Packaging and Transportation Support at LANL CTMA 2012

Operations Support Packaging and Transportation (OS-PT) supports LANL in various functions. Some highlights of the past year have been with the work relating to environmental remediation, type B packaging, non-DOT compliant transfers, and special permit training. The TA-21 remediation project was part of the ARRA funding that LANL received. The $212 million in funding was used to demolish 24 buildings at TA-21, excavate the lab's oldest waste disposal site, and install 16 groundwater monitoring wells. The project was completed ahead of schedule and under budget. More than 300 tons of metal was recycled and all the soil excavated from MDA-B was replaced with clean fill. OS-PT supported this projected by transporting more than 7 million pounds of waste to TA-54 Area G with an addendum to their TSD. Because of the public access on the transfer route, Los Alamos County restricted the transfer to happen from 2:00 AM to 4:00 AM. OS-PT conducted 8 transfers in support of this project. Some concerns included the contaminated trailers at receipt facilities when transferring filled Super Sacks. Future Super Sacks were over packed into new IP-2 Super Sacks before shipping. OS-PT is also supporting the remediation of TA-54 Area G. LANL has an agreement with the State of New Mexico to remove all TRU waste currently stored above ground from at Area G. OS-PT supports this initiative with transfers of TRU waste under LANL's TSD and support of TRU shipments to WIPP. Another project supported by our organization is gas cylinder/dewar recycling and remediation. We are focusing on reducing risk associated with unneeded gasses at LANL. To minimized excessive ordering, to save money and time, and to minimize hazards OS-PT is supporting a gas recycling program. This program will allow programmatic organization across LANL to share unused/unneeded gasses. Instead of old dewars being disposed of, OS-PT has began identifying these dewars and sending them for refurbishment. To date, this effort has saved LANL $450K and estimated saving for future efforts will be more than $1.5 million. Some Projects that are happening here at LANL are offsite source recovery, weapon component transfers, and isotope science production. There are specific packages that help support these projects for the shipment of related materials. OS-PT provides support to these packages to ensure they are and will be available to continue this support. The Areva 435-B Overpack will help the Offsite Source Recovery Project recover high activity gamma sources from various locations across the globe. The Safety Analysis for Packaging is scheduled for initial completion June of 2012. The DPP-1 package is designed to replace the Model FL, which was designed by Rocky Flats and began service in 1990. LANL has collaborated on package design with LLNL, Pantex, Y-12, and KCP. LANL is supporting LLNL on component fixture development. Testing to 10 CFR 71 is to be completed in the Fall of 2012 and scheduled for NA-174 approval in 2014. The SAFESHIELD package helps supports LANL's Isotope production projects. This package can transfer highly irradiated materials from LANL's accelerator to material processing facilities. LANL worked to renew the SAFESHEILD's Certification for 5 more years.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydraulic Isolation of Waste Disposal Areas at Oak Ridge National Laboratory

The Melton Valley watershed at Oak Ridge National Laboratory (ORNL) is the location of several large waste disposal areas that received waste from more than 50 years of operation, production, and research activities at ORNL and the U.S. Atomic Energy Commission's Southern Regional Burial Ground for wastes from more than 50 other facilities. The major burial grounds in the valley are Solid Waste Storage Areas (SWSAs) 4, 5, and 6, where wastes were buried in more than 850 unlined trenches and more than 1500 unlined auger holes. The area includes 3 seepage pits and 3 gravel-filled trenches used by ORNL for the disposal of liquid low level wastes. The burial grounds contained several hundred thousand cubic yards of waste, and the combined inventory of the burial grounds and liquid disposal sites was well over 1 million curies. The Record of Decision for Interim Actions for the Melton Valley Watershed at ORNL selected hydraulic isolation of major waste sources as the primary mechanism for remediation of the watershed. Isolation was to be accomplished mainly through the construction of multi-layer caps over the burial grounds, seepage pits, and trenches. Groundwater diversion and collection systems were installed along the up-gradient and down-gradient edges, respectively, of selected caps to enhance the performance of the isolation system. The waste areas were covered with both Resource Conservation and Recovery Act (RCRA)-type and isolation multi-layer caps. A total of 13 multi-layer caps covering 58.7 hectares (ha) (plan view) were constructed in Melton Valley between 2003 and 2006. The project encountered considerable challenges, not the least of which was its scale, involving simultaneous construction activities at widely scattered sites across the 430-ha watershed. Detailed planning and coordination enabled year-round fieldwork, an essential requirement necessary to retain a skilled, experienced workforce and meet the contract milestone for completion. Other factors key to the success of the project involved the use of an on-site borrow area and construction of a dedicated haul road for transfer of materials from the borrow area to the capping sites. In summary: Remedy effectiveness data obtained during 2007 for the Melton Valley ROD actions collectively indicate that the remedy is generally operating and functioning as planned. Contaminant releases of the principal contaminants of concern in Melton Valley have decreased significantly during and since remediation of the contaminant source areas. Hydrologic isolation systems at the burial grounds functioned as intended as demonstrated by attainment of groundwater level goals in most areas. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

