Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Protection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,135 records · Page 63

Defending the Homeland: Growing Foreign Challenges to the U.S. Missile Defense Posture

The Office of the Secretary of Defense (OSD) for Policy requested that Lawrence Livermore National Laboratory conduct a Congressionally directed study on homeland missile defense, pursuant to Section 1692 of the fiscal year 2020 National Defense Authorization Act. In accordance with the statutory language, this study considers whether the security benefits obtained by deployment of homeland missile defenses of the United States are undermined or counterbalanced by adverse reactions of potential adversaries, and considers the effectiveness of homeland missile defense efforts of the United States to deter the development of ballistic missiles. Almost a half-century has elapsed since the United States and the Soviet Union signed the Anti-Ballistic Missile (ABM) Treaty, and almost two decades since the former withdrew. Since withdrawing, the United States has sought to develop and deploy a layered missile defense system to defend against regional threats to U.S. and allied interests abroad and to counter limited threats to the U.S. homeland. As such, missile defense supports key national defense policy objectives. Protecting the U.S. homeland, forces abroad, allies, and partners. Deterring attacks against the United States, its allies, and partners. Assuring allies an strengthening U.S. diplomatic activities in peacetime and crisis. We offer five key findings: 1. The primary benefit of the Ground-based Midcourse Defense (GMD) system is the protection it provides the U.S. homeland against a limited but evolving rogue-state missile threat. While this system has never been tested in combat, it appears thus far to have effectively paced North Korea’s development and deployment of intercontinental ballistic missiles (ICBMs). In the absence of such a defensive capability, the United States would likely have been more heavily exposed to North Korean actions, would have operated at a much higher-risk posture, and would have had less negotiating room with which to navigate coercive tactics and crises. Its allies would have been more concerned about U.S. willingness in time of crisis and war to run the risks of protecting them. The GMD system also serves as a hedge against Iranian breakout. 2. Potential adversaries continue to develop long-range ballistic missiles despite deployment of a U.S. homeland missile defense system. This includes both rogue states and major power rivals whose long-range missile programs predated the deployment of U.S. missile defenses. While North Korea has continued its long-range missile developments and achieved an intercontinental capability, Iran has not yet reached this threshold. The broader proliferation of long-range missiles anticipated in the late 1990s has not materialized. 3. While Russia has used the existence of a U.S. homeland missile defense system as a justification for its substantial and continuing weapon modernization program, neither Russian force modernization nor the limited U.S. homeland missile defense system has altered the strategic balance. Russia has long considered U.S. missile defenses—both theater and homeland—as directed against its strategic forces and as a capability that could rapidly advance, thereby eroding Russian confidence in its nuclear deterrent. Russia’s political and military actions appear excessive and negatively impact areas such as arms control, but they do not undermine the primary benefit of the U.S. system cited in Key Finding 1. 4. China’s expansion and diversification of nuclear and missile forces has been influenced by its concerns about U.S. homeland missile defense, but those concerns are only one of many factors in China’s force planning. Although China’s actions to preserve and expand its assured retaliation prospects have not fundamentally altered the strategic balance, its buildup and lack of transparency about its force modernization goals are troubling. Taken together, the aggregate pattern of China’s modernization activities over the past two decades strongly suggests a concerted effort to develop a modern military force commensurate with its intended geopolitical status. Whatever China’s legacy concerns over the survivability of its strategic nuclear forces, its ability to overwhelm the GMD system appears intact today and will be further strengthened in the years ahead as it continues its long-term modernization program. China’s political and military actions negatively affect U.S. security interests but do not undermine the primary benefit of the U.S. system cited in Key Finding 1. 5. The basic finding that benefits have not so far been undermined by adverse reactions is a function of circumstances that are increasingly in flux. The existing GMD-centered system is under increasing pressure from the pace and scope of North Korean missile deployments. The proposed “layered” system seeks to mitigate this impending capability gap in the near term and to complement future capabilities, such as the Next Generation Interceptor, when they come online. Given the pace of U.S. missile defense developments since 2000, it is possible that adversary advances in capability will outpace the U.S. system’s ability to adapt. Additionally, because this layered system is in principle more readily scaled, it will almost certainly be viewed skeptically by China and Russia. In a context of growing great-power security competition, the Department of Defense (DoD) should consider undertaking a broader net assessment of the U.S., Russian, and Chinese force balance.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

