Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Probabilistic Risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,135 records · Page 63

A Comparison of Probabilistic and Deterministic Campaign Analysis for Human Space Exploration

Human space exploration is by its very nature an uncertain endeavor. Vehicle reliability, technology development risk, budgetary uncertainty, and launch uncertainty all contribute to stochasticity in an exploration scenario. However, traditional strategic analysis has been done in a deterministic manner, analyzing and optimizing the performance of a series of planned missions. History has shown that exploration scenarios rarely follow such a planned schedule. This paper describes a methodology to integrate deterministic and probabilistic analysis of scenarios in support of human space exploration. Probabilistic strategic analysis is used to simulate "possible" scenario outcomes, based upon the likelihood of occurrence of certain events and a set of pre-determined contingency rules. The results of the probabilistic analysis are compared to the nominal results from the deterministic analysis to evaluate the robustness of the scenario to adverse events and to test and optimize contingency planning.

Merrill, R. Gabe↗

Bayesian analysis of rare events

In many areas of engineering and science there is an interest in predicting the probability of rare events, in particular in applications related to safety and security. Increasingly, such predictions are made through computer models of physical systems in an uncertainty quantification framework. Additionally, with advances in IT, monitoring and sensor technology, an increasing amount of data on the performance of the systems is collected. This data can be used to reduce uncertainty, improve the probability estimates and consequently enhance the management of rare events and associated risks. Bayesian analysis is the ideal method to include the data into the probabilistic model. It ensures a consistent probabilistic treatment of uncertainty, which is central in the prediction of rare events, where extrapolation from the domain of observation is common. We present a framework for performing Bayesian updating of rare event probabilities, termed BUS. It is based on a reinterpretation of the classical rejection-sampling approach to Bayesian analysis, which enables the use of established methods for estimating probabilities of rare events. By drawing upon these methods, the framework makes use of their computational efficiency. These methods include the First-Order Reliability Method (FORM), tailored importance sampling (IS) methods and Subset Simulation (SuS). In this contribution, we briefly review these methods in the context of the BUS framework and investigate their applicability to Bayesian analysis of rare events in different settings. We find that, for some applications, FORM can be highly efficient and is surprisingly accurate, enabling Bayesian analysis of rare events with just a few model evaluations. In a general setting, BUS implemented through IS and SuS is more robust and flexible.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Human reliability analysis studies from simulator experiments using Bayesian inference

Probabilistic Safety Assessment (PSA) of complex facilities is performed to arrive at the risk posed by them. PSA also accounts for the contribution of the human errors towards the overall risk through Human Reliability Analysis (HRA) in terms of Human Error Probability (HEP). Human operators are part of the system and do not work in isolation. Their performance is influenced by the context in which the actions are performed. As a result, quantification of HEP requires operator performance data under the given context. Some good sources of operator performance data are plant‘s operation data, simulator data and expert judgement. The plant operation data pertaining to HRA is generally sparse. In this situation, a full scope plant simulator provides a good alternative for operator performance data generation. Many of the currently practiced HRA methods have been developed by combining the empirical evidence with expert judgement and contain a lot of uncertainty in their estimates. Bayesian inference is suitable for updating the prior HRA estimates with the simulator evidence to obtain the posterior HEP. Here, posterior HEP has been calculated for postulated accident scenarios in advanced reactor (first of its kind) at design stage, using plant simulator.

97 MATHEMATICS AND COMPUTING↗

Exploration of Use of Copulas in Analysing the Relationship between Precipitation and Meteorological Drought in Beijing, China