From Pushing Paper to Pushing Dirt - Canada's Largest LLRW Cleanup Gets Underway - 13111

The Port Hope Project is the larger of the two projects in the Port Hope Area Initiative (PHAI), Canada's largest low level radioactive waste (LLRW) cleanup. With a budget of approximately $1 billion, the Port Hope Project includes a broad and complex range of remedial elements from a state of the art water treatment plant, an engineered waste management facility, municipal solid waste removal, remediation of 18 major sites within the Municipality of Port Hope (MPH), sediment dredging and dewatering, an investigation of 4,800 properties (many of these homes) to identify LLRW and remediation of approximately 450 of these properties. This paper discusses the status of the Port Hope Project in terms of designs completed and regulatory approvals received, and sets out the scope and schedule for the remaining studies, engineering designs and remediation contracts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reducing Contingency through Sampling at the Luckey FUSRAP Site - 13186

Typically, the greatest risk in developing accurate cost estimates for the remediation of hazardous, toxic, and radioactive waste sites is the uncertainty in the estimated volume of contaminated media requiring remediation. Efforts to address this risk in the remediation cost estimate can result in large cost contingencies that are often considered unacceptable when budgeting for site cleanups. Such was the case for the Luckey Formerly Utilized Sites Remedial Action Program (FUSRAP) site near Luckey, Ohio, which had significant uncertainty surrounding the estimated volume of site soils contaminated with radium, uranium, thorium, beryllium, and lead. Funding provided by the American Recovery and Reinvestment Act (ARRA) allowed the U.S. Army Corps of Engineers (USACE) to conduct additional environmental sampling and analysis at the Luckey Site between November 2009 and April 2010, with the objective to further delineate the horizontal and vertical extent of contaminated soils in order to reduce the uncertainty in the soil volume estimate. Investigative work included radiological, geophysical, and topographic field surveys, subsurface borings, and soil sampling. Results from the investigative sampling were used in conjunction with Argonne National Laboratory's Bayesian Approaches for Adaptive Spatial Sampling (BAASS) software to update the contaminated soil volume estimate for the site. This updated volume estimate was then used to update the project cost-to-complete estimate using the USACE Cost and Schedule Risk Analysis process, which develops cost contingencies based on project risks. An investment of $1.1 M of ARRA funds for additional investigative work resulted in a reduction of 135,000 in-situ cubic meters (177,000 in-situ cubic yards) in the estimated base volume estimate. This refinement of the estimated soil volume resulted in a $64.3 M reduction in the estimated project cost-to-complete, through a reduction in the uncertainty in the contaminated soil volume estimate and the associated contingency costs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Systems-Based Approach for Reaching Acceptable End Points for Groundwater - 13629