MARSAME Release Report for TA-03 Building 16

Environmental Protection and Compliance, Environmental Stewardship (EPC-ES) has determined that materials associated with technical area 3, Buildings 16 and 18 (collectively known as TA-3-16) (Figure 1) do not meet the criteria for unrestricted release to the public under Department of Energy (DOE) Order 458.1, Radiation Protection for the Public and the Environment (DOE 2020) and are to be treated as Low Level Waste (LLW). These conclusions are based on the known history of the building combined with radiation survey data collected in 2020 and 2021, and findings are consistent with DOE Order 458.1 and Los Alamos National Laboratory (LANL) Functional Series Document EPC-ES-FSD-004, Environmental Radiation Protection (LANL 2020a). Sampling and data analysis, as described in this report, were sufficient to meet measurement quality objectives under the Multi-Agency Radiation Survey and Assessment of Materials and Equipment (MARSAME) manual (MARSAME 2000) and LANL procedures (LANL 2020b). Final approvals for waste disposition will come from LANL’s Waste Management Program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Air-Purifying Respirator (APR) and Powered Air-Purifying Respirator (PAPR) Cartridge Performance Testing on Hanford Tanks BY-108 and BY-110 Volume 2: Raw Analytical Data

As the Tank Operations Contractor for U.S. Department of Energy operations at the Hanford site in Washington State, Washington River Protection Solutions (WRPS) is responsible for managing highly radioactive wastes stored in tanks at Hanford. WRPS tests air-purifying respirator (APR) and powered air-purifying respirator (PAPR) chemical cartridges commonly used by workers at Hanford Tank Farms to determine the period of time that the cartridges would provide adequate performance for APRs and PAPRs used to protect workers when exposed to a mixture of Chemicals of Potential Concern (COPC) from any vapors exiting headspaces in the storage tanks. The Occupational Safety and Health Administration (OSHA) Standard promulgated in Title 29 of the Code of the Federal Regulations (CFR) 1910.134(d)(3)(iii)(b)(2) specifies that for protection against gases and vapors, employers shall implement a schedule for cartridges to ensure that change-outs occur before the end of service life. The change schedule can be based on objective information or data that ensures cartridge change-outs occur before the end of their service life. The primary function of the WRPS Cartridge Test Program is to obtain objective data to determine service lives for the APR and PAPR cartridges used at Hanford Tank Farms. WRPS contracted with Pacific Northwest National Laboratory to analyze the test data and offer an independent analysis and any recommendations. This report summarizes data analysis of APR and PAPR cartridge testing on BY-110 and BY-108 headspace vapors, respectively. Two different APR cartridges from SCOTT Safety (Monroe, North Carolina) were assessed for the BY-110 headspace vapors, and two different PAPR cartridges—one from MSA Safety Inc. (Pittsburgh, Pennsylvania) and another from 3M (Maplewood, Minnesota)—were assessed for the BY-108 headspace vapors. Volume 1 of this report documents the testing, data analysis, results, conclusions, and recommendations resulting from the cartridge testing of vapors from the BY-110 and BY-108 headspaces. Volume 2 provides an introduction to the raw data, including analytical laboratory analysis results that supported the analysis and conclusions documented in Volume 1.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Air-Purifying Respirator (APR) and Powered Air-Purifying Respirator (PAPR) Cartridge Performance Testing on a Hanford AX Tank Farm Exhauster Slipstream Volume 2: Raw Analytical Data

As the Tank Operations Contractor for U.S. Department of Energy operations at the Hanford site in Washington State, Washington River Protection Solutions (WRPS) is responsible for managing highly radioactive wastes stored in tanks at Hanford. To protect workers at Hanford Tank Farms, WRPS tests air-purifying respirator (APR) and powered air-purifying respirator (PAPR) chemical cartridges commonly used at the tank farms. The tests were conducted to determine the period of time the cartridges would provide adequate performance for APRs and PAPRs when workers are exposed to a mixture of Chemicals of Potential Concern (COPC) from any vapors exiting headspaces in the storage tanks. Occupational Safety and Health Administration (OSHA) Standard 29 Code of the Federal Regulations (CFR) 1910.134(d)(3)(iii)(b)(2) specifies that for protection against gases and vapors, employers shall implement a schedule for cartridges to ensure that change-outs occur before the end of service life. The change schedule can be based on objective information or data that ensures cartridge change-outs occur before the end of their service life. The primary function of the WRPS Cartridge Test Program is to obtain objective data to determine service lives for the APR and PAPR cartridges used at Hanford Tank Farms. WRPS contracted with Pacific Northwest National Laboratory to analyze the test data and offer an independent analysis and any recommendations. This report summarizes data analysis of APR and PAPR cartridge testing on a vapor slipstream from the Hanford AX tank farm exhauster. Volume 1 of this report documents the testing, data analysis, results, conclusions, and recommendations resulting from the cartridge testing on AX exhauster slipstream vapors. Volume 2 provides an introduction to the raw data, including analytical laboratory analysis results that supported the analysis and conclusions documented in Volume 1.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Powered Air-Purifying Respirator (PAPR) Cartridge Performance Testing on Hanford Tanks SX-101 and SX-104: Volume 2 Raw Analytical Data