Drought risk analysis is essential for regional water resource management. In this study, the probabilistic relationship between precipitation and meteorological drought in Beijing, China, was calculated under three different precipitation conditions (precipitation equal to, greater than, or less than a threshold) based on copulas. The Standardized Precipitation Evapotranspiration Index (SPEI) was calculated based on monthly total precipitation and monthly mean temperature data. The trends and variations in the SPEI were analysed using Hilbert-Huang Transform (HHT) and Mann-Kendall (MK) trend tests with a running approach. The results of the HHT and MK test indicated a significant decreasing trend in the SPEI. The copula-based conditional probability indicated that the probability of meteorological drought decreased as monthly precipitation increased and that 10 mm can be regarded as the threshold for triggering extreme drought. From a quantitative perspective, when R ≤ mm, the probabilities of moderate drought, severe drought, and extreme drought were 22.1%, 18%, and 13.6%, respectively. This conditional probability distribution not only revealed the occurrence of meteorological drought in Beijing but also provided a quantitative way to analyse the probability of drought under different precipitation conditions. Furthermore, the results provide a useful reference for future drought prediction.

54 ENVIRONMENTAL SCIENCES↗

Treatment of Passive Component Reliability in Risk-Informed Safety Margin Characterization FY 2010 Report

The Risk-Informed Safety Margin Characterization (RISMC) pathway is a set of activities defined under the U.S. Department of Energy (DOE) Light Water Reactor Sustainability Program. The overarching objective of RISMC is to support plant life-extension decision-making by providing a state-of-knowledge characterization of safety margins in key systems, structures, and components (SSCs). A technical challenge at the core of this effort is to establish the conceptual and technical feasibility of analyzing safety margin in a risk-informed way, which, unlike conventionally defined deterministic margin analysis, is founded on probabilistic characterizations of SSC performance.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Reliability Indexing of Intra-Facility Dispatch Decisions

The Powertrain Reliability Index (PRI) quantifies the trade-offs made in system reliability for efficiency, water use, and environmental purposes for relevant stakeholders. Using historical data from five North American hydroelectric facilities on a shared river system, this metric characterizes the annual probabilistic reliability of intra-facility dispatch decisions. The metric characterizes the operational risk of actual dispatch based on the lowest risk-exposed dispatch and the highest risk-exposed dispatch. By normalizing facility reliability by the number of components described within the facility, constraining operation by the historic dispatch total of unit starts and generating hours, and bounding by required grid flexibility, each facility’s dispatch can be scored for reliability.

Signore, Stephen R.↗

Qualitative Evaluation of Human Reliability Analysis Quality

On August, 2001, the Korean government issued a severe accident policy statement. In this policy statement, a safety goal was proposed in a form of quantitative health objective(QHO) such that an additive risk of early fatality and cancer fatality caused by accident or operation of nuclear power plant(NPPs) should not exceed 0.1% of the sum of other accidents and cancer fatality risks resulting from all other causes, respectively. In accordance with the policy statement, probabilistic safety analysis(PSA) for all Korean NPPs was conducted to show each plant satisfies QHO. Given the increasing importance of PSA to assess the level of safety of NPPs, it is crucial that the quality of the PSA results should be assured. Compared to well-established PSA method used for domestic NPPs, there is consensus that human reliability analysis (HRA) has lack of consistency due to the different assumptions and different characteristics of the methods, which could possibly result in low quality of the PSA. To resolve the issues with lack of consistency of the HRA methods, there have been efforts to develop a standardized HRA method in Korea. However, quality of existing Korean HRA should be evaluated before developing a standardized method, since the results can be used for deriving requirements and give feedback and insights for developing the standardized method. In this study, literature review was performed to select an adequate method for evaluating the quality of the HRA, and the quality of the HRA is evaluated. Finally, results and insights of this study are shown in the conclusion. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

High Performance-Multidisciplinary Simulation for Regional Scale Earthquake Hazard and Risk Assessments

