is the final report for the St. Mary’s/Pitka’s Point Wind Construction Project. Under the project Alaska Village Electric Cooperative, Inc. (AVEC) constructed and commissioned one new 900 kW-capacity wind turbine at a site in Pitka’s Point about 4 miles from the diesel-fired prime power plant in St. Mary’s. The main objective of this project is to generate electric power from a renewable resource in an effort to reduce the local dependency on fuel oil as the sole source of electric power generation. The wind generator’s output augments the prime source generation provided by the diesel-powered generators.

17 WIND ENERGY↗

Bethel Wind Energy Construction Project. Final report

Final report for the Bethel (Alaska) Wind Construction project. Under this project, Alaska Village Electric Cooperative, Inc. (AVEC) constructed and commissioned one new 900 kW-capacity wind turbine at a site in Bethel about 3.3 miles NE of the diesel-fired prime power plant. The wind generator’s output will augment the prime source generation provided by the diesel-powered generators.

17 WIND ENERGY↗

Savannah River Site Composite Analysis (FY2019 Annual Review)

The Savannah River Site (SRS) is a Department of Energy (DOE) site encompassing approximately 310 square miles in South Carolina. It is bounded on the southwest by the Savannah River (SR) and is situated approximately 12 miles south of Aiken, South Carolina, and 15 miles southeast of Augusta, Georgia. Construction of and subsequent operations at the SRS began in 1951 under the direction of the Atomic Energy Commission. The primary mission of the SRS was to produce tritium and plutonium for the national nuclear weapons complex. Between 1953 and 1955, SRS brought five reactors and various support facilities into operation in support of its primary mission. Support facilities included two chemical separations plants, a heavy water extraction plant, a nuclear fuel and target fabrication facility, a tritium extraction facility and waste management facilities. With the declining need for a large nuclear weapons stockpile since the end of the Cold War, many SRS facilities no longer produce or process nuclear materials. All reactors were shut down by 1993. However, the SRS Tritium Extraction Facility continues to supply DOE with tritium. Additionally, operations at the K-Area Complex currently provide interim safe storage for much of DOE’s excess plutonium (Pu) and high enriched uranium, in a building which formerly housed K Reactor. As the SRS mission has changed, many surplus facilities are being dispositioned safely and economically. SRS has completed extensive decommissioning activities in D-Area, M-Area, P-Area, R-Area, and T-Area, with groundwater (GW) remediation ongoing. High-level waste tanks continue to be emptied and closed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Computational-experimental Study to Simulate Mixing and Thermal Stratification in SFRs

This NEUP project 16-10579 entitled “A Computational-Experimental Study to Simulate Mixing and Thermal Stratification in SFRs”, has investigated important phenomena of thermal stratification and mixing in Sodium-cooled Faster reactors (SFRs). A liquid metal experimental set-up was built at Kansas State University to generate high fidelity experimental data and validate computational models. The scope of the work involved - scaled down design of experimental facility, construction and commissioning of the new facility, conducting thermal-hydraulics experiments relevant to the physics of thermal stratification and mixing in the plena, developing 3D CFD models of the experiments, developing SAS4A/SASSYS-1 system model of the liquid metal experimental facility , survey of previous data in literature on stratification experiments and recommendations for improved models.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

An Integrated Energy Systems Prototype Human-System Interface for a Steam Extraction Loop System to Support Joint Electricity-Hydrogen Flexible Operations