As the Tank Operations Contractor for U.S. Department of Energy operations at the Hanford site in Washington State, Washington River Protection Solutions (WRPS) is responsible for managing highly radioactive wastes stored in tanks at Hanford. WRPS tests of cartridges used in air-purifying respirators (APR) and powered air-purifying respirators (PAPR) commonly used at Hanford Tank Farms. The tests are conducted to determine the period of time the cartridges would provide adequate performance for APRs and PAPRs used to protect workers when exposed to a mixture of Chemicals of Potential Concern (COPC) from any vapors exiting headspaces in the storage tanks. Occupational Safety and Health Administration (OSHA) Standard 29 Code of the Federal Regulations (CFR) 1910.134(d)(3)(iii)(b)(2) specifies that for protection against gases and vapors, employers shall implement a schedule for cartridges to ensure that change-outs occur before the end of service life. The change schedule can be based on objective information or data that ensures cartridge change-outs occur before the end of their service life. The primary function of the WRPS Cartridge Test Program is to obtain objective data to determine service lives for the APR and PAPR cartridges used at Hanford Tank Farms. WRPS contracted with Pacific Northwest National Laboratory to analyze the test data and offer an independent analysis and any recommendations. This report summarizes data analysis of PAPR cartridge testing on headspace vapors from Hanford SX-101 and SX-104 single-shell tanks. Two different PAPR cartridges—one from MSA Safety Inc. (Pittsburgh, Pennsylvania) and another from 3M (Maplewood, Minnesota)—were assessed on each tank headspace source on separate days. These data represent the first PAPR cartridge testing under the recent WRPS program, as testing to date had been focused on APR cartridges. Volume 1 of this report documents the testing, data analysis, results, conclusions, and recommendations resulting from the PAPR testing on SX-101 and SX-104 headspace vapors. Volume 2 provides an introduction to the raw data, including analytical laboratory analysis results that supported the analysis and conclusions documented in Volume 1.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PNNL Sequim Campus Radionuclide Air Emissions Report for Calendar Year 2020

The U.S. Department of Energy Office of Science (DOE-SC) Pacific Northwest Site Office has oversight and stewardship duties associated with the Pacific Northwest National Laboratory Sequim Campus. Some research projects have the potential to emit low levels of radioactive materials. This report is prepared to document compliance with the Code of Federal Regulation, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, "Radiation Protection–Air Emissions." Compliance is indicated by comparing the estimated effective dose equivalent (EDE) to the maximally exposed individual (MEI) member of the public with the 10 millirem per year (mrem/yr) U.S. Environmental Protection Agency (EPA) standard. The PNNL Sequim Campus has only fugitive emissions sources. Despite the fact that the regulations are intended for application to point source emissions, fugitive emissions are included with regard to complying with the EPA standard. The EDE to the Campus MEI due to routine operations in 2020 was 3.5E-05 mrem (3.5E-07 mSv). No non-routine emissions occurred in 2020. The Sequim Campus is in compliance with the federal and state 10 mrem/yr standard.

40 CFR 61 Subpart H↗

PNNL Sequim Campus Radionuclide Air Emissions Report for Calendar Year 2021

The U.S. Department of Energy Office of Science (DOE-SC) Pacific Northwest Site Office has oversight and stewardship duties associated with the Pacific Northwest National Laboratory Sequim Campus. Some research projects have the potential to emit low levels of radioactive materials. This report is prepared to document compliance with the Code of Federal Regulation, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, "Radiation Protection–Air Emissions." Compliance is indicated by comparing the estimated effective dose equivalent (EDE) to the maximally exposed individual (MEI) member of the public with the 10 millirem per year (mrem/yr) U.S. Environmental Protection Agency (EPA) standard. The PNNL Sequim Campus has only fugitive emissions sources. Despite the fact that the regulations are intended for application to point source emissions, fugitive emissions are included with regard to complying with the EPA standard. The EDE to the Campus MEI due to routine operations in 2021 was 5.4E-05 mrem (5.4E-07 mSv). No non-routine emissions occurred in 2021. The Sequim Campus is in compliance with the federal and state 10 mrem/yr standard.

