Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Retrofitting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,135 records · Page 63

Impact analysis of heating electrification in US buildings with geothermal heat pumps

Few studies have investigated the impacts of large-scale deployment of geothermal heat pumps (GHPs, also called ground source heat pumps) on the electric grid. GHPs utilize the ground as a heat source to warm buildings more efficiently than other space-heating systems. The coupling with the ground offers seasonal thermal storage so that GHPs can also cool buildings in summer more efficiently than other space-cooling systems. This study simulated the performance of GHP systems for various commercial and residential buildings in 15 climate zones in the United States. Combined with the latest End-Use Load Profiles of the US building stock and grid modeling, this study aims to assess the impacts of a national deployment of GHP systems on the US electric grid in terms of energy consumption, emissions, and operational resilience. The preliminary results show that the GHP deployment can save 429 billion kWh of electricity (a 19% reduction from baseline) and reduce carbon emissions by 496 million tons per year (a 31 % reduction from baseline). A geographical view of the results indicates that retrofitting existing HVAC systems with new GHP systems can lead to further reductions in annual electricity consumption and peak electricity demand in the southern regions of the United States than in other parts of the country. On the other hand, GHP retrofits result in higher percentages of site energy savings and carbon emission reduction in the north (cold climates) than in the south (warm climates).

Liu, Xiaobing↗

Raleigh Housing Authority Duct Sealing Evaluation

In multifamily and attached buildings, manual duct sealing methods are often impractical or very costly and disruptive because of the difficulty in accessing leakage sites. In this project, two retrofit duct sealing techniques manually applied sealants and injecting a spray sealant (Aeroseal) in combination with some manual sealing were implemented in several low-rise multi-unit buildings in North Carolina. An analysis of the cost and performance of the two methods is presented. Each method was used in 20 housing units: approximately half of each group of units are single story and the remainder are two story. Results show that duct leakage to the outside was reduced by an average of 59% through the use of manual methods, and by 90% in the units where a combination of injected spray sealant and manual sealing was used. Some of this difference is likely due to the fact that injected spray sealing reached portions of the duct system that were inaccessible to manual methods. It was found that 73% of the leakage reduction in homes that were treated with injected spray sealant was attributable to the manual sealing done at boots, returns, and the air handler. The cost of manually applying sealant ranged from $275 to $511 per unit and for the Aeroseal treated ducts the cost was $700 per unit. Utility bills were collected and compared for 1 year before and after the retrofits for each unit. Energy savings based on utility bills were within 25%-50% of those predicted by the models for most unit types. Utility bill analysis shows 14% and 16% energy savings using the Aeroseal and hand sealing procedures, respectively, in heating season whereas in cooling season, energy savings using Aeroseal and hand sealing were both 16%. Average simple payback based on utility bills was 2.2 years for manual units and 4.7 years for the Aeroseal units. Only 18 of 40 units had usable utility bills. Berkshire Village Court - House Count - 4: Single Story, Hand sealed ducts; Single Story, Aeroseal Ducting; 2-Story, Hand Sealed ducts; 2-Story, Aeroseal ducts Terrace Park Court - House Count - 2: Single Story, Hand sealed ducts; Double Story, Hand sealed ducting Winter Park Court - House Count - 2: Single Story, Hand sealed ducts, Aeroseal sealed ducting; Double Story, Aeroseal ducting

Aeroseal↗

NorthernSTAR 1.5-Story Demonstration House of Cold Climate Solutions for Affordable Housing

This is a NorthernSTAR renovation project for Urban Homeworks incorporating installation of a combination space and water heater, Overcoat insulation retrofit on the roof, and Excavationless foundation insulation retrofit. STRUCTURE - 1401 North 16th Ave Minneapolis, MN 55411 Various groups from the affordable housing industry have consulted with the University of Minnesota's Cold Climate Housing Program to solve persistent energy and health-related problems such as ice dams, high energy bills, and mold/moisture issues-especially in complicated house types such as 1.5-story homes in cold climates. The NorthernSTAR Building America Partnership has completed multiple research projects on high-performance measures applied during renovation of single-family homes that could help the affordable housing industry address performance concerns. This demonstration project is an example of three high-performance measures applied to one house in Minneapolis, Minnesota. The selected vacant home was completely renovated by Urban Homeworks (UHW), which is a nonprofit housing partner, with the intent of selling the home to a low-income family. The renovation included the addition of the three advanced-performance technologies that were applied to the overall scope of the project. Single-family homes in urban areas that are available for renovation by nonprofit developers are often in need of repair. Budgeting has historically focused on improving homes to meet basic housing standards. A rising interest in the long-term impact of homeownership has introduced the need to balance basic needs with home performance. The goal of this demonstration project was to help UHW and other nonprofit developers become familiar with three U.S. Department of Energy Building America performance measures-including the installation processes, impacts, and benefits of each. To maximize efficiency of application and to address budget issues, the NorthernSTAR team worked with UHW to identify ways to use volunteers and construction training programs to install the measures. An open invitation to visit the job site was provided to other nonprofit developers and support teams to encourage dialog about the systems during live installation.