Moderate-to-large magnitude earthquakes represent a significant risk around the world and a major issue across the Department of Energy (DOE) mission interests, ranging from DOE's one-of-a-kind mission critical facilities to national energy systems (nuclear power plants, electric/gas distribution systems, and renewable energy production facilities). As a result, for the DOE there is a strong motivation in promoting and developing a risk-informed and performance-based approach for both the assessment of existing facilities and the design of new structures. DOE National Labs have historically made multidisciplinary contributions to the solution of challenging seismic hazard and risk problems and have been at the forefront for the development of design standards for major facilities. The current approach for estimating the ground motion hazard for critical facilities is based upon a Probabilistic Seismic Hazard Analysis (PSHA), whereby measured ground motion data are collected and homogenized into a probabilistic framework to estimate the hazard for future events. However, recent studies have highlighted the site-specific nature of earthquakes and shown the limitations of a purely empirical approach. Moreover, the design of infrastructure systems has been moving toward a performance-based approach, in which specific performance goals are specified at different levels of excitation and for different limit states. Such an approach requires the availability of robust and reliable computational tools for the nonlinear dynamic analysis of complex structural systems. Ongoing research at Lawrence Berkeley National Laboratory (LBNL) and Lawrence Livermore National Laboratory (LLNL) aims at developing an advanced simulation environment at the exascale for a coupled assessment of earthquake hazard (ground motions) and earthquake risk (structural demands)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

U.S. NRC CONFIRMATORY LEVEL 1 PRA SUCCESS CRITERIA ACTIVITIES

The U.S. Nuclear Regulatory Commission’s standardized plant analysis risk (SPAR) models are used to support a number of risk-informed initiatives. The fidelity and realism of these models are ensured through a number of processes including cross-comparison with industry models, review and use by a wide range of technical experts, and confirmatory analysis. This paper will describe a key activity in the latter arena. Specifically, this paper will describe MELCOR analyses performed to augment the technical basis for confirming or modifying specific success criteria of interest. The analyses that will be summarized provide the basis for confirming or changing success criteria in a specific 3-loop pressurized-water reactor and a Mark-I boiling-water reactor. Initiators that have been analyzed include loss-of-coolant accidents, loss of main feedwater, spontaneous steam generator tube rupture, inadvertent opening of a relief valve at power, and station blackout. For each initiator, specific aspects of the accident evolution are investigated via a targeted set of calculations (3 to 22 distinct accident analyses per initiator). Further evaluation is ongoing to extend the analyses’ conclusions to similar plants (where appropriate), with consideration of design and modeling differences on a scenario-by-scenario basis. This paper will also describe future plans.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Assessing the need for an update of a probabilistic seismic hazard analysis using a SSHAC Level 1 study and the Seismic Hazard Periodic Reevaluation Methodology

A key decision for nuclear facilities is evaluating the need for an update of an existing seismic hazard analysis in light of new data and information that has become available since the time that the analysis was completed. We introduce the newly developed risk-informed Seismic Hazard Periodic Review Methodology (referred to as the SHPRM) and present how a Senior Seismic Hazard Analysis Committee (SSHAC) Level 1 probabilistic seismic hazard analysis (PSHA) was performed in an implementation of this new methodology. The SHPRM offers a defensible and documented approach that considers both the changes in seismic hazard and engineering-based risk information of an existing nuclear facility to assess the need for an update of an existing PSHA. The SHPRM has seven evaluation criteria that are employed at specific analysis, decision, and comparison points which are applied to seismic design categories established for nuclear facilities in United States. The SHPRM is implemented using a SSHAC Level 1 study performed for the Idaho National Laboratory, USA. The implementation focuses on the first six of the seven evaluation criteria of the SHPRM which are all provided from the SSHAC Level 1 PSHA. Finally, to illustrate outcomes of the SHPRM that do not lead to the need for an update and those that do, the example implementations of the SHPRM are performed for nuclear facilities that have target performance goals expressed as the mean annual frequency of unacceptable performance at 1x10 -4 , 4x10 -5 and 1x10 -5 .