40 CFR 61 Subpart H↗

PNNL-Sequim Campus Radionuclide Air Emissions Report for Calendar Year 2022

The U.S. Department of Energy Office of Science (DOE-SC) Pacific Northwest Site Office has oversight and stewardship duties associated with the Pacific Northwest National Laboratory Sequim Campus. Some research projects have the potential to emit low levels of radioactive materials. This report is prepared to document compliance with the Code of Federal Regulation, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, "Radiation Protection–Air Emissions." Compliance is indicated by comparing the estimated effective dose equivalent (EDE) to the maximally exposed individual (MEI) member of the public with the 10 millirem per year (mrem/yr) U.S. Environmental Protection Agency (EPA) standard. The PNNL-Sequim Campus has only fugitive emissions sources. Despite the fact that the regulations are intended for application to point source emissions, fugitive emissions are included with regard to complying with the EPA standard. The EDE to the Campus MEI due to routine operations in 2022 was 7.5E-07 mrem (7.5E-09 mSv). No non-routine emissions occurred in 2022. The PNNL-Sequim Campus is in compliance with the federal and state 10 mrem/yr standard.

40 CFR 61 Subpart H↗

Approach and Model Used to Represent a Timeline Analysis for Security Design Enhancements

Next-generation reactors will be able to use risk to inform and performance base the licensing of many aspects of the reactor, facility, and site design, including attributes of physical security. There are several factors related to security, including site topography, reactor design, and physical protection system components, to consider when designing the physical protection system into the overall facility design and plan of operation. With the versatility of advanced reactors, especially micro reactors, methods are needed to simplify and quickly evaluate potential timelines for designing a site configuration. This report describes an approach to generate qualitative and quantitative insights using a risk-informed simulation. The modeling process is described in detail, focusing on three aspects: (1) the facility mission time (the time required to control the plant until safe), (2) the attacker timeline (the time to potential sabotage), and (3) the response timeline (the time to counter the facility attack). The modeling capabilities also are extended to include facility physical phenomena such as thermal-hydraulics and heat transfer to capture realistic representation of dynamic changes to a facility. While the plant models and examples are hypothetical and do not represent a real facility, these modeling approaches could be used for future security-by-design engineering in advanced reactors. The outputs and insights from the modeling approach may be used to modify and optimize the security posture of a facility by efficiently making modifications to the model and seeing the overall impact from the modification. Lastly, use of the approach described in this report can also provide the technical basis for a physical protection program, describing how the facility and security strategy will cope with off-normal events.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

MARSAME Radiological Release Report for Metal Items from Technical Area 53, Set 25

Environmental Protection and Compliance, Environmental Stewardship Group (EPC-ES) has evaluated the survey results for metal items from the Los Alamos Neutron Science Center (LANSCE) at Technical Area 53 (TA-53) and found that the metal items described in Table 1 of this report (identified by Radiation Protection [RP] Tracking Numbers) meet the criteria for unrestricted release under Department of Energy (DOE) Order 458.1 Chg 4, Radiation Protection of the Public and the Environment (DOE 2020) and can be recycled. This conclusion is based on the known history of the metal items and radiation survey data (see the completed RP-Form-031 LANSCE Metals Clearance Log [LANL 2021a] for each item in Attachment 1). None of the items in this report are located within radiological areas. Therefore, the items are considered unencumbered and are not subject to the moratorium suspension on metal recycling from DOE facilities. Additionally, Los Alamos National Laboratory (LANL) has determined that there is no practical opportunity for internal DOE reuse of this metal.