affordable housing↗

Hybrid Solar Thermal Energy System for District Heating Application

Solar district heating (SDH) systems can be good alternatives to conventional systems when they are optimized with hybrid configurations and thermal energy storage (TES). In this scope, a hybrid renewable thermal energy system (RTES) model has been built combining flat plate collector (FPC) solar system with parabolic trough collector (PTC) system via a heat exchanger and coupled with TES. To undertake the hybridization of the system, System Advisor Model (SAM) software was modified, which allowed control over configurations and more accurate modelling of heat transfer between the collectors. The model is first compared to an existing hybrid solar district heating systems (DHS) system in Taars, Denmark. The results showed a good correlation with an overestimation of only 6.4% compared to most recent heat output. Then the same system configuration was modeled in different geographic locations to investigate the impact of changes in direct normal irradiance (DNI) to the heat sink thermal output of the hybrid system. The results showed that the annual net thermal power output in California, USA can be three times more than the annual net thermal power output in Taars, Denmark. Finally, multiple hybrid configurations with varying solar field sizes were simulated based on the heat demand of two different university campuses DHS. The results showed that, retrofit applications of this hybrid DHS system coupled with TES could reduce the natural gas consumption of the existing systems between 25% and 41%. The use of hybrid RTES highlighted in this paper can be extended to many more opportunities.

district heating↗

Updating the Building Science Advisor (BSA): A Tool to Assist in the Design of Durable Building Envelopes

Predicting the moisture durability of building envelope components remains challenging due to multiple influencing factors, including material selection, assembly positioning, local climate conditions, air tightness, interior environment, and construction quality. Building codes increasingly emphasize energy efficiency through enhanced insulation and tighter envelopes but offer limited guidance on moisture durability considerations. Consequently, builders face uncertainty, particularly as new materials and assemblies enter the market.The Building Science Advisor (BSA) is a free, web-based expert system developed to address these challenges by providing actionable insights into the moisture durability and energy efficiency of both new and retrofit wall designs. Recently updated, we are now providing version 3.0 of the tool. BSA features significant user interface improvements, enhancing navigation and user interaction through a refreshed, intuitive design. Additionally, the tool incorporates a newly developed database containing pre-simulated wall assembly cases, significantly reducing response times and improving the accuracy of moisture durability assessments. Furthermore, the updated BSA includes moisture content as a performance criterion, providing users with a more comprehensive understanding of moisture-related durability risks. These enhancements enable rapid, reliable assessments tailored to specific climate zones and local building practices. BSA continues to offer targeted guidance on wall retrofit scenarios and delivers access to an expanded library of location-specific building science resources.This paper describes these key updates, highlighting the enhanced features, expanded capabilities, and overall improvements to user experience and educational content. The paper includes a demonstration that illustrates how the revised BSA effectively supports practitioners in designing durable, energy-efficient building envelope assemblies.

Salonvaara, Mikael [ORNL] (ORCID:0000000318991554)↗

Next generation safeguards initiative (NGSI) program plan for safeguards by design

Safeguards by Design (SBD) is defined as the incorporation of safeguards features early in the design phase of a new nuclear facility in order to avoid the need to redesign the facility at a later date, or retrofit the completed facility. Not only can SBD avoid the need for redesign or retrofit, but consideration of safeguards features early in the facility design effort can provide for a more efficient and effective safeguards design. A program has been initiated by the United States Department of Energy during the past several years to develop, demonstrate and institutionalization SBD. This plan has been developed in parallel with a similar effort at the IAEA while taking into account their achievements and future plans. The United States SBD program is focused on (1) identification of best practices that satisfy existing safeguards requirements, (2) identification of advanced concepts where best practices can be improved, and (3) institutionalizing SBD by gaining its acceptance as a global norm for the design of new nuclear facilities. SBD guidance documents are being prepared as an aid to industry for their design activities, to describe the relationship between requirements, best practices, and advanced concepts. SBD 'lessons learned' studies have been conducted to help identify the existing best practices and potential areas for improvement. Finally, acceptance as a global norm is being pursued by way of international workshops, engagement with industry and the IAEA, and setting an example by way of its use in new nuclear facilities in the United States.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Energy End-Use Patterns in Full-Service Hotels: A Case Study