58 GEOSCIENCES↗

Structural Analysis Made 'NESSUSary'

Everywhere you look, chances are something that was designed and tested by a computer will be in plain view. Computers are now utilized to design and test just about everything imaginable, from automobiles and airplanes to bridges and boats, and elevators and escalators to streets and skyscrapers. Computer-design engineering first emerged in the 1970s, in the automobile and aerospace industries. Since computers were in their infancy, however, architects and engineers during the time were limited to producing only designs similar to hand-drafted drawings. (At the end of 1970s, a typical computer-aided design system was a 16-bit minicomputer with a price tag of $125,000.) Eventually, computers became more affordable and related software became more sophisticated, offering designers the "bells and whistles" to go beyond the limits of basic drafting and rendering, and venture into more skillful applications. One of the major advancements was the ability to test the objects being designed for the probability of failure. This advancement was especially important for the aerospace industry, where complicated and expensive structures are designed. The ability to perform reliability and risk assessment without using extensive hardware testing is critical to design and certification. In 1984, NASA initiated the Probabilistic Structural Analysis Methods (PSAM) project at Glenn Research Center to develop analysis methods and computer programs for the probabilistic structural analysis of select engine components for current Space Shuttle and future space propulsion systems. NASA envisioned that these methods and computational tools would play a critical role in establishing increased system performance and durability, and assist in structural system qualification and certification. Not only was the PSAM project beneficial to aerospace, it paved the way for a commercial risk- probability tool that is evaluating risks in diverse, down- to-Earth application

Source record↗

Induced seismicity potential based on probabilistic geomechanics for the San Juan Basin CarbonSAFE project

Although geologic carbon sequestration projects have yet to induce — or may never induce — a damaging earthquake, experiences from other deep injection industries such as hydraulic fracturing, enhanced geothermal systems, and saltwater disposal suggest that effective quantitative seismic risk assessment is necessary for deep saline carbon capture and sequestration (CCS) projects. One such imminent CCS project is the San Juan Basin CarbonSAFE Phase III program. We use Monte Carlo probabilistic geomechanical analyses combined with observations of the geologic and operational parameters of the San Juan Basin site and suggest that this project is of low-induced seismic risk. The primary analysis is split into four sections. First, we assess the literature for faults and past seismicity, and at least five faulting scenarios are directly relevant. Second, we develop and calibrate an integrated earth model for the project site. Third, we perform Monte Carlo simulations that consider reasonable uncertainties of the geomechanical parameters. Of five tested faulting scenarios, only one presents high Coulomb failure functions, but fourth, we determine the risk to be low based on the combined lack of historical seismicity, the geologic framework of the faulting scenario, and the presence of saltwater injection at the same depth as the proposed supercritical carbon dioxide injection. The most sensitive parameters in the geomechanical calculations are the fault dip and the coefficient of friction. The least sensitive are the fault strike and the orientation of the maximum horizontal principal stress.

58 GEOSCIENCES↗

Cyber100 Compass [SWR 23-64]

Cyber100 Compass ("Compass") is a unique risk assessment framework that will enable grid system planners to understand and mitigate cybersecurity risk for grids transitioning to high levels of renewable generation, including 100%. The idea for Compass was developed by NREL based on past work on high-renewable grids and a series of discussions with DOE. Compass is part of Cyber100, a portfolio of proposed research activities that would greatly expand understanding of cybersecurity for high-renewable grids. Compass is a desktop application designed with a user-friendly interface. The tool gathers information from users, conducts probabilistic backend calculations, and outputs a series of visualizations to help users understand and analyze their cybersecurity risks based on the unique features of their future grid. Compass will take as inputs the values for different conditions and produce a risk score of the resulting grid. By trying different configurations, system planners can compare the resultant risks against their own risk tolerance and decide which system-of-system controls to implement as they transition toward a 100% renewable grid.