54 ENVIRONMENTAL SCIENCES↗

MARSAME Radiological Release Report for Metal Items from Technical Area 53, Set 26

Environmental Protection and Compliance, Environmental Stewardship Group (EPC-ES) has evaluated the survey results for metal items from the Los Alamos Neutron Science Center (LANSCE) at Technical Area 53 (TA-53) and found that the metal items described in Table 1 of this report (identified by Radiation Protection [RP] Tracking Numbers) meet the criteria for unrestricted release under Department of Energy (DOE) Order 458.1 Chg 4, Radiation Protection of the Public and the Environment (DOE 2020) and can be recycled. This conclusion is based on the known history of the metal items and radiation survey data. None of the items in this report are located within radiological areas. Therefore, the items are considered unencumbered and are not subject to the moratorium suspension on metal recycling from DOE facilities. Additionally, Los Alamos National Laboratory (LANL) has determined that there is no practical opportunity for internal DOE reuse of this metal. Process knowledge indicates that these metal items were unlikely to ever be in direct contact with the beam and thus are unlikely to have become activated. Surface contamination measurements (both total and removable) showed either no detectable radioactivity or activity levels within the range of background. All measurements for volumetric contamination were indistinguishable from background based on calculated decision limits. Additionally, all gamma isotopic surveys conducted for defense-in depth showed no identifiable gamma radiation from beam activation.

54 ENVIRONMENTAL SCIENCES↗

MARSAME Radiological Release Report for Replacement Water Lines from TA-48 to TA-55

Environmental Protection and Compliance, Environmental Stewardship (EPC-ES) has determined that only a portion of the soil associated with Replacement Water Lines from Technical Area (TA)-48 to TA55 (Figure 1) meets the criteria for unrestricted release to the public under Department of Energy (DOE) Order 458.1, Radiation Protection for the Public and the Environment (DOE, 2020). The remaining soil did not meet the criteria for unrestricted release and must be managed appropriately. These conclusions are based on the known history of the area combined with soil sample data collected in 2022; the findings are consistent with DOE Order 458.1 and Los Alamos National Laboratory (LANL) Functional Series Document EPC-ES-FSD-004, Environmental Radiation Protection (LANL, 2021). Sampling and data analysis, as described in this report, were sufficient to meet measurement quality objectives (MQOs) under the Multi-Agency Radiation Survey and Assessment of Materials and Equipment (MARSAME) manual (NUREG, 2009) and LANL procedures (LANL, 2020). Final approvals for waste disposition will come from LANL’s Waste Management Program.

54 ENVIRONMENTAL SCIENCES↗

Confirmation of Radiological Non-Impact Status for TA-22 Magazines

Environmental Protection and Compliance, Environmental Stewardship (EPC-ES) has evaluated radiological process knowledge and surveys and found that the structures and associated building materials in magazines and process building at Technical Area 22 (TA-22) are candidates for unrestricted use and public release. TA-22 magazines included in this analysis are: buildings TA-0011, -0012, -0014, -0015, -0016, -0017, -0019, -0021, -0022, -0023, -0024, -0035, and -0069 and building TA-22-0025, which is an a process building. This finding is consistent with the requirements of DOE Order 458.1 Radiation Protection of the Public and the Environment and LANL Procedure FSD-004 Environmental Radiation Protection.

54 ENVIRONMENTAL SCIENCES↗

Confirmation of Radiological Non-Impact Status for TA-37 Magazines

Environmental Protection and Compliance, Environmental Stewardship (EPC-ES) has evaluated radiological process knowledge and surveys and found that the structures and associated building materials in magazines at Technical Area 37 (TA-37) are candidates for unrestricted use and public release. TA-37 magazines included in this analysis are: buildings TA- 0006, -0008, -0009, -0019, and -0020. This finding is consistent with the requirements of DOE Order 458.1 Radiation Protection of the Public and the Environment and LANL Procedure FSD-004 Environmental Radiation Protection.

54 ENVIRONMENTAL SCIENCES↗

MARSAME Radiological Release Report for Metal Items from Technical Area 53, Set 28

Environmental Protection and Compliance, Environmental Stewardship Group (EPC-ES) has evaluated the survey results for metal items from the Los Alamos Neutron Science Center (LANSCE) at Technical Area 53 (TA-53) and found that the metal items described in Table 1 of this report (identified by Radiation Protection [RP] Tracking Numbers) meet the criteria for unrestricted release under Department of Energy (DOE) Order 458.1 Chg 4, Radiation Protection of the Public and the Environment (DOE 2020) and can be recycled. This conclusion is based on the known history of the metal items and radiation survey data (see the completed RP-Form-031 LANSCE Metals Clearance Log [LANL 2021a] for each item in Attachment 1). Process knowledge indicates that items were released from radiological areas, including radiation areas, prior to the implementation of the 2000 metals moratorium. Therefore, the items are considered unencumbered and are not subject to the moratorium suspension on metal recycling from DOE facilities. Additionally, Los Alamos National Laboratory (LANL) has determined that there is no practical opportunity for internal DOE reuse of this metal. Process knowledge indicates that these metal items were unlikely to ever be in direct contact with the beam and thus are unlikely to have become activated. Surface contamination measurements (both total and removable) showed either no detectable radioactivity or activity levels within the range of background. All measurements for volumetric contamination were indistinguishable from background based on calculated decision limits. Additionally, all gamma isotopic surveys conducted for defense-in depth showed no identifiable gamma radiation from beam activation.