Due to increasing economic competition from renewables and combined-cycle natural gas plants, nuclear power plants are looking toward flexible operations to enhance their cost competitiveness. The Integrated Energy Systems project under the Light Water Reactor Sustainability program of the U.S. Department of Energy focuses on joint electricity-hydrogen flexible operations. Joint electricity-hydrogen flexible operations entail the nuclear power plant diverting thermal energy via main steam to a hydrogen production plant located nearby. The steam serves to enhance the efficiency of the hydrogen production. Furthermore, high temperature electrolysis requires a large amount of electricity, which the plant can also provide. The plant provides steam and electricity to the hydrogen plant throughout the day, but during peak demand hours the nuclear power plant returns to solely providing electricity to meet the high demand. Through this flexible concept of operations, the plant can optimize the thermal energy it produces without having to maneuver the power of the plant. This report documents the human factors process to design and develop a prototype human-system interface for the steam extraction loop that serves as the conduit between the nuclear power plant and the adjacent hydrogen plant. The design process followed the human factors guidelines set by NUREG-0711, Human Factors Engineering Program Review Model (O’Hara, Higgins, & Fleger, 2012), and expanded upon by the Guideline for Operational Nuclear Usability and Knowledge Elicitation (GONUKE; Boring, Ulrich, Joe, & Lew, 2015; Boring, Lew, & Ulrich, 2016). The design process entailed operator interviews to determine the concept of operations for the steam extraction loop, a review and adaptation of digital interface design concepts developed by the team in prior projects, an iterative design process, and reviews conducted by both operators and human factors experts. Several versions of the prototype human-system interface were developed. Operators were interviewed to determine what design features they found useful and would like to see in the interface. The design underwent a review by human factors experts against NUREG-0700, Human Interface Design Review Guidelines (U.S. Nuclear Regulatory Commission, 2019), to ensure compliance with the latest human factors standards for digital interfaces in nuclear applications. The design was then prototyped as a functional windows-based application integrated with the Generic Pressurized Water Reactor simulator modified to include the steam extraction loop. The simulation is supported by the Human Systems Simulation Laboratory at Idaho National Laboratory, which supports operator-in-the-loop testing. This is an ongoing project and the next phase of the project entails performing an operator-in-the-loop usability study to evaluate the interface and examine the proposed concept of operations to extraction steam from the nuclear power plant for delivery to the coupled hydrogen production plant.

99 GENERAL AND MISCELLANEOUS↗

A Comparison of the Environmental Effects of Open-Loop and Closed-Loop Pumped Storage Hydropower

Pumped storage hydropower (PSH) capabilities are generally characterized as either open-loop or closed-loop. The U.S. Department of Energy (DOE) defines open-loop PSH as “continuously connected to a naturally flowing water feature,” and closed-loop PSH as “not continuously connected to a naturally flowing water feature.” All the PSH projects constructed in the United States to date are open-loop, so the potential environmental effects of closed-loop systems are not as well documented as the effects of open-loop systems. To address this knowledge gap, the DOE Water Power Technologies Office, under its HydroWIRES Initiative, has prepared this report to: (1) compare the potential environmental effects of open-loop PSH projects with those of closed-loop PSH projects; (2) describe how these effects are being avoided, minimized, or mitigated at existing projects in other countries and proposed projects in the United States; and (3) discuss the relative significance of the environmental issues. The report begins with a brief introduction on the current status of PSH development in the United States. Next, the report describes the current Federal Energy Regulatory Commission (FERC) hydropower licensing process, emphasizing some recent regulatory changes that affect closed-loop PSH development. The report then provides a summary comparison of the environmental effects of constructing and operating open-loop and closed-loop PSH systems and discusses the relative significance of those issues. This comparison and discussion are based on the results of a literature review and a review of FERC licensing records. The literature review includes journal articles, technical reports, and presentations on the environmental effects of PSH systems. It includes literature from the United States as well as countries where closed-loop PSH projects have been constructed. The FERC records review examines the FERC licensing record (e.g., National Environmental Policy Act documents and license orders) to identify the environmental effects anticipated and mitigation measures proposed for six of the closed-loop PSH projects currently licensed or permitted in the United States. For comparison, the FERC records review also discusses the environmental effects and mitigation measures for four open-loop PSH projects proposed or currently operating in the United States. The comparison of effects between open-loop and closed-loop projects is relative; that is, it characterizes the impacts of each project type as generally lower or higher than another project type. The comparison reflects general trends among project types because there are sometimes exceptions to the examples cited. The comparison is based on both spatial (location) and temporal (duration) factors and reflects both the severity and likelihood of effects. The report concludes that the environmental effects of closed-loop PSH projects are generally lower (i.e., more localized and of shorter duration) than those of open-loop PSH projects because they are located “off-stream,” minimizing aquatic and terrestrial impacts, and often have greater siting flexibility than open-loop PSH projects. For certain closed-loop project designs, however, impacts to groundwater may be higher relative to open-loop projects and should be considered in any environmental review.