Martin, Maurice↗

Review of APR+ Level 2 PSA. Revision 2

Brookhaven National Laboratory (BNL) assisted the Korea Institute of Nuclear Safety (KINS) in reviewing the Level 2 Probabilistic Safety Assessment (PSA) of the APR+ Advanced Pressurized Water Reactor (PWR) prepared by the Korea Hydro & Nuclear Power Co., Ltd (KHNP) and KEPCO Engineering & Construction Co., Inc. (KEPCO-E&C). The work described in this report involves a review of the APR+ Level 2 PSA submittal [Ref. 1]. The PSA and, therefore, the review is limited to consideration of accidents initiated by internal events. As part of the review process, the review team also developed three sets of Requests for Additional Information (RAIs). These RAIs were provided to KHNP and KEPCO-E&C for their evaluation and response. This final detailed report documents the review findings for each technical element of the PSA and includes consideration of all of the RAIs made by the reviewers as well as the associated responses. This final report was preceded by an interim report [Ref. 2] that focused on identifying important issues regarding the PSA. In addition, a final meeting on the project was held at BNL on November 21-22, 2011, where BNL and KINS reviewers discussed their preliminary review findings with KHNP and KEPCO-E&C staffs. Additional information obtained during this final meeting was also used to inform the review findings of this final report. The review focused not only on the robustness of the APR+ design to withstand severe accidents, but also on the capability and acceptability of the Level 2 PSA in terms of level of detail and completeness. The Korean nuclear regulatory authorities will decide whether the PSA is acceptable and the BNL review team is providing its comments for KINS consideration. Section 2.0 provides the basis for the BNL review. Section 3.0 presents the review of each technical element of the PSA. Conclusions and a summary are presented in Section 4.0. Section 5.0 contains the references.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

iTOUGH2-IFC: An Integrated Flow Code in Support of Nagra's Probabilistic Safety Assessment:--User's Guide and Model Description

This document describes the development and use of the Integrated Flow Code (IFC), a numerical code and related model to be used for the simulation of time-dependent, two-phase flow in the near field and geosphere of a gas-generating nuclear waste repository system located in an initially fully water-saturated claystone (Opalinus Clay) in Switzerland. The development of the code and model was supported by the Swiss National Cooperative for the Disposal of Radioactive Waste (Nagra), Wettingen, Switzerland. Gas generation (mainly H{sub 2}, but also CH{sub 4} and CO{sub 2}) may affect repository performance by (1) compromising the engineered barriers through excessive pressure build-up, (2) displacing potentially contaminated pore water, (3) releasing radioactive gases (e.g., those containing {sup 14}C and {sup 3}H), (4) changing hydrogeologic properties of the engineered barrier system and the host rock, and (5) altering the groundwater flow field and thus radionuclide migration paths. The IFC aims at providing water and gas flow fields as the basis for the subsequent radionuclide transport simulations, which are performed by the radionuclide transport code (RTC). The IFC, RTC and a waste-dissolution and near-field transport model (STMAN) are part of the Integrated Radionuclide Release Code (IRRC), which integrates all safety-relevant features, events, and processes (FEPs). The IRRC is embedded into a Probabilistic Safety Assessment (PSA) computational tool that (1) evaluates alternative conceptual models, scenarios, and disruptive events, and (2) performs Monte-Carlo sampling to account for parametric uncertainties. The preliminary probabilistic safety assessment concept and the role of the IFC are visualized in Figure 1. The IFC was developed based on Nagra's PSA concept. Specifically, as many phenomena as possible are to be directly simulated using a (simplified) process model, which is at the core of the IRRC model. Uncertainty evaluation (scenario uncertainty, conceptualization uncertainty, parametric uncertainty) is handled by the outer shell of the PSA model; it is not further discussed in this report. Moreover, justifications for the inclusion or exclusion of FEPs as well as for certain simplifying assumptions are available or can be obtained using detailed process models and other supporting information. The IFC is both a numerical code and a model of a repository system. The numerical code is a modification of the multiphase, multicomponent simulator TOUGH2 (Pruess et al., 1999), as implemented within the iTOUGH2 (Finsterle, 2007abc) framework. The code modifications are mainly concerned with the implementation of relevant FEPs as outlined in Nagra (2007a, AN 07-115), as well as removal of processes and features that are not needed within the IFC; the modifications are summarized in Appendix A1. In addition, the IFC includes a model, i.e., a simplified representation of the repository system. Specifically, a computational grid was generated, which includes the emplacement tunnels for spent fuel, high-level wastes, as well as long-lived intermediate-level wastes. Moreover, the model represents engineered barriers (backfill, seals, plugs, etc.), various tunnels and other underground facilities, and includes a simplified representation of the geological structure, i.e., the host rock (including the excavation disturbed zone (EDZ) around the underground openings), confining units, local aquifers, and a highly transmissive zone. The IFC model was designed in close collaboration with Nagra. This report describes all functional requirements of the IFC and how they are implemented in the IFC. The input formats needed to invoke added modeling capabilities are documented. Finally, the IFC model grid is described, and results from a test simulation are presented.