The sheer mass and nature of contaminated materials at DOE and DoD sites, makes it impractical to completely restore these sites to pre-disposal conditions. DOE faces long-term challenges, particularly with developing monitoring and end state approaches for clean-up that are protective of the environment, technically based and documented, sustainable, and most importantly cost effective. Integrated systems-based monitoring approaches (e.g., tools for characterization and monitoring, multi-component strategies, geophysical modeling) could provide novel approaches and a framework to (a) define risk-informed endpoints and/or conditions that constitute completion of cleanup and (b) provide the understanding for implementation of advanced scientific approaches to meet cleanup goals. Multi-component strategies which combine site conceptual models, biological, chemical, and physical remediation strategies, as well as iterative review and optimization have proven successful at several DOE sites. Novel tools such as enzyme probes and quantitative PCR for DNA and RNA, and innovative modeling approaches for complex subsurface environments, have been successful at facilitating the reduced operation or shutdown of pump and treat facilities and transition of clean-up activities into monitored natural attenuation remedies. Integrating novel tools with site conceptual models and other lines of evidence to characterize, optimize, and monitor long term remedial approaches for complex contaminant plumes are critical for transitioning active remediation into cost effective, yet technically defensible endpoint strategies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Multidisciplinary Paradigm and Approach to Protecting Human Health and the Environment, Society, and Stakeholders at Nuclear Facilities - 12244

As the Department of Energy (DOE) continues to remediate its lands, and to consider moving toward long-term stewardship and the development of energy parks on its industrial, remediated land, it is essential to adequately characterize the environment around such facilities to protect society, human health, and the environment. While DOE sites re considering several different land-use scenarios, all of them require adequate protection of the environment. Even if DOE lands are developed for energy parks that are mainly for industrializes sections of DOE lands that will not be remediated to residential standards, there is still the need to consider the protection of human health and the environment. We present an approach to characterization and establishment of teams that will gather the information, and integrate that information for a full range of stakeholders from technical personnel, to public policy makers, and that public. Such information is needed to establish baselines, site new energy facilities in energy parks, protect existing nuclear facilities and nuclear wastes, improve the basis for emergency planning, devise suitable monitoring schemes to ensure continued protection, provide data to track local and regional response changes, and for mitigation, remediation and decommissioning planning. We suggest that there are five categories of information or data needs, including 1) geophysical, sources, fate and transport, 2) biological systems, 3) human health, 4) stakeholder and environmental justice, and 5) societal, economic, and political. These informational needs are more expansive than the traditional site characterization, but encompass a suite of physical, biological, and societal needs to protect all aspects of human health and the environment, not just physical health. We suggest a Site Committee be established that oversees technical teams for each of the major informational categories, with appropriate representation among teams and with a broad involvement of a range of governmental personnel, natural and social scientists, Native Americans, environmental justice communities, and other stakeholders. Such informational teams (and Oversight Committee) would report to a DOE-designated authority or Citizen's Advisory Board. Although designed for nuclear facilities and energy parks on DOE lands, the templates and information teams can be adapted for other hazardous facilities, such as a mercury storage facility at Oak Ridge. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mercury Issues and Complexities in Oak Ridge, Tennessee; Redefining the Conceptual Model - 12277

Releases of mercury from an industrial facility in Oak Ridge, Tennessee in the 1950's and early 1960's resulted in contamination of soil and groundwater within the facility, as well as downstream surface waters. Remediation efforts, which began in the 1980's, have decreased waterborne mercury concentrations near the facility, but elevated levels of mercury remain in the soil, sediment, water, and biota. Widespread distribution of mercury sources and complex mercury transport pathways are some of many challenges at the site. For effective environmental management and closure decision making relative to mercury contamination at the facilities, an up-to-date conceptual model of mercury source areas, processes, likely flow paths, and flux was deemed necessary. Recent facility and reconfiguration efforts, site characterizations, remedial actions, and research are facilitating the collection of new mercury data in Oak Ridge. To develop the current model, a multi-organizational team reviewed existing conceptual models from a variety of sources, consolidated historical data and source information, gathered input from local experts with extensive site knowledge, and used recently collected mercury data from a variety of sampling programs. The developed site conceptual model indicates that the nature and extent of mercury concentration and contaminant flux has significantly changed in the ten years since flux-based conceptual models were used for previous remedial action decisions. A new water treatment system has effectively reduced mercury inputs to the creek and is removing substantially greater quantities of mercury from groundwater than was expected. However, fish concentrations in downstream waters have not responded to decreased water concentrations in the stream. Flux from one large out-fall at the creek's headwaters appears to be a greater percentage of the overall flux leaving the site than previous years, albeit year to year variation in flux is large, and the many small sources of mercury identified in the model may also be important if the goal is to reach very low mercury levels in stream water and fish. The conceptual model is a key reference in helping to prioritize future remedial actions, defining future monitoring, conducting numerical modeling efforts, and evaluating research needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Successful Implementation of Soil Segregation Technology at the Painesville FUSRAP Site - 12281