The U.S. Department of Energy (DOE) recently initiated a program -- Commercial Building Partnerships (CBP) -- to work with private-sector companies in the design of highly-efficient retrofit and new construction projects. Pacific Northwest National Laboratory (PNNL) is conducting a project with a major hotel company to retrofit a full-service, large hotel with the goal of reducing energy consumption by at least 30%. The first step of the project was an intensive metering and monitoring effort aimed at understanding energy end use patterns in the hotel. About 10% of the guest rooms (32), as well as circuits for most of the end uses in public spaces (lighting, elevators, air handlers and other HVAC system components, and various equipment), were equipped with meters. Data are being collected at 1- or 5-minute intervals and downloaded on a monthly basis for analysis. This paper presents results from the first four months of the monitoring effort, which revealed energy end-use consumption patterns, variability of guest room energy use, daily load curves, monthly variations, and other aspects of hotel energy use. Metered end-use data for hotels at this level of detail are not available from any currently-available public sources. This study presents unique information and insight into energy end-use patterns in the lodging sector of commercial buildings and can also serve as a case study of a complex sub-metering project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Safeguards by design - industry engagement for new uranium enrichment facilities in the United States

The United States Department of Energy's (DOE's) Office of Nonproliferation and International Security (NA-24) has initiated a Safeguards by Design (SBD) effort to encourage the incorporation of international (IAEA) safeguards features early in the design phase of a new nuclear facility in order to avoid the need to redesign or retrofit the facility at a later date. The main goals of Safeguards by Design are to (1) make the implementation of international safeguards at new civil nuclear facilities more effective and efficient, (2) avoid costly and time-consuming re-design work or retrofits at such facilities and (3) design such facilities in a way that makes proliferation as technically difficult, as time-consuming, and as detectable as possible. The U.S. Nuclear Regulatory Commission (NRC) has recently hosted efforts to facilitate the use of Safeguards by Design for new uranium enrichment facilities currently being planned for construction in the U.S. While SBD is not a NRC requirement, the NRC is aiding the implementation of SBD by coordinating discussions between DOE's NA-24 and industry's facility design teams. More specifically, during their normal course of licensing discussions the NRC has offered industry the opportunity to engage with NA-24 regarding SBD.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Mountaineer Commercial Scale Carbon Capture and Storage Project Topical Report: Preliminary Public Design Report

This Preliminary Public Design Report consolidates for public use nonproprietary design information on the Mountaineer Commercial Scale Carbon Capture & Storage project. The report is based on the preliminary design information developed during the Phase I - Project Definition Phase, spanning the time period of February 1, 2010 through September 30, 2011. The report includes descriptions and/or discussions for: (1) DOE's Clean Coal Power Initiative, overall project & Phase I objectives, and the historical evolution of DOE and American Electric Power (AEP) sponsored projects leading to the current project; (2) Alstom's Chilled Ammonia Process (CAP) carbon capture retrofit technology and the carbon storage and monitoring system; (3) AEP's retrofit approach in terms of plant operational and integration philosophy; (4) The process island equipment and balance of plant systems for the CAP technology; (5) The carbon storage system, addressing injection wells, monitoring wells, system monitoring and controls logic philosophy; (6) Overall project estimate that includes the overnight cost estimate, cost escalation for future year expenditures, and major project risks that factored into the development of the risk based contingency; and (7) AEP's decision to suspend further work on the project at the end of Phase I, notwithstanding its assessment that the Alstom CAP technology is ready for commercial demonstration at the intended scale.

01 COAL, LIGNITE, AND PEAT↗

Using EnergyPlus to Simulate the Dynamic Response of a Residential Building to Advanced Cooling Strategies: Preprint

This study demonstrates the ability of EnergyPlus to accurately model complex cooling strategies in a real home with a goal of shifting energy use off peak and realizing energy savings. The house was retrofitted through the Sacramento Municipal Utility District's (SMUD) deep energy retrofit demonstration program; field tests were operated by the National Renewable Energy Laboratory (NREL). Theexperimental data were collected as part of a larger study and are used here to validate simulation predictions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Building America Case Study: Measure Guideline: Guidance on Taped Insulating Sheathing Drainage Planes (Fact Sheet)

