At least 1,135 records · Page 63

Field Demonstration of Inverter-based Voltage Management using Extremum Seeking Control

The influx of Distributed Energy Resources (DER) throughout the distribution system presents a challenge and an opportunity for maintaining power quality standards throughout the system. As such, DER Management systems have become a burgeoning field in both industry and academia. This work presents results from a field test of a model-free, distributed control approach, Extremum Seeking, applied to voltage management on a live feeder in Riverside, CA. The paper presents selected results to highlight the successes and challenges the control approach faced. The work shows that despite slow inverter response, extremum seeking control is able to drive voltage toward a target without knowledge of the system it is operating on.

14 SOLAR ENERGY↗

Development of an Optimal Variable-Pitch Controller for Floating Axial-Flow Marine Hydrokinetic Turbines

This article discusses the development of an optimal variable-pitch controller for floating, axial-flow marine turbines. Recently, OpenFAST, an open-source wind turbine modeling tool, has been extended to model marine turbines. A controller is necessary to simulate marine turbines for different load cases using OpenFAST, which greatly impacts the performance of the energy system. Previous studies have designed controllers using a linearized model of the marine turbine, which can be time-consuming and require the expertise of a control engineer. In this study, we use an automated approach that uses generic models of the marine turbine to identify the controller gains, which can expedite the process of designing a controller. Using an optimizer to identify the control system parameters can additionally improve the controller's performance. The optimal controller tuned using such an approach results in a 20% reduction in the tower-base damage equivalent loading and better tracking of the rated generator speed and power.

axial flow↗

Distributed Algorithm for Volt-VAr Optimization in Unbalanced Distribution System

Conservation voltage reduction (CVR) is implemented in the distribution system to reduce the voltage along the feeder with the objective to reduce the power consumption. Due to the increased penetration of distributed generators in the distribution system the centralized control is cumbersome. Hence, in this paper, a distributed algorithm is proposed for volt-var optimization (VVO) with CVR objective in a three-phase unbalanced distribution network. The proposed method is based on alternating direction method of multipliers (ADMM) algorithm. Mathematically the problem is formulated as a convex optimization problem with reactive power support from smart inverters. The convexity guarantees the solution obtained using the proposed method is a converged solution. The proposed method is validated on IEEE 4-bus and 13-bus three-phase unbalanced systems.

ADMM↗

Dynamic consensus and extended high gain observers as a tool to achieve practical frequency synchronization in power systems under unknown time-varying power demand

In this paper, we consider the frequency synchronization problem in a network of lossless, connected, and network-reduced power system. Frequency synchronization is an important problem in power systems as frequency deviation can lead to degraded power quality, tripping of generators, etc. We present a load-estimator-based consensus algorithm in a network of fourth-order generator models that achieves practical frequency synchronization in the presence of unknown time-varying power demand. We do not assume that the demand is generated by a known model. We follow a multiple time-scale approach for the stability analysis. It is shown that synchronization is achieved for the case of constant power demand, by showing that the system is exponentially stable. Furthermore, for the case of time-varying power demand, we show the error trajectories are ultimately bounded, and the synchronization error is proportional to an upper bound on the derivative of the time-varying power demand. We simulate the controller performance on a four area network which is equivalent to the IEEE New England 39-Bus system.

42 ENGINEERING↗

Combustion Performance and Emissions Optimization through Integration of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Physics Informed Reinforcement Learning for Power Grid Control using Augmented Random Search

Wide adoption of deep reinforcement learning need to overcome several challenges in energy system domain, including scalability, learning from limited samples, and high-dimensional continuous state and action spaces. In this paper, we integrated physics-based information from the normal generator operation state formula in the reinforcement learning agent's neural network loss function, and applied an augmented random search agent to optimize the generator control under dynamic contingency. Simulation results demonstrated the reliability performance improvements in training speed, reward convergence, sampling efficiency, scalability, and transferability.

physics informed ML, Physics Informed Neural Netwo↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

42 ENGINEERING↗

High-Temperature Multi-Process Sensor Development and Demonstration at a Full-scale PC Combustion System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Application of Controller Area Network for Power Converter Network Monitoring and Control