Typically the highest cost component of the radiological soils remediation of Formerly Utilized Sites Remedial Action Program (FUSRAP) sites is the cost to transport and dispose of the excavated soils, typically contaminated with naturally occurring isotopes of uranium, thorium and radium, at an appropriately permitted off-site disposal facility. The heterogeneous nature of the contamination encountered at these sites makes it difficult to accurately delineate the extent of contaminated soil using the limited, discrete sampling data collected during the investigation phases; and difficult to precisely excavate only the contaminated soil that is above the established cleanup limits using standard in-field scanning and guiding methodologies. This usually results in a conservative guided excavation to ensure cleanup criteria are met, with the attendant transportation and disposal costs for the larger volumes of soil excavated. To address this issue during the remediation of the Painesville FUSRAP Site, located in Painesville, Ohio, the Buffalo District of the U.S. Army Corps of Engineers, and its contractor, Safety and Ecology Corporation (SEC), employed automatic soil segregation technology provided by MACTEC (now AMEC) to reduce the potential for transportation and disposal of soils that met the cleanup limits. This waste minimization technology utilized gamma spectroscopy of conveyor-fed soils to automatically segregate the material into above and below criteria discharge piles. Use of the soil segregation system resulted in cost savings through the significant reduction of the volume of excavated soil that required off-site transportation and disposal, and the reduction of the amount of imported clean backfill required via reuse of 'below criteria' segregated soil as place back material in restoring the excavations. Measurements taken by the soil segregation system, as well as results of quality control sampling of segregated soils, confirmed that soils segregated as below criteria for reuse as site fill did meet the Record of Decision cleanup criteria for the site. Automatic soil segregation technology was successfully implemented as part of the 2010 - 2011 remediation effort at the Painesville FUSRAP Site. The Orion ScanSortSM system employed at the site demonstrated the ability to accurately determine the radioactivity concentrations in the processed soil and soil-like material and quickly segregate that material for appropriate final disposition. Data from the soil segregation system and confirmatory QC samples indicated that the segregated 'below criteria' soils met the cleanup criteria in the ROD, and was appropriate for reuse as fill in the excavations. The reduction of the total excavated soil volume requiring off-site disposal by 94% yielded significant project cost savings through reduction of transportation and disposal and backfill procurement costs. Use of automatic soil segregation technology was an efficient and cost-effective method for addressing the radiological contamination at the Painesville Site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Russian Experience in the Regulatory Supervision of the Uranium Legacy Sites - 12441

Management of the uranium legacy is accompanied with environmental impact intensity of which depends on the amount of the waste generated, the extent of that waste localization and environmental spreading. The question is: how hazardous is such impact on the environment and human health? The criterion for safety assurance is adequate regulation of the uranium legacy. Since the establishment of the uranium industry, the well done regulatory system operates in the FMBA of Russia. Such system covers inter alia, the uranium legacy. This system includes the extent laboratory network of independent control and supervision, scientific researches, regulative practices. The current Russian normative and legal basis of the regulation and its application practice has a number of problems relating to the uranium legacy, connected firstly with the environmental remediation. To improve the regulatory system, the urgent tasks are: -To introduce the existing exposure situation into the national laws and standards in compliance with the ICRP system. - To develop criteria for site remediation and return, by stages, to uncontrolled uses. The similar criteria have been developed within the Russian-Norwegian cooperation for the purpose of remediation of the sites for temporary storage of SNF and RW. - To consider possibilities and methods of optimization for the remediation strategies under development. - To separate the special category - RW resulted from uranium ore mining and dressing. The current Russian RW classification is based on the waste subdivision in terms of the specific activities. Having in mind the new RW-specific law, we receive the opportunity to separate some special category - RW originated from the uranium mining and milling. Introduction of such category can simplify significantly the situation with management of waste of uranium mining and milling processes. Such approach is implemented in many countries and approved by IAEA. The category of 'RW originated from uranium mining and milling' is to be introduced as the legal acts and regulatory documents. The recent ICRP recommendations provide the flexible approaches for solving of such tasks. The FMBA of Russia recognizes the problems of radiation safety assurance related to the legacy of the former USSR in the uranium mining industry. Some part of the regulatory problems assumes to be solved within the EurAsEC inter-state target program 'Reclamation of the territories of the EurAsEC member states affected by the uranium mining and milling facilities'. Using the example of the uranium legacy sites in Kyrgyz and Tajikistan which could result in the tran-boundary disasters and require urgent reclamation, the experience will be gained to be used in other states as well. Harmonization of the national legislations and regulative documents on radiation safety assurance is envisaged. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Cleaning Up Large Groundwater Plumes to Drinking Water Standards: Dynamic Groundwater Recirculation at Reese Air Force Base - 17248