13 HYDRO ENERGY↗

Ultra-Low SWaP CO 2 Sensing for Demand Control Ventilation (Final Report)

In this project PARC and Energy ETC aimed to develop an ultra-low cost, size, weight, and power (SWaP) printed CO 2 sensor system for occupancy detection to enable Demand Control Ventilation (DCV) on a per-room basis. The CO 2 sensor technology is based on the temperature variation when CO 2 reversibly physisorbs to a highly conductive and high surface area sorbent surface, and is compatible with integration with PARC innovations in printed sensors and flexible electronics, for which PARC is a globally leading research center. The printed CO 2 sensor itself is designed to be compatible with PARC’s “peel-and-stick” platform of ultra-low power, low-cost, distributed sensors, and to facilitate real-time DCV based on overall indoor air quality (IAQ). Previously, PARC has developed flexible hybrid electronics (FHE) compatible materials to measure humidity, temperature, light, strain, and gases such as carbon monoxide, methane, ammonia, and hydrogen sulfide. Through this project, PARC developed FHE-compatible materials to measure CO 2 . Thus, with one <$15 FHE “peel-and-stick” based sensor node, a building management system (BMS) will be able to capture a complete picture of the indoor environment. This includes IAQ, light, temperature, and other comfort factors that impact building operations. Combined with optimized DCV, this low-cost sensor capability can be a key enabler of annual primary energy savings of ~ 0.3-0.4 Quad in commercial buildings while ensuring healthy IAQ. Energy ETC is a leader in supplier-agnostic BMS deployments and will design the commissioning and deployment procedures to maximize system interoperability.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Harnessing the Hydroelectric Potential of Engineered Drops (Final Technical Report)

The potential for low-head hydropower in the engineered drops in both federal and private irrigation system is well known and significant. The environmental and socio/recreational impacts of harnessing this renewable energy resource in man-made conduits are much less, and often insignificant, compared with comparable hydro-electric potential in natural water features on rivers, lakes, and streams. Yet, few new plants have been commissioned in more than two decades. Over the same time period, low head hydro installations in Germany have more than doubled. The challenge is in finding economical ways to harness the hydro-electric potential in the engineered drops, and efficiently deliver the power to the grid. The objectives of Percheron Power, LLC's (Percheron Power) Project were to design, develop, permit, and operate an innovative low-head hydro-electric generation facility on an existing engineered drop of a large irrigation canal system. The hydro-electric generation facility was designed to employ a new type of turbine and technology, called an Archimedes Hydrodynamic Screw (AHS), to harness the existing potential of the engineered drop. The goal was to demonstrate the new lower cost AHS technology system to federal agencies, irrigation districts and other system owners and to support further development of new small hydropower projects at previously marginal low-head sites in the U.S. The objective of this funding opportunity of the Department of Energy Water Power Technologies Office was to reduce the Levelized Cost of Energy (LCOE) for small hydropower to less than ${$}$0.07/kWh (${$}$70/MWh) to be competitive with existing base-load power sources such as coal-powered power plants.

13 HYDRO ENERGY↗

Technical and Licensing Considerations for Micro-Reactors

The U.S. Nuclear Regulatory Commission (NRC) has interacted with vendors pursuing the commercialization of micro-reactors (i.e., reactors capable of producing about 1 MW(th) to 20 MW(th) of energy from nuclear fission). It is envisioned that micro-reactors could be assembled and fueled in a factory and shipped to a site. Many of the sites are expected to be remote locations requiring off-grid power or in some cases military bases. The objective of this effort is to explore the technical issues and the approach required to reach a finding of "reasonable assurance of public health and safety" for this new and different class of reactors. The analysis performed here leverages available micro-reactor design and testing data available from national laboratory experience as well as commercial design information to explore technical issues. Some factors considered include source term, accidents that would need to be analyzed, and the extent of the probabilistic risk assessment (PRA). The technical evaluation was performed within the framework of the Licensing Modernization Project (LMP) to identify licensing basis events, classification of structures, systems and components, and defense-in-depth needed to provide regulatory certainty. With this framework and technical evaluation in mind, the scope and content of a micro-reactor licensing application is discussed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