61 RADIATION PROTECTION AND DOSIMETRY↗

Safety Basis Compliant Flexible Operations [Capstone Project]

Compliant nuclear operations must be weighed against the radiological risk to the worker, public, and the environment. This project set out to look at one facility at Los Alamos National Laboratory (LANL or the Laboratory) and compare the risk with the operational restrictions associated with the Technical Safety Requirements (TSRs). The hope was to identify controls that could be reduced or simplified while maintaining compliance with 10 CFR 830, Nuclear Safety Management. This would result in increasing facility operational flexibility and efficiency. Controls were identified to be simplified or eliminated based on risk. This identification was initially envisioned from the perspective of reanalysis of the accident and hazard analysis consequences. Additionally, it was envisioned that fire testing could show that the consequences of a fire are not as dramatic as analyzed. Specific facility controls were identified that cause operational inefficiencies. Based on data collection, two controls were identified for further evaluation. The first control was combustible loading within the waste storage buildings, and the second control is related to the seismic power cutoff switch. In evaluating the combustible loading control, the thought is that the fire suppression system (FSS) provides adequate protection and the combustible loading controls do not need elevation to a TSR control. The FSS, along with the Fire Protection Program, would provide protection to prevent a fire from impacting large amounts of stored waste material. The seismic switch was more of a challenge. When reviewing the facility operation, it was determined that the facility does not operate anywhere near the established material-at-risk (MAR – radioactive material) limits. By adjusting these limits, a reduced consequence could be achieved and hence, a significant risk reduction achieved. A new operating mode would be used to achieve this reduction. A reduced MAR limit was successfully used as a test case for snow removal during this project. This project expands on that trial case as related to combustible loading and the seismic power cutoff switch TSRs. This will increase the efficiency of operations with reduced TSR controls while reducing overall facility risk. This is a win-win situation for Triad National Security, LLC (Triad) and the U.S. Department of Energy (DOE). Due to schedule and budgetary constraints, not all envisioned work scope was accomplished. However, it is maintained in this report for future efforts.

61 RADIATION PROTECTION AND DOSIMETRY↗

MARSAME Release Report for Replacement Water Lines From TA-48 to TA-55, Revision 2

Environmental Protection and Compliance, Environmental Stewardship (EPC-ES) has determined that only a portion of the soil associated with Replacement Water Lines from Technical Area (TA)-48 to TA 55 (Figure 1) meets the criteria for unrestricted release to the public under Department of Energy (DOE) Order 458.1, Radiation Protection for the Public and the Environment (DOE, 2020). The remaining soil did not meet the criteria for unrestricted release and must be managed appropriately. These conclusions are based on the known history of the area combined with soil sample data collected in 2022; the findings are consistent with DOE Order 458.1 and Los Alamos National Laboratory (LANL) Functional Series Document EPC-ES-FSD-004, Environmental Radiation Protection (LANL, 2021). Sampling and data analysis, as described in this report, were sufficient to meet measurement quality objectives (MQOs) under the Multi-Agency Radiation Survey and Assessment of Materials and Equipment (MARSAME) manual (NUREG, 2009) and LANL procedures (LANL, 2020). Final approvals for waste disposition will come from LANL’s Waste Management Program.

54 ENVIRONMENTAL SCIENCES↗

Microreactor Security-by-Design Recommendations for Domestic and International Deployments

This report outlines methods vendors can use to incorporate security-by-design (SeBD) into their microreactor facility design to support and address security for both U.S. and international deployment. The team developed a hypothetical below-grade microreactor with a physical protection system (PPS) to protect the microreactor against acts of theft and sabotage and evaluated it against two adversary attack scenarios defined by a group of adversary subject matter experts (SMEs). The hypothetical microreactor facility consists of two distinct buildings. The first is the above-grade protected area (PA) entry control point (ECP) building, which houses security personnel responsible for conducting screenings and managing access to the PA. The second building is the reactor building, which features both an above-grade floor and a below-grade floor.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