This presentation explores the adaptation and implementation of CAN bus technology in a network of power converters, emphasizing its potential beyond automotive applications. In this system, multiple power converters can utilize the CAN bus to transmit diverse data types, each assigned specific message and node IDs. A central controller continuously monitors the status of each converter, ensuring efficient management and coordination of power distribution. Additionally, an individual CAN node is

Montoya, Armando Yassir↗

Data-Driven Scalable Emulation of Hydropower Using Real-Time Hardware-in-the-Loop

This presentation covers Motivation: (1) With the increased grid integration of inverter-based resources, hydropower plays a crucial role in maintaining the bulk power system reliability and resilience; and (2) A more dynamic response and new control designs are required to meet the grid requirements. To evaluate any modification, control-prototyping, performance validation and de-risking grid integration of hydropower, a high-fidelity environment is required. Also covers Objectives: (1) To develop data-driven emulation of hydropower using hardware-in-the-loop for different size, types of hydro plants; and (2) To characterize hardware and obtain accurate dynamic response for shaft speed, torque, and power. Provide a mechanical power interface with emulated dynamics of a hydro-turbine shaft that can be coupled to electrical generators for mechanical and electrical PHIL.

electrical↗

Experimental Validation of a Modular All-Electric Power Take-Off Topology for Wave Energy Converter Enabling Marine Renewable Energy Interconnection

Power electronic converters are an enabling technology for the emerging marine energy applications, such as using ocean waves to produce electricity. This paper outlines the power take-off system and its key components used in a wave energy converter offering modularity and scalability to generate power efficiently. The proposed power take-off system was implemented based on a modular multilevel converter and could be deployed to convert any alternating current electrical energy to a different alternating current for interconnection to grid or non-grid applications. Examples of widespread deployment are supplying electricity to coastal communities or producing clean drinking water. The analysis using both the simulation tests and laboratory experiments verified the design objectives and basic functionality of the developed power take-off system. An acceptable response using a field programmable gate array-based controlled laboratory testbench was achieved, complying with guidelines specified in the prevalent industry standards. Seamless operation during steady-state and transients for the studied wave energy converter was achieved as supported by the obtained results. The key findings of this work were experimentally examined under different load conditions, direct current bus voltage fluctuations, and generator speed–torque regulation. The ability of the power take-off system to generate high-power quality of the waveforms, e.g., against adhering to the IEEE 519-2022 standard for total harmonic distortion limits, is also confirmed.

Engineering↗

ReNew100: Reliable Power System Operation with 100% Renewable Generation

The ReNew100 project has developed and demonstrated an operator support system (OSS) to operate power systems with 100% renewable power generation from inverter-based resources (IBRs) like wind and solar that significantly reduces the risk of widespread power outages in a simulated operational environment at Technology Readiness Level (TRL) 6. The OSS achieves resilient operation for power systems under changing operation modes including varying combinations of conventional and renewable generation, including cases with 100% renewable generation from wind and solar IBRs. The OSS continuously monitors the N-1 security of the power system, which refers to the ability of the power systems to survive single outages of power system elements, like the loss of a generator or a power line, without causing widespread power outages beyond those expected and planned for. If the OSS identifies that the system is not N-1 secure, an automatic Controller Parameter Optimization (CoPO) developed within Renew100 is activated to optimize the N-1 security of the system by tuning controller parameters within different assets like batteries, wind, and solar plants. The core innovation of ReNew100 is the development of this CoPO as well as the demonstration of the OSS for a real-time simulation of the Hawai'i Island power system. Moreover, Renew100 has developed new model calibration techniques for dynamic power system models and demonstrated them for Hawai'i Island.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Low-Cost, Easy-To-Integrate and Reliable Grid Energy Storage System with 2 nd Life Lithium Batteries