54 ENVIRONMENTAL SCIENCES↗

Geomechanical Characterization of the Mount Simon Sandstone and Eau Claire Formation of Northern Illinois Basin

The purpose of this paper is to analyze publicly available geomechanical data from two carbon storage sites in the Illinois Basin: the Illinois Basin-Decatur Project (IBDP) in Macon County, IL and the FutureGen2.0 project in Morgan County, IL, cancelled before injection began. This study estimates the magnitudes and directions of the least compressive principal stress gradient using hydraulic fracture-based stress measurement tests, borehole breakouts, and sonic logs in the Eau Claire Formation (primary confining zone) and the Mount Simon Sandstone (targeted reservoir). The range of stresses expected in the underlying Precambrian basement is also investigated. The evaluation of the state of stress is carried out in a probabilistic manner using the State of Stress Analysis Tool (SOSAT) developed under the National Risk Assessment Partnership (NRAP) program. Finally, the paper also provides a discussion on distinctions between fracture initiation pressure, propagation pressure, and fracture closure pressure, given that hydraulic fracture testing results show a significant difference between these three values. The discussion also addresses why the fracture closure pressure should be preferred in injection pressure determinations, a critical point in geological carbon storage projects.

de Toledo Camargo, Julia↗

Performance Assessment of a Generic Repository for Defense-Related HLW/SNF in Fractured Crystalline Host Rock - 17059

Recently the U.S. made a policy decision to begin R and D for geologic disposal of defense-related HLW/SNF in a facility separate from commercially generated waste. A deep geologic repository for the disposal of DOE-managed HLW, and some thermally cooler DOE-managed SNF, arising from defense and DOE R and D activities, is part of a stepwise, phased approach for disposal of the Nation's nuclear waste, as recommended by the Blue Ribbon Commission on America's Nuclear Future. The work discussed here focuses on post-closure safety (or performance) assessment for such a Defense Waste Repository (DWR), which is divided into four major activities: (1) development of generic reference cases (i.e., knowledge or technical bases for 'generic' or 'non-site-specific' deep geologic repositories); (2) features, events, and processes (FEPs) analyses and screening to support the technical bases and the performance assessment (PA) model; (3) performance evaluation of alternative EBS design concepts; and (4) post-closure safety analyses of the repository system under consideration. Using the known inventory of defense-related SNF, as well as defense-related HLW stored at the Savannah River and Hanford sites, the Geologic Disposal Safety Assessment (GDSA) Framework modeling and software system has been applied to simulate the potential performance of a DWR in crystalline host rock, resulting in a suite of single-realization (i.e., deterministic) and multi-realization (i.e., probabilistic) 3-D post-closure system analyses, over a performance period of one million years. Two types of emplacement concepts are examined, including single-canister vertical-borehole emplacement for the hotter defense SNF waste (KBS-3V concept) and multi-canister horizontal emplacement for defense HLW (similar to Yucca Mountain co-disposal waste packages). Sensitivity analyses examine the effect of key uncertain parameters on repository performance, including the effects of fracture distribution, waste package degradation rate, buffer and disturbed rock zone (DRZ) properties, and sorption parameters. Initial results indicate that a crystalline host rock with a connected fracture system may require additional safety features to ensure robustness of the isolation safety function, such as a deep unsaturated zone, a sufficiently thick sedimentary overburden, and/or a disposal overpack with a very slow corrosion rate. None of these should pose an undue obstacle for successful disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