This guide provides information and recommendations to the following groups: Insulation contractors, General contractors, Builders, Home remodelers, Mechanical contractors, and Homeowners as a guide to the work that needs to be done. The order of work completed during home construction and retrofit improvements is important. Health and safety issues must be addressed first and are more important than durability issues. And durability issues are more important than saving energy. Not all techniques can apply to all houses. Special conditions will require special action. Some builders or homeowners will wish to do more than the important but basic retrofit strategies outlined by this guide. The following are best practice and product recommendations from the interviewed contractors and home builders who collectively have a vast amount of experience. Three significant items were discussed with the group which are required to make taped insulating sheathing a simple, long term, and durable drainage plane: 4. Horizontal joints should be limited or eliminated wherever possible 5. Where a horizontal joint exists use superior materials 6. Frequent installation inspection and regular trade training are required to maintain proper installation Section 5 of this measure guideline contains the detailed construction procedure for the three recommended methods to effectively seal the joints in exterior insulating sheathing to create a simple, long term, and durable drainage plane.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Validation/Uncertainty Quantification for Large Eddy Simulations of the heat flux in the Tangentially Fired Oxy-Coal Alstom Boiler Simulation Facility

The objective of this task is to produce predictive capability with quantified uncertainty bounds for the heat flux in commercial-scale, tangentially fired, oxy-coal boilers. Validation data came from the Alstom Boiler Simulation Facility (BSF) for tangentially fired, oxy-coal operation. This task brings together experimental data collected under Alstom’s DOE project for measuring oxy-firing performance parameters in the BSF with this University of Utah project for large eddy simulation (LES) and validation/uncertainty quantification (V/UQ). The Utah work includes V/UQ with measurements in the single-burner facility where advanced strategies for O2 injection can be more easily controlled and data more easily obtained. Highlights of the work include: • Simulations of Alstom’s 15 megawatt (MW) BSF, exploring the uncertainty in thermal boundary conditions. A V/UQ analysis showed consistency between experimental results and simulation results, identifying uncertainty bounds on the quantities of interest for this system (Subtask 9.1) • A simulation study of the University of Utah’s oxy-fuel combustor (OFC) focused on heat flux (Subtask 9.2). A V/UQ analysis was used to show consistency between experimental and simulation results. • Measurement of heat flux and temperature with new optical diagnostic techniques and comparison with conventional measurements (Subtask 9.3). Various optical diagnostics systems were created to provide experimental data to the simulation team. The final configuration utilized a mid-wave infrared (MWIR) camera to measure heat flux and temperature, which was synchronized with a high-speed, visible camera to utilize two-color pyrometry to measure temperature and soot concentration. • Collection of heat flux and temperature measurements in the University of Utah’s OFC for use is subtasks 9.2 and 9.3 (Subtask 9.4). Several replicates were carried to better assess the experimental error. Experiments were specifically designed for the generation of high-fidelity data from a turbulent oxy-coal flame for the validation of oxy-coal simulation models. Experiments were also conducted on the OFC to determine heat flux profiles using advanced strategies for O2 injection. This is important when considering retrofit of advanced O2 injection in retrofit configurations.

Smith, P.J.↗

Use of a Geothermal-Solar Hybrid Power Plant to Mitigate Declines in Geothermal Resource Productivity

Many, if not all, geothermal resources are subject to decreasing productivity manifested in the form of decreasing brine temperature, flow rate, or both during the life span of the associated power generation project. The impacts of resource productivity decline on power plant performance can be significant; a reduction in heat input to a power plant not only decreases the thermal energy available for conversion to electrical power, but also adversely impacts the power plant conversion efficiency. The reduction in power generation is directly correlated to a reduction in revenues from power sales. Further, projects with Power Purchase Agreement (PPA) contracts in place may be subject to significant economic penalties if power generation falls below the default level specified. A potential solution to restoring the performance of a power plant operating from a declining productivity geothermal resource involves the use of solar thermal energy to restore the thermal input to the geothermal power plant. There are numerous technical merits associated with a renewable geothermal-solar hybrid plant in which the two heat sources share a common power block. The geo-solar hybrid plant could provide a better match to typical electrical power demand profiles than a stand-alone geothermal plant. The hybrid plant could also eliminate the stand-alone concentrated solar power plant thermal storage requirement for operation during times of low or no solar insolation. This paper identifies hybrid plant configurations and economic conditions for which solar thermal retrofit of a geothermal power plant could improve project economics. The net present value of the concentrated solar thermal retrofit of an air-cooled binary geothermal plant is presented as functions of both solar collector array cost and electricity sales price.