Overall cleanup of large plumes is perceived as being impossible because of issues of scale, contaminant mass accessibility, time to achieve cleanup, and cost. As a result, when a groundwater pump and treat (P and T) remedy is applied to larger plumes, the focus is usually hydraulic containment of contaminated groundwater to prevent further plume migration, rather than a total restoration objective. Recent experience with dynamic operation of groundwater extraction, treatment, and strategic reinjection (collectively referred to as dynamic groundwater recirculation [DGR]) demonstrates that large plume remediation can be accomplished cost effectively and in a timely manner. The insight from operating DGR remedies at multiple sites has demonstrated that contaminant mass residing in a complex aquifer setting is most appropriately described by a three-compartment model, which is a new revelation in contaminant hydrogeology redefining what is possible in restoration. A large-scale application of DGR was implemented under a firm fixed price contract at former Reese Air Force Base (AFB) located in Lubbock, Texas. The strategy was successful in restoration of a sole-source drinking water aquifer affected by a 3-mile long trichloroethene (TCE) plume. DGR allowed groundwater P and T rates to be decreased from over 3,400 liters per minute (lpm) to less than 1,500 lpm through initial optimization efforts. The DGR strategy focused extraction and reinjection on two key objectives: 1) maximizing contaminant mass recovery and 2) maintaining hydraulic control of the plume. Extraction and injection wells were dynamically operated and cycled to maintain a remediation pace that restored 0.8 to 1.2 hectares of the plume per week over a 6-year period. Plume cleanup to drinking water standards was achieved in 9 years of optimized operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Large-Scale Implementation of Recirculation Systems for In-Situ Treatment of Hexavalent Chromium in Groundwater in Hinkley CA - 17338

In-situ remediation using recirculation systems is being used to treat hexavalent chromium (Cr[VI]) in groundwater within the plume core at the Pacific Gas and Electric Company Hinkley Compressor Station in Hinkley, California (the Site). In-situ Reactive Zones (IRZs) are currently treating an area of 0.8 kilometers (km, one-half of a mile) by 1.6 km (a mile) to target treatment of the core of the Cr(VI) plume, where concentrations of Cr(VI) range from 10 s of micrograms per liter (μg/L) to several milligrams per liter (mg/L). Following pilot testing from 2004-2006, large scale implementation of in-situ remediation began in late 2007 and has been on-going. Implementation of the recirculation systems has been successful in remediating Cr(VI) in groundwater at a large scale. Through Third Quarter 2015, in-situ remediation had removed over 44 percent of the mass in the target treatment area. Within the IRZs, concentrations are rapidly reduced within the timeframe of weeks to a few months. Down-gradient of the IRZs, treatment has been observed at distances over 915 meters (3,000 feet). This presentation will focus on the design, operation, adaptive management and results of this effort. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Evolution of Community Engagement Through Ongoing Services Provided by the Fernald Preserve Visitors Center - 17402