Batteries retired from electric vehicles have the potential to extend their service as low-cost stationary energy storage systems. However, disperse battery state of health (SOH) and nonuniform battery characters often lead to compromised battery performance and reliability, which greatly hinder their adoption. A Heterogenous Unifying Battery (HUB) system is proposed to stage 2 nd life battery bricks for a period, and enable them to attain improved SOH uniformity, performance, and reliability before being sold for 2 nd life applications, while simultaneously providing grid services. It may offer a technically and economically advantageous solution for the broad utilization of 2 nd use batteries. The goal of this project was to develop the hardware and software that enables the key functions of the HUB system. The first achievement of the project was the development of a 1kW scale proof-of-concept (POC) system, which comprises (i) a modular plug-n-play DC-DC power converter matrix with isolated series output connections to achieve fully independent control of energy flow to each of the connected battery units at low voltage; (ii) enhanced model based control that drives each batteries’ SOH towards uniformity while collectively providing grid energy storage services; and (iii) comprehensive procedures to perform battery diagnostics and prognostics. The second achievement was the development of a 100kW scale HUB system and demonstrated its performance of re-establishing battery SOH uniformity through a period of battery cycling operation. The final HUB system incorporates six DC-DC power converter matrices paired with six battery bricks. Hot swapping of a single battery brick while maintaining consistent system power was demonstrated and system operation was validated to be capable of implementing the approved grid duty cycle and of balancing and conditioning the battery bricks. Through the course of the project, the team optimized the building-block design, form-factors, and adjusted life balancing control. An up-sized 250kW Scale was developed and deployed in October 2022 with pack-level battery form factors, see photo in Figure 1 The third achievement of the project was to perform a techno-economic analysis in order to better understand the cost and revenue potentials in this new “recondition-then-resell" value proposition. The final TEA quantified the economics of new Li-ion batteries as well as second-life batteries processed via reconditioning and traditional binning. Results showed the reconditioned second-life batteries in this project to be economically favorable and viable in grid energy storage markets. The TEA results were published in the Applied Energy journal. The fourth achievement of the project was to deliver a tech-to-market plan for the HUB system that includes funding, IP, and manufacturing strategies. The final T2M plan outlines a business strategy in which the HUB provides a B2B service to EV companies as an alternative to battery recycling that can prepare batteries for 2nd life applications. A company named Smartville Inc. was founded to carry on the commercialization, funding, and technical IP licensing activities of the OPEN project.

25 ENERGY STORAGE↗

Cooperative Load Scheduling for Multiple Aggregators Using Hierarchical ADMM: Preprint

Demand response (DR) serves an important role in improving the efficiency and stability of power systems. In recent years, with advances in communication and smart device technologies, many aggregators have emerged to facilitate end customer participation in DR programs. These aggregators, equipped with customized optimal control algorithms, are capable of providing various grid services. Among them is load scheduling during DR events, namely following a load signal provided by the utility company while minimizing overall customer discomfort. However, as the number of aggregators keeps increasing, it becomes challenging for utility companies to conduct load scheduling for multiple aggregators and generate reference signals for each of them. This paper proposes an optimization framework using hierarchical alternating direction method of multipliers (H-ADMM) to optimally generate load following signals for multiple aggregators. Under this framework, utility and multiple aggregators work in a cooperative manner, aiming at minimizing an overall system cost from different levels of the power system hierarchy, while protecting user privacy. A case study has been conducted in a system with multiple aggregators, based on control of HVAC loads. Experimental results validate the effectiveness of the proposed algorithm.

97 MATHEMATICS AND COMPUTING↗

Optimal operational controls for power grid

Power grid operation is facing increased penetration of renewables and distributed energy resources at both transmission and distribution levels. This presents an increased level of randomness and uncertainty for its operational quality, where the challenges are mainly how controls and optimizations can be performed so that the operational quality of the power grid can be maintained. An interesting feature is also that we need to make a good use of uncertainties embedded in the swing equation from the renewable contributions rather than simply trying to minimize the impact of uncertainties. Furthermore, this requires effective solutions on system estimation, control, and optimization. Indeed, in past decades, work has been carried out on the development of advanced controls and optimization for such complicated dynamic systems. Examples are optimal operational control for both performance and stability enhancement considering random renewables penetration, frequency, and active power control for microgrids and parameter estimation for various parts of the power grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