14 SOLAR ENERGY↗

A Downtown Denver Law Firm Leverages Tenant Improvement Funds to Cut Operating Expenses

Bryan Cave HRO (formerly Holme Roberts & Owen LLP, headquartered in Denver, Colorado), an international law firm, partnered with the U.S Department of Energy (DOE) to develop and implement solutions to retrofit existing buildings to reduce annual energy consumption by at least 30% versus pre-retrofit energy use as part of DOE’s Commercial Building Partnership (CBP) program.

bryan cave↗

Technology Solutions Case Study: Guidance on Taped Insulating Sheathing Drainage Planes

The energy efficiency-based financial benefits of adding exterior insulation are well accepted by the building industry, and using exterior insulation as the drainage plane is the next logical step. This case study focuses on the field implementation of taped board insulation as the drainage plane in both new and retrofit residential applications, and provides information and recommendations for insulation contractors, general contractors, builders, remodelers, mechanical contractors, and homeowners. The order of work completed during home construction and retrofit improvements is important. Health and safety issues must be addressed first and are more important than durability issues, and durability issues are more important than saving energy. Three significant items are required to make taped insulating sheathing a simple, long term, and durable drainage plane: first, horizontal joints should be limited or eliminated wherever possible; where a horizontal joint exists, use superior materials; and, frequent installation inspection and regular trade training are required to maintain proper installation.

BSC↗

Technology Solutions Case Study: Advanced Boiler Load Monitoring Controls, Chicago, Illinois

Most of Chicago’s older multifamily housing stock is heated by centrally metered steam or hydronic systems. The cost of heat is typically absorbed into the owner’s operating cost and is then passed to tenants. Central boilers typically have long service lifetimes; the incentive for retrofit system efficiency upgrades is greater than equipment replacement for the efficiency-minded owner. System improvements as the “low-hanging fruit” are familiar, from improved pipe insulation to aftermarket controls such as outdoor temperature reset (OTR) or lead/lag controllers for sites with multiple boilers. Beyond these initial system efficiency upgrades are an emerging class of Advanced Load Monitoring (ALM) aftermarket controllers that dynamically respond to the boiler load, with claims of 10% to 30% of fuel savings over a heating season. In this project, the Building America team Partnership for Advanced Residential Retrofit (PARR) installed and monitored an ALM aftermarket controller, the M2G from Greffen Systems, at two Chicago area multifamily buildings with existing OTR control. Results show that energy savings depend on the degree to which boilers are oversized for their load, represented by cycling rates. Also, savings vary over the heating season with cycling rates, with greater savings observed in shoulder months. Over the monitoring period, oversized boilers at one site showed reductions in cycling and energy consumption in line with prior laboratory studies, while less oversized boilers at another site showed muted savings.

Building America↗

Technology Solutions Case Study: Combustion Safety for Appliances Using Indoor Air

This case study describes how to assess and carry out the combustion safety procedures for appliances and heating equipment that uses indoor air for combustion in low-rise residential buildings. Only appliances installed in the living space, or in an area freely communicating with the living space, vented alone or in tandem with another appliance are considered here. This document is for inspectors, auditors, and technicians working in homes where energy upgrades are being conducted whether or not air infiltration control is included in the package of measures being applied. In the indoor combustion air case, guidelines summarized here are based on language provided in several of the codes to establish minimum requirements for the space using simplified prescriptive measures. In addition, building performance testing procedures are provided by testing agencies. The codes in combination with the test procedures offer comprehensive combustion safety coverage to address safety concerns, allowing inexperienced residential energy retrofit inspectors to effectively address combustion safety issues and allow energy retrofits to proceed.

Building America↗

Existing Whole-House Case Study: Evaluation of Missed Energy Saving Opportunity Based on Illinois Home Performance Program Field Data: Homeowner Selected Upgrades vs. Cost-Optimized Solutions, Chicago, Illinois

Expanding on previous research by PARR, this study compares measure packages installed during 800 Illinois Home Performance with ENERGY STAR® (IHP) residential retrofits to those recommended as cost-optimal by Building Energy Optimization (BEopt) modeling software. In previous research, cost-optimal measure packages were identified for 15 Chicagoland single family housing archetypes, called housing groups. In the present study, 800 IHP homes are first matched to one of these 15 housing groups, and then the average measures being installed in each housing group are modeled using BEopt to estimate energy savings. For most housing groups, the differences between recommended and installed measure packages is substantial. By comparing actual IHP retrofit measures to BEopt-recommended cost-optimal measures, missed savings opportunities are identified in some housing groups; also, valuable information is obtained regarding housing groups where IHP achieves greater savings than BEopt-modeled, cost-optimal recommendations.

Air Sealing↗