The Fernald Preserve is located on the site of a former uranium-processing plant that underwent extensive environmental remediation followed by comprehensive ecological restoration. It is managed by the US Department of Energy Office of Legacy Management and is located approximately 29 kilometers (km) (18 miles) northwest of Cincinnati, Ohio. Remedial activities and subsequent ecological restoration have converted the site from an industrial production facility to an undeveloped park, encompassing a series of wetlands, prairies, and forested communities. Although the remediation of buildings and soil contamination was completed in 2006, site aquifer remediation is ongoing and remains a topic of interest to the community. Much of the site is open to the public, with approximately 11 km (7 miles) of year-round walking trails within the 425-hectare (1050-acre) site. The Fernald Preserve Visitors Center is open Wednesdays through Saturdays and site staff are available to accommodate program requests as needed. The Visitors Center was originally requested by stakeholders involved in developing recommendations for the site's final land use. Stakeholders requested a 'multi-use educational facility' that would recognize the site's history, serve as a source of site information, and recognize the contributions of energy workers during the Cold War. This building was converted from a warehouse built to support site cleanup and was ultimately awarded a Platinum rating by the U.S. Green Building Council. The Visitors Center was designed to accommodate site history exhibits, free meeting space for nonprofit groups, and public interpretive programs. It was opened to the public in 2008, and today's ongoing visitor services are continually adapted to meet the needs of current stakeholders. Over time, the interpretive services have evolved to include more diverse onsite cultural and natural history public programs, events, and activities. Today's community engagement efforts include public and private onsite programs and exhibits, public and private offsite programs and displays, meeting space, and regular open hours for the Visitors Center. This paper presents the various methods used to engage the greater Cincinnati community at the Fernald Preserve. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Road to 2020: Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA): Cleanup of the East Tennessee Technology Park - 17425

Uranium enrichment activities at the 890-ha (2,200-acre) East Tennessee Technology Park (ETTP), formerly the Oak Ridge Gaseous Diffusion Plant, date back to the World War II Manhattan Project. The site produced nuclear fuel for weapons and reactors for four decades. Because of these operations, ETTP has a legacy of radiologically and chemically contaminated buildings, soil, sediment, and groundwater that required remedial action to reduce the risk to human health and the environment. Since the early 1990's, the DOE Oak Ridge Office of Environmental Management (OREM) has directed the environmental cleanup of this contaminated site through the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA) process. Cleanup activities have included the demolition of contaminated facilities and structures, including five gaseous diffusion buildings; remediation of contaminated soils; disposal of associated waste; and treatment of contaminated groundwater. In August 2016, DOE realized its Vision 2016, demolition of all five gaseous diffusion buildings at ETTP. This milestone marked the first time that an entire uranium enrichment complex has been demolished. The landmark cleanup included deactivation and demolition of 418,064 m{sup 2} (4.5 million ft{sup 2}) of radiologically and chemically contaminated facilities, and disposal of more than 55,000 truckloads of debris. Fulfillment of Vision 2016 was a major step toward completing ETTP cleanup by 2020. To attain 2020 cleanup, DOE and its cleanup contractor, URS - CH2M Oak Ridge LLC (UCOR), must complete demolition of the following areas: - Poplar Creek Facilities; - K-731 Switch House; - Building K-1037; - Central Neutralization Facility; - K-1200 Complex; - Toxic Substances Control Act Incinerator facilities; - Balance of Site Facilities. In addition, DOE will complete all remedial actions in accordance with current Records of Decision (RODs); as well as cleanup activities involving surface water, sediment, and groundwater that will be addressed in a final site-wide ROD. All waste, including soils, debris, and rubble from demolition and remediation activities, will be dispositioned. Final cleanup of ETTP further advances DOE's goal for re-industrialization of the site as a private sector industrial park. With risks reduced, hazards removed, and the environment restored, DOE can transfer usable ETTP building and land assets to the community for redevelopment and reuse. A history center, equipment building, viewing tower, and wayside exhibits will tell the story of the site, honoring its contributions to the nation's defense and energy needs. Approximately 1,214 ha (3,000 acres) of adjoining lands, now the Black Oak Ridge Conservation Easement (BORCE), will be used for conservation and recreational purposes, including green-ways and trail systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Risk Assessment and Management of Uranium Mill Tailings Legacies - 17508

exploitation activities took place at 61 sites. The great majority of these mining sites are located in central-east Portugal, including the Urgeirica mine that was the most important uranium deposit exploited in the country. The mining activities at this site generated 1.6 million m{sup 3} of radioactive wastes disposed in an open air area originating the largest radioactive tailings pile of the country. The environmental remediation of the Urgeirica site was one of the main priorities of the national plan for the rehabilitation of former uranium mining sites. Site remediation, that included the mine industrial area with several support infrastructures and a processing plant, was executed between 2006 and 2008 (1. phase) and between 2008 and 2014 (2. phase). Nevertheless, the environmental rehabilitation of the Portuguese uranium legacies sites is not yet concluded. One of the last largest mining complexes, the Quinta do Bispo open pit, is scheduled to be rehabilitated only in 2020. This work presents a study to evaluate the environmental impacts from the uranium mill tailings legacies before and after the remediation works, focusing on two different approaches: a deterministic methodology for dose assessment and a probabilistic methodology with the Monte Carlo method to estimate the incremental lifetime risk. Probabilistic distributions of the input parameters were used in the risk calculation approach. The methodology for dose and risk assessments may be applied to other sites that are still under intervention and the results may be used to prioritize the remediation stages. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overcoming Vicinity Property and Ground Water Challenges at the FUSRAP Middlesex Sampling Plant Project - 17529

The US Army Corps of Engineers (USACE) is addressing the Formerly Utilized Sites Remedial Action Program (FUSRAP) Middlesex Sampling Plant Site (MSP) in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The MSP has been an active FUSRAP site since the early 1980's and was listed on the National Priority List (NPL) in 1999. Two challenges that the project team are currently addressing are Ground Water (GW) movement through fractured bedrock and Vicinity Properties (VP) assessments. USACE and the US Environmental Protection Agency (USEPA) signed a Record of Decision (ROD) for soils remedial action in 2005 and USACE completed the soils remediation at MSP in 2008, however, VPs were not a part of the soils ROD. Additionally, the State of New Jersey recently identified a potential contaminated VP of the site. VPs are any property in the vicinity of a CERCLA 'facility.' The contaminated VPs of the MSP were addressed prior to the adoption of the CERCLA process to address FUSRAP sites. Since the 1980's many changes to potential Applicable or Relevant and Appropriate Requirements have occurred. As such USACE has begun reassessing the previously addressed VPs for inclusion under the soils ROD as part of the CERCLA process. USACE does expect to have to revisit and potentially remediate up to 12 VPs. This paper will discuss the approach, some challenges, and lessons learned in adequately addressing VPs both from a field work and a post ROD regulatory perspective. USACE is currently in the Feasibility Study phase of the CERCLA process for GW. The project team has encountered and overcome significant challenges with regard to contaminant plume bounding and groundwater movement through the secondary porosity of dipping bedding plane partings and fractured bedrock of the Passaic Aquifer beneath the site. This paper will discuss the challenges, the approaches used, and lessons learned while delineating these contaminants. This paper's discussions are useful for anyone addressing an environmental site with soils contamination on VPs or with delineating contaminants in fractured bedrock. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Model-assisted decision analyses related to a chromium plume at Los Alamos national Laboratory - 15449

?he chromium plume at Los Alamos National Laboratory is a complex contaminant-remediation site with spatial extent of several square kilometers. It is located in a regional aquifer near water-supply wells and other points of compliance. The plume originated on the ground surface and the contaminant migrated along complex pathways through a thick vadose zone (∼300 m) that includes intermediate lateral zones of saturation and vertical preferential flow paths. Here we discuss the development of a modeling computational framework for the site. The framework work incorporates data assimilation and model-results analysis tools including decision support techniques. The decision tools are demonstrated using synthetic problems consistent with the interpretation of existing site data and site modeling results. The analyses aim at robust and efficient environmental management of the plume and explore a series of alternative remedial options. The remedial options include natural attenuation (NA), enhanced attenuation (EA), contaminant source removal (in the vadose zone), contaminant extraction (in the regional aquifer at the plume centroid and peripheries), biogeochemical remediation (injection of fluids stimulating growth of organisms in the aquifer impacting chromium concentrations), as wells as hydraulic controls on the groundwater flow and transport in the vadose zone and the regional aquifer. The applied model analyses and decision-support algorithms are implemented in code MADS (Model Analyses for Decision Support; http://mads.lanl.gov). MADS is an open-source framework for model-based decision support employing system and physics simulation models. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Legacy mercury: A watershed scale cleanup challenge - 15559

Over the next three decades, the US Department of Energy (DOE) Oak Ridge Office of Environmental Management (OREM) will focus on reducing the flux of mercury contamination that exits at the Y-12 National Security Complex (Y-12 NSC) [1, 2]. OREM, Tennessee Department of Environment and Conservation (TDEC), and US Environmental Protection Agency (EPA) have identified mercury contamination within and released from the Y-12 NSC as the highest priority cleanup risk on the Oak Ridge Reservation (ORR). Furthermore, mercury contamination is a worldwide issue with more than 3,000 mercury-contaminated sites currently identified [3], and the United Nations Environment Programme has recently highlighted the risk of this contamination to human health [4]. Unlike other contaminants-metals, radionuclides, and organic solvents-that impact the DOE Environmental Management (DOE-EM) cleanup program at the ORR and other DOE sites, mercury has several unique characteristics that make environmental remediation of the Y-12 NSC one of the most complex efforts ever encountered. These distinctive physicochemical properties for mercury include the following: it is a dense non-aqueous liquid at ambient-temperature-pressure; it is the only metal that bio-magnifies; and it is the only contaminant transported as both a cation and/or a dissolved or gaseous elemental metal (similar to an organic solvent) under environmental conditions. Most importantly, mercury also undergoes biogeochemical transformation processes, which include aqueous and surface complexation, redox reactions, and atypical methylation reactions, producing the potent neurotoxin methylmercury [5, 6]. Each of the aforementioned distinctive characteristics for mercury is observed within this heterogeneous and dynamic watershed-scale system-which includes the Y-12 NSC boundary and 23 km of contaminated creek and flood plain downstream. Because of these complexities, implementing cost effective and sustainable solutions that reduce mercury flux from various primary and secondary contamination sources will require the linking of basic science understanding and applied research advancements into OREM's cleanup process. In 2009, the DOE-EM Office of Site Restoration's Soil and Groundwater Remediation Program and Oak Ridge National Laboratory (ORNL) initiated an applied field research initiative with the goal of developing a systems-based approach to control mercury flux in soil and water to protect surface water, groundwater, and ecological receptors. The Remediation of Mercury and Industrial Contaminants Applied Field Research Initiative (ROMIC-AFRI) represents the vehicle that enables the linking of science to remedial applications. Here we discuss the progress made to date in addressing key applied research and technology development needs to address this watershed scale conundrum. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Applications Using the Advanced Simulation Capability for Environmental Management Tool-set - 16335

The Office of Soil and Groundwater of the U.S. Department of Energy (DOE) Office of Environmental Management (EM) developed the Advanced Simulation Capability for Environmental Management (ASCEM). The ASCEM tool-sets can be used for making informed choices in uncertain and complex environments, where cost-benefits of environmental impacts and human health need to be considered. The deployments and demonstrations show how ASCEM provides a unified framework that facilitates efficient modeling and analyses to address costs and benefits of engineering and remediation decisions: - Evaluation of engineered remediation and monitoring strategies at the Savannah River Site (SRS) F-Area in collaboration with the Office of Soil and Groundwater Remediation, Attenuation-Based Remedies in the Subsurface Applied Field Research Initiative; - Assessment of performance assessment issues and waste tank closure at SRS; - Evaluation of alternative conceptual models for the deep vadose zone at the Hanford Site, supporting waste tank closure. The ASCEM tool-sets enable computationally efficient representations of the complex subsurface systems, including fractured and faulted volcanic and carbonate aquifers, a very deep water table, and multiple contaminant sources. The applications demonstrate that deployment of the ASCEM tool-sets provides an opportunity to reduce conservatisms in modeling assessments and allows detailed investigation of alternative conceptual models. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